Immersion Suit Pressure Testing.pdf

PDF 94 KB Posted

Attached to
DORFP 1305M224R0041 – NOAA Ship Henry Bigelow FY25 Dockside Repairs
Solicitation number
1305M224R0041
Issued by

About this file

This document contains the "Guidelines for Periodic Testing of Immersion Suit and Anti-Exposure Suit Seams and Closures" issued by the International Maritime Organization (IMO). It recommends that immersion suits and anti-exposure suits be subjected to an air pressure test at intervals not exceeding three years, or more frequently for suits over ten years old, to detect deterioration of seams and closures that may not be readily apparent through visual inspection. The guidelines provide detailed instructions for performing the air pressure test, including sealing the suit, inflating it to a specific pressure, and using a soapy water solution to identify any leaks. It emphasizes that repairs should be conducted by facilities with access to the original manufacturer's servicing instructions and personnel.

The related federal contract opportunity is for the NOAA Ship Henry Bigelow FY25 Dockside Repairs, issued by the Department of Commerce National Oceanic and Atmospheric Administration. This is a Special Notice for NOAA Region 1 Dockside Repair and Ship Maintenance Indefinite Delivery, Indefinite Quantity (IDIQ) Contract Holders only. The attachment includes all references, drawings, and manuals related to this contract opportunity.

View the file

Other files

File Type Posted
Wet Lab Conveyor System Parts Manual.pdf PDF
Immersion Suit Inventory (05-2-24).xlsx XLSX spreadsheet
HB-167-002 Wet Lab Door Modification REV A - Approved_143748972.pdf PDF
HB-583-03 (FRV40-225-093-010) Rescue Boat Handling System.pdf PDF
00 51 21.01 Vent Duct Cleaning.pdf PDF
HB-085 FF01 Insulation Arrangement.pdf PDF
Bigelow 2024 GMDSS Inspection Certificates.pdf PDF
3-ZF 63 Marine Propulsion Systems Operator_s Manual.pdf PDF
Steering Gear Handwheel Pump H330 and Piping Drawings.pdf PDF
HB-512 FV02 HVAC Diagram.pdf PDF
DWG MOCA-HB-434A-02 INSTALLATION Rev B (As Built).pdf PDF
Carsoe REPORT No 2 Conveyor Overhaul.pdf PDF
HB-631 FF04 Paint Schedule r1.0.pdf PDF
HB-170 FH22 Mast Rigging Flagstaff Layout Details.pdf PDF
DWG MOCA-HB-434A-02 INSTALLATION Rev C (New System).pdf PDF
HB-801 FC05 Tank Capacity Curves.pdf PDF
HB-167-001 Hydro Lab Door Modification REV A - Approved_143742608.pdf PDF
MarineTuff - Cat6 Cable Specification.pdf PDF
2-Volvo Penta D3 Operator_s Manual.pdf PDF
HB-985 FA05 Fire Control Plan.pdf PDF
SECNAV FORM 5512-NSNPT - JUL 2023 - HIGHLIGHTED.pdf PDF
Installation Guide TracVision UHD7 SWM Expansion Kit.pdf PDF
OLEX processor location and dimensions.pdf PDF
15732 Henry Bigelow_Lab Manual.pdf PDF
SECNAV FORM 5512 - Quick Guide.pdf PDF
HB-568 PE32 Bow Thruster Control System Terminal List.pdf PDF
Newport Naval Station Base Access Map.pdf PDF
New KVH UDH-7 and old Intellian HD6 Antenna footprint.pdf PDF
MOC-631-2D Coating Systems for Steel Surfaces.pdf PDF
4-HJ-274 Water Jet Installation and Service Manual.pdf PDF
FRV40-226-008-010 Bow Thruster Model 40 T3S.zip ZIP file
HB-506 FP02 Vents Sounds System Diagram.pdf PDF
HB-085 FA02 General Arrangements.pdf PDF
HVAC Systems for Duct Cleaning (04-25-24).xlsx XLSX spreadsheet
AMC-583-1B General Requirements for Liferaft Inspections.pdf PDF
Installation Guide - TracVision UDH7 - 54-1308_UHD7_IG.pdf PDF
00 00 01.07 General Requirements.pdf PDF
FRV40-225-058-010 Motor Propulsion DC.pdf PDF
Bigelow Direct TV Box Inventory March 2024.xlsx XLSX spreadsheet
Newport Naval Station-Pier 2 Load Restrictions 7-15-19.pdf PDF
Bow Thruster HMI Cutout Pictures.pdf PDF
IEEE 45 Recommended Practice for Electrical Installations on Shipboard.pdf PDF
HB Fire System Inventory (05-3-24).xlsx XLSX spreadsheet
Rescue Boat Manual - 670 SOLAS - Willard Marine.zip ZIP file
Siemens Report - How to built a NOAA SPDM.pdf PDF
HB-512 FV04 Fan List.pdf PDF
HB-561 02 (FRV40-225-128-010) Steering Gear Model 1xSR662.pdf PDF
HB Fire System Inspection Report - FEB 2024.pdf PDF
13603 Manual Complete.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I:\CIRC\MSC\1114.DOC

INTERNATIONAL MARITIME ORGANIZATION

4 ALBERT EMBANKMENT

LONDON SE1 7SR

Telephone: 020 7735 7611 Fax: 020 7587 3210

IMO

E

Ref. T4/3.01 MSC/Circ.1114 25 May 2004

GUIDELINES FOR PERIODIC TESTING OF IMMERSION SUIT AND

ANTI-EXPOSURE SUIT SEAMS AND CLOSURES

1 The Maritime Safety Committee, at its seventy-eighth session (12 to 21 May 2004), recognizing that shipboard inspections of immersion suits and anti-exposure suits carried out in accordance with SOLAS regulation III/20.7 and MSC/Circ.1047 may not be adequate to detect deterioration of seams and closures of the suits due to adhesive ageing, and having considered the recommendation made by the Sub-Committee on Ship Design and Equipment at its forty-sixth session, approved the Guidelines for periodic testing of immersion suit and anti-exposure suit seams and closures, as set out in the annex.

2 Member Governments are invited to bring the annexed Guidelines to the attention of all parties concerned.

MSC/Circ.1114

ANNEX

GUIDELINES FOR PERIODIC TESTING OF IMMERSION SUIT AND

ANTI-EXPOSURE SUIT SEAMS AND CLOSURES

1 Research performed by several Member Governments has demonstrated that the seams and closures of immersion suits and anti-exposure suits experience deterioration over time. The rate and severity of deterioration may vary widely, depending upon the specific components and procedures employed in the manufacture of the suit and the conditions under which the suit is stored. However, even under ideal conditions, the materials and adhesives used have a finite service life and will inevitably experience a reduction in strength and/or loss of watertightness with age.

2 The Guidelines for monthly shipboard inspection of immersion suits and anti-exposure suits (MSC/Circ.1047) are very helpful in identifying obvious problems with a suit, but do not adequately address deterioration of seams and closures (zippers, etc.) which may not be readily apparent by visual inspection. Such deterioration can be detected by pressurization of the suit with air, and testing of the seams and closures for leaks with a soapy water solution.

3 To ensure the maintenance of adequate strength and watertightness of seams and closures of immersion suits and anti-exposure suits with age, it is recommended that each suit be subjected to an air pressure test such as the following, at intervals not exceeding three years, or more frequently for suits over ten years of age:

.1 A suitable head piece, fitted with a means to inject air into the suit, should be inserted into the face orifice of the suit and secured so as to minimize leakage around the face seal. A low-pressure monitoring device, either integral to the fitting for air injection or as a separate device, should also be inserted. If the suit is fitted with detachable gloves and/or boots, the wrists and/or cuffs should be sealed by inserting a short length of suitable diameter plastic pipe and securing the gloves and/or boots with suitable wire ties or hose clamps. The zipper should be fully zipped, and any face flap closed. The suit should then be inflated to a pressure of 0.7 to 1.4 kPa (0.1 to

0.2 psi). If an auxiliary inflatable means of buoyancy is provided, it should be inflated through the oral valve to a pressure of 0.7 kPa (0.1 psi) or until firm to the touch.

.2 Each seam and closure of the suit - and each seam, oral tube and attachment points and joint or valve of any auxiliary inflatable means of buoyancy - should then be covered with a soapy water solution containing enough soap to produce bubbles (if leakage is noted at a foot valve to the extent that air pressure cannot be maintained, the valves should be sealed for the test).

.3 If leaks are revealed by the propagation of bubbles at seams or closures, the leaking areas should be marked and, after cleaning the suit thoroughly with fresh water and drying it, repaired in accordance with the suit manufacturer's recommendations.

MSC/Circ.1114

ANNEX

4 It is recommended that the air pressure test be performed at a suitable shore-based facility equipped to make any necessary repairs in accordance with the manufacturer's recommendations. In view of the wide variety of materials and adhesives used in immersion suits and anti-exposure suits, it is strongly recommended that any repairs to a suit be carried out by a facility which has access to the original manufacturer's recommended servicing instructions, parts and adhesives, and suitably trained personnel. The air pressure test may be carried out on board ship if suitable equipment is available.

File details come from the government source that posted it. Updated .