00 51 21.01 Vent Duct Cleaning.pdf

PDF 56 KB Posted

Attached to
DORFP 1305M224R0041 – NOAA Ship Henry Bigelow FY25 Dockside Repairs
Solicitation number
1305M224R0041
Issued by

About this file

This document is a DRYDOCK WORK ITEM for the cleaning of various HVAC systems on the NOAA Ship. It outlines the general scope, requirements, and quality assurance for the vent duct cleaning work.

The key requirements include: removing all dirt, debris, and damaged insulation; scheduling work to minimize HVAC system disruption; removing interferences to access ducts; cleaning ducts using high-volume reverse airflow and vacuum methods; and inspecting the work with the Chief Engineer and Contracting Officer's Representative. The work must be performed in accordance with referenced HVAC diagrams. No government-furnished items are provided. The document also includes an Appendix A listing the specific HVAC systems to be cleaned.

This work item is related to a federal contract opportunity for the NOAA Ship Henry Bigelow FY25 Dockside Repairs, solicitation number 1305M224R0041. This is a special notice for NOAA Region 1 Dockside Repair and Ship Maintenance IDIQ contract holders only.

View the file

Other files

File Type Posted
Wet Lab Conveyor System Parts Manual.pdf PDF
Immersion Suit Inventory (05-2-24).xlsx XLSX spreadsheet
HB-167-002 Wet Lab Door Modification REV A - Approved_143748972.pdf PDF
HB-583-03 (FRV40-225-093-010) Rescue Boat Handling System.pdf PDF
HB-085 FF01 Insulation Arrangement.pdf PDF
Bigelow 2024 GMDSS Inspection Certificates.pdf PDF
3-ZF 63 Marine Propulsion Systems Operator_s Manual.pdf PDF
Steering Gear Handwheel Pump H330 and Piping Drawings.pdf PDF
HB-512 FV02 HVAC Diagram.pdf PDF
DWG MOCA-HB-434A-02 INSTALLATION Rev B (As Built).pdf PDF
Carsoe REPORT No 2 Conveyor Overhaul.pdf PDF
HB-631 FF04 Paint Schedule r1.0.pdf PDF
HB-170 FH22 Mast Rigging Flagstaff Layout Details.pdf PDF
DWG MOCA-HB-434A-02 INSTALLATION Rev C (New System).pdf PDF
HB-801 FC05 Tank Capacity Curves.pdf PDF
HB-167-001 Hydro Lab Door Modification REV A - Approved_143742608.pdf PDF
MarineTuff - Cat6 Cable Specification.pdf PDF
Immersion Suit Pressure Testing.pdf PDF
2-Volvo Penta D3 Operator_s Manual.pdf PDF
HB-985 FA05 Fire Control Plan.pdf PDF
SECNAV FORM 5512-NSNPT - JUL 2023 - HIGHLIGHTED.pdf PDF
Installation Guide TracVision UHD7 SWM Expansion Kit.pdf PDF
OLEX processor location and dimensions.pdf PDF
15732 Henry Bigelow_Lab Manual.pdf PDF
SECNAV FORM 5512 - Quick Guide.pdf PDF
HB-568 PE32 Bow Thruster Control System Terminal List.pdf PDF
Newport Naval Station Base Access Map.pdf PDF
New KVH UDH-7 and old Intellian HD6 Antenna footprint.pdf PDF
MOC-631-2D Coating Systems for Steel Surfaces.pdf PDF
4-HJ-274 Water Jet Installation and Service Manual.pdf PDF
FRV40-226-008-010 Bow Thruster Model 40 T3S.zip ZIP file
HB-506 FP02 Vents Sounds System Diagram.pdf PDF
HB-085 FA02 General Arrangements.pdf PDF
HVAC Systems for Duct Cleaning (04-25-24).xlsx XLSX spreadsheet
AMC-583-1B General Requirements for Liferaft Inspections.pdf PDF
Installation Guide - TracVision UDH7 - 54-1308_UHD7_IG.pdf PDF
00 00 01.07 General Requirements.pdf PDF
FRV40-225-058-010 Motor Propulsion DC.pdf PDF
Bigelow Direct TV Box Inventory March 2024.xlsx XLSX spreadsheet
Newport Naval Station-Pier 2 Load Restrictions 7-15-19.pdf PDF
Bow Thruster HMI Cutout Pictures.pdf PDF
IEEE 45 Recommended Practice for Electrical Installations on Shipboard.pdf PDF
HB Fire System Inventory (05-3-24).xlsx XLSX spreadsheet
Rescue Boat Manual - 670 SOLAS - Willard Marine.zip ZIP file
Siemens Report - How to built a NOAA SPDM.pdf PDF
HB-512 FV04 Fan List.pdf PDF
HB-561 02 (FRV40-225-128-010) Steering Gear Model 1xSR662.pdf PDF
HB Fire System Inspection Report - FEB 2024.pdf PDF
13603 Manual Complete.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRYDOCK

WORK ITEM 106 VENT DUCT CLEANING

PART 1 GENERAL

SCOPE: This item describes the requirement to clean various heating, ventilation, and air conditioning (HVAC) systems through out NOAA SHIP.

1.1 References

NOAA

HVAC Diagram Drawing, NOAA SHIP HVAC Diagram

1.2 Government-Furnished

1. None.

PART 2 DEFINITIONS

2.1 None.

PART 3 REQUIREMENTS

3.1 General Requirements

1. Accomplish all of the following requirements for the entire systems listed in Appendix A.

2. Remove all dirt and debris accumulated during the performance of this work from the ship daily. Clean areas worked in or traversed by workmen and equipment daily.

3. Replace insulation damaged or removed during performance of work.

4. Touch up all painted surfaces damaged during the performance of work using marine grade coatings matching the surrounding areas.

3.2 Schedule Work

1. Prior to starting work, provide a work plan and schedule for the Chief Engineer and COR.

Outline the location and methods of gaining access to ducts and components for cleaning, and the day and time specific sections of the HVAC system will be inoperable. As changes occur in the schedule, advise the Chief Engineer and COR.

2. Schedule all work to minimize disruption of the ships' HVAC systems. Work on only one system at a time. Restore all systems to full operation at the end of each work shift except only when work will continue immediately on another work shift.

DOCUMENT 00 51 21.01 Page 1

3.3 Remove Interferences

1. Remove all interferences necessary to complete the required work. An interference is any structure, equipment, piping, bulkhead sheathing, overhead sheathing, cable, insulation, or other part of the ship which interferes with access to the ducting or equipment being cleaned.

After the work has been completed, restore the removed interference(s) to a condition equal to existing.

2. Use existing access openings in ducts to the extent practical. Where necessary, cut new accesses in the ducts for cleaning or inspection purposes. Seal new access openings with new sheet metal covers, gaskets, and sheet metal screws (no rivets).

3.4 Clean Ducts

1. Clean ducts removing all grease, dirt, dust, lint, grit, debris, and other foreign particles by using a vacuum truck. Dry ice cleaning is also acceptable in conjunction with the vacuum truck or contractor furnished fan in lieu of a skipper. Do not use ships fans to clean systems. If dry ice blasting of system is utilized, ensure that debris is not blown throughout the space or adjacent spaces. For either method, augmentation by hand tools and degreasers may be required as necessary to clean the systems.

2. Using a high-vacuum truck capable of pulling a minimum of 12,000 cubic feet per minute (cfm) through a 10-inch diameter duct, pull a high-volume reverse air flow through each section of ducting. While the high-volume air is being pulled through the ducting, air blast the entire interior of the ducting with a "skipper" hose delivering compressed air at a minimum of 125 psig.

3. For ducts having a cross-sectional area less than 75 square inches, maintain a reverse air flow velocity not be less than 350 feet-per-second. This velocity is roughly equivalent to pulling 12,000 cfm of air through a 10-inch diameter duct.

4. For ducts having a cross-sectional area of 75 square inches and greater, maintain a reverse air flow velocity not be less than that which can be created by pulling 12,000 cfm of air through the duct

5. Take necessary precautions and steps to ensure that ducting and components are not collapsed or otherwise damaged due to the excess vacuum created when pulling the reverse air.

6. If required to obtain the required air flow in individual branch ducts, temporarily blank off the registers, terminals and other openings in other branch lines.

7. Portable units may be substituted for vacuum truck. The vacuum collection device requirements include:

a. Render all areas being cleaned under negative pressure, such that containment of debris and the protection of the indoor environment are assured.

b. Remove dislodged debris from the ducting system.

c. Ensure discharge of portable units exhausts outside the ship's structure. Equip all vacuum devices exhausting air outside the ship's structure with Particulate Collection

DOCUMENT 00 51 21.01 Page 2 including adequate filtration to contain debris removed from the HVAC system. Ensure such devices exhaust in a manner that will not allow contaminants to re-enter the ship or contaminate the ship's decks and structure. Release of debris outdoors cannot violate any outdoor environmental standards, codes or regulations.

8. Clean all fans, filters, screens, coils, diffusers, dampers, mixing boxes, preheaters, heaters and other components in the specified HVAC system using degreasers and brushes as needed to remove all grease, dirt, dust, lint, grit, debris, and other foreign particles.

9. Remove and replace all disposable filters with new ones equal to existing. Dispose of removed filters in accordance with applicable Federal, State and Local environmental laws and regulations.

3.5 Inspections

16. Provide an opportunity for the Chief Engineer and the COR to inspect and accept each system prior to reinstalling access openings or closing up the system.

17. Accomplish a final walk through of the specified systems with the Chief Engineer and COR to prove all access openings are properly sealed prior to re-installing sheathing or interferences.

18. Accomplish a final walk through of the specified systems with the Chief Engineer and COR to prove that all overheads and interferences are restored and that the effected spaces are clean.

PART 4 QUALITY ASSURANCE

1. Perform required inspections with the Chief Engineer and COR.

PART 5 NOTES

1. None.

PART 6 APPENDIX A

6.1 NOAA SHIP HVAC Systems

-- End of Section --