AMC-583-1B General Requirements for Liferaft Inspections.pdf

PDF 26 KB Posted

Attached to
DORFP 1305M224R0041 – NOAA Ship Henry Bigelow FY25 Dockside Repairs
Solicitation number
1305M224R0041
Issued by

About this file

This document is a standard specification, AMC-583-1B, which outlines the general requirements and procedures for performing U.S. Coast Guard inspections on NOAA liferafts and hydraulic releases.

The key details are:

  • The specification applies to all work performed on NOAA liferafts and hydraulic releases, which must be completed by an authorized service facility of the liferaft manufacturer.
  • It requires annual U.S. Coast Guard inspections on the liferafts, which include renewing specific components such as bands, clips, instruction labels, certifications, flashlight batteries, and repair kit cement.
  • Every five years, a special inspection is required, which includes recharging the CO2 inflation cylinder.
  • Annual U.S. Coast Guard inspections are also required for the hydraulic releases.
  • The specific quantities, capacities, manufacturers, and locations of the liferafts and hydraulic releases to be serviced will be provided in the Detail Specification or other procurement documents.

View the file

Other files

File Type Posted
Wet Lab Conveyor System Parts Manual.pdf PDF
Immersion Suit Inventory (05-2-24).xlsx XLSX spreadsheet
HB-167-002 Wet Lab Door Modification REV A - Approved_143748972.pdf PDF
HB-583-03 (FRV40-225-093-010) Rescue Boat Handling System.pdf PDF
00 51 21.01 Vent Duct Cleaning.pdf PDF
HB-085 FF01 Insulation Arrangement.pdf PDF
Bigelow 2024 GMDSS Inspection Certificates.pdf PDF
3-ZF 63 Marine Propulsion Systems Operator_s Manual.pdf PDF
Steering Gear Handwheel Pump H330 and Piping Drawings.pdf PDF
HB-512 FV02 HVAC Diagram.pdf PDF
DWG MOCA-HB-434A-02 INSTALLATION Rev B (As Built).pdf PDF
Carsoe REPORT No 2 Conveyor Overhaul.pdf PDF
HB-631 FF04 Paint Schedule r1.0.pdf PDF
HB-170 FH22 Mast Rigging Flagstaff Layout Details.pdf PDF
DWG MOCA-HB-434A-02 INSTALLATION Rev C (New System).pdf PDF
HB-801 FC05 Tank Capacity Curves.pdf PDF
HB-167-001 Hydro Lab Door Modification REV A - Approved_143742608.pdf PDF
MarineTuff - Cat6 Cable Specification.pdf PDF
Immersion Suit Pressure Testing.pdf PDF
2-Volvo Penta D3 Operator_s Manual.pdf PDF
HB-985 FA05 Fire Control Plan.pdf PDF
SECNAV FORM 5512-NSNPT - JUL 2023 - HIGHLIGHTED.pdf PDF
Installation Guide TracVision UHD7 SWM Expansion Kit.pdf PDF
OLEX processor location and dimensions.pdf PDF
15732 Henry Bigelow_Lab Manual.pdf PDF
SECNAV FORM 5512 - Quick Guide.pdf PDF
HB-568 PE32 Bow Thruster Control System Terminal List.pdf PDF
Newport Naval Station Base Access Map.pdf PDF
New KVH UDH-7 and old Intellian HD6 Antenna footprint.pdf PDF
MOC-631-2D Coating Systems for Steel Surfaces.pdf PDF
4-HJ-274 Water Jet Installation and Service Manual.pdf PDF
FRV40-226-008-010 Bow Thruster Model 40 T3S.zip ZIP file
HB-506 FP02 Vents Sounds System Diagram.pdf PDF
HB-085 FA02 General Arrangements.pdf PDF
HVAC Systems for Duct Cleaning (04-25-24).xlsx XLSX spreadsheet
Installation Guide - TracVision UDH7 - 54-1308_UHD7_IG.pdf PDF
00 00 01.07 General Requirements.pdf PDF
FRV40-225-058-010 Motor Propulsion DC.pdf PDF
Bigelow Direct TV Box Inventory March 2024.xlsx XLSX spreadsheet
Newport Naval Station-Pier 2 Load Restrictions 7-15-19.pdf PDF
Bow Thruster HMI Cutout Pictures.pdf PDF
IEEE 45 Recommended Practice for Electrical Installations on Shipboard.pdf PDF
HB Fire System Inventory (05-3-24).xlsx XLSX spreadsheet
Rescue Boat Manual - 670 SOLAS - Willard Marine.zip ZIP file
Siemens Report - How to built a NOAA SPDM.pdf PDF
HB-512 FV04 Fan List.pdf PDF
HB-561 02 (FRV40-225-128-010) Steering Gear Model 1xSR662.pdf PDF
HB Fire System Inspection Report - FEB 2024.pdf PDF
13603 Manual Complete.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC-583-1B

DECEMBER 1998

SUPERSEDING

AMC-583-1A

JULY 1995

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

ATLANTIC MARINE CENTER

STANDARD SPECIFICATION AMC-583-1B

GENERAL REQUIREMENTS FOR LIFERAFT INSPECTIONS

1. SCOPE. This specification contains the general requirements and procedures to be used for performing U.S. Coast Guard inspections on NOAA liferafts and hydraulic releases.

2. REFERENCE.

(a) Code of Federal Regulations Title 46, Part 160, section 151, "Inflatable Liferafts (SOLAS)"

(b) Code of Federal Regulations Title 46, Part 160, Section 062, "Releases. Lifesaving Equipment, Hydraulic, and Manual."

3. REQUIREMENTS.

3.1. General. The following requirements apply to all work.

3.1.1. Except as otherwise specified, the contractor shall

provide all labor, material, services, tools, supervision, and technical expertise needed to accomplish the work required by this specification.

3.1.2. All work shall be performed by an authorized service

facility of the liferaft manufacturer.

3.1.3. Provide and install parts and components during

servicing of the liferafts as required by this specification, the Detail Specification, and other procurement documents. Renewal of other parts and components determined to be needed, as a result of servicing the liferafts will be negotiated by the Contracting Officer as an additional cost to the purchase order or contract. Provide a list of renewal parts and components which have not reached their expiration date to the COTR for disposition.

3.1.4. The Contractor shall remove all the ocean liferafts and associated hydraulic releases from the ship to the contractors facility for inspection.

3.1.5. Service the liferaft in accordance with reference (a)

and this specification.

3.1.6. Stamp the metal inspection plate in accordance with

reference (a).

3.1.7. Reinstall all liferafts and hydraulic releases in their original locations.

3.2. Annual Inspection. Perform an annual U.S. Coast Guard

inspection on the required ocean liferafts in accordance with reference (a). Renew or provide the following items as part of the inspection:

3.2.1. All bands.

3.2.2. All clips.

3.2.3. All required instruction labels.

3.2.4. All certifications (including U.S. Coast Guard) for

inspected items.

3.2.5. Deleted.

3.2.6. All flashlight batteries.

3.2.7. All repair kit cement.

3.2.8. A report for each liferaft with a cost breakdown for

all renewed items and an inventory of all dated items with their expiration date.

3.3. Special Five-Year Inspection. In addition to the above

annual inspection, perform a five-year U.S. Coast Guard inspection on the required ocean liferafts in accordance with reference (a). In addition to all renewals identified in reference (a), provide a CO2 recharge of the inflation cylinder with certification of the cylinder’s weight prior to and after the two week stand period as part of the inspection.

3.4. Hydraulic Release Inspection. Perform an annual U.S. Coast Guard inspection on all hydraulic releases in accordance with reference (b).

4. NOTES.

4.1. The following information will be provided by the Detail Specification or other procurement document:

4.1.1. The quantity, capacity, and manufacturer of each

liferaft being serviced.

4.1.2. The location of each liferaft being services.

4.1.3. The type of servicing (annual inspection or special

five-year inspection) required for each of the liferafts being serviced.

4.1.4. The quantity and manufacturer of the hydraulic

releases being serviced.

END OF SPECIFICATION

Page 1
Page 2
Page 3

File details come from the government source that posted it. Updated .