HB-985 FA05 Fire Control Plan.pdf

PDF 1 MB Posted

Attached to
DORFP 1305M224R0041 – NOAA Ship Henry Bigelow FY25 Dockside Repairs
Solicitation number
1305M224R0041
Issued by

About this file

This document appears to be a Fire Control Plan related to the NOAA Ship Henry Bigelow FY25 Dockside Repairs contract opportunity. The contract opportunity is a special notice issued by the Department of Commerce's National Oceanic and Atmospheric Administration (NOAA) for NOAA Region 1 Dockside Repair and Ship Maintenance Indefinite Delivery, Indefinite Quantity (IDIQ) contract holders. The Fire Control Plan contains various models (FA05-001-05ab through FA05-006-05ab) that provide details on the fire control systems and procedures for the NOAA Ship Henry Bigelow. This document is likely included as a reference for the dockside repair work required under the contract opportunity.

View the file

Other files

File Type Posted
Wet Lab Conveyor System Parts Manual.pdf PDF
Immersion Suit Inventory (05-2-24).xlsx XLSX spreadsheet
HB-167-002 Wet Lab Door Modification REV A - Approved_143748972.pdf PDF
HB-583-03 (FRV40-225-093-010) Rescue Boat Handling System.pdf PDF
00 51 21.01 Vent Duct Cleaning.pdf PDF
HB-085 FF01 Insulation Arrangement.pdf PDF
Bigelow 2024 GMDSS Inspection Certificates.pdf PDF
3-ZF 63 Marine Propulsion Systems Operator_s Manual.pdf PDF
Steering Gear Handwheel Pump H330 and Piping Drawings.pdf PDF
HB-512 FV02 HVAC Diagram.pdf PDF
DWG MOCA-HB-434A-02 INSTALLATION Rev B (As Built).pdf PDF
Carsoe REPORT No 2 Conveyor Overhaul.pdf PDF
HB-631 FF04 Paint Schedule r1.0.pdf PDF
HB-170 FH22 Mast Rigging Flagstaff Layout Details.pdf PDF
DWG MOCA-HB-434A-02 INSTALLATION Rev C (New System).pdf PDF
HB-801 FC05 Tank Capacity Curves.pdf PDF
HB-167-001 Hydro Lab Door Modification REV A - Approved_143742608.pdf PDF
MarineTuff - Cat6 Cable Specification.pdf PDF
Immersion Suit Pressure Testing.pdf PDF
2-Volvo Penta D3 Operator_s Manual.pdf PDF
SECNAV FORM 5512-NSNPT - JUL 2023 - HIGHLIGHTED.pdf PDF
Installation Guide TracVision UHD7 SWM Expansion Kit.pdf PDF
OLEX processor location and dimensions.pdf PDF
15732 Henry Bigelow_Lab Manual.pdf PDF
SECNAV FORM 5512 - Quick Guide.pdf PDF
HB-568 PE32 Bow Thruster Control System Terminal List.pdf PDF
Newport Naval Station Base Access Map.pdf PDF
New KVH UDH-7 and old Intellian HD6 Antenna footprint.pdf PDF
MOC-631-2D Coating Systems for Steel Surfaces.pdf PDF
4-HJ-274 Water Jet Installation and Service Manual.pdf PDF
FRV40-226-008-010 Bow Thruster Model 40 T3S.zip ZIP file
HB-506 FP02 Vents Sounds System Diagram.pdf PDF
HB-085 FA02 General Arrangements.pdf PDF
HVAC Systems for Duct Cleaning (04-25-24).xlsx XLSX spreadsheet
AMC-583-1B General Requirements for Liferaft Inspections.pdf PDF
Installation Guide - TracVision UDH7 - 54-1308_UHD7_IG.pdf PDF
00 00 01.07 General Requirements.pdf PDF
FRV40-225-058-010 Motor Propulsion DC.pdf PDF
Bigelow Direct TV Box Inventory March 2024.xlsx XLSX spreadsheet
Newport Naval Station-Pier 2 Load Restrictions 7-15-19.pdf PDF
Bow Thruster HMI Cutout Pictures.pdf PDF
IEEE 45 Recommended Practice for Electrical Installations on Shipboard.pdf PDF
HB Fire System Inventory (05-3-24).xlsx XLSX spreadsheet
Rescue Boat Manual - 670 SOLAS - Willard Marine.zip ZIP file
Siemens Report - How to built a NOAA SPDM.pdf PDF
HB-512 FV04 Fan List.pdf PDF
HB-561 02 (FRV40-225-128-010) Steering Gear Model 1xSR662.pdf PDF
HB Fire System Inspection Report - FEB 2024.pdf PDF
13603 Manual Complete.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA05-001-05ab-Fire Control Plan Model (1)

FA05-01A-05ab Model (1)
FA05-002-05ab Model (1)
FA05-003-05ab Model (1)
FA05-004-05ab Model (1)
FA05-005-05ab Model (1)
FA05-006-05ab Model (1)

File details come from the government source that posted it. Updated .