LHR Prices.pdf

PDF 859 KB Posted

Attached to
Detroit Supply Schedule #11 Single Family Home Repairs
Solicitation number
300000146520058
Issued by
Michigan

About this file

This is a fixed price sheet for lead hazard control programs issued by the City of Detroit Housing & Revitalization Department for residential rehabilitation work. The document outlines standardized pricing for various construction and remediation services designed to address lead-based paint hazards and perform general home repairs in Detroit properties. Services include cabinet removal and installation, carpeting, lead paint stabilization and encapsulation, door and window replacement, drywall installation, flooring work, garage door replacement, gutter replacement, painting (interior and exterior), porch rehabilitation, soil abatement, stairway enclosure, trim and shelving work, vinyl siding installation, and window replacement with both standard and historic preservation options. All work must comply with Detroit Historic Commission approval where applicable and adhere to applicable building codes, EPA regulations, HUD guidelines, and OSHA construction standards including the Construction Industry Lead Standard (29 CFR 1926.62).

Pricing for individual line items is established on a per-unit basis, including costs per linear foot, square foot, and fixed amounts per task, ranging from $1.50 per square foot for cleaning preparation to $5,000 for complete carpet and padding installation. Dumpster removal is provided based on project cost tiers: 10 cubic yards for projects up to $20,000, 20 cubic yards for projects up to $30,000, and 30 cubic yards for projects exceeding $40,000. The pricing was finalized on March 31, 2022, and expires on March 31, 2023. Contractors must acknowledge acceptance of the fixed price sheet and comply with the City's Procurement Policy before receiving new contracts; signed documentation must be submitted to HRDhomerepair@detroitmi.gov. All workmanship and materials must meet the City of Detroit Housing and Revitalization Department's Contractor's Performance Standards, and contractors are responsible for removing all construction debris as it is generated and maintaining cleanliness throughout the project.

View the file

Other files

File Type Posted
185422_5_SUPPLIER.pdf PDF
OCP Standard Documents DSS.pdf PDF
DSS 11 PRE-BID FLYER.pdf PDF
HRD SF Sample Construction Contract.pdf PDF
Warranty Notice.pdf PDF
Violation Notice.pdf PDF
SEHR ICE.pdf PDF
Re-Occupancy Form.pdf PDF
Removal Notice.pdf PDF
Punchlist.pdf PDF
Property Issues.pdf PDF
Notice to Proceed.pdf PDF
No Access.pdf PDF
Memo For Payment Without Signature.pdf PDF
LIRA Request.pdf PDF
Liquidated Damages.pdf PDF
Invitation to Bid Template.pdf PDF
Homeowner Acknowledgement FOrm.pdf PDF
Fixed Price Inspection Request for Grant Programs.xlsx XLSX spreadsheet
Exceed Form.pdf PDF
ER Prices.pdf PDF
Disciplanary Form.pdf PDF
Decline Form.pdf PDF
Contractor Bid Withdrawal Sheet.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE Permit Type

Permit Type 6.130

Building

6.130

Building

6.130

Building

Permit Type

City of Detroit Housing & Revitalization Price Sheet for Lead Hazard Control Programs

HISTORIC

All workmanship and materials must comply with and be approved by the Detroit Historic Commission.

*ALL WORK TO REQUIRE BUILDING PERMIT*

DISCRIPTION

CABINETS

Remove existing wood cabinets containing lead based paint. Install approx. _____ lin.ft. of base cabinets and approx. ______ lin.ft of wall cabinets along the _______ wall(s). Cabinet work shall be Custom grade construction with hardwood doors and drawer faces, plywood construction drawers, hardwood veneer end panels, and solid wood toe kicks. This work includes installation of cabinet pulls and associated shelving. Price in separate line item: Perform paint stabilization where cabinets were removed and/or replaced.

Remove cabinet doors and drawers, trim edges to eliminate friction points. Perform substrate stabilization. Wet scrape and fully apply Eco- Bond Lead Defender (or equivalent) to face surface of cabinets. Follow manufacturer’s written instructions. Install soft stops to remediate impact.

Remove existing medicine cabinet or equivalent. Replace with factory finished with equivalent unit. Perform paint stabilization where cabinets were removed and/or replaced.

CARPETING

Building

Building

Building

2.100

Remove existing carpet, padding, and rugs. Do not replace with new. This line item will only be completed per HUD Guidelines if a contractor fails two consecutive clearances.

CLEANING (Preperation for Lead Clearance)

ENTIRE HOUSE CLEANING-FINAL CLEANING FOR LEAD

Clean entire house including all floors (include main basement floor), window sills & troughs according to the established lead safety regulations (i.e. HEPA vacuum and wet cleaning procedures).

EXTERIOR: Perimeter paint chips/debris & other work areas. Note: this includes Paint Chips Prior to the start of work, and any highly visible area of paint chip debris. General Debris-House Perimeter Only Note: this would include other debris such as generic trash, bottles, etc. along the Perimeter of House or other work areas. Additional $00.50 cleaning cost can be provided due to extreme hazards (Dog fecies, extreme dust hazards, excess debris and clutter).

CONTAINMENT (Preperation for Lead Remediation)

Containment: After pre-cleaning of property, set up proper containment over all floorings, furnitures, belongings, heat registers, etcs, to protect the spread of lead dust in dwelling. Interior containment to remain up until the lead clearance, exterior containment to be replaced at the end of each work day. Interior containment will need to be inspected at the beginning of each work day to ensure complaince of leadsafe protocols.

DEMOLITION - GARAGE

Comply with manufacturer’s instructions and recommendations for seam locations and direction of carpet. Center seams under doors; do not place seams in traffic direction at doorways. Extend carpet under open-bottomed obstructions and under removable flanges and furnishings.

Extend into closets and alcoves. Provide cutouts where required and bind cut edges properly where not concealed by protective edge guards or overlapping flanges. Install carpet edge guards where edge of carpet is exposed. Install tackless carpet stripping with adhesive or by nailing or both where required for adequate strength. Trim doors as needed to provide proper clearance above carpet. Carpet not to be less than interior apartment grade. Contractor to consult with homeowner on color. Cost per square foot (carpet and padding) not to exceed $xxx

2.100

Permit Type

Building

Building

Building

Building

Demolish existing garage (Subject to collapse). Remove existing wiring or utilities as necessary, tying off at established service connections.

(Remove all debris from the site promptly). Unless otherwise specified in the Work Description, the slab shall remain and shall be properly protected from damage during the removal work. Contractor shall replace slabs damaged by the Contractor at his own expense. Temporarily remove any fence or gate and re-install when complete. (Two-Car Garage)

DOORS

Remove and dispose of existing door casing, interior door and jamb.

Install new equivalent pre-hung hollow-core wood (or molded) door and stop with lock set. Install new equivalent casing to both sides. Must match existing architecture, when possible. Caulk all casing seams with low VOC caulk. Prime and paint all new material. Additional cost for special order doors.

Remove and dispose of existing door slab. Install new hinges into existing hinge cut outs. Hang a new slab type door into existing opening on the new hinges. Must match existing architecture, when possible. Caulk all seams with low VOC caulk. Homeowner responsible for finish painting.

Install a new privacy bell type knob-set with new striker with brass finish.

Trim all edges of doors to remove all paint at impact/friction points.

Remove stops and replace with new stops. Perform substrate stabilization on doors and all remaining door trim. Wet scrape and fully apply Eco- Bond Lead Defender (or equivalent) to door and all remaining door trim.

Homeowner responsible for finish painting.

Remove and dispose of existing door casing. Install new equivalent casing. Homeowner responsible for finish painting. Caulk all seams with low VOC caulk.

Demolish existing garage (Subject to collapse). Remove existing wiring or utilities as necessary, tying off at established service connections.

(Remove all debris from the site promptly). Unless otherwise specified in the Work Description, the slab shall remain and shall be properly protected from damage during the removal work. Contractor shall replace slabs damaged by the Contractor at his own expense. Temporarily remove any fence or gate and re-install when complete. (One-Car Garage)

Building

Building

Building

Building

Building

Building

Remove and dispose of existing door stop. Install new equivalent stop.

Caulk all seams with low VOC caulk. Prime and paint all new wood and door jamb.

Remove/Reinstall security or storm door (When necessary)

EXTERIOR: Remove and properly dispose of existing door coated with lead paint and install a new construction metal clad replacement door at ___________. (total ). Replace existing wood framing to ensure proper fit and use of new door. Additional cost for special order doors.

Remove/reinstall security door

Exterior: Remove existing door(s). Remove Door Jamb, stop, and casing containing lead paint. Replace with all new wood components. Caulk all seams with low VOC caulk. Prime and paint all new wood. Rehang exisiting door(s)

Exterior: Remove and keep existing door. Remove existing stop. Plane all edges of door to prevent friction/impact surfaces. Perform substrate stabilization on doors and all remaining door trim. Wet scrape and fully apply Eco-Bond Lead Defender (or equivalent) to doors, jamb and interior/exterior casing. Install new equivalent primed stop. Re-install existing door. Replace weatherstripping if necessary to provide an airtight seal.

Exterior: Remove existing door(s). Enclose door jamb and stop with aluminum. Re-install existing door(s) after proper enclosure. Scrape down all loose and flaking paint and label "Lead" prior to enclosing.

Remove/Reinstall security or storm door (When necessary)

EXTERIOR: Install a new security/storm/screen replacement door (with factory applied finish) at. (Total ) . Price and material to include all hardware, framing and fasteners.

Threshold: Prepare surfaces to be stabilized. Fully apply lead based paint Eco-Bond Lead Defender, or equivalent to threshold surfaces. Follow manufacturer’s written instructions. After Eco-Bond Lead Defender, or equivalent has dried, install glued down vinyl runner the entire length of the threshold to enclose the encapsulated surface. Install bullnose over entire threshold.

THRESHOLD: Strip all paint from threshold. Seal with low VOC polyurethane finish with Bitrex or approved taste-aversion product.

Permit Type

Building

Building

Building

WALL/BATHROOM: Install over existing walls all new *½” moisture resistant drywall to walls and ceiling. Tape and finish drywall and prime with low VOC. Insulate all stud walls in bathroom area with fiberglass insulation to serve as sound barrier. Finish work shall be ready for painting by homeowner.

*Alternate: Install marlight after firring out walls to provide for a solid, level surface.

Replace Plaster- cut out affected area. Remove existing wall material and replace with new drywall material to be flush with surrounding surfaces.

Glue (Low VOC) and screw. Tape all joints and mud. Apply PVA primer.

Paint color to be choosen by occupant.

Interior/Exterior: Remove and dispose of existing door. DO NOT replace

Historic/Exterior: Chemically strip, neutralize and repaint/refinish lead-identified door and door components. Furnish and install all new materials required to provide proper operation of wood door. Include new brass weatherstripping. Stain and varnish door, applying at least 2 coats of varnish. Verify color with owner.

DRYWALL

Remove existing substrate containing lead based paint and replace with new Drywall - install new ½” gypsum board. Glue (Low VOC) and screw.

Tape all joints, mud and use appropriate corner bead on all corners. Apply PVA primer. Paint color to be choosen by occupant.

Building/Plumbing

Permit Type

Building

Building

Permit Type

Building

ENCLOSURE: Prepare surfaces to be stabilized. Label all substrate containing lead- based paint "LEAD". Enclose all drywall/plaster with new 1/4" drywall. Glue (Low VOC) and screw. Tape all joints and mud. Apply PVA primer. Paint color to be choosen by occupant.

Remove the existing faucet/fixture and replace with new. Install lead free Delta Kitchen Sink Faucet model number 100 DST or 100 BH-DST for non-sprayer locations. Or model number 400 DST,400BH-DST ,400 DST-A or 400 DST-L for sprayer equipped locations the shut off valves. Components to be from Lead Free product lines or nonmetal. (Must meet minimum NSF/ANSI 61- G and NSF/ANSI 372). Faucet documents/paperwork to be presented to RFC for verification of proper components. All aerator keys/wrenches to be provided to homeowner. Contractor responsible to ensure proper drainage as of job completion-verify before staring

FLOORING GRATES/VENTS

Remove identified grates, wet scrape and paint with low VOC paint. Color to match existing.

Remove identified grates and replace with new to fit grate opening.

FLOORING

If necessary, remove baseboards. Prepare surface for the application of Michigan approved encapsulating product. Perform substrate stabilization with Eco-Bond, or equivalent. After paint has cured completely label the surface "Contains Lead Paint" to state requirements. Then install 1/4 or 3/16" luan over the entire floor surface area. Nail every 4" and fill all seams. Caulk edges to make air tight enclosure. Sand the filler smooth.

Ensure height of new floor does not disrupt threshold and opening/closing of door. Homeowner responsible for desired final surface covering (ie, carpet, vinyl). Square Feet > 100

FAUCET FIXTURE

If necessary, remove baseboards. Prepare surface for the application of Michigan approved encapsulating product. Perform substrate stabilization with Eco-Bond, or equivalent. After paint has cured completely label the surface "Contains Lead Paint" to state requirements. Then install 1/4 or 3/16" luan over the entire floor surface area. Nail every 4" and fill all seams. Caulk edges to make air tight enclosure. Sand the filler smooth.

Ensure height of new floor does not disrupt threshold and opening/closing of door. Provide ¼ round molding where existing wood base and new floor covering meetFasten flooring and base to structure with waterproof adhesive. Undercut all doors to provide a minimum ¼ inch clearance. Verify color and pattern of floor covering with owner.

Include threshold strips at all exposed flooring edges. Install pre-finished wood shoe trim or vinyl trim where floor meets wall, color to match existing or per owner’s choice.

GARAGE DOOR -REPLACEMENT

If necessary, remove baseboards. Prepare surface for the application of Michigan approved encapsulating product. Perform substrate stabilization with Eco-Bond, or equivalent. After paint has cured completely label the surface "Contains Lead Paint" to state requirements. Then install 1/4 or 3/16" luan over the entire floor surface area. Nail every 4" and fill all seams. Caulk edges to make air tight enclosure. Sand the filler smooth.

Ensure height of new floor does not disrupt threshold and opening/closing of door. Homeowner responsible for desired final surface covering (ie, carpet, vinyl). Square Feet < 100

Remove and dispose of existing overhead garage door and replace with new door of equal size and dimension. New door shall be a pre-finished flush door. Consult with owner on style. Adjust springs so that door operates properly. Bottom edge of door shall have vinyl weather seal.

Door shall have locking mechanism. Wrap exterior door casing and jamb with aluminum coil stock and seal all seams. Install new vinyl weatherstripping stops. (One-Car Garage).

Building

Building

Building

Building/Mechanical /Electrical/Plumbing

Building

Provide commercial grade dumpster to remove all debris using lead safe protocols. 30 Cubic Yards. (Qty 1). One will be given for projects over $40K

Permit. Cost to only include pulling a permit for all required work. Cost for smoke detectors and carbon monoxide detectors will be in their own line item.

CARBON MONOXIDE DETECTOR-INSTALL (HH) Install Underwriters Laboratory (UL)-certified, Carbon Monoxide Detector. Install near sleeping areas. Install at recommended height per manufacturer. Do not install on ceiling. Test detector upon installation.

Remove and dispose of existing overhead garage door and replace with new door of equal size and dimension. New door shall be a pre-finished flush door. Consult with owner on style. Adjust springs so that door operates properly. Bottom edge of door shall have vinyl weather seal.

Door shall have locking mechanism. Wrap exterior door casing and jamb with aluminum coil stock and seal all seams. Install new vinyl weatherstripping stops. (Two-Car Garage).

General Requirement

Provide commercial grade dumpster to remove all debris using lead safe protocols. 10 Cubic Yards. (Qty 1). One will be given for projects up to $20K.

Provide commercial grade dumpster to remove all debris using lead safe protocols. 20 Cubic Yards. (Qty 1). One will be given for projects up to $30K.

Building

Permit Type

Building

Building

Building

PAINTING

EXTERIOR: Perform substrate stabilization (First Floor). Repair or replace all damaged or rotted substrate. Wet scrape, prime any bare areas and repaint these surfaces with two coats of exterior grade, 20 year paint.

Apply all products to manufacturer’s specifications for application and proper surface temperature at time of application. Ensure all exterior, horizontal surfaces are free of visual dust, paint chips and debris, including but not limited to roofs and eaves troughs.

EXTERIOR (Second Floor): Perform substrate stabilization (Second Floor).

Repair or replace all damaged or rotted substrate. Wet scrape, prime any bare areas and repaint these surfaces with two coats of exterior grade, 20 year paint. Apply all products to manufacturer’s specifications for application and proper surface temperature at time of application. Ensure all exterior, horizontal surfaces are free of visual dust, paint chips and debris, including but not limited to roofs and eaves troughs.

INTERIOR: Perform substrate stabilization. Repair all damaged or rotted substrate. Wet scrape, prime any bare areas and repaint these surfaces with two coats of enamel paint. Apply all products to manufacturer’s specifications for application and proper surface temperature at time of application. (Greater than 100 SF)

SEALED SMOKE DETECTORS- INSTALL (HH) - Furnish & install Sealed Smoke Detectors with 10 -year lithium battery. Replace old existing detectors with new detectors per City of Detroit Code.

GUTTERS_LHR

Remove and dispose of identified gutters and downspouts. Replace all missing gutters and downspouts with new equivalent. Install to manufacturer specifications. Construct from 0.027 gauge seamless aluminum. Provide watertight construction fastened securely to structure. Include downspout extensions where needed and direct away from foundation of unit. Ensure all exterior, horizontal surfaces are free of visual dust, paint chips and debris, including but not limited to roofs and eaves troughs.

Building

Building

Building

Permit Type

INTERIOR (Door Trim): Perform substrate stabilization. Repair all damaged or rotted substrate. Wet scrape, prime any bare areas and repaint these surfaces with two coats of enamel paint. Apply all products to manufacturer’s specifications for application and proper surface temperature at time of application.

METAL SURFACES: Perform substrate stabilization. Wet scrape and remove existing rust. Prime any bare areas and repaint these surfaces with two coats of exterior grade, rust resistant paint.

PORCH

Interior Painting Per Stanchion: Build containment around each stanchion. Wet scrape and sand and apply two coats of rustoleum. Allow 24-hours too dry. Once dried, prime and paint with two coats.

INTERIOR (Less than 100 SF): Perform substrate stabilization. Repair all damaged or rotted substrate. Wet scrape, prime any bare areas and repaint these surfaces with two coats of enamel paint. Apply all products to manufacturer’s specifications for application and proper surface temperature at time of application.

INTERIOR (Window Trim): Perform substrate stabilization. Repair all damaged or rotted substrate. Wet scrape, prime any bare areas and repaint these surfaces with two coats of enamel paint. Apply all products to manufacturer’s specifications for application and proper surface temperature at time of application.

Building

Building

Permit Type

Building

RAIL: Remove and dispose of existing porch railings. Install new pressure-treated wood railing to meet code requirements. Securely fasten railing to wall and/or columns. Rail system to be 5-piece system.

SOFFIT/FASCIA

Replace all deteriorated wood as needed to properly secure soffit system.

Scrape all areas with peeling paint. Install new solid, vinyl soffit system to completely enclose the soffit. Encapsulate fascia/soffit where vented (if neccessary). Minimize face nailing.

FLOOR/ENCLOSURE: Repair missing or damaged floor boards, as necessary. Make sure that existing porch flooring is level and sound to receive new plywood cover. Ensure proper clearance at door entrance(s).

Install 1/2” exterior grade treated plywood or tongue and groove to serve as an enclosure of the porch floor. Backcaulk plywood and fasten with screws into floor joists. Caulk all vertical joints and seams such as at the house, porch wall, etc. with “Quad” caulk or silicone caulk (no latex).

Install bullnose at edge. Install indoor/outdoor, marine-grade carpeting (color to be chosen by homeowner).

FLOOR/INTERIM: Repair missing or damaged floor boards, as necessary.

Prepare the porch floor for paint stabilization and apply 2 coats of exterior grade 20 year paint. Ensure proper clearance at door entrance(s). Install indoor/outdoor, marine-grade carpeting (color to be chosen by homeowner).

SKIRTING: Remove and dispose of current porch skirting. Replace with pre-constructed skirting on all sides, meeting flush with sides of house.

Permit Type

Building

Building

Building

HISTORIC: Replace all deteriorated wood as needed. Replace with new wood using "in kind" materials.

SOIL

AMATEMENT: Remove all soil within the soil abatement area to a minimum depth of 6”. Dump soil directly into containers within the abatement area, Do not transport soil out of the abatement area. Install new replacement soil that has been tested for lead based paint and has less than 400ppm lead. Provide documented soil testing results from a certified NLLAP laboratory. Final grade of replacement soil shall be 2” higher than existing grade to allow for settling. Slope final grade away from house. Dampen area with water. *Install sod to cover abated area.

If soil abatement activity cannot be completed in one day then install temporary fencing to enclose the area and to prevent unauthorized entry.

*Alternate: Seed area with grass seed.

Furnish and install new aluminum trim, white in color, fastened securely to all specified substrate. Replace all deteriorated wood as needed to properly secure soffit system. Fir out windows and doors if needed.

Remove all light fixtures, hose bibs, dryer vents, electrical service masts, etc. prior to siding application (except gas and plumbing pipes). Cutting around these items will not be accepted. (Allowance can be granted for height).

Interim: Rototill top 6” of soil to completely mix soil within the defined area. Ensure that all soil clumps are removed. Dampen area with water.

*Install sod to cover abated area. Square Feet > 100

* Alternate: Seed area with grass seed.

Interim: Rototill top 6” of soil to completely mix soil within the defined area. Ensure that all soil clumps are removed. Dampen area with water.

*Install sod to cover abated area. Square Feet < 100

* Alternate: Seed area with grass seed.

Permit Type 6.100

Building

6.100

Building

Interim: Remove all visible paint chips and debris from area. Rototill to a minimum of 6” of soil to completely mix soil within the defined area.

Insure that all soil clumps are removed. Cover area with landscape fabric and a minimum of 4-6” of natural stone or other landscape covering (homeowner to choose). Integrated Pest Management protocol to be followed (no mulch). Ensure soil is graded away from foundation. If unable to rototill, cover with a minimum of 6” of landscape covering.

Square Feet < 100

Interim: Remove all visible paint chips and debris from area. Rototill to a minimum of 6” of soil to completely mix soil within the defined area.

Insure that all soil clumps are removed. Cover area with landscape fabric and a minimum of 4-6” of natural stone or other landscape covering (homeowner to choose). Integrated Pest Management protocol to be followed (no mulch). Ensure soil is graded away from foundation. If unable to rototill, cover with a minimum of 6” of landscape covering.

Square Feet > 100

STAIRWAY

ENCLOSURE: Prepare surfaces to be stabilized. Wet scrape and fully apply Eco-Bond Lead Defender, or equivalent, to all surfaces-treads, risers, stringers, landing, etc.. Follow manufacturer’s written instructions. After paint has cured for 24 hours install FULL WIDTH and full length 3/16” or 1/8” luann plywood panels glued and stapled/nailed to treads and risers (include bull nose) and landing. Properly label all lead-painted surfaces before applying runner.

INTERIM: Prepare surfaces to be stabilized. Wet scrape and fully apply Eco-Bond Lead Defender, or equivalent, to all surfaces-treads, risers, stringers, landing, etc.. Follow manufacturer’s written instructions. After paint has cured for 24 hours install FULL WIDTH and full length vinyl runners glued to steps, risers (include bull nose) and landing. Properly label all lead-painted surfaces before applying runner.

6.100

Building

6.100

Building

Building

6.100

Permit Type

TRIM/SHELVING

Replace wood trim containing lead based paint with new wood trim.

Prime with low VOC primer and paint white. Any replaced trim need to be similar to existing architecture and mateerial. (Baseboards, Crown Moldings, Chair Rail, etc.).

Where drywall is being installed over an existing surface or wall, the existing trim work shall be removed, and retained. Upon the completion of the drywall installation, all trim shall be reinstalled, with filler strips/jamb extensions to conceal drywall edge. Any damaged, distorted, or missing trim shall be replaced, as necessary.

Shelving: Remove existing shelving containing lead based paint and replace with new. New shelving shall be: 3/4-inch #2 Pine, or 3/4-inch A-B interior plywood (exposed edge faces shall have solid wood edge material applied). Particleboard shall not be used. Each shelf shall be supported on a continuous wood cleat at the walls.

VINYL SIDING & WRAP ALL WOOD TRIM

REMOVE/REPLACE: Remove existing stairway completely and dispose of

it. Install a new stair system using 2X materials. Install resin board or other like material as pad under stringer, between wood and concrete.

Build to code requirements as existing conditions allow. Include all fall protection, railings and other materials as needed.

Building

Building

Building

WINDOWS

REPLACEMENT/VINYL: Remove and dispose of existing wood windows.

Install new vinyl double hung replacement window unit (Energy Star Rated). In bathroom, use obscure glass. Caulk all seams. Prime and paint all interior trim white. Custom fit .019 thick trim sheet aluminum coilstock on window trim. (total ) (Up to 100 United Inches/Allowance can be granted for windows larger than 100 United Inches).

REPLACEMENT/VINYL: Remove and dispose of existing wood windows.

Install new vinyl slider replacement window unit (Energy Star Rated). In bathroom, use obscure glass. Caulk all seams. Prime and paint all interior trim white. Custom fit .019 thick trim sheet aluminum coilstock on window trim. (total )

REPLACEMENT/VINYL: Remove and dispose of existing wood windows.

Install new vinyl casement replacement window unit (Energy Star Rated).

In bathroom, use obscure glass. Caulk all seams. Prime and paint all interior trim white. Custom fit .019 thick trim sheet aluminum coilstock on window trim. (total )

Furnish and install premium vinyl siding and ¼” plastic faced, foam core backer board or fanfold as per manufacturer’s written instructions to entire house and inside walls of porch(es), to provide a complete, weather tight and maintenancefree exterior (with chip-catch). New vinyl siding color to be selected by owner. Remove all light fixtures, hose bibs, dryer vents, electrical service masts, etc. prior to siding application (except gas and plumbing pipes). Cutting around these items will not be accepted.

Siding should include metal cap over fanfold or backer board at perimeter base of buildings to be siding as well as rakes over roofs. All vinyl siding must conform to ASTM Standard D3679-17. Contractor to provide homeowner with siding warranty. Ensure all exterior, horizontal surfaces are free of visual dust, paint chips and debris, including but not limited to roofs and eaves troughs.

HISTORIC/REPLACEMENT: Remove interior and exterior casings and save for re-installation. Remove and dispose of existing window units including window frames and weights. Thoroughly clean, before installation of new window units, all window openings using lead safe cleaning practices.

Furnish and install new wood window unit(s) as manufactured by JELD WEN or equal. Window units to have factory applied primer on exterior surfaces. Note: do not use sash packs. New windows must comply with Historic Preservation guidelines i.e. match the size, design, proportions, profile and whenever possible, materials of the existing windows. New windows shall be Energy Star Rated (low E).Windows to have full screens and sash locks. Owner responsible for finish painting and/or staining of windows.

Stabilize existing interior and exterior painted casings and associated painted window trim with Eco-Bond Lead Defender, or equivalent. Re-install all casings. Make necessary interior and exterior wall repairs. Caulk all seams. Caulk must be low VOC, butyl-based or silicone caulk (no latex).

Window must be finished flush with interior portion of remaining casing.

Install fiberglass batt insulation in any remaining gap greater than 3/8”.

Contractor to provide homeowner with window warranty. Use tempered safety glass or obscured glass where necessary. REFER to the Secretary Of Interior’s Standards for Rehabilitation and Guidelines for Rehabilitating Historic Buildings. Ensure all exterior, horizontal surfaces are free of visual dust, paint chips and debris, including but not limited to roofs and eaves troughs.

If window bars are present, they should be removed and shall not be replaced. They should be provided to the homeowner after the work is completed.

HISTORIC/INTERIM: Remove the interior stops and save (or discard and replace with new RFC choice). Remove the upper and lower window sashes. Perform substrate stabilization, wet scrape and fully apply Eco- Bond Lead Defender, or equivalent to all painted surfaces of the jambs and troughs. Determine track shape, most wood sashes have either a square-shaped groove or a “V” shaped groove. Install the proper jamb liner so that it extends the full length of each side jamb. Install jamb liners to manufacturers’ recommendations. Reinstall the sashes and stops. If stops are damaged, broken or missing, install new stops that closely match existing in like and kind.

Building

Dependant on Trade

STORM WINDOWS: Remove and dispose of existing interior/exterior stops, parting beads, sashes, and storms. Wet scrape and fully apply Eco- Bond Lead Defender, or equivalent, with Bitrex (ie, LBC or equal) or approved taste-aversion product, to all remaining interior painted wood window structures. Install new storm window with screen. Ensure all exterior, horizontal surfaces are free of visual dust, paint chips and debris, including but not limited to roofs and eaves troughs.

If window bars are present, they should be removed and shall not be replaced. They should be provided to the homeowner after the work is completed.

BOARD UP: Remove and dispose of existing interior stop, parting beads, sashes, and storms. Wet scrape and fully apply Eco-Bond Lead Defender, or equivalent, with Bitrex (ie, LBC or equal) or approved taste-aversion product to all remaining window structures. Install 2” x 4” board vertically through center of openings greater then 16” wide. Install OSB over remaining opening from exterior of home and caulk seams. Ensure all exterior, horizontal surfaces are free of visual dust, paint chips and debris, including but not limited to roofs and eaves troughs.

BASEMENT/GLASS BLOCK: Remove and dispose of basement windows and all framing. Install new framing to receive glass block windows complete with metal vent. Mortar and caulk (low VOC) to provide secure and weather tight fit. Ensure all exterior, horizontal surfaces are free of visual dust, paint chips and debris, including but not limited to roofs and eaves troughs.

Work Not Listed

Miscellaneous sub-contracted work not otherwise listed above

Pricing finalized 3/31/2022 and Expires on 3/31/2023

Company Name

CONTRACTOR AGREES TO THE FOLLOWING: Unless specifically excluded, all workmanship and materials are to fully comply with all applicable building codes and meet the minimum standards set forth in the City of Detroit Housing And Revitalization Department's Contractor’s Performance Standards. During the initial walk-through, all measurements and quantities to be verified. The execution of this work shall comply with all applicable state, federal and local laws, rules, regulations and guidelines.

These standards include but are not limited to the following: 29 CFR 1926 - Construction Industry Standards; 29 CFR 1926.62 – Construction Industry Lead Standard; 29 CFR 1910.1200 - Hazard Communication; 40 CFR Part 261 and 40 CFR Part 745 - EPA Regulations; NCLSH-HUD Lead Paint Guidelines, Evaluation

Protocols (most current version).

DEMOLITION-DEBRIS REMOVAL: The Contractor shall remove all construction and demolition debris related to the work performed during rehabilitation as it is generated. It shall not be allowed to accumulate on the premises. He shall clean all glass and remove all labels and spots on equipment furnished or installed.

Clean-up requirements shall apply to all other walls, floors, fixtures, or areas that have suffered in any way from the performance of the contractor or subcontractors.

By my signature below, I acknowledge that I have reviewed the final fixed price sheet from a representative of the City of Detroit Housing And Revitalization Department, accept and approve the items listed above. I also acknowledge that I have reviewed and agreeing to the terms written and outlined in the Procurement Policy, which has been explained by a representative of the City of Detroit Housing and Revitalization Department. I have been provided a copy of the Procurement Policy and understand that it is subject to change. I have recieved a copy of the fixed price sheet, and will not change until the expiration date unless reasons specified in the procurement policy.I will not recieve any new contracts with the City of Detroit Housing and Revitalization Department until this document is signed and returned, to the HRDhomerepair@detroitmi.gov email.

UNIT

UNIT Final Price

LF $450.00

EA $225.00

EA $400.00

UNIT

City of Detroit Housing & Revitalization Price Sheet for Lead Hazard Control Programs

All workmanship and materials must comply with and be approved by the Detroit Historic Commission.

SF $3.50

SF $2.00

SF $1.50

Per Floor $750.00

$3,500.00

EA $5,000.00

UNIT COST

EA $650.00

EA $525.00

EA $450.00

LF $13.00

EA $125.00

EA $1,100.00

EA $800.00

EA $675.00

EA $450.00

EA $800.00

EA $250.00

EA $150.00

EA $250.00

EA $1,750.00

UNIT COST

SF $12.00

SF $8.00

SF $7.00

UNIT COST

EA

$550.00

UNIT COST

EA

$125.00

EA

$225.00

SF $6.00

SF $7.00

$1,800.00

EA $2,600.00

EA $500.00

EA $600.00

EA $700.00

EA Based on Project Cost

EA $70.00

EA $50.00

LF $14.00

UNIT COST

SF $6.00

SF $4.00

SF $6.00

Each $225.00

Each $225.00

SF $10.00

Each $600.00

SF

Price on Site

SF

$15.00

SF

$22.00

LF

$70.00

UNIT COST

LF

$20.00

LF

$20.00

LF

$15.00

UNIT COST

SF $25.00

SF $20.00

SF $15.00

SF $20.00

SF $15.00

UNIT COST

EA $200.00

Each $2,800.00

EA COST

LF $10.00

LF $15.00

SQ $750.00

EA $825.00

EA $800.00 Grids/Tempered_Obscure Glass

EA $850.00

EA $1,200.00

EA $1,400.00

EA $700.00

EA $500.00

EA $550.00

EA TBD (Do not enter a price)

Pricing finalized 3/31/2022 and Expires on 3/31/2023

Company Owner Signature

Unless specifically excluded, all workmanship and materials are to fully comply with all applicable building codes and meet the minimum standards set forth in the City of Detroit Housing And Revitalization Department's Contractor’s Performance Standards. During the initial walk-through, all measurements and quantities to be verified. The execution of this work shall comply with all applicable state, federal and local laws, rules, These standards include but are not limited to the following: 29 CFR 1926 - Construction Industry Standards; 29 CFR 1926.62 – Construction Industry Lead Standard; 29 CFR 1910.1200 - Hazard Communication; 40 CFR Part 261 and 40 CFR Part 745 - EPA Regulations; NCLSH-HUD Lead Paint Guidelines, Evaluation

The Contractor shall remove all construction and demolition debris related to the work performed during rehabilitation as it is generated. It shall not be allowed to accumulate on the premises. He shall clean all glass and remove all labels and spots on equipment furnished or installed.

Clean-up requirements shall apply to all other walls, floors, fixtures, or areas that have suffered in any way from the performance of the contractor or

By my signature below, I acknowledge that I have reviewed the final fixed price sheet from a representative of the City of Detroit Housing And Revitalization Department, accept and approve the items listed above. I also acknowledge that I have reviewed and agreeing to the terms written and outlined in the Procurement Policy, which has been explained by a representative of the City of Detroit Housing and Revitalization Department. I have been provided a copy of the Procurement Policy and understand that it is subject to change. I have recieved a copy of the fixed price sheet, and will not change until the expiration date unless reasons specified in the procurement policy.I will not recieve any new contracts with the City of Detroit Housing and Revitalization Department until this document is signed and returned, to the HRDhomerepair@detroitmi.gov email.

File details come from the government source that posted it. Updated .