This is an invitation for bids from the United States Agency for International Development in Vietnam for construction services for USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1. The solicitation seeks bids for construction work with an estimated total value of over $50 million. Bids are due by February 11, 2022 and the contract will be awarded as a fixed price award with option per FAR Part 14 and 17 subject to fund availability. A virtual site walk and conference will be held on December 1, 2021 for prospective bidders to ask questions. Both US and Vietnamese firms are eligible to participate but bids must not include foreign government-controlled organizations. Bidders must be registered in SAM and hold required licenses. The awarded contractor must continue SAM registration through final payment.

View the file

Other files

File Type Posted
J.2-Bid_Form_IFB_Amendment_6.xlsx XLSX spreadsheet
20220216_Amendment_6_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.13_Compendium_IFB_Amendment_5.pdf PDF
20220214_Amendment_5_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.2-Bid_Form_IFB_Amendment_5.xlsx XLSX spreadsheet
20220126_Amendment_4_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.2-Bid_Form_IFB_Amendment_4.xlsx XLSX spreadsheet
J.4_10_Treatment_Area_IFB_Amendment+3.pdf PDF
J.2_Bid_Form_IFB_Amendment_3.xlsx XLSX spreadsheet
J.9_40_LTSA_Final_Cover_IFB_Amendment_3.pdf PDF
J.13_Compendium_IFB_Amendment_3.pdf PDF
20220122_Amendment_3_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.8_30_Roadways_IFB_Amendment_3.pdf PDF
J.2-Bid_form_IFB Amendment#2.xlsx XLSX spreadsheet
J.8-30_Roadways_Amendment 2.pdf PDF
J.13_Compendium_Amendment 2.pdf PDF
J.3_Civil_Works_Phase_1_Overview_Amendment 2.pdf PDF
J.12_Groundwater_Contours_Amendment 2.pdf PDF
J.11-IM2_LTSA_and_HCTS_Plans_and_Sections_Amendment 2.pdf PDF
J.10-IM1_LCSA_HCSA_and_Staging_Area_Plans_and_Sections_Amendment 2.pdf PDF
20220115 Amendment_2 to IFB_72044021B00001 for USAID Civil Works P1 for Dioxin Remediation at Bien Hoa Airbase Area.pdf PDF
J.5-Decision_Units_Amendment 2.pdf PDF
J.6-20_Dig_and_Haul_SW-07_Amendment 2.pdf PDF
20220115 Revised No. 2 lFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1.pdf PDF
20211203 SF30 Amendment_1 to IFB_72044021B00001 for USAID Civil Works P1 for Dioxin Remediation at Bien Hoa Airbase Area.pdf PDF
20211203 Revised No. 1 lFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1.pdf PDF
20211201 CW1 Virtual Conference IFB No. 72044021B00001.pdf PDF
20211203 J.1_SF1442-14b IFB_72044021B00001 BH CW1_removed block 17.pdf PDF
20211117 lFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1.pdf PDF
J.18-BRANDING IMPLEMENTATION PLAN AND MARKING PLAN.pdf PDF
J.11-IM2_LTSA_and_HCTS_Plans_and_Sections.pdf PDF
J.9-40_LTSA_COVER.pdf PDF
J.3-Civil_Works_Phase_1_Overview.pdf PDF
J.13-Compendium.pdf PDF
J.1_SF1442-14b IFB_72044021B00001 BH CW1.pdf PDF
J.16-Site_wide_EMMP.pdf PDF
J.4-10_Treatment_area.pdf PDF
J.5-Decision_Units.pdf PDF
J.10-IM1_LCSA_HCSA_and_Staging_Area_Plans_and_Sections.pdf PDF
J.7-20_D_H_NF-04.pdf PDF
J.12-Groundwater Contours.pdf PDF
J.8-30_Roadways.pdf PDF
J.15-Site-wide_HASP_Sign_off_Page.docx DOCX document
J.2-Bid_form.xlsx XLSX spreadsheet
J.17-Site-wide_EMMP_Sign_off_Page.docx DOCX document
J.19-Certification of Key personnel.xlsx XLSX spreadsheet
J.14-Site_wide_HASP.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIEN HOA, NOVEMBER 2021

VIETNAM

BIEN HOA

AIRBASE AREA

20G-01 01

A3

PREPARED BY

NGƯỜI THỰC HIỆN:

CHECKED BY

NGƯỜI KIỂM TRA:

AS NOTED

REV DESCRIPTION DATE BY

BẢN ĐIỀU CHỈNH NGÀY BỞI

PREPARED FOR

CHỦ ĐẦU TƯ:

LISBETH HABANS NAGRATH

DESIGNER OF RECORD

CHỦ NHIỆM THIẾT KẾ:

PROJECT NAME/ TÊN DỰ ÁN:

DRAWING TITLE/ TÊN BẢN VẼ:

DATE/ NGÀY: SIZE/ KHỔ: SCALE/ TỈ LỆ:

LE THI THANH THUY

PHAN THANH LUAN

SHEET

TỜ:

OF

CỦA:

Trigon Associates, llc1515 Poydras St., Ste 2200 New Orleans, LA 70112 www.trigonassociates.com

ENGINEERING • CONSULTING • MANAGEMENT

A&E BIEN HOA CONTRACTOR

NHÀ THẦU TV&TK BIÊN HÒA

DRAWING NO / BẢN VẼ SỐ:

DIOXIN REMEDIATION AT BIEN HOA

AIRBASE AREA PROJECT - PHASE 1

DỰ ÁN XỬ LÝ Ô NHIỄM DIOXIN KHU VỰC

SÂN BAY BIÊN HÒA - GIAI ĐOẠN 1

IFB ATTACHMENT J.6

20 DIG AND HAUL SW-07

ITEM/ HẠNG MỤC:

15-Nov-2021

PRELIMINARY

THIS DOCUMENT IS PRELIMINARY AND IS

NOT INTENDED FOR CONSTRUCTION, OR

PERMIT PURPOSES

ENGINEER: LISBETH HABANS NAGRATH

LOUISIANA LICENSE No. 36792 19

BIEN HOA AIRBASE, VIETNAM

USAID CIVIL WORKS FOR DIOXIN REMEDIATION

AT BIEN HOA AIRBASE AREA - PHASE 1

CONTRACT NO. AID-OAA-I-15-00053

NOVEMBER 2021

IFB ATTACHMENT J.6

20 DIG AND HAUL SW-07

Trigon Associates, llc 1515 Poydras St., Ste 2200 New Orleans, LA 70112 www.trigonassociates.com engineering • consulting • management

COVER/ BÌA

INDEX OF SHEETS

20 DIG AND HAUL SW-07

SHEET NO. SHEET TITLE

1 COVER

2 INDEX OF SHEETS

3 EXCAVATION PLAN SW-07E

4 EXCAVATION CROSS SECTION SW-07E

5 EROSION CONTROL PLAN SW-07E

6 EXCAVATION GRID PLAN SW-07E

7 GRID COORDINATES PLAN SW-07E

8 EXCAVATION PLAN SW-07A1&2

9 EXCAVATION CROSS SECTION SW-07A1&2 - I

10 EXCAVATION CROSS SECTION SW-07A1&2 - II

11 EROSION CONTROL PLAN SW-07A1&2

12 EXCAVATION GRID PLAN SW-07A1&2 - 0-30 - I

13 EXCAVATION GRID PLAN SW-07A1&2 - 0-30 - II

14 EXCAVATION GRID PLAN SW-07A1&2 - 30-60 -1

15 EXCAVATION GRID PLAN SW-07A1&2 - 30-60 - II

16 EXCAVATION GRID PLAN SW-07A1&2 - 60-90 -1

17 EXCAVATION GRID PLAN SW-07A1&2 - 60-90 - II

18 GRID COORDINATES PLAN SW-07A1&2

19 GRID COORDINATES SW-07A1&2

SHEET NAME

20G-01 20G-02 20C-01 20C-02 20C-03 20C-04 20C-05 20C-06 20C-07 20C-08 20C-09 20C-10 20C-11 20C-12 20C-13 20C-14 20C-15 20C-16 20C-17

THIS DOCUMENT IS PRELIMINARY AND IS

RE\/

BAI\

DESCRIPTION

0IEU CHiNH

PREPARED FOR

CHO DAU TU':

DATE BY

N GAY BO'I

@�l��!,�

A&E BIEN HOA CONTRACTOR

NHA THAU TV&TK BIEN HOA

Trigon

ENGINEERING• CONSULTING• MANAGEMENT

Trigon Associates, llc1515 Poydras St., Ste 2200 New Orleans, LA 70112 www.trigonassociates.com

PREPARED BY

NGU'O'I THl,J'C Hll;N:

PHAN THANH LUAN

CHECKED BY

NGU'O'I K IEM TRA:

LE THI THANH THUY

DESIGNER OF RECORD

CHO NHll;M THll::T KE :

LISBETH HABANS NAGRATH

PROJECT NAME/ TEN Dl,J' AN:

DIOXIN REMEDIATION AT BIEN HOA

AIRBASE AREA PROJECT - PHASE 1

Dl,J' AN XO' LY O NHIEM DIOXIN KHU Vl,J'C

SAN BAY BIEN HOA - GIAI 00,A.N 1

PRELIMINARY

ITEM/ HANG Ml,JC:

IFB ATTACHMENT J.6

20 DIG AND HAUL SW-07

DRAWING TITLE/ TEN BAN VE:

INDEX OF SHEETS/ Ml)C Ll)C

NOT INTENDED FOR CONSTRUCTION, OR f D- A-T -E/ _N_G�A_Y_: --y l

-S-IZ-E/_ K_H�O- : -,-

I S_ C_A_L-E/- T�f-LE-. :

l

PERMIT PURPOSES 15-Nov-2021 A3 AS NOTED

ENGINEER: LISBETH HABANS NAGRATH DRAVVING NO/BANVESO:ISHEET 02 OF 19

LOUISIANA LICENSE No. 36792 20G-02 TO: cOA:

SW-07E

A C

B

EXCAVATION SCHEDULE/ BẢNG ĐÀO ĐẮP

EXCAVATION PLAN SW-07E

MẶT BẰNG ĐÀO XÚC SW-07E

EXCAVATION PLAN SW-07E

MẶT BẰNG ĐÀO XÚC SW-07E

20C-01 03

SW-07E

A3

PREPARED BY

NGƯỜI THỰC HIỆN:

CHECKED BY

NGƯỜI KIỂM TRA:

AS NOTED

REV DESCRIPTION DATE BY

BẢN ĐIỀU CHỈNH NGÀY BỞI

PREPARED FOR

CHỦ ĐẦU TƯ:

LISBETH HABANS NAGRATH

DESIGNER OF RECORD

CHỦ NHIỆM THIẾT KẾ:

PROJECT NAME/ TÊN DỰ ÁN:

DRAWING TITLE/ TÊN BẢN VẼ:

DATE/ NGÀY: SIZE/ KHỔ: SCALE/ TỈ LỆ:

LE THI THANH THUY

PHAN THANH LUAN

SHEET

TỜ:

OF

CỦA:

Trigon Associates, llc1515 Poydras St., Ste 2200 New Orleans, LA 70112 www.trigonassociates.com

ENGINEERING • CONSULTING • MANAGEMENT

A&E BIEN HOA CONTRACTOR

NHÀ THẦU TV&TK BIÊN HÒA

DRAWING NO / BẢN VẼ SỐ:

DIOXIN REMEDIATION AT BIEN HOA

AIRBASE AREA PROJECT - PHASE 1

DỰ ÁN XỬ LÝ Ô NHIỄM DIOXIN KHU VỰC

SÂN BAY BIÊN HÒA - GIAI ĐOẠN 1

IFB ATTACHMENT J.6

20 DIG AND HAUL SW-07

ITEM/ HẠNG MỤC:

15-Nov-2021

PRELIMINARY

THIS DOCUMENT IS PRELIMINARY AND IS

NOT INTENDED FOR CONSTRUCTION, OR

PERMIT PURPOSES

ENGINEER: LISBETH HABANS NAGRATH

LOUISIANA LICENSE No. 36792 19

GENERAL NOTES/ GHI CHÚ CHUNG:

A

GENERAL NOTES/ GHI CHÚ CHUNG:

B

C

AutoCAD SHX Text A

AutoCAD SHX Text 20C-07

AutoCAD SHX Text A

AutoCAD SHX Text 20C-07

AutoCAD SHX Text B

AutoCAD SHX Text 20C-07

AutoCAD SHX Text B

AutoCAD SHX Text 20C-07

AutoCAD SHX Text

DECONTAMINATION AREA KHU VỰC KHỬ NHIỄM

AutoCAD SHX Text C-0006

AutoCAD SHX Text REMOVABLE BARRIER FENCE (LOCATE TO FACILITATE DIG AND HAUL OPERATIONS, COORDINATE LOCATION WITH ENGINEER) RÀO CHẮN DI DỘNG (PHỐI HỢP VỚI TƯ VẤN ĐỂ XÁC ĐỊNH VỊ TRÍ THUẬN LỢI CHO CÔNG TÁC ĐÀO XÚC)

AutoCAD SHX Text C-0004

AutoCAD SHX Text 6.50

AutoCAD SHX Text 6.50

AutoCAD SHX Text 6.75

AutoCAD SHX Text 7.00

AutoCAD SHX Text 7.25

AutoCAD SHX Text 7.75

AutoCAD SHX Text 8.00

AutoCAD SHX Text 8.25

AutoCAD SHX Text 8.50

AutoCAD SHX Text 9.00

AutoCAD SHX Text 9.25

AutoCAD SHX Text C-0003

AutoCAD SHX Text

SW-07E

AutoCAD SHX Text

SW-07E

AutoCAD SHX Text 1798.40

AutoCAD SHX Text 0-270

AutoCAD SHX Text

LOW

AutoCAD SHX Text

CONCENTRATION

AutoCAD SHX Text

DEPTH (CM)

AutoCAD SHX Text

BỀ DÀYỀ DÀY

AutoCAD SHX Text

NỒNG ĐỘỒNG ĐỘ

AutoCAD SHX Text

LOCATION VỊ TRÍỊ TRÍ

AutoCAD SHX Text

IDENTIFICATION KÝ HIỆUỆU

AutoCAD SHX Text

AREA (M2) DIỆN TÍCHỆN TÍCH

AutoCAD SHX Text

SCALE/TỈ LỆ: 1/500

AutoCAD SHX Text

1. REFER TO CONTRACT DOCUMENTS FOR REQUIRED REFER TO CONTRACT DOCUMENTS FOR REQUIRED CONSTRUCTION SEQUENCING./ THAM CHIẾU TÀI LIỆU HỢP ĐỒNG CHO PHẦN YÊU CẦU VỀ TRÌNH TỰ THI CÔNG. 2. REFER TO SECTION 02 41 13 - DEMOLITION FOR DEMOLITION, REFER TO SECTION 02 41 13 - DEMOLITION FOR DEMOLITION, REMOVAL, AND DISPOSAL REQUIREMENTS./ THAM CHIẾU CHỈ DẪN KỸ THUẬT 02 41 13 ĐỐI VỚI YÊU CẦU PHÁ DỠ, DỠ BỎ VÀ ĐỔ THẢI. 3. REFER TO SECTION 01 57 13 - ENVIRONMENTAL MITIGATION, 31 REFER TO SECTION 01 57 13 - ENVIRONMENTAL MITIGATION, 31 23 19 - DEWATERING AND DRAINAGE, AND 31 23 16 - EXCAVATION FOR SOIL AND SEDIMENT DRAINING REQUIREMENTS./ THAM CHIẾU CHỈ DẪN 01 57 13 - KHẮC PHỤC MÔI TRƯỜNG; 31 23 19 -THÁO NƯỚC VÀ THOÁT NƯỚC;VÀ 31 23 16 - CÔNG TÁC ĐÀO ĐỂ NẮM CÁC YÊU CẦU VỀ THOÁT NƯỚC CHO ĐẤT VÀ TRẦM TÍCH. 4. REFER TO SECTION 31 23 23 - FILL FOR BACKFILL OR REFER TO SECTION 31 23 23 - FILL FOR BACKFILL OR EXCAVATED AREAS./ THAM CHIẾU CHỈ DẪN 31 23 23 CÔNG TÁC ĐẮP ĐỐI VỚI CÁC KHU VỰC ĐÀO VÀ ĐẮP HOÀN TRẢ. 5. REFER TO SECTION 02 41 13 FOR ABOVE GRADE AND BELOW REFER TO SECTION 02 41 13 FOR ABOVE GRADE AND BELOW GRADE MATERIAL DISPOSAL DIRECTIONS./ THAM CHIẾU CHỈ DẪN 02 41 13 ĐỐI VỚI VIỆC ĐỔ THẢI VẬT LIỆU TRÊN VÀ DƯỚI NỀN TỰ NHIÊN. 6. REFER TO SECTION 02 41 13 - DEMOLITION IF UNMARKED REFER TO SECTION 02 41 13 - DEMOLITION IF UNMARKED GRAVES OR UNEXPLODED ORDINANCES ARE ENCOUNTERED DURING EXCAVATION./ THAM CHIẾU 02 41 13 - PHÁ DỠ NẾU TÌM THẤY CÁC NGÔI MỘ CHƯA ĐƯỢC ĐÁNH DẤU HOẶC BOM MÌN TRONG QUÁ TRÌNH ĐÀO XÚC. 7. POST-EXCAVATION SAMPLING MAY BE PERFORMED BEFORE POST-EXCAVATION SAMPLING MAY BE PERFORMED BEFORE RESTORATION./ CÔNG TÁC LẤY MẪU THÍ NGHIỆM XÁC NHẬN KÉT QUẢ ĐÀO XÚC CÓ THỂ SẼ ĐƯỢC THỰC HIỆN TRƯỚC KHI HOÀN THỔ 8. FINAL GRADE TO MATCH EXISTING UNLESS OTHERWISE NOTED./ FINAL GRADE TO MATCH EXISTING UNLESS OTHERWISE NOTED./ CAO ĐỘ HOÀN THIỆN PHẢI BẰNG VỚI CAO ĐỘ HIỆN TRẠNG TRỪ KHI CÓ QUY ĐỊNH KHÁC. 9. FINAL SITE RESTORATION IN ACCORDANCE WITH SECTION 32 93 FINAL SITE RESTORATION IN ACCORDANCE WITH SECTION 32 93 00 - PLANTS./ CÔNG TÁC HOÀN THỔ CUỐI CÙNG TUÂN THEO CHỈ DẪN 32 93 00- CÂY.

AutoCAD SHX Text KEY NOTE: CONTRACTOR TO PROTECT EXISTING ROAD/ NHÀ THẦU PHẢI BẢO VỆ ĐƯỜNG HIỆN HỮU. CONTRACTOR IS REQUIRED TO REPLACE THE EXISTING AIRBASE FENCING/ NHÀ THẦU PHẢI THAY THẾ HÀNG RÀO HIỆN TRẠNG. CONTRACTOR IS REQUIRED TO PROTECT HOUSES NEXT TO AIRBASE FENCING FROM CONTROL POINT 1 TO CONTROL POINT 5 / NHÀ THẦU PHẢI BẢO VỆ CÁC NGÔI NHÀ CẠNH HÀNG RÀO SÂN BAY TỪ ĐIỂM KHỐNG CHẾ 1 TỚI ĐIỂM KHỐNG CHẾ 5

AutoCAD SHX Text

1. REFER TO CONTRACT DOCUMENTS FOR REQUIRED REFER TO CONTRACT DOCUMENTS FOR REQUIRED CONSTRUCTION SEQUENCING./ THAM CHIẾU TÀI LIỆU HỢP ĐỒNG CHO PHẦN YÊU CẦU VỀ TRÌNH TỰ THI CÔNG. 2. REFER TO SECTION 02 41 13 - DEMOLITION FOR DEMOLITION, REFER TO SECTION 02 41 13 - DEMOLITION FOR DEMOLITION, REMOVAL, AND DISPOSAL REQUIREMENTS./ THAM CHIẾU CHỈ DẪN KỸ THUẬT 02 41 13 ĐỐI VỚI YÊU CẦU PHÁ DỠ, DỠ BỎ VÀ ĐỔ THẢI. 3. REFER TO SECTION 01 57 13 - ENVIRONMENTAL MITIGATION, 31 REFER TO SECTION 01 57 13 - ENVIRONMENTAL MITIGATION, 31 23 19 - DEWATERING AND DRAINAGE, AND 31 23 16 - EXCAVATION FOR SOIL AND SEDIMENT DRAINING REQUIREMENTS./ THAM CHIẾU CHỈ DẪN 01 57 13 - KHẮC PHỤC MÔI TRƯỜNG; 31 23 19 -THÁO NƯỚC VÀ THOÁT NƯỚC;VÀ 31 23 16 - CÔNG TÁC ĐÀO ĐỂ NẮM CÁC YÊU CẦU VỀ THOÁT NƯỚC CHO ĐẤT VÀ TRẦM TÍCH. 4. REFER TO SECTION 31 23 23 - FILL FOR BACKFILL OR REFER TO SECTION 31 23 23 - FILL FOR BACKFILL OR EXCAVATED AREAS./ THAM CHIẾU CHỈ DẪN 31 23 23 CÔNG TÁC ĐẮP ĐỐI VỚI CÁC KHU VỰC ĐÀO VÀ ĐẮP HOÀN TRẢ. 5. REFER TO SECTION 02 41 13 FOR ABOVE GRADE AND BELOW REFER TO SECTION 02 41 13 FOR ABOVE GRADE AND BELOW GRADE MATERIAL DISPOSAL DIRECTIONS./ THAM CHIẾU CHỈ DẪN 02 41 13 ĐỐI VỚI VIỆC ĐỔ THẢI VẬT LIỆU TRÊN VÀ DƯỚI NỀN TỰ NHIÊN. 6. REFER TO SECTION 02 41 13 - DEMOLITION IF UNMARKED REFER TO SECTION 02 41 13 - DEMOLITION IF UNMARKED GRAVES OR UNEXPLODED ORDINANCES ARE ENCOUNTERED DURING EXCAVATION./ THAM CHIẾU 02 41 13 - PHÁ DỠ NẾU TÌM THẤY CÁC NGÔI MỘ CHƯA ĐƯỢC ĐÁNH DẤU HOẶC BOM MÌN TRONG QUÁ TRÌNH ĐÀO XÚC. 7. POST-EXCAVATION SAMPLING MAY BE PERFORMED BEFORE POST-EXCAVATION SAMPLING MAY BE PERFORMED BEFORE RESTORATION./ CÔNG TÁC LẤY MẪU THÍ NGHIỆM XÁC NHẬN KÉT QUẢ ĐÀO XÚC CÓ THỂ SẼ ĐƯỢC THỰC HIỆN TRƯỚC KHI HOÀN THỔ 8. FINAL GRADE TO MATCH EXISTING UNLESS OTHERWISE NOTED./ FINAL GRADE TO MATCH EXISTING UNLESS OTHERWISE NOTED./ CAO ĐỘ HOÀN THIỆN PHẢI BẰNG VỚI CAO ĐỘ HIỆN TRẠNG TRỪ KHI CÓ QUY ĐỊNH KHÁC. 9. FINAL SITE RESTORATION IN ACCORDANCE WITH SECTION 32 93 FINAL SITE RESTORATION IN ACCORDANCE WITH SECTION 32 93 00 - PLANTS./ CÔNG TÁC HOÀN THỔ CUỐI CÙNG TUÂN THEO CHỈ DẪN 32 93 00- CÂY.

A SECTION A-A/ MẶT CẮT A-A SECTION B-B/ MẶT CẮT B-BB

EXCAVATION CROSS SECTIONS SW-07E

MẶT CẮT NGANG ĐÀO XÚC SW-07E

20C-02 04

A3

PREPARED BY

NGƯỜI THỰC HIỆN:

CHECKED BY

NGƯỜI KIỂM TRA:

AS NOTED

REV DESCRIPTION DATE BY

BẢN ĐIỀU CHỈNH NGÀY BỞI

PREPARED FOR

CHỦ ĐẦU TƯ:

LISBETH HABANS NAGRATH

DESIGNER OF RECORD

CHỦ NHIỆM THIẾT KẾ:

PROJECT NAME/ TÊN DỰ ÁN:

DRAWING TITLE/ TÊN BẢN VẼ:

DATE/ NGÀY: SIZE/ KHỔ: SCALE/ TỈ LỆ:

LE THI THANH THUY

PHAN THANH LUAN

SHEET

TỜ:

OF

CỦA:

Trigon Associates, llc1515 Poydras St., Ste 2200 New Orleans, LA 70112 www.trigonassociates.com

ENGINEERING • CONSULTING • MANAGEMENT

A&E BIEN HOA CONTRACTOR

NHÀ THẦU TV&TK BIÊN HÒA

DRAWING NO / BẢN VẼ SỐ:

DIOXIN REMEDIATION AT BIEN HOA

AIRBASE AREA PROJECT - PHASE 1

DỰ ÁN XỬ LÝ Ô NHIỄM DIOXIN KHU VỰC

SÂN BAY BIÊN HÒA - GIAI ĐOẠN 1

IFB ATTACHMENT J.6

20 DIG AND HAUL SW-07

ITEM/ HẠNG MỤC:

15-Nov-2021

PRELIMINARY

THIS DOCUMENT IS PRELIMINARY AND IS

NOT INTENDED FOR CONSTRUCTION, OR

PERMIT PURPOSES

ENGINEER: LISBETH HABANS NAGRATH

LOUISIANA LICENSE No. 36792 19

GHI CHÚ CHUNG: GENERAL NOTES:

NOTES:

AutoCAD SHX Text 20C-06

AutoCAD SHX Text

HORIZONTAL/NGANG: 1/1000 VERTICAL/ĐỨNG: 1/10000

AutoCAD SHX Text

HORIZONTAL/NGANG: 1/1000 VERTICAL/ĐỨNG: 1/10000

AutoCAD SHX Text 20C-06

AutoCAD SHX Text SURFACE FOLLOWING REMOVAL OF LOW CONCENTRATED MATERIAL BỀ MẶT SAU KHI BÓC LỚP VẬT LIỆU NHIỄM NỒNG ĐỘ THẤP

AutoCAD SHX Text

EXISTING AND FINAL GRADE BỀ MẶT TỰ NHIÊN VÀ HOÀN THIỆN

AutoCAD SHX Text

ELEVATION (METERS) CAO ĐỘ (M)

AutoCAD SHX Text

DISTANCE (METERS) KHOẢNG CÁCH (M)

AutoCAD SHX Text

EXISTING AND FINAL GRADE BỀ MẶT TỰ NHIÊN VÀ HOÀN THIỆN

AutoCAD SHX Text SURFACE FOLLOWING REMOVAL OF LOW CONCENTRATED MATERIAL BỀ MẶT SAU KHI BÓC LỚP VẬT LIỆU NHIỄM NỒNG ĐỘ THẤP

AutoCAD SHX Text

ELEVATION (METERS) CAO ĐỘ (M)

AutoCAD SHX Text

DISTANCE (METERS) KHOẢNG CÁCH (M)

AutoCAD SHX Text

1. ĐỐI VỚI CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐỐI VỚI CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP VỚI CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP VỚI CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP SÂU, NHÀ THẦU PHẢI ĐÁP SÂU, NHÀ THẦU PHẢI ĐÁP NHÀ THẦU PHẢI ĐÁP NHÀ THẦU PHẢI ĐÁP THẦU PHẢI ĐÁP THẦU PHẢI ĐÁP PHẢI ĐÁP PHẢI ĐÁP ĐÁP ĐÁP ĐÁP ỨNG CÁC QUY ĐỊNH CỦA ĐỊA PHƯƠNG VÀ QUY ĐỊNH AN TOÀN. 2. NHÀ THẦU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU NHÀ THẦU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU THẦU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU THẦU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU TẠI CÁC KHU VỰC ĐÀO XÚC, KHU TẠI CÁC KHU VỰC ĐÀO XÚC, KHU CÁC KHU VỰC ĐÀO XÚC, KHU CÁC KHU VỰC ĐÀO XÚC, KHU KHU VỰC ĐÀO XÚC, KHU KHU VỰC ĐÀO XÚC, KHU VỰC ĐÀO XÚC, KHU VỰC ĐÀO XÚC, KHU ĐÀO XÚC, KHU ĐÀO XÚC, KHU XÚC, KHU XÚC, KHU KHU KHU VỰC TRONG SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRONG SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRONG SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN CỎ Ở KHU VỰC NGOÀI SÂN CỎ Ở KHU VỰC NGOÀI SÂN Ở KHU VỰC NGOÀI SÂN Ở KHU VỰC NGOÀI SÂN KHU VỰC NGOÀI SÂN KHU VỰC NGOÀI SÂN VỰC NGOÀI SÂN VỰC NGOÀI SÂN NGOÀI SÂN NGOÀI SÂN SÂN SÂN BAY.

AutoCAD SHX Text

1. FOR ALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL FOR ALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL ALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL ALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL DEPTH TRANSITIONS, THE CONTRACTOR SHALL DEPTH TRANSITIONS, THE CONTRACTOR SHALL TRANSITIONS, THE CONTRACTOR SHALL TRANSITIONS, THE CONTRACTOR SHALL THE CONTRACTOR SHALL THE CONTRACTOR SHALL CONTRACTOR SHALL CONTRACTOR SHALL SHALL SHALL MEET, LOCAL,STATE, FEDERAL, AND SAFETY REQUIREMENTS 2. CONTRACTOR MUST BACKFILL WITH 90% COMPACTION AT EXCAVATED CONTRACTOR MUST BACKFILL WITH 90% COMPACTION AT EXCAVATED MUST BACKFILL WITH 90% COMPACTION AT EXCAVATED MUST BACKFILL WITH 90% COMPACTION AT EXCAVATED BACKFILL WITH 90% COMPACTION AT EXCAVATED BACKFILL WITH 90% COMPACTION AT EXCAVATED WITH 90% COMPACTION AT EXCAVATED WITH 90% COMPACTION AT EXCAVATED 90% COMPACTION AT EXCAVATED 90% COMPACTION AT EXCAVATED COMPACTION AT EXCAVATED COMPACTION AT EXCAVATED AT EXCAVATED AT EXCAVATED EXCAVATED EXCAVATED AREAS. ON-BASE AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS ON-BASE AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS ON-BASE AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS RECEIVE HYDROSEED. OFF-BASE AREAS RECEIVE HYDROSEED. OFF-BASE AREAS HYDROSEED. OFF-BASE AREAS HYDROSEED. OFF-BASE AREAS OFF-BASE AREAS OFF-BASE AREAS AREAS AREAS MUST NOT RECEIVE SOD OR SEED.

AutoCAD SHX Text

HIGH CONCENTRATED MATERIAL VẬT LIỆU NHIỄM NÒNG ĐỘ CAO

LOW CONCENTRATED MATERIAL VẬT LIỆU NHIỄM NÒNG ĐỘ THẤP

C-0012

C-0004

20C-03 05

A3

PREPARED BY

NGƯỜI THỰC HIỆN:

CHECKED BY

NGƯỜI KIỂM TRA:

AS NOTED

REV DESCRIPTION DATE BY

BẢN ĐIỀU CHỈNH NGÀY BỞI

PREPARED FOR

CHỦ ĐẦU TƯ:

LISBETH HABANS NAGRATH

DESIGNER OF RECORD

CHỦ NHIỆM THIẾT KẾ:

PROJECT NAME/ TÊN DỰ ÁN:

DRAWING TITLE/ TÊN BẢN VẼ:

DATE/ NGÀY: SIZE/ KHỔ: SCALE/ TỈ LỆ:

LE THI THANH THUY

PHAN THANH LUAN

SHEET

TỜ:

OF

CỦA:

Trigon Associates, llc1515 Poydras St., Ste 2200 New Orleans, LA 70112 www.trigonassociates.com

ENGINEERING • CONSULTING • MANAGEMENT

A&E BIEN HOA CONTRACTOR

NHÀ THẦU TV&TK BIÊN HÒA

DRAWING NO / BẢN VẼ SỐ:

DIOXIN REMEDIATION AT BIEN HOA

AIRBASE AREA PROJECT - PHASE 1

DỰ ÁN XỬ LÝ Ô NHIỄM DIOXIN KHU VỰC

SÂN BAY BIÊN HÒA - GIAI ĐOẠN 1

IFB ATTACHMENT J.6

20 DIG AND HAUL SW-07

ITEM/ HẠNG MỤC:

15-Nov-2021

PRELIMINARY

THIS DOCUMENT IS PRELIMINARY AND IS

NOT INTENDED FOR CONSTRUCTION, OR

PERMIT PURPOSES

ENGINEER: LISBETH HABANS NAGRATH

LOUISIANA LICENSE No. 36792 19

EROSION CONTROL PLAN SW-07E

MẶT BẰNG KHỐNG CHẾ XÓI MÒN SW-07E

EROSION CONTROL PLAN SW-07E

MẶT BẰNG KHỐNG CHẾ SÓI MÒN SW-07E

AutoCAD SHX Text 6.50

AutoCAD SHX Text 6.50

AutoCAD SHX Text 6.75

AutoCAD SHX Text 7.00

AutoCAD SHX Text 7.25

AutoCAD SHX Text 7.75

AutoCAD SHX Text 8.00

AutoCAD SHX Text 8.25

AutoCAD SHX Text 8.50

AutoCAD SHX Text 9.00

AutoCAD SHX Text 9.25

AutoCAD SHX Text

DECONTAMINATION AREA KHU VỰC KHỬ NHIỄM

AutoCAD SHX Text SILT FENCING ALONG BOUNDARY (LOCATE TO FACILITATE DIG AND HAUL OPERATIONS, COORDINATE LOCATION WITH ENGINEER)

AutoCAD SHX Text RÀO CHẮN BÙN DỌC THEO RANH GIỚI (PHỐI HỢP VỚI TƯ VẤN ĐỂ XÁC ĐỊNH VỊ TRÍ THUẬN LỢI CHO CÔNG TÁC ĐÀO XÚC)

SCALE/ TỶ LỆ: 1/500

b b b b b b b b b b

SW-07E

A3

PREPARED BY

NGƯỜI THỰC HIỆN:

CHECKED BY

NGƯỜI KIỂM TRA:

AS NOTED

REV DESCRIPTION DATE BY

BẢN ĐIỀU CHỈNH NGÀY BỞI

PREPARED FOR

CHỦ ĐẦU TƯ:

LISBETH HABANS NAGRATH

DESIGNER OF RECORD

CHỦ NHIỆM THIẾT KẾ:

PROJECT NAME/ TÊN DỰ ÁN:

DRAWING TITLE/ TÊN BẢN VẼ:

DATE/ NGÀY: SIZE/ KHỔ: SCALE/ TỈ LỆ:

LE THI THANH THUY

PHAN THANH LUAN

SHEET

TỜ:

OF

CỦA:

Trigon Associates, llc1515 Poydras St., Ste 2200 New Orleans, LA 70112 www.trigonassociates.com

ENGINEERING • CONSULTING • MANAGEMENT

A&E BIEN HOA CONTRACTOR

NHÀ THẦU TV&TK BIÊN HÒA

DRAWING NO / BẢN VẼ SỐ:

DIOXIN REMEDIATION AT BIEN HOA

AIRBASE AREA PROJECT - PHASE 1

DỰ ÁN XỬ LÝ Ô NHIỄM DIOXIN KHU VỰC

SÂN BAY BIÊN HÒA - GIAI ĐOẠN 1

IFB ATTACHMENT J.6

20 DIG AND HAUL SW-07

ITEM/ HẠNG MỤC:

15-Nov-2021

PRELIMINARY

THIS DOCUMENT IS PRELIMINARY AND IS

NOT INTENDED FOR CONSTRUCTION, OR

PERMIT PURPOSES

ENGINEER: LISBETH HABANS NAGRATH

LOUISIANA LICENSE No. 36792 1920C-04 06

EXCAVATION GRID PLAN SW-07E

MẶT BẰNG Ô LƯỚI ĐÀO XÚC SW-07E

EXCAVATION GRID PLAN SW-07E

MẶT BẰNG Ô LƯỚI ĐÀO XÚC SW-07E

NOTE/ GHI CHÚ:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ROW

AutoCAD SHX Text

HÀNG

AutoCAD SHX Text

COLUMN/CỘT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6.50

AutoCAD SHX Text 6.50

AutoCAD SHX Text 6.75

AutoCAD SHX Text 7.00

AutoCAD SHX Text 7.25

AutoCAD SHX Text 7.75

AutoCAD SHX Text 8.00

AutoCAD SHX Text 8.25

AutoCAD SHX Text 8.50

AutoCAD SHX Text 9.00

AutoCAD SHX Text 9.25

AutoCAD SHX Text 7.02

AutoCAD SHX Text 4.32

AutoCAD SHX Text -2.70

AutoCAD SHX Text 6.80

AutoCAD SHX Text 4.10

AutoCAD SHX Text -2.70

AutoCAD SHX Text 6.92

AutoCAD SHX Text 4.22

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.00

AutoCAD SHX Text 4.30

AutoCAD SHX Text -2.70

AutoCAD SHX Text 6.86

AutoCAD SHX Text 4.16

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.05

AutoCAD SHX Text 4.35

AutoCAD SHX Text -2.70

AutoCAD SHX Text 6.55

AutoCAD SHX Text 3.85

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.00

AutoCAD SHX Text 4.30

AutoCAD SHX Text -2.70

AutoCAD SHX Text 6.85

AutoCAD SHX Text 4.15

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.26

AutoCAD SHX Text 4.56

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.08

AutoCAD SHX Text 4.38

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.25

AutoCAD SHX Text 4.55

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.26

AutoCAD SHX Text 4.56

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.49

AutoCAD SHX Text 4.79

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.41

AutoCAD SHX Text 4.71

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.29

AutoCAD SHX Text 4.59

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.46

AutoCAD SHX Text 4.76

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.64

AutoCAD SHX Text 4.94

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.86

AutoCAD SHX Text 5.16

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.45

AutoCAD SHX Text 4.75

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.77

AutoCAD SHX Text 5.07

AutoCAD SHX Text -2.70

AutoCAD SHX Text 8.18

AutoCAD SHX Text 5.48

AutoCAD SHX Text -2.70

AutoCAD SHX Text 8.31

AutoCAD SHX Text 5.61

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.93

AutoCAD SHX Text 5.23

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.50

AutoCAD SHX Text 4.80

AutoCAD SHX Text -2.70

AutoCAD SHX Text 8.52

AutoCAD SHX Text 5.82

AutoCAD SHX Text -2.70

AutoCAD SHX Text 8.79

AutoCAD SHX Text 6.09

AutoCAD SHX Text -2.70

AutoCAD SHX Text 8.21

AutoCAD SHX Text 5.51

AutoCAD SHX Text -2.70

AutoCAD SHX Text 8.76

AutoCAD SHX Text 6.06

AutoCAD SHX Text -2.70

AutoCAD SHX Text 8.89

AutoCAD SHX Text 6.19

AutoCAD SHX Text -2.70

AutoCAD SHX Text 9.13

AutoCAD SHX Text 6.43

AutoCAD SHX Text -2.70

AutoCAD SHX Text 8.94

AutoCAD SHX Text 6.24

AutoCAD SHX Text -2.70

AutoCAD SHX Text 6.21

AutoCAD SHX Text 7.95

AutoCAD SHX Text 5.25

AutoCAD SHX Text -2.70

AutoCAD SHX Text 9.60

AutoCAD SHX Text 6.90

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.51

AutoCAD SHX Text 4.81

AutoCAD SHX Text -2.70

AutoCAD SHX Text 9.07

AutoCAD SHX Text 6.37

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.24

AutoCAD SHX Text 4.54

AutoCAD SHX Text -2.70

AutoCAD SHX Text 8.49

AutoCAD SHX Text 5.79

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.00

AutoCAD SHX Text 4.30

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.76

AutoCAD SHX Text 5.06

AutoCAD SHX Text -2.70

AutoCAD SHX Text 6.97

AutoCAD SHX Text 4.27

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.06

AutoCAD SHX Text 4.36

AutoCAD SHX Text -2.70

AutoCAD SHX Text 6.37

AutoCAD SHX Text 3.67

AutoCAD SHX Text -2.70

AutoCAD SHX Text 6.33

AutoCAD SHX Text 3.63

AutoCAD SHX Text -2.70

AutoCAD SHX Text 8.91

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.87

AutoCAD SHX Text 5.17

AutoCAD SHX Text -2.70

AutoCAD SHX Text 6.91

AutoCAD SHX Text 4.21

AutoCAD SHX Text -2.70

AutoCAD SHX Text 6.33

AutoCAD SHX Text 3.63

AutoCAD SHX Text -2.70

AutoCAD SHX Text 7.51

AutoCAD SHX Text 4.81

AutoCAD SHX Text -2.70

AutoCAD SHX Text 8.76

AutoCAD SHX Text 6.06

AutoCAD SHX Text -2.70

AutoCAD SHX Text 9.66

AutoCAD SHX Text 6.96

AutoCAD SHX Text -2.70

AutoCAD SHX Text 6.96

AutoCAD SHX Text 4.26

AutoCAD SHX Text -2.70

AutoCAD SHX Text

SCALE/TỈ LỆ: 1/500

AutoCAD SHX Text 11.00

AutoCAD SHX Text 10.10

AutoCAD SHX Text -0.90

AutoCAD SHX Text

EXISTING AND FINAL GRADE

AutoCAD SHX Text

CAO ĐỘ TỰ NHIÊN VÀ HOÀN THIỆN

AutoCAD SHX Text

POST-EXCAVATION ELEVATION

AutoCAD SHX Text

CAO ĐỘ SAU KHI ĐÀO

AutoCAD SHX Text

EXCAVATION DEPTH

CHIỀU SÂU ĐÀO

20C-05 07

A3

PREPARED BY

NGƯỜI THỰC HIỆN:

CHECKED BY

NGƯỜI KIỂM TRA:

AS NOTED

REV DESCRIPTION DATE BY

BẢN ĐIỀU CHỈNH NGÀY BỞI

PREPARED FOR

CHỦ ĐẦU TƯ:

LISBETH HABANS NAGRATH

DESIGNER OF RECORD

CHỦ NHIỆM THIẾT KẾ:

PROJECT NAME/ TÊN DỰ ÁN:

DRAWING TITLE/ TÊN BẢN VẼ:

DATE/ NGÀY: SIZE/ KHỔ: SCALE/ TỈ LỆ:

LE THI THANH THUY

PHAN THANH LUAN

SHEET

TỜ:

OF

CỦA:

Trigon Associates, llc1515 Poydras St., Ste 2200 New Orleans, LA 70112 www.trigonassociates.com

ENGINEERING • CONSULTING • MANAGEMENT

A&E BIEN HOA CONTRACTOR

NHÀ THẦU TV&TK BIÊN HÒA

DRAWING NO / BẢN VẼ SỐ:

DIOXIN REMEDIATION AT BIEN HOA

AIRBASE AREA PROJECT - PHASE 1

DỰ ÁN XỬ LÝ Ô NHIỄM DIOXIN KHU VỰC

SÂN BAY BIÊN HÒA - GIAI ĐOẠN 1

IFB ATTACHMENT J.6

20 DIG AND HAUL SW-07

ITEM/ HẠNG MỤC:

15-Nov-2021

PRELIMINARY

THIS DOCUMENT IS PRELIMINARY AND IS

NOT INTENDED FOR CONSTRUCTION, OR

PERMIT PURPOSES

ENGINEER: LISBETH HABANS NAGRATH

LOUISIANA LICENSE No. 36792 19

GRID COORDINATES PLAN SW-07E

MẶT BẰNG TỌA ĐỘ Ô LƯỚI SW-07E

GRID COORDINATES PLAN SW-07E

MẶT BẰNG TỌA ĐỘ Ô LƯỚI SW-07E

NOTE/ GHI CHÚ:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ROW

AutoCAD SHX Text

HÀNG

AutoCAD SHX Text

COLUMN/CỘT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE/TỈ LỆ: 1/500

AutoCAD SHX Text 8:9

AutoCAD SHX Text

ROW/ HÀNG:COLUMN/ CỘT

AutoCAD SHX Text

NO.: STT (SỐ THỨ TỰ)

GRID-CELL NAME TÊN MẮT LƯỚI

11.25

.25

.2

11.25

11.25

11.2511.25

11.25

11.25

11.25

11.25

.25

10.00

11.25

11.25

11.25

C-0006

C-0004

A

SW-07A1

SW-07A2

A

B

EXCAVATION SCHEDULE/ BẢNG ĐÀO ĐẮP

EXCAVATION PLAN SW-07A1&2

MẶT BẰNG ĐÀO XÚC SW-07A1&2

EXCAVATION PLAN SW-07A1&2

MẶT BẰNG ĐÀO XÚC SW-07A1&2

20C-06 08

SW-07A1

A3

PREPARED BY

NGƯỜI THỰC HIỆN:

CHECKED BY

NGƯỜI KIỂM TRA:

AS NOTED

REV DESCRIPTION DATE BY

BẢN ĐIỀU CHỈNH NGÀY BỞI

PREPARED FOR

CHỦ ĐẦU TƯ:

LISBETH HABANS NAGRATH

DESIGNER OF RECORD

CHỦ NHIỆM THIẾT KẾ:

PROJECT NAME/ TÊN DỰ ÁN:

DRAWING TITLE/ TÊN BẢN VẼ:

DATE/ NGÀY: SIZE/ KHỔ: SCALE/ TỈ LỆ:

LE THI THANH THUY

PHAN THANH LUAN

SHEET

TỜ:

OF

CỦA:

Trigon Associates, llc1515 Poydras St., Ste 2200 New Orleans, LA 70112 www.trigonassociates.com

ENGINEERING • CONSULTING • MANAGEMENT

A&E BIEN HOA CONTRACTOR

NHÀ THẦU TV&TK BIÊN HÒA

DRAWING NO / BẢN VẼ SỐ:

DIOXIN REMEDIATION AT BIEN HOA

AIRBASE AREA PROJECT - PHASE 1

DỰ ÁN XỬ LÝ Ô NHIỄM DIOXIN KHU VỰC

SÂN BAY BIÊN HÒA - GIAI ĐOẠN 1

IFB ATTACHMENT J.6

20 DIG AND HAUL SW-07

ITEM/ HẠNG MỤC:

15-Nov-2021

PRELIMINARY

THIS DOCUMENT IS PRELIMINARY AND IS

NOT INTENDED FOR CONSTRUCTION, OR

PERMIT PURPOSES

ENGINEER: LISBETH HABANS NAGRATH

LOUISIANA LICENSE No. 36792 19

GENERAL NOTES/ GHI CHÚ CHUNG:

A

GENERAL NOTES/ GHI CHÚ CHUNG:

B

AutoCAD SHX Text 20C-12

AutoCAD SHX Text A

AutoCAD SHX Text 20C-12

AutoCAD SHX Text A

AutoCAD SHX Text 20C-13

AutoCAD SHX Text B

AutoCAD SHX Text 20C-13

AutoCAD SHX Text B

AutoCAD SHX Text REMOVABLE BARRIER FENCE (LOCATE TO FACILITATE DIG AND HAUL OPERATIONS, COORDINATE LOCATION WITH ENGINEER) RÀO CHẮN DI DỘNG (PHỐI HỢP VỚI TƯ VẤN ĐỂ XÁC ĐỊNH VỊ TRÍ THUẬN LỢI CHO CÔNG TÁC ĐÀO XÚC)

AutoCAD SHX Text

DECONTAMINATION AREA KHU VỰC KHỬ NHIỄM

AutoCAD SHX Text 11134.72

AutoCAD SHX Text 0-30

AutoCAD SHX Text

LOW

AutoCAD SHX Text

CONCENTRATION

AutoCAD SHX Text

DEPTH (CM)

AutoCAD SHX Text

BỀ DÀYỀ DÀY

AutoCAD SHX Text

NỒNG ĐỘỒNG ĐỘ

AutoCAD SHX Text

LOCATION VỊ TRÍỊ TRÍ

AutoCAD SHX Text

IDENTIFICATION KÝ HIỆUỆU

AutoCAD SHX Text

AREA (M2) DIỆN TÍCHỆN TÍCH

AutoCAD SHX Text

SCALE/TỈ LỆ: 1/800

AutoCAD SHX Text

1. REFER TO CONTRACT DOCUMENTS FOR REQUIRED REFER TO CONTRACT DOCUMENTS FOR REQUIRED CONSTRUCTION SEQUENCING./ THAM CHIẾU TÀI LIỆU HỢP ĐỒNG CHO PHẦN YÊU CẦU VỀ TRÌNH TỰ THI CÔNG. 2. REFER TO SECTION 02 41 13 - DEMOLITION FOR DEMOLITION, REFER TO SECTION 02 41 13 - DEMOLITION FOR DEMOLITION, REMOVAL, AND DISPOSAL REQUIREMENTS./ THAM CHIẾU CHỈ DẪN KỸ THUẬT 02 41 13 ĐỐI VỚI YÊU CẦU PHÁ DỠ, DỠ BỎ VÀ ĐỔ THẢI. 3. REFER TO SECTION 01 57 13 - ENVIRONMENTAL MITIGATION, 31 REFER TO SECTION 01 57 13 - ENVIRONMENTAL MITIGATION, 31 23 19 - DEWATERING AND DRAINAGE, AND 31 23 16 - EXCAVATION FOR SOIL AND SEDIMENT DRAINING REQUIREMENTS./ THAM CHIẾU CHỈ DẪN 01 57 13 - KHẮC PHỤC MÔI TRƯỜNG; 31 23 19 -THÁO NƯỚC VÀ THOÁT NƯỚC;VÀ 31 23 16 - CÔNG TÁC ĐÀO ĐỂ NẮM CÁC YÊU CẦU VỀ THOÁT NƯỚC CHO ĐẤT VÀ TRẦM TÍCH. 4. REFER TO SECTION 31 23 23 - FILL FOR BACKFILL OR REFER TO SECTION 31 23 23 - FILL FOR BACKFILL OR EXCAVATED AREAS./ THAM CHIẾU CHỈ DẪN 31 23 23 CÔNG TÁC ĐẮP ĐỐI VỚI CÁC KHU VỰC ĐÀO VÀ ĐẮP HOÀN TRẢ. 5. REFER TO SECTION 02 41 13 FOR ABOVE GRADE AND BELOW REFER TO SECTION 02 41 13 FOR ABOVE GRADE AND BELOW GRADE MATERIAL DISPOSAL DIRECTIONS./ THAM CHIẾU CHỈ DẪN 02 41 13 ĐỐI VỚI VIỆC ĐỔ THẢI VẬT LIỆU TRÊN VÀ DƯỚI NỀN TỰ NHIÊN. 6. REFER TO SECTION 02 41 13 - DEMOLITION IF UNMARKED REFER TO SECTION 02 41 13 - DEMOLITION IF UNMARKED GRAVES OR UNEXPLODED ORDINANCES ARE ENCOUNTERED DURING EXCAVATION./ THAM CHIẾU 02 41 13 - PHÁ DỠ NẾU TÌM THẤY CÁC NGÔI MỘ CHƯA ĐƯỢC ĐÁNH DẤU HOẶC BOM MÌN TRONG QUÁ TRÌNH ĐÀO XÚC. 7. POST-EXCAVATION SAMPLING MAY BE PERFORMED BEFORE POST-EXCAVATION SAMPLING MAY BE PERFORMED BEFORE RESTORATION./ CÔNG TÁC LẤY MẪU THÍ NGHIỆM XÁC NHẬN KÉT QUẢ ĐÀO XÚC CÓ THỂ SẼ ĐƯỢC THỰC HIỆN TRƯỚC KHI HOÀN THỔ 8. FINAL GRADE TO MATCH EXISTING UNLESS OTHERWISE NOTED./ FINAL GRADE TO MATCH EXISTING UNLESS OTHERWISE NOTED./ CAO ĐỘ HOÀN THIỆN PHẢI BẰNG VỚI CAO ĐỘ HIỆN TRẠNG TRỪ KHI CÓ QUY ĐỊNH KHÁC. 9. FINAL SITE RESTORATION IN ACCORDANCE WITH SECTION 32 93 FINAL SITE RESTORATION IN ACCORDANCE WITH SECTION 32 93 00 - PLANTS./ CÔNG TÁC HOÀN THỔ CUỐI CÙNG TUÂN THEO CHỈ DẪN 32 93 00- CÂY.

AutoCAD SHX Text KEY NOTE: CONTRACTOR TO PROTECT EXISTING ROAD/ NHÀ THẦU PHẢI TO PROTECT EXISTING ROAD/ NHÀ THẦU PHẢI TO PROTECT EXISTING ROAD/ NHÀ THẦU PHẢI PROTECT EXISTING ROAD/ NHÀ THẦU PHẢI PROTECT EXISTING ROAD/ NHÀ THẦU PHẢI EXISTING ROAD/ NHÀ THẦU PHẢI EXISTING ROAD/ NHÀ THẦU PHẢI ROAD/ NHÀ THẦU PHẢI ROAD/ NHÀ THẦU PHẢI NHÀ THẦU PHẢI NHÀ THẦU PHẢI NHÀ THẦU PHẢI THẦU PHẢI THẦU PHẢI PHẢI PHẢI BẢO VỆ ĐƯỜNG HIỆN HỮU. CONTRACTOR TO RESTORE WITH PAVEMENT STRUCTURE SHOWN TO RESTORE WITH PAVEMENT STRUCTURE SHOWN TO RESTORE WITH PAVEMENT STRUCTURE SHOWN RESTORE WITH PAVEMENT STRUCTURE SHOWN RESTORE WITH PAVEMENT STRUCTURE SHOWN WITH PAVEMENT STRUCTURE SHOWN WITH PAVEMENT STRUCTURE SHOWN PAVEMENT STRUCTURE SHOWN PAVEMENT STRUCTURE SHOWN STRUCTURE SHOWN STRUCTURE SHOWN SHOWN SHOWN IN C-0003 AND 40 ROADWAYS/ NHÀ THẦU HOÀN TRẢ TỚI ĐÁY C-0003 AND 40 ROADWAYS/ NHÀ THẦU HOÀN TRẢ TỚI ĐÁY C-0003 AND 40 ROADWAYS/ NHÀ THẦU HOÀN TRẢ TỚI ĐÁY AND 40 ROADWAYS/ NHÀ THẦU HOÀN TRẢ TỚI ĐÁY AND 40 ROADWAYS/ NHÀ THẦU HOÀN TRẢ TỚI ĐÁY 40 ROADWAYS/ NHÀ THẦU HOÀN TRẢ TỚI ĐÁY 40 ROADWAYS/ NHÀ THẦU HOÀN TRẢ TỚI ĐÁY ROADWAYS/ NHÀ THẦU HOÀN TRẢ TỚI ĐÁY ROADWAYS/ NHÀ THẦU HOÀN TRẢ TỚI ĐÁY NHÀ THẦU HOÀN TRẢ TỚI ĐÁY NHÀ THẦU HOÀN TRẢ TỚI ĐÁY THẦU HOÀN TRẢ TỚI ĐÁY THẦU HOÀN TRẢ TỚI ĐÁY HOÀN TRẢ TỚI ĐÁY HOÀN TRẢ TỚI ĐÁY TRẢ TỚI ĐÁY TRẢ TỚI ĐÁY TỚI ĐÁY TỚI ĐÁY ĐÁY ĐÁY KẾT CẤU ÁO ĐƯỜNG C-0003 VÀ 40 ĐƯỜNG

AutoCAD SHX Text

1. REFER TO CONTRACT DOCUMENTS FOR REQUIRED REFER TO CONTRACT DOCUMENTS FOR REQUIRED CONSTRUCTION SEQUENCING./ THAM CHIẾU TÀI LIỆU HỢP ĐỒNG CHO PHẦN YÊU CẦU VỀ TRÌNH TỰ THI CÔNG. 2. REFER TO SECTION 02 41 13 - DEMOLITION FOR DEMOLITION, REFER TO SECTION 02 41 13 - DEMOLITION FOR DEMOLITION, REMOVAL, AND DISPOSAL REQUIREMENTS./ THAM CHIẾU CHỈ DẪN KỸ THUẬT 02 41 13 ĐỐI VỚI YÊU CẦU PHÁ DỠ, DỠ BỎ VÀ ĐỔ THẢI. 3. REFER TO SECTION 01 57 13 - ENVIRONMENTAL MITIGATION, 31 REFER TO SECTION 01 57 13 - ENVIRONMENTAL MITIGATION, 31 23 19 - DEWATERING AND DRAINAGE, AND 31 23 16 - EXCAVATION FOR SOIL AND SEDIMENT DRAINING REQUIREMENTS./ THAM CHIẾU CHỈ DẪN 01 57 13 - KHẮC PHỤC MÔI TRƯỜNG; 31 23 19 -THÁO NƯỚC VÀ THOÁT NƯỚC;VÀ 31 23 16 - CÔNG TÁC ĐÀO ĐỂ NẮM CÁC YÊU CẦU VỀ THOÁT NƯỚC CHO ĐẤT VÀ TRẦM TÍCH. 4. REFER TO SECTION 31 23 23 - FILL FOR BACKFILL OR REFER TO SECTION 31 23 23 - FILL FOR BACKFILL OR EXCAVATED AREAS./ THAM CHIẾU CHỈ DẪN 31 23 23 CÔNG TÁC ĐẮP ĐỐI VỚI CÁC KHU VỰC ĐÀO VÀ ĐẮP HOÀN TRẢ. 5. REFER TO SECTION 02 41 13 FOR ABOVE GRADE AND BELOW REFER TO SECTION 02 41 13 FOR ABOVE GRADE AND BELOW GRADE MATERIAL DISPOSAL DIRECTIONS./ THAM CHIẾU CHỈ DẪN 02 41 13 ĐỐI VỚI VIỆC ĐỔ THẢI VẬT LIỆU TRÊN VÀ DƯỚI NỀN TỰ NHIÊN. 6. REFER TO SECTION 02 41 13 - DEMOLITION IF UNMARKED REFER TO SECTION 02 41 13 - DEMOLITION IF UNMARKED GRAVES OR UNEXPLODED ORDINANCES ARE ENCOUNTERED DURING EXCAVATION./ THAM CHIẾU 02 41 13 - PHÁ DỠ NẾU TÌM THẤY CÁC NGÔI MỘ CHƯA ĐƯỢC ĐÁNH DẤU HOẶC BOM MÌN TRONG QUÁ TRÌNH ĐÀO XÚC. 7. POST-EXCAVATION SAMPLING MAY BE PERFORMED BEFORE POST-EXCAVATION SAMPLING MAY BE PERFORMED BEFORE RESTORATION./ CÔNG TÁC LẤY MẪU THÍ NGHIỆM XÁC NHẬN KÉT QUẢ ĐÀO XÚC CÓ THỂ SẼ ĐƯỢC THỰC HIỆN TRƯỚC KHI HOÀN THỔ 8. FINAL GRADE TO MATCH EXISTING UNLESS OTHERWISE NOTED./ FINAL GRADE TO MATCH EXISTING UNLESS OTHERWISE NOTED./ CAO ĐỘ HOÀN THIỆN PHẢI BẰNG VỚI CAO ĐỘ HIỆN TRẠNG TRỪ KHI CÓ QUY ĐỊNH KHÁC. 9. FINAL SITE RESTORATION IN ACCORDANCE WITH SECTION 32 93 FINAL SITE RESTORATION IN ACCORDANCE WITH SECTION 32 93 00 - PLANTS./ CÔNG TÁC HOÀN THỔ CUỐI CÙNG TUÂN THEO CHỈ DẪN 32 93 00- CÂY.

AutoCAD SHX Text 30-60

AutoCAD SHX Text

HIGH

AutoCAD SHX Text

SW-07A1 SW-07A2W-07A2

AutoCAD SHX Text 60-90

AutoCAD SHX Text

LOW

AutoCAD SHX Text 11134.72

AutoCAD SHX Text 11134.72

AutoCAD SHX Text

SW-07A1 SW-07A2W-07A2

AutoCAD SHX Text

SW-07A1 SW-07A2W-07A2

AutoCAD SHX Text

SW-07A1 SW-07A2W-07A2

AutoCAD SHX Text

SW-07A1 SW-07A2W-07A2

SW-07A1 SW-07A2W-07A2

20C-07 09

A3

PREPARED BY

NGƯỜI THỰC HIỆN:

CHECKED BY

NGƯỜI KIỂM TRA:

AS NOTED

REV DESCRIPTION DATE BY

BẢN ĐIỀU CHỈNH NGÀY BỞI

PREPARED FOR

CHỦ ĐẦU TƯ:

LISBETH HABANS NAGRATH

DESIGNER OF RECORD

CHỦ NHIỆM THIẾT KẾ:

PROJECT NAME/ TÊN DỰ ÁN:

DRAWING TITLE/ TÊN BẢN VẼ:

DATE/ NGÀY: SIZE/ KHỔ: SCALE/ TỈ LỆ:

LE THI THANH THUY

PHAN THANH LUAN

SHEET

TỜ:

OF

CỦA:

Trigon Associates, llc1515 Poydras St., Ste 2200 New Orleans, LA 70112 www.trigonassociates.com

ENGINEERING • CONSULTING • MANAGEMENT

A&E BIEN HOA CONTRACTOR

NHÀ THẦU TV&TK BIÊN HÒA

DRAWING NO / BẢN VẼ SỐ:

DIOXIN REMEDIATION AT BIEN HOA

AIRBASE AREA PROJECT - PHASE 1

DỰ ÁN XỬ LÝ Ô NHIỄM DIOXIN KHU VỰC

SÂN BAY BIÊN HÒA - GIAI ĐOẠN 1

IFB ATTACHMENT J.6

20 DIG AND HAUL SW-07

ITEM/ HẠNG MỤC:

15-Nov-2021

PRELIMINARY

THIS DOCUMENT IS PRELIMINARY AND IS

NOT INTENDED FOR CONSTRUCTION, OR

PERMIT PURPOSES

ENGINEER: LISBETH HABANS NAGRATH

LOUISIANA LICENSE No. 36792 19

SECTION C-C/ MẶT CẮT A-A

EXCAVATION CROSS SECTION SW-07A1&2 - I

MẶT CẮT NGANG ĐÀO XÚC SW-07A1&2 - I

20C-07 09

A3

PREPARED BY

NGƯỜI THỰC HIỆN:

CHECKED BY

NGƯỜI KIỂM TRA:

AS NOTED

REV DESCRIPTION DATE BY

BẢN ĐIỀU CHỈNH NGÀY BỞI

PREPARED FOR

CHỦ ĐẦU TƯ:

LISBETH HABANS NAGRATH

DESIGNER OF RECORD

CHỦ NHIỆM THIẾT KẾ:

PROJECT NAME/ TÊN DỰ ÁN:

DRAWING TITLE/ TÊN BẢN VẼ:

DATE/ NGÀY: SIZE/ KHỔ: SCALE/ TỈ LỆ:

LE THI THANH THUY

PHAN THANH LUAN

SHEET

TỜ:

OF

CỦA:

Trigon Associates, llc1515 Poydras St., Ste 2200 New Orleans, LA 70112 www.trigonassociates.com

ENGINEERING • CONSULTING • MANAGEMENT

A&E BIEN HOA CONTRACTOR

NHÀ THẦU TV&TK BIÊN HÒA

DRAWING NO / BẢN VẼ SỐ:

DIOXIN REMEDIATION AT BIEN HOA

AIRBASE AREA PROJECT - PHASE 1

DỰ ÁN XỬ LÝ Ô NHIỄM DIOXIN KHU VỰC

SÂN BAY BIÊN HÒA - GIAI ĐOẠN 1

IFB ATTACHMENT J.6

20 DIG AND HAUL SW-07

ITEM/ HẠNG MỤC:

15-Nov-2021

PRELIMINARY

THIS DOCUMENT IS PRELIMINARY AND IS

NOT INTENDED FOR CONSTRUCTION, OR

PERMIT PURPOSES

ENGINEER: LISBETH HABANS NAGRATH

LOUISIANA LICENSE No. 36792 19

GHI CHÚ CHUNG: GENERAL NOTES:

NOTES:

AutoCAD SHX Text 20C-11

AutoCAD SHX Text A

AutoCAD SHX Text

HORIZONTAL/NGANG: 1/1000 VERTICAL/ĐỨNG: 1/10000

AutoCAD SHX Text SURFACE FOLLOWING REMOVAL OF LOW CONCENTRATED MATERIAL BỀ MẶT SAU KHI BÓC LỚP VẬT LIỆU NHIỄM NỒNG ĐỘ THẤP

AutoCAD SHX Text

EXISTING AND FINAL GRADE BỀ MẶT TỰ NHIÊN VÀ HOÀN THIỆN

AutoCAD SHX Text

ELEVATION (METERS) CAO ĐỘ (M)

AutoCAD SHX Text

DISTANCE (METERS) KHOẢNG CÁCH (M)

AutoCAD SHX Text SURFACE FOLLOWING REMOVAL OF HIGH CONCENTRATED MATERIAL BỀ MẶT SAU KHI BÓC LỚP VẬT LIỆU NHIỄM NỒNG ĐỘ CAO

AutoCAD SHX Text SURFACE FOLLOWING REMOVAL OF LOW CONCENTRATED MATERIAL BỀ MẶT SAU KHI BÓC LỚP VẬT LIỆU NHIỄM NỒNG ĐỘ THẤP

AutoCAD SHX Text

1. ĐỐI VỚI CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐỐI VỚI CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP VỚI CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP VỚI CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP SÂU, NHÀ THẦU PHẢI ĐÁP SÂU, NHÀ THẦU PHẢI ĐÁP NHÀ THẦU PHẢI ĐÁP NHÀ THẦU PHẢI ĐÁP THẦU PHẢI ĐÁP THẦU PHẢI ĐÁP PHẢI ĐÁP PHẢI ĐÁP ĐÁP ĐÁP ĐÁP ỨNG CÁC QUY ĐỊNH CỦA ĐỊA PHƯƠNG VÀ QUY ĐỊNH AN TOÀN. 2. NHÀ THẦU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU NHÀ THẦU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU THẦU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU THẦU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU TẠI CÁC KHU VỰC ĐÀO XÚC, KHU TẠI CÁC KHU VỰC ĐÀO XÚC, KHU CÁC KHU VỰC ĐÀO XÚC, KHU CÁC KHU VỰC ĐÀO XÚC, KHU KHU VỰC ĐÀO XÚC, KHU KHU VỰC ĐÀO XÚC, KHU VỰC ĐÀO XÚC, KHU VỰC ĐÀO XÚC, KHU ĐÀO XÚC, KHU ĐÀO XÚC, KHU XÚC, KHU XÚC, KHU KHU KHU VỰC TRONG SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRONG SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRONG SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN CỎ Ở KHU VỰC NGOÀI SÂN CỎ Ở KHU VỰC NGOÀI SÂN Ở KHU VỰC NGOÀI SÂN Ở KHU VỰC NGOÀI SÂN KHU VỰC NGOÀI SÂN KHU VỰC NGOÀI SÂN VỰC NGOÀI SÂN VỰC NGOÀI SÂN NGOÀI SÂN NGOÀI SÂN SÂN SÂN BAY.

AutoCAD SHX Text

1. FOR ALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL FOR ALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL ALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL ALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL DEPTH TRANSITIONS, THE CONTRACTOR SHALL DEPTH TRANSITIONS, THE CONTRACTOR SHALL TRANSITIONS, THE CONTRACTOR SHALL TRANSITIONS, THE CONTRACTOR SHALL THE CONTRACTOR SHALL THE CONTRACTOR SHALL CONTRACTOR SHALL CONTRACTOR SHALL SHALL SHALL MEET, LOCAL,STATE, FEDERAL, AND SAFETY REQUIREMENTS 2. CONTRACTOR MUST BACKFILL WITH 90% COMPACTION AT EXCAVATED CONTRACTOR MUST BACKFILL WITH 90% COMPACTION AT EXCAVATED MUST BACKFILL WITH 90% COMPACTION AT EXCAVATED MUST BACKFILL WITH 90% COMPACTION AT EXCAVATED BACKFILL WITH 90% COMPACTION AT EXCAVATED BACKFILL WITH 90% COMPACTION AT EXCAVATED WITH 90% COMPACTION AT EXCAVATED WITH 90% COMPACTION AT EXCAVATED 90% COMPACTION AT EXCAVATED 90% COMPACTION AT EXCAVATED COMPACTION AT EXCAVATED COMPACTION AT EXCAVATED AT EXCAVATED AT EXCAVATED EXCAVATED EXCAVATED AREAS. ON-BASE AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS ON-BASE AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS ON-BASE AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS RECEIVE HYDROSEED. OFF-BASE AREAS RECEIVE HYDROSEED. OFF-BASE AREAS HYDROSEED. OFF-BASE AREAS HYDROSEED. OFF-BASE AREAS OFF-BASE AREAS OFF-BASE AREAS AREAS AREAS MUST NOT RECEIVE SOD OR SEED.

AutoCAD SHX Text

HIGH CONCENTRATED MATERIAL VẬT LIỆU NHIỄM NÒNG ĐỘ CAO

A3

PREPARED BY

NGƯỜI THỰC HIỆN:

CHECKED BY

NGƯỜI KIỂM TRA:

AS NOTED

REV DESCRIPTION DATE BY

BẢN ĐIỀU CHỈNH NGÀY BỞI

PREPARED FOR

CHỦ ĐẦU TƯ:

LISBETH HABANS NAGRATH

DESIGNER OF RECORD

CHỦ NHIỆM THIẾT KẾ:

PROJECT NAME/ TÊN DỰ ÁN:

DRAWING TITLE/ TÊN BẢN VẼ:

DATE/ NGÀY: SIZE/ KHỔ: SCALE/ TỈ LỆ:

LE THI THANH THUY

PHAN THANH LUAN

SHEET

TỜ:

OF

CỦA:

Trigon Associates, llc1515 Poydras St., Ste 2200 New Orleans, LA 70112 www.trigonassociates.com

ENGINEERING • CONSULTING • MANAGEMENT

A&E BIEN HOA CONTRACTOR

NHÀ THẦU TV&TK BIÊN HÒA

DRAWING NO / BẢN VẼ SỐ:

DIOXIN REMEDIATION AT BIEN HOA

AIRBASE AREA PROJECT - PHASE 1

DỰ ÁN XỬ LÝ Ô NHIỄM DIOXIN KHU VỰC

SÂN BAY BIÊN HÒA - GIAI ĐOẠN 1

IFB ATTACHMENT J.6

20 DIG AND HAUL SW-07

ITEM/ HẠNG MỤC:

15-Nov-2021

PRELIMINARY

THIS DOCUMENT IS PRELIMINARY AND IS

NOT INTENDED FOR CONSTRUCTION, OR

PERMIT PURPOSES

ENGINEER: LISBETH HABANS NAGRATH

LOUISIANA LICENSE No. 36792 19

SECTION D-D/ MẶT CẮT B-B

20C-08 10

EXCAVATION CROSS SECTION SW-07A1&2 - II

MẶT CẮT NGANG ĐÀO XÚC SW-07A1&2 - II

A3

PREPARED BY

NGƯỜI THỰC HIỆN:

CHECKED BY

NGƯỜI KIỂM TRA:

AS NOTED

REV DESCRIPTION DATE BY

BẢN ĐIỀU CHỈNH NGÀY BỞI

PREPARED FOR

CHỦ ĐẦU TƯ:

LISBETH HABANS NAGRATH

DESIGNER OF RECORD

CHỦ NHIỆM THIẾT KẾ:

PROJECT NAME/ TÊN DỰ ÁN:

DRAWING TITLE/ TÊN BẢN VẼ:

DATE/ NGÀY: SIZE/ KHỔ: SCALE/ TỈ LỆ:

LE THI THANH THUY

PHAN THANH LUAN

SHEET

TỜ:

OF

CỦA:

Trigon Associates, llc1515 Poydras St., Ste 2200 New Orleans, LA 70112 www.trigonassociates.com

ENGINEERING • CONSULTING • MANAGEMENT

A&E BIEN HOA CONTRACTOR

NHÀ THẦU TV&TK BIÊN HÒA

DRAWING NO / BẢN VẼ SỐ:

DIOXIN REMEDIATION AT BIEN HOA

AIRBASE AREA PROJECT - PHASE 1

DỰ ÁN XỬ LÝ Ô NHIỄM DIOXIN KHU VỰC

SÂN BAY BIÊN HÒA - GIAI ĐOẠN 1

IFB ATTACHMENT J.6

20 DIG AND HAUL SW-07

ITEM/ HẠNG MỤC:

15-Nov-2021

PRELIMINARY

THIS DOCUMENT IS PRELIMINARY AND IS

NOT INTENDED FOR CONSTRUCTION, OR

PERMIT PURPOSES

ENGINEER: LISBETH HABANS NAGRATH

LOUISIANA LICENSE No. 36792 19

GHI CHÚ CHUNG: GENERAL NOTES:

NOTES:

AutoCAD SHX Text 20C-11

AutoCAD SHX Text B

AutoCAD SHX Text

HORIZONTAL/NGANG: 1/1000 VERTICAL/ĐỨNG: 1/10000

AutoCAD SHX Text SURFACE FOLLOWING REMOVAL OF LOW CONCENTRATED MATERIAL BỀ MẶT SAU KHI BÓC LỚP VẬT LIỆU NHIỄM NỒNG ĐỘ THẤP

AutoCAD SHX Text

EXISTING AND FINAL GRADE BỀ MẶT TỰ NHIÊN VÀ HOÀN THIỆN

AutoCAD SHX Text

ELEVATION (METERS) CAO ĐỘ (M)

AutoCAD SHX Text

DISTANCE (METERS) KHOẢNG CÁCH (M)

AutoCAD SHX Text SURFACE FOLLOWING REMOVAL OF HIGH CONCENTRATED MATERIAL BỀ MẶT SAU KHI BÓC LỚP VẬT LIỆU NHIỄM NỒNG ĐỘ CAO

AutoCAD SHX Text SURFACE FOLLOWING REMOVAL OF LOW CONCENTRATED MATERIAL BỀ MẶT SAU KHI BÓC LỚP VẬT LIỆU NHIỄM NỒNG ĐỘ THẤP

AutoCAD SHX Text

1. ĐỐI VỚI CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐỐI VỚI CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP VỚI CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP VỚI CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CÁC CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CÔNG TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP TÁC ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐÀO ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐẤT VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP VÀ CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP CHUYỂN TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP TIẾP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP ĐỘ SÂU, NHÀ THẦU PHẢI ĐÁP SÂU, NHÀ THẦU PHẢI ĐÁP SÂU, NHÀ THẦU PHẢI ĐÁP NHÀ THẦU PHẢI ĐÁP NHÀ THẦU PHẢI ĐÁP THẦU PHẢI ĐÁP THẦU PHẢI ĐÁP PHẢI ĐÁP PHẢI ĐÁP ĐÁP ĐÁP ĐÁP ỨNG CÁC QUY ĐỊNH CỦA ĐỊA PHƯƠNG VÀ QUY ĐỊNH AN TOÀN. 2. NHÀ THẦU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU NHÀ THẦU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU THẦU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU THẦU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU PHẢI ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU ĐẮP TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU TRẢ VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU VỚI ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU ĐỘ CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU CHẶT K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU K>=0.90 TẠI CÁC KHU VỰC ĐÀO XÚC, KHU TẠI CÁC KHU VỰC ĐÀO XÚC, KHU TẠI CÁC KHU VỰC ĐÀO XÚC, KHU CÁC KHU VỰC ĐÀO XÚC, KHU CÁC KHU VỰC ĐÀO XÚC, KHU KHU VỰC ĐÀO XÚC, KHU KHU VỰC ĐÀO XÚC, KHU VỰC ĐÀO XÚC, KHU VỰC ĐÀO XÚC, KHU ĐÀO XÚC, KHU ĐÀO XÚC, KHU XÚC, KHU XÚC, KHU KHU KHU VỰC TRONG SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRONG SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRONG SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN BAY SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN SẼ ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN ĐƯỢC TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRỒNG CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN CỎ. KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN KHÔNG TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN TRỒNG CỎ Ở KHU VỰC NGOÀI SÂN CỎ Ở KHU VỰC NGOÀI SÂN CỎ Ở KHU VỰC NGOÀI SÂN Ở KHU VỰC NGOÀI SÂN Ở KHU VỰC NGOÀI SÂN KHU VỰC NGOÀI SÂN KHU VỰC NGOÀI SÂN VỰC NGOÀI SÂN VỰC NGOÀI SÂN NGOÀI SÂN NGOÀI SÂN SÂN SÂN BAY.

AutoCAD SHX Text

1. FOR ALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL FOR ALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL ALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL ALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL EXCAVATIONS AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL AND DEPTH TRANSITIONS, THE CONTRACTOR SHALL DEPTH TRANSITIONS, THE CONTRACTOR SHALL DEPTH TRANSITIONS, THE CONTRACTOR SHALL TRANSITIONS, THE CONTRACTOR SHALL TRANSITIONS, THE CONTRACTOR SHALL THE CONTRACTOR SHALL THE CONTRACTOR SHALL CONTRACTOR SHALL CONTRACTOR SHALL SHALL SHALL MEET, LOCAL,STATE, FEDERAL, AND SAFETY REQUIREMENTS 2. CONTRACTOR MUST BACKFILL WITH 90% COMPACTION AT EXCAVATED CONTRACTOR MUST BACKFILL WITH 90% COMPACTION AT EXCAVATED MUST BACKFILL WITH 90% COMPACTION AT EXCAVATED MUST BACKFILL WITH 90% COMPACTION AT EXCAVATED BACKFILL WITH 90% COMPACTION AT EXCAVATED BACKFILL WITH 90% COMPACTION AT EXCAVATED WITH 90% COMPACTION AT EXCAVATED WITH 90% COMPACTION AT EXCAVATED 90% COMPACTION AT EXCAVATED 90% COMPACTION AT EXCAVATED COMPACTION AT EXCAVATED COMPACTION AT EXCAVATED AT EXCAVATED AT EXCAVATED EXCAVATED EXCAVATED AREAS. ON-BASE AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS ON-BASE AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS ON-BASE AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS MUST RECEIVE HYDROSEED. OFF-BASE AREAS RECEIVE HYDROSEED. OFF-BASE AREAS RECEIVE HYDROSEED. OFF-BASE AREAS HYDROSEED. OFF-BASE AREAS HYDROSEED. OFF-BASE AREAS OFF-BASE AREAS OFF-BASE AREAS AREAS AREAS MUST NOT RECEIVE SOD OR SEED.

AutoCAD SHX Text

HIGH CONCENTRATED MATERIAL VẬT LIỆU NHIỄM NÒNG ĐỘ CAO

11.25

.25

.2

11.25

11.25

11.2511.25

11.25

11.25

11.25

11.25

.25

11.25

10.00

11.25

11.25

11.25

C-0012

C-0004

SW-07A2

SW-07A1

EROSION CONTROL PLAN SW-07A1&2

MẶT BẰNG KHỐNG CHẾ XÓI MÒN SW-07A1&2

20C-09 11

A3

PREPARED BY

NGƯỜI THỰC HIỆN:

CHECKED BY

NGƯỜI KIỂM TRA:

AS NOTED

REV DESCRIPTION DATE BY

BẢN ĐIỀU CHỈNH NGÀY BỞI

PREPARED FOR

CHỦ ĐẦU TƯ:

LISBETH HABANS NAGRATH

DESIGNER OF RECORD

CHỦ NHIỆM THIẾT KẾ:

PROJECT NAME/ TÊN DỰ ÁN:

DRAWING TITLE/ TÊN BẢN VẼ:

DATE/ NGÀY: SIZE/ KHỔ: SCALE/ TỈ LỆ:

LE THI THANH THUY

PHAN THANH LUAN

SHEET

TỜ:

OF

CỦA:

Trigon Associates, llc1515 Poydras St., Ste 2200 New Orleans, LA 70112 www.trigonassociates.com