J.2-Bid_form_IFB Amendment#2.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1
Solicitation number
72044021B00001
Issued by

About this file

This Invitation for Bid solicits construction services for dioxin remediation at Bien Hoa Airbase in Vietnam. The United States Agency for International Development in Vietnam seeks a contractor to perform civil works in four phases. Phase 1 involves site preparation, excavation and hauling of contaminated materials for storage and treatment. The estimated total bid value exceeds $50 million. Bids are due on February 11, 2022 and will be publicly opened on February 16, 2022. The anticipated award is a fixed-price contract with optional provisions. US and Vietnamese firms meeting registration requirements are eligible to respond. The contractor must adhere to all applicable laws and regulations regarding foreign ownership and control.

View the file

Other files

File Type Posted
J.2-Bid_Form_IFB_Amendment_6.xlsx XLSX spreadsheet
20220216_Amendment_6_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.13_Compendium_IFB_Amendment_5.pdf PDF
20220214_Amendment_5_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.2-Bid_Form_IFB_Amendment_5.xlsx XLSX spreadsheet
20220126_Amendment_4_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.2-Bid_Form_IFB_Amendment_4.xlsx XLSX spreadsheet
J.4_10_Treatment_Area_IFB_Amendment+3.pdf PDF
J.2_Bid_Form_IFB_Amendment_3.xlsx XLSX spreadsheet
J.9_40_LTSA_Final_Cover_IFB_Amendment_3.pdf PDF
J.13_Compendium_IFB_Amendment_3.pdf PDF
20220122_Amendment_3_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.8_30_Roadways_IFB_Amendment_3.pdf PDF
J.8-30_Roadways_Amendment 2.pdf PDF
J.13_Compendium_Amendment 2.pdf PDF
J.3_Civil_Works_Phase_1_Overview_Amendment 2.pdf PDF
J.12_Groundwater_Contours_Amendment 2.pdf PDF
J.11-IM2_LTSA_and_HCTS_Plans_and_Sections_Amendment 2.pdf PDF
J.10-IM1_LCSA_HCSA_and_Staging_Area_Plans_and_Sections_Amendment 2.pdf PDF
20220115 Amendment_2 to IFB_72044021B00001 for USAID Civil Works P1 for Dioxin Remediation at Bien Hoa Airbase Area.pdf PDF
J.5-Decision_Units_Amendment 2.pdf PDF
J.6-20_Dig_and_Haul_SW-07_Amendment 2.pdf PDF
20220115 Revised No. 2 lFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1.pdf PDF
20211203 SF30 Amendment_1 to IFB_72044021B00001 for USAID Civil Works P1 for Dioxin Remediation at Bien Hoa Airbase Area.pdf PDF
20211203 Revised No. 1 lFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1.pdf PDF
20211201 CW1 Virtual Conference IFB No. 72044021B00001.pdf PDF
20211203 J.1_SF1442-14b IFB_72044021B00001 BH CW1_removed block 17.pdf PDF
20211117 lFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1.pdf PDF
J.18-BRANDING IMPLEMENTATION PLAN AND MARKING PLAN.pdf PDF
J.11-IM2_LTSA_and_HCTS_Plans_and_Sections.pdf PDF
J.9-40_LTSA_COVER.pdf PDF
J.3-Civil_Works_Phase_1_Overview.pdf PDF
J.13-Compendium.pdf PDF
J.1_SF1442-14b IFB_72044021B00001 BH CW1.pdf PDF
J.16-Site_wide_EMMP.pdf PDF
J.4-10_Treatment_area.pdf PDF
J.6-20_D_H_SW-07.pdf PDF
J.5-Decision_Units.pdf PDF
J.10-IM1_LCSA_HCSA_and_Staging_Area_Plans_and_Sections.pdf PDF
J.7-20_D_H_NF-04.pdf PDF
J.12-Groundwater Contours.pdf PDF
J.8-30_Roadways.pdf PDF
J.15-Site-wide_HASP_Sign_off_Page.docx DOCX document
J.2-Bid_form.xlsx XLSX spreadsheet
J.17-Site-wide_EMMP_Sign_off_Page.docx DOCX document
J.19-Certification of Key personnel.xlsx XLSX spreadsheet
J.14-Site_wide_HASP.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid_form

USAID/VIETNAM CIVIL WORKS FOR DIOXIN REMEDIATION AT THE BIEN HOA AIRBASE AREA – PHASE I
ATTACHMENT J.2 BID FORM(IFB Amendment No. 2)
CLINBid Item No.Bid Item DescriptionUnitsQuantityUnit Price (USD)Total Amount (USD)
100 GENERAL$ -
01.00.01MobilizationLS1$ -$ -
01.00.02Environmental MitigationLS1$ -$ -
01.00.03Health and Safety, Including PPE and Blood MonitoringLS1$ -$ -
01.00.04Traffic ControlLS1$ -$ -
01.00.05DecontaminationLS1$ -$ -
01.00.06Site OfficeLS1$ -$ -
01.00.07Project Management and SupportLS1$ -$ -
01.00.08Bonds and GuaranteesLS1$ -$ -
10 TREATMENT AREA$ -
01.10.01General - Clearing and Removal of VegetationLS1$ -$ -
01.10.02General - Remove amd Stockpile TopsoilLS1$ -$ -
01.10.03General - Excavation, Fill and CompactionLS1$ -$ -
01.10.04PTSA - Non-Woven GeotextileLS1$ -$ -
01.10.05PTSA - Double-Sided Textured HDPE LinerLS1$ -$ -
01.10.06PTSA - Sumps, Piping, Pump Station, Access Points, and All Ancillary ItemsLS1$ -$ -
01.10.07PTSA - Access RampLS1$ -$ -
01.10.08PTSA - Excavate, Fill, and Compact PTSA and Detention Pond BaseLS1$ -$ -
01.10.09PTSA - Fill and Compaction PTSA and Detention Pond BermLS1$ -$ -
01.10.10PTSA - Detention Ponds and Piping, and All Ancillary ItemsLS1$ -$ -
01.10.11Drainage - Install Perimeter Concrete Lined Channel 1000 mm wideLS1$ -$ -
01.10.12Drainage - Install Perimeter Concrete Lined Channel 2000 mm wideLS1$ -$ -
01.10.13Drainage - Improve Existing Earthen Channel 2000 mm wide, DissipationLS1$ -$ -
01.10.14Drainage - 1000 mm by 1000 mm Box Culvert, Headwalls, DissipationLS1$ -$ -
01.10.15Drainage - Double 1000 mm by 1000 mm Box Culvert, Headwalls, DissipationLS1$ -$ -
01.10.16Monitoring WellsEA4$ -$ -
01.10.17Security FenceLS1$ -$ -
01.10.18Northern Control GateEA1$ -$ -
01.10.19Southern Control GateEA1$ -$ -
01.10.20Guard ShacksEA3$ -$ -
01.10.21Site RestorationLS1$ -$ -
20 DIG AND HAUL$ -
01.20.01Dig and Haul - Clear, Chip and Stockpile of VegetationLS1$ -$ -
01.20.02Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Soil - Excavation Depth up to 1.5mm343,600$ -$ -
01.20.03Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Soil - Excavation Depth >1.5 mm356,000$ -$ -
01.20.04Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Sedimentm318,800$ -$ -
01.20.05Dig and Haul - Compaction at LTSAm359,200$ -$ -
01.20.06Dig and Haul - Unloading Low Concentration Material from LCSA; Transport, Placement and Grade LTSAm331,000$ -$ -
01.20.07Dig and Haul - Unloading, High Concentration Material from HCSA and HCTS; Transport, Placement and Grade in PTSAm320,000$ -$ -
01.20.08Monitoring WellsEA3$ -$ -
01.20.09Moveable Barrier FenceLS1$ -$ -
01.20.10Brick Fencing Type 1m135$ -$ -
01.20.11Brick Fencing Type 2m100$ -$ -
01.20.12Guard ShacksEA5$ -$ -
01.20.13Site Restoration - Backfilling and Compaction of Borrow Materialsm384,500$ -$ -
01.20.14Site Restoration - Topsoilm2100,000$ -$ -
01.20.15Site Restoration - Soddingm2100,000$ -$ -
30 ROADWAYS$ -
01.30.01Access Road to Treatment areaLS1$ -$ -
01.30.02Reconstruct SW-07 Road SectionLS1$ -$ -
01.30.03Dig and Haul - Bypass RoadLS1$ -$ -
01.30.04Construction of Masonry Ditchm7,200$ -$ -
40 PROTECT, MAINTAIN, AND HANDOVER PROJECT ASSETS$ -
01.40.01Maintainance of Installed Project Work - High Concentration Storage Area, High Concentration Temporary Storage, and Low Concentration Storage AreaLS1$ -$ -
01.40.02Maintenance of Installed Project Work - Long Term Storage Area Including Drainage, LTSA Site Office, and all Associated FacilitiesLS1$ -$ -
01.40.03Operation and Maintenance of Treatment Area Components Including the PTSA, PTSA Detention Ponds, Drainage, Fencing, Guard Shacks, Access Roads, and all Associated WorkLS1$ -$ -
01.40.04Grass cutting, and tree trimming alongside roadways, ditches, existing steel fencingLS1$ -$ -
01.40.05LTSA - Non-Woven Geotextile at baseLS1$ -$ -
01.40.06LTSA - Final CoverLS1$ -$ -
50 STORAGE AND STAGING AREA DEMOLITION$ -
01.50.01LCSA and IM1 CLIN 2 Area Demolition and Site RestorationLS1$ -$ -
01.50.02HCSA Demolition and Site RestorationLS1$ -$ -
01.50.03HCTS Demolition and Site RestorationLS1$ -$ -
01.50.04IM1 Staging Area DemolitionLS1$ -$ -
CLIN 1 SUBTOTAL$ -
200 GENERAL$ -
02.00.01DemobilizationLS1$ -$ -
CLIN 2 SUBTOTAL$ -
320 DIG AND HAUL$ -
03.20.01Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Soil - Excavation Depth up to 1.5mm321,000$ -$ -
03.20.02Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Soil - Excavation Depth >1.5 mm331,500$ -$ -
03.20.03Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Sedimentm311,300$ -$ -
03.20.04Dig and Haul - Compaction at LTSAm327,600$ -$ -
03.20.05Hauling Treated Material to Stockpilem350,000$ -$ -
03.20.06Monitoring WellsEA5$ -$ -
03.20.07Site Restoration - Backfilling and Compaction of Borrow Materialsm352,500$ -$ -
03.20.08Dig and Haul and Site Restoration - Unloading, Transport, Backfill and Compaction of Treated Materialm350,000$ -$ -
03.20.09Temporary Steel Sheet Fencem1,500$ -$ -
03.20.10On and Off-Base GatesEA6$ -$ -
30 ROADWAYS$ -
03.30.01Construction of Masonry Ditchm1,680$ -$ -
03.30.02Asphalt Concrete C12.5, Average 8 cm Thickm230,000$ -$ -
03.30.03Tack Coat 0.5 L/ 1m2 in Densitym260,000$ -$ -
03.30.04Asphalt Concrete C19, Average 10 cm Thickm230,000$ -$ -
03.30.05Fiberglass Mesh 100/100 kN/mm230,000$ -$ -
03.30.06Patching Type 1m220,000$ -$ -
03.30.07Patching Type 2m235,000$ -$ -
CLIN 3 SUBTOTAL$ -
60 TOTAL DAY WORKS$ 3,000,000
03.60.01Total Day Works - The CONTRACTOR is not entitled to any part of the Day Work item, either partially or fully, unless specifically authorized by USAID--$ 3,000,000$3,000,000
CLIN 3 SUBTOTAL + TOTAL DAY WORKS$ 3,000,000
400 GENERAL$ -
04.00.01Environmental MitigationLS1$ -$ -
04.00.02Health and Safety, Including PPE and Blood MonitoringLS1$ -$ -
04.00.03Traffic ControlLS1$ -$ -
04.00.04DecontaminationLS1$ -$ -
04.00.05Site Office Operation and MaintenanceLS1$ -$ -
04.00.06Project Management and SupportLS1$ -$ -
04.00.07Bonds and GuaranteesLS1$ -$ -
20 DIG AND HAUL$ -
04.20.01Dig and Haul - Clear, Chip and Stockpile of VegetationLS1$ -$ -
04.20.02Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Soil - Excavation Depth up to 1.5mm318,400$ -$ -
04.20.03Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Soil - Excavation Depth >1.5 mm338,000$ -$ -
04.20.04Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Sedimentm315,000$ -$ -
04.20.05Dig and Haul - Compaction at LTSAm323,300$ -$ -
04.20.06Moveable Barrier FenceLS1$ -$ -
04.20.07Site Restoration - Backfilling and Compaction of Borrow Materialsm347,600
04.20.08Guard ShacksEA6$ -$ -
04.20.09Site Restoration - Topsoilm258,500$ -$ -
04.20.10Site Restoration - Soddingm258,500$ -$ -
30 ROADWAYS$ -
04.30.01Construction of Masonry Ditchm7,920$ -$ -
40 PROTECT, MAINTAIN, AND HANDOVER PROJECT ASSETS$ -
04.40.01Operation and Maintenance of Treatment Area Components Including the PTSA, PTSA Detention Ponds, Drainage, Fencing, Guard Shacks, Access Roads, and all Associated WorkLS1$ -$ -
04.40.02Grass cutting, and tree trimming alongside roadways, ditches, existing steel fencingLS1$ -$ -
04.40.03LTSA - Non-Woven Geotextile at baseLS1$ -$ -
04.40.04LTSA - Final CoverLS1$ -$ -
CLIN 4 SUBTOTAL$ -
TOTAL BASE BID (CLIN 1 + CLIN 2 + CLIN 3 + TOTAL DAY WORKS + CLIN 4)$ 3,000,000

File details come from the government source that posted it. Updated .