J.13_Compendium_IFB_Amendment_3.pdf

PDF 8 MB Posted

Attached to
USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1
Solicitation number
72044021B00001
Issued by

About this file

This is an invitation for bids from the United States Agency for International Development in Vietnam for construction services for Phase 1 of dioxin remediation at Bien Hoa Airbase Area. The solicitation seeks bids for civil works including site preparation, excavation, filling, and infrastructure construction. The total estimated value of work to be bid on is over $50 million. Questions are due by December 17, 2021 and bids are due February 11, 2022. Bids will be publicly opened on February 16, 2022. The award will be a fixed-price contract with option provisions in accordance with FAR Part 14 and FAR Part 17. The contractor must be registered in SAM and hold required Vietnamese licenses. Both US and Vietnamese firms are eligible to bid. The award is subject to funding availability.

View the file

Other files

File Type Posted
J.2-Bid_Form_IFB_Amendment_6.xlsx XLSX spreadsheet
20220216_Amendment_6_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.13_Compendium_IFB_Amendment_5.pdf PDF
20220214_Amendment_5_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.2-Bid_Form_IFB_Amendment_5.xlsx XLSX spreadsheet
20220126_Amendment_4_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.2-Bid_Form_IFB_Amendment_4.xlsx XLSX spreadsheet
J.4_10_Treatment_Area_IFB_Amendment+3.pdf PDF
J.2_Bid_Form_IFB_Amendment_3.xlsx XLSX spreadsheet
J.9_40_LTSA_Final_Cover_IFB_Amendment_3.pdf PDF
20220122_Amendment_3_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.8_30_Roadways_IFB_Amendment_3.pdf PDF
J.2-Bid_form_IFB Amendment#2.xlsx XLSX spreadsheet
J.8-30_Roadways_Amendment 2.pdf PDF
J.13_Compendium_Amendment 2.pdf PDF
J.3_Civil_Works_Phase_1_Overview_Amendment 2.pdf PDF
J.12_Groundwater_Contours_Amendment 2.pdf PDF
J.11-IM2_LTSA_and_HCTS_Plans_and_Sections_Amendment 2.pdf PDF
J.10-IM1_LCSA_HCSA_and_Staging_Area_Plans_and_Sections_Amendment 2.pdf PDF
20220115 Amendment_2 to IFB_72044021B00001 for USAID Civil Works P1 for Dioxin Remediation at Bien Hoa Airbase Area.pdf PDF
J.5-Decision_Units_Amendment 2.pdf PDF
J.6-20_Dig_and_Haul_SW-07_Amendment 2.pdf PDF
20220115 Revised No. 2 lFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1.pdf PDF
20211203 SF30 Amendment_1 to IFB_72044021B00001 for USAID Civil Works P1 for Dioxin Remediation at Bien Hoa Airbase Area.pdf PDF
20211203 Revised No. 1 lFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1.pdf PDF
20211201 CW1 Virtual Conference IFB No. 72044021B00001.pdf PDF
20211203 J.1_SF1442-14b IFB_72044021B00001 BH CW1_removed block 17.pdf PDF
20211117 lFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1.pdf PDF
J.18-BRANDING IMPLEMENTATION PLAN AND MARKING PLAN.pdf PDF
J.11-IM2_LTSA_and_HCTS_Plans_and_Sections.pdf PDF
J.9-40_LTSA_COVER.pdf PDF
J.3-Civil_Works_Phase_1_Overview.pdf PDF
J.13-Compendium.pdf PDF
J.1_SF1442-14b IFB_72044021B00001 BH CW1.pdf PDF
J.16-Site_wide_EMMP.pdf PDF
J.4-10_Treatment_area.pdf PDF
J.6-20_D_H_SW-07.pdf PDF
J.5-Decision_Units.pdf PDF
J.10-IM1_LCSA_HCSA_and_Staging_Area_Plans_and_Sections.pdf PDF
J.7-20_D_H_NF-04.pdf PDF
J.12-Groundwater Contours.pdf PDF
J.8-30_Roadways.pdf PDF
J.15-Site-wide_HASP_Sign_off_Page.docx DOCX document
J.2-Bid_form.xlsx XLSX spreadsheet
J.17-Site-wide_EMMP_Sign_off_Page.docx DOCX document
J.19-Certification of Key personnel.xlsx XLSX spreadsheet
J.14-Site_wide_HASP.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIOXIN REMEDIATION AT BIEN HOA

AIRBASE AREA PROJECT

FINAL COMPENDIUM OF ENGINEERING &

CONSTRUCTION DESIGN MATERIAL STANDARDS

(COMPENDIUM)

SPECIFICATIONS

JANUARY 20, 2022

DIOXIN REMEDIATION AT BIEN HOA

AIRBASE AREA PROJECT

FINAL COMPENDIUM OF ENGINEERING

& CONSTRUCTION DESIGN MATERIAL

STANDARDS (COMPENDIUM)

SPECIFICATIONS

US AGENCY FOR INTERNATIONAL DEVELOPMENT

CONTRACT NUMBER: AID-OAA-I-15-00053

ORDER NUMBER: 72044019F00001

JANUARY 20, 2022

TRIGON ASSOCIATES, LLC

1515 POYDRAS ST. SUITE 2200

NEW ORLEANS, LA 70112

USA

Compendium Revision Table

(Amendment No.3)

SECTION NUMBER DESCRIPTION

00 01 10

TABLE OF CONTENTS

REPLACE SECTION 00 01 10 – TABLE OF CONTENTS in its entirety.

01 57 13

ENVIRONMENTAL

MITIGATION

ADD paragraph 3.05.F.3:

3. Additional measures indicated in the Contract Documents, as required.

03 30 00

CAST-IN-PLACE

CONCRETE

ADD paragraphs 1.03.A.26 through 46:

26. TCVN 5574-2018 – Reinforced Concrete and Concrete Structure –

Design Standard.

27. TCVN 5724-1993 – Concrete and Reinforced Concrete Structures

– Minimum Technical Conditions for Execution and Acceptance.

28. TCVN 1548-1987 – Non-destructive Testing for Welded Joints, Ultrasonic Methods.

29. TCVN 3106-1993 - Fresh Heavyweight Concrete - Method for

Slump Test.

30. TCVN 3107-1993 - Fresh Heavyweight Concrete - Method for

Determining Hardness.

31. TCVN 3108-1993 - Fresh Heavyweight Concrete - Method for

Determining Density

32. TCVN 3109-1993 - Fresh Heavyweight Concrete - Method for

Determining Mortar and Water Segregation.

33. TCVN 4787-2009 - Methods of Testing Cement – Part 7: Methods of Taking and Preparing Samples of Cement.

34. TCVN 8827-2011 - Highly Active Mineral Admixture for Concrete and Mortar - Silicafume and Finely Ground Rice Husk Ash.

35. TCVN 8163-2009 - Steel for the Reinforcement of Concrete.

Threaded Coupler Splice.

36. TCVN 10306-2014 - High Strength Concrete - Proportional Design with Cylinder Sample.

37. TCVN 141-2080 - Portland Cement - Methods of Chemical

Analysis.

38. TCVN 9340-2012 - Ready-Mixed Concrete - Specification and

Acceptance.

39. TCVN 9341-2012 - Massive concrete - Construction and

Acceptance.

40. TCVN 9342-2012 - Metal Arc Welding of Steel for Concrete

Reinforcement.

41. TCVN 9345-2012 - Concrete and Reinforced Concrete Structures.

Guide on Technical Measures for Prevention of Cracks Occurred

Under the Action of Hot Humid Climate

42. TCVN 9382-2012 - Waterstops for Joint in Construction Works.

Specifications for Use.

43. TCXDVN 239-2006 - Heavyweight Concrete – Guide to

Assessment of Concrete Strength in Existing Structures.

SECTION NUMBER DESCRIPTION

44. TCVN 197-2014 - Metallic Materials - Tensile Testing - Part 1:

Method of Test at Room Temperature.

45. TCVN 198-2014 - Metallic Materials. Bend Test.

46. TCVN 1075-1971 - Planks. Basic Dimensions.”

03 30 00

CAST-IN-PLACE

CONCRETE

DELETE paragraph 1.05.D.2.n.

03 30 00

CAST-IN-PLACE

CONCRETE

REPLACE paragraph 2.01.B.2 with the following: “Form Linings: as indicated by choice of form materials.”

03 30 00

CAST-IN-PLACE

CONCRETE

REPLACE Table 1 in paragraph 2.04.C

03 30 00

CAST-IN-PLACE

CONCRETE

REPLACE paragraph 2.06.C with the following: “Air Entrainment Admixture: ASTM C260/C260M/TCVN 12300/TCVN 8827. Provide not less than four percent, nor more than eight percent, entrained air for concrete exposed to freezing and thawing, and provide from three to five percent entrained air for other concrete”

03 30 00

CAST-IN-PLACE

CONCRETE

REPLACE paragraph 2.07.I.1 with the following: “General: All waterstop materials must be compatible with potable water applications per AWWA, TCVN 9407, and any other industry standards.”

03 30 00

CAST-IN-PLACE

CONCRETE

ADD paragraph 2.07.I.2.b.4: “Or as indicated by in the Contract Documents and/or applicable reference standards.”

03 30 00

CAST-IN-PLACE

CONCRETE

ADD paragraph 2.07.I.2.c.4: “Or as indicated by in the Contract Documents and/or applicable reference standards.”

03 30 00

CAST-IN-PLACE

CONCRETE

REPLACE paragraph 2.10.3 with the following: “Manufacturer must meet all requirements of the specifications.”

03 30 00

CAST-IN-PLACE

CONCRETE

REPLACE paragraph 3.04.D.1 with the following: “Place concrete in a continuous operation within planned joints or sections in accordance with ACI 304R and TCVN 4453.”

03 30 00

CAST-IN-PLACE

CONCRETE

REPLACE paragraph 3.04.D.7 with the following: “Consolidate placed concrete in accordance with ACI 309R, TCVN 4453, and TCVN 9345 using mechanical vibrating equipment supplemented with hand rodding and tamping, such that concrete is worked around placing and other embedded items and into all parts of formwork. Insert and withdraw vibrators vertically at uniformly spaced locations. Do not use vibrators to transport concrete within the formwork. Vibration of formwork or placing is not allowed.”

03 30 00

CAST-IN-PLACE

CONCRETE

REPLACE paragraph 3.04.D.8 with the following: “Protect concrete from physical damage or reduced strength due to weather extremes during mixing, placing, and curing, comply with TCVN 4453.”

03 60 00

GROUTING

ADD SECTION 03 60 00 – GROUTING.

05 50 00

METAL FABRICATIONS

ADD SECTION 05 50 00 - METAL FABRICATIONS

26 01 00

ELECTRICAL WORK,

GENERAL

ADD SECTION 26 01 00 - ELECTRICAL WORK, GENERAL

26 05 19

WIRES AND CABLES

(600 VOLT MAXIMUM)

ADD SECTION 26 05 19 - WIRES AND CABLES (600 VOLT

MAXIMUM)

26 05 26

GROUNDING

ADD SECTION 26 05 26 - GROUNDING

26 05 33

ELECTRICAL RACEWAY

SYSTEMS

ADD SECTION 26 05 33 - ELECTRICAL RACEWAY SYSTEMS

26 05 50

ELECTRICAL

IDENTIFICATION

ADD SECTION 26 05 50 - ELECTRICAL IDENTIFICATION

26 08 10

ELECTRICAL TESTS

ADD SECTION 26 08 10 - ELECTRICAL TESTS

26 27 27

FASTENERS,

ATTACHMENTS, AND

SUPPORTING DEVICES

ADD SECTION 26 27 27 - FASTENERS, ATTACHMENTS, AND

SUPPORTING DEVICES.

26 28 19

SAFETY SWITCHES

ADD SECTION 26 28 19 – SAFETY SWITCHES.

26 43 00

SURGE PROTECTIVE

DEVICE (SPD)

ADD SECTION 26 43 00 – SURGE PROTECTIVE DEVICE (SPD).

31 23 16

EXCAVATION

ADD paragraph 1.03.B. 2: “TCVN 4055-2012 - Organization of Construction Activities.”

31 05 19.19

GEOSYNTHETICS

ADD SECTION 31 05 19.19 – GEOSYNTHETICS.

31 23 16

EXCAVATION

ADD paragraph 1.03.B. 3: “3. TCVN 5474-1993 - Soil – Classification for Civil Engineering.”

31 23 16

EXCAVATION

ADD paragraph 1.03.B. 4: “4. TCVN 4195-1995 - Soil - Method of Laboratory Determination of Specific Weight.”

31 23 16

EXCAVATION

ADD paragraph 1.03.B. 5: “TCVN 2683-1991 - Soils - Sampling, Packing, Transportation and Curing of Samples.”

31 23 23

FILL

REPLACE paragraph 1.05.D.6.a with: “Dioxin level in material must be below 21.5 parts per trillion TEQ in accordance with QCVN

43:2017/BTNMT.”

31 23 23

FILL

REPLACE paragraph 3.08.C.2.b with: “After rolling, check for grade with a line not less than 12 meters in length. Depressions over 1 centimeter deep must be filled to satisfaction of

ENGINEER/CONSTRUCTION MANAGER.”

32 11 33

CEMENT TREATED

AGGREGATE BASE

ADD SECTION 32 11 33 - CEMENT TREATED AGGREGATE BASE.

32 12 16

ASPHALT PAVING

REPLACE paragraph 1.02 with: “

A. SECTION 31 05 19.19 – GEOSYNTHETICS.

B. SECTION 31 23 23 - FILL.

C. SECTION 32 13 13 - CONCRETE PAVING.

D. SECTION 32 15 40 – CRUSHED STONE AGGREGATE AND

CRUSHED STONE.”

32 12 16

ASPHALT PAVING

ADD 2.02.A

A. Aggregates – General

1. All sources of supply of aggregate and mineral filler shall be approved by the CONSTRUCTION MANAGER prior to the delivery of any materials. Samples of each material shall be submitted as directed.

2. Aggregates to be used in the Works shall have a retained strength of not less than 75 % when tested for loss of cohesion resulting from the action of water in accordance with AASHTO T165 and

AASHTO T245.

3. Fine aggregates shall be stored under cover to provide protection from rain

4. Aggregates of each type shall be fed into the mixing plant via a separate cold feed bin. The mixing of aggregates of different types or from different sources will not be permitted.

5. The Contractor shall take into account the bitumen absorption properties of aggregates when selecting his proposed material sources.

32 12 16

ASPHALT PAVING

ADD 2.02.B

B. Coarse Aggregate

1. The aggregate shall consist of clean, tough, durable crushed stone free from dirt or other objectionable matter. The aggregate shall have a percentage of wear of no more than 35% at 500 revolutions when tested in accordance with 22TCN318-04.

2. The aggregate shall have a weight loss not greater than 12% when subjected to five cycles of the sodium sulphate soundness test in accordance with AASHTO T104.

3. The aggregate shall have a coated area of not less than 95% when subjected to coating and stripping tests in accordance with

AASHTO T182.

32 12 16

ASPHALT PAVING

ADD 2.02.C

C Fine Aggregate

1. The aggregate shall be free from lumps or balls of clay and other objectionable materials and shall consist of clean, tough durable particles of natural sands or crushed stone screenings or suitable combinations thereof. If some crushed stone screenings (crusher dust) are used the dust shall be produced by crushing clean stone having no clay or silt content and shall be stockpiled separately from any natural sand to be used in the mix. When used in combination the crusher dust and natural sand components shall be fed into the mixing plant using separate cold bin feeds so that the ratio of sand to crusher dust can be properly controlled.

2. The Contractor shall not be permitted to use in his asphalt mixes contaminated natural sands having more than 8% fines passing a

No.200 sieve or having a sand equivalent value less than 50 as determined by AASHTO T176.

32 12 16

ASPHALT PAVING

ADD 2.02.D

D. Mineral Filler for Asphalt Mixtures

3. Mineral filler for asphalt mixtures shall fully conform to the particular provisions of TCVN 8819:2011.

4. Mineral filler shall consist of; limestone dust, dolomite dust, Portland cement, fly ash, cement kiln dust or other hard mineral matter from sources approved by the CONSTRUCTION

MANAGER. It shall be free from foreign or other objectionable material.

5. Mineral filler shall be dry and free from lumps and when tested by wet sieving shall contain not less than 75% (preferably not less than 85%) by weight of particles passing a 75 micron sieve

32 12 16

ASPHALT PAVING

DELETE 2.02.D with “ Mineral Filler: Finely ground particles of limestone, hydrated lime, or other mineral dust, free of foreign matter.”

32 12 16

ASPHALT PAVING

ADD 3.05.D

D. Repairs: Areas indicated for asphalt repairs or defective areas as determined by the ENGINEER/CONSTRUCTION MANAGER must be removed and replaced with fresh, hot-mix asphalt. Compact by rolling to specified density and surface smoothness.

1. Skin patching is not permitted. Defective materials must be removed for the full thickness of the course.

2. The pavement must be cut so that all edges are vertical, the sides are parallel to the direction of traffic, and the ends are skewed between fifteen and twenty-five degrees (15º and 25º).

Edges must be coated with a thin tack coat of material.

3. Asphalt Concrete mixture must be placed in sufficient quantity so that the finished surface will conform to grade and smoothness requirements

32 12 16

ASPHALT PAVING

DELETE paragraph 3.09.C.

32 12 16

ASPHALT PAVING

DELETE paragraph 3.09.D

32 13 13 CONCRETE

PAVING

REPLACE SECTION 32 13 13 – CONCRETE PAVING in its entirety.

32 15 40

CRUSHED STONE

AGGREGATE AND

CRUSHED STONE

DELETE paragraph 1.05.B.

32 15 40

CRUSHED STONE

AGGREGATE AND

CRUSHED STONE

REPLACE paragraph 2.02 with: “The material must be well-graded crushed or uncrushed gravel, stone, rock-fill or natural sand or a well-mixed combination of any of these. Grading The requirements for Crushed Stone must be as follows:”

32 15 40

CRUSHED STONE

AGGREGATE AND

CRUSHED STONE

ADD paragraph 2.02.A.1 and 2: “

1. The maximum size of crushed stone should not be more than 0.8 the thickness of the foundation layer of a single spread (compacted thickness) sieve passing dimension of D = 60mm, sieve lying on dimension of D= 20mm (standard sieve, square hole sieve).

2. The amount of flat grain should not exceed 10% (by weight).”

32 15 40

CRUSHED STONE

AGGREGATE AND

CRUSHED STONE

REMOVE paragraph 3.02. C to F

32 15 40

CRUSHED STONE

AGGREGATE AND

CRUSHED STONE

ADD paragraph 3.03. A to F:

“3.03 COMPACTION

A. Compaction shall be carried out only when the moisture content of the material is in the range -2% to +2% of the optimum moisture content, where the optimum moisture content is as defined by the maximum modified dry density determined by Vietnamese Standard 22TCN 333:06.

B. Each layer shall be compacted to the full width by the methods in the Contractor’s approved method statement confirmed by satisfactory trials. Rolling operations shall begin along the edges and progress gradually towards the center in a longitudinal direction. On super elevated sections rolling shall begin at the low side and progress towards the high side. The rolling operation shall continue until all roller marks are eliminated and the layer is uniformly compacted and the aggregates firmly keyed. Any irregularities or depressions that develop shall be corrected by loosening the material at these places and adding or removing material until the surface is smooth and uniform. Along headers and walls and at all places not accessible to the roller the Subbase, Base and Leveling Courses material may be compacted with tampers or compactors. At the end at each shift the surface of the Base, Subbase and Leveling Courses shall be shaped and sloped to prevent ponding of rain water.

C. The aggregate Subbase, Base surfaces, which are to receive a prime coat, shall be compacted to produce a stable, tightly locked surface with no open pores and suitable for priming.

All coarse aggregates shall be tightly locked in place.

The locking process shall be achieved by compaction only. Under no circumstances shall any form of fine aggregate be added to the surface to assist the locking process. Vibration shall not be used in the final stages of the compaction of the surface. Pneumatic rollers or static steel wheeled rollers shall be used for the final surface compaction unless excessive breakdown or degradation of the aggregate Subbase, Base and Leveling Courses occurs, in which only pneumatic rollers shall be used.

D. When the underlying material is soft or yielding compaction of the Subbase, Base shall be stopped and the underlying materials rectified in a manner approved by the Engineer.

E. Compaction of each layer shall continue until a satisfactory field density has been achieved. Insitu densities shall be determined in accordance with Vietnamese Standard 22TCN346-06.

F. Proof rolling shall be conducted after finishing by a roller of at least 25 tons weight. If the deflection is more than 3mm the layer shall be replaced at the Contractor’s expense.”

32 80 00

IRRIGATION SYSTEM

ADD SECTION 32 80 00 – IRRIGATION SYSTEM.

33 05 19

DUCTILE IRON PIPE

ADD SECTION 33 05 19 – DUCTILE IRON PIPE.

33 05 33.36

CORRUGATED, NON-

PERFORATED HDPE

DRAINAGE PIPE

ADD SECTION 33 05 33.36 - CORRUGATED, NON-PERFORATED

HDPE DRAINAGE PIPE.

33 05 39.49

CONCRETE BOX

CULVERTS

ADD SECTION 33 05 39.49 - CONCRETE BOX CULVERTS.

33 05 61 CONCRETE

MANHOLES

ADD SECTION 33 05 61 - CONCRETE MANHOLES.

33 32 43

SUBMERSIBLE NON-

CLOG PUMPS

ADD SECTION 33 32 43 - SUBMERSIBLE NON-CLOG PUMPS.

COMPENDIUM 00 01 10 - 1 TABLE OF CONTENTS

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT

SECTION 00 01 10 - TABLE OF CONTENTS

TECHNICAL SPECIFICATIONS

00 01 10 TABLE OF CONTENTS

DIVISION 01 -- GENERAL REQUIREMENTS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 31 13 PROJECT COORDINATION

01 32 16 CONSTRUCTION PROGRESS SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 29 HEALTH AND SAFETY

01 45 16.13 CONTRACTOR QUALITY CONTROL

01 45 16.13 CONTRACTOR QUALITY CONTROL - APPENDIX

01 50 01 TEMPORARY FACILITIES

01 52 13 FIELD OFFICE

01 57 13 ENVIRONMENTAL MITIGATION

01 60 00 PRODUCT REQUIREMENTS

01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS

01 71 13 MOBILIZATION AND DEMOBILIZATION

01 71 23 FIELD ENGINEERING

DIVISION 02 -- EXISTING CONDITIONS

02 41 13 DEMOLITION

DIVISION 03 -- CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 41 00 PRECAST STRUCTURAL CONCRETE

03 60 00 GROUTING

COMPENDIUM 00 01 10 - 2 TABLE OF CONTENTS

DIVISION 05 – METALS

05 50 00 METAL FABRICATIONS

DIVISION 26 – ELECTRICAL

26 01 00 ELECTRICAL WORK, GENERAL

26 01 00 APPENDIX A - ELECTRICAL WORK GENERAL, SUPPLEMENTAL

SPECIFICATION

26 05 19 WIRES AND CABLES (600 VOLT MAXIMUM)

26 05 26 GROUNDING

26 05 33 ELECTRICAL RACEWAY SYSTEMS

26 05 50 ELECTRICAL IDENTIFICATION

26 08 10 ELECTRICAL TESTS

26 27 27 FASTENERS, ATTACHMENTS, AND SUPPORTING DEVICES

26 28 19 SAFETY SWITCHES

26 43 00 SURGE PROTECTIVE DEVICE (SPD)

DIVISION 31 -- EARTHWORK

31 05 19 GEOTEXTILE FABRIC

31 05 19.16 HIGH DENSITY POLYETHYLENE (HDPE) LAYER

31 05 19.19 GEOSYNTHETICS

31 05 19.20 GEOCELLS

31 10 01 SITE PREPARATION AND CLEARING

31 22 00 GRADING

31 23 16 EXCAVATION

31 23 19 DEWATERING AND DRAINAGE

31 23 23 FILL

COMPENDIUM 00 01 10 - 3 TABLE OF CONTENTS

31 36 00 GABIONS

31 37 00 RIPRAP

DIVISION 32 -- EXTERIOR IMPROVEMENTS

32 11 33 CEMENT TREATED AGGREGATE BASE

32 12 16 ASPHALT PAVING

32 13 13 CONCRETE PAVING

32 15 40 CRUSHED STONE AGGREGATE AND CRUSHED STONE

32 31 13 FENCES AND GATES

32 80 00 IRRIGATION PUMP SYSTEM

32 91 19.13 TOPSOIL

32 93 00 PLANTS

DIVISION 33 -- UTILITIES

33 05 19 DUCTILE IRON PIPE

33 05 33.36 CORRUGATED, NON-PERFORATED HDPE DRAINAGE PIPE

33 05 39.41 REINFORCED CONCRETE DRAIN PIPE

33 05 39.43 CONCRETE BOX CULVERTS

33 05 61 CONCRETE MANHOLES

33 32 43 SUBMERSIBLE NON-CLOG PUMPS

33 51 39 MONITORING WELLS

STANDARD DETAILS

END OF SECTION

COMPENDIUM 01 30 00 - 1

ADMINISTRATIVE

REQUIREMENTS

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT

SECTION 01 30 00 - ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. General administrative requirements.

B. Project Coordinator.

C. Contractor Work Plans.

D. Preconstruction conference.

E. Site mobilization meeting.

F. Progress meetings.

G. Requests for interpretation (RFI) procedures.

H. Photographic documentation.

1.02 RELATED REQUIREMENTS

A. SECTION 01 31 13 - PROJECT COORDINATION.

B. SECTION 01 32 16 - CONSTRUCTION PROGRESS SCHEDULE.

C. SECTION 01 33 00 - SUBMITTAL PROCEDURES.

D. SECTION 01 35 29 - HEALTH AND SAFETY.

E. SECTION 01 45 16.13 - CONTRACTOR QUALITY CONTROL.

F. SECTION 01 50 01 - TEMPORARY FACILITIES.

G. SECTION 01 57 13 - ENVIRONMENTAL MITIGATION.

H. SECTION 01 70 00 - EXECUTION AND CLOSEOUT REQUIREMENTS.

I. SECTION 01 71 13 - MOBILIZATION AND DEMOBILIZATION.

J. SECTION 02 41 13 - DEMOLITION.

K. SECTION 31 10 01 - SITE PREPARATION AND CLEARING.

L. SECTION 31 23 16 - EXCAVATION.

M. All technical sections.

1.03 REFERENCE STANDARDS

A. Vietnamese Standards.

1. QCVN 41:2019/BGTVT: National Technical Regulation on Traffic Signs and Signals and applicable local regulations.

2. TCVN 6707:2009 - Hazardous Wastes - Warning Signs.

3. Waste management standards:

a. Government Decree on Waste and Scrap Management, 38/2015/ND-CP.

b. MONRE Circular on Scrap Recycle and Disposal, 34/2017/TT-BTNMT.

c. MONRE Circular on Hazardous Waste Management, 36/2015/TT-BTNMT.

d. National Technical Regulation on Hazardous Waste Thresholds, QCVN

07:2009/BTNMT.

1) National Technical Regulation on Industrial Wastewater, QCVN

40:2011/BTNMT.

2) National Technical Regulation on Domestic Wastewater, QCVN

14:2008/BTNMT.

3) National Technical Regulation on Industrial Gas Emission of Dust and

Inorganic Substances, QCVN 19:2009/BTNMT.

4) National Technical Regulation on Industrial Gas Emission of Organic

Substances, QCVN 20:2009/BTNMT.

COMPENDIUM 01 30 00 - 2

REQUIREMENTS

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT

5) Vietnam National Standard (TCVN) 9737: 2013 – Dioxin Discharge Standards in Wastewater and Air Waste from Dioxin Residue Treatment Activities.

6) National technical regulation on the allowable limits of heavy metals in soils, QCVN 03-MT:2015/BTNMT.

B. American Standards.

1. Title 44 Code of Federal Regulation (CFR) Chapter 1.

1.04 SUBMITTALS

A. Demolition, Excavation (including Fill), and Construction WORK Plans and Sampling and

Analysis Coordination.

B. Health and Safety Documentation.

C. Environmental Mitigation Documentation.

D. Traffic Control Plan.

E. Waste Management Plan.

F. Mobilization Plan.

G. Construction Quality Control (CQC) Plan.

H. Decontamination and Demobilization Plan.

I. Video surveys, photographs, and other data of the pre-construction conditions must be submitted to the ENGINEER/CONSTRUCTION MANAGER for record purposes prior to, but not more than three weeks before, commencement of any construction activities. These items must be provided digitally in a widely acceptable, high resolution, readable format.

J. A complete set of all photographs and survey data of the post-construction conditions must be completed and submitted prior to final inspection by the OWNER and ENGINEER/

CONSTRUCTION MANAGER. These items must be provided digitally in a widely acceptable, readable format, and prints as required by the project documents.

1.05 QUALITY ASSURANCE

A. Comply with laws, regulations, and reference standards applying to the WORK under this section.

B. Comply with the requirements of authorities having jurisdiction.

1.06 GENERAL ADMINISTRATIVE REQUIREMENTS

A. Comply with requirements of SECTION 01 70 00 - EXECUTION AND CLOSEOUT

REQUIREMENTS for coordination required for execution of administrative tasks with timing of construction activities.

1.07 COORDINATION

A. Project Coordinator: CONSTRUCTION MANAGER.

B. Cooperate with the Project Coordinator in allocation of mobilization areas of site, for field offices and sheds, access, traffic, and parking facilities.

C. During construction, coordinate use of site and facilities through the Project Coordinator.

D. Comply with Project Coordinator's procedures for intra-project communications; submittals, reports and records, schedules, coordination drawings, and recommendations; and resolution of ambiguities and conflicts.

E. Comply with instructions of the Project Coordinator for use of temporary utilities and construction facilities.

F. Coordinate field engineering and layout WORK under instructions of the Project Coordinator.

G. Make the following types of submittals to OWNER and ENGINEER/CONSTRUCTION

MANAGER through the Project Coordinator:

COMPENDIUM 01 30 00 - 3

REQUIREMENTS

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT

1. Requests for Interpretation.

2. Requests for substitution.

3. Shop drawings, product data, and samples.

4. Test and inspection reports.

5. Design data.

6. Manufacturer's instructions and field reports.

7. Applications for payment and change order requests.

8. Progress schedules.

9. Coordination drawings.

10. Correction Punch List and Final Correction Punch List for Substantial Completion.

11. Closeout submittals.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.01 DEMOLITION, EXCAVATION, CONSTRUCTION WORK PLANS AND SAMPLING AND

ANALYSIS COORDINATION.

A. WORK plans are required for all components of the WORK.

B. The CONTRACTOR must prepare Construction WORK Plans for each area of WORK, including transportation practices, indicated in the Contract Documents, and as requested by the ENGINEER/CONSTRUCTION MANAGER. Project tasks and schedules required for each activity. WORK Plans include conditions of installation, preparation, and installation or application procedures, and coordination with related WORK and/or work of others.

C. Demolition must be according to a Demolition Plan per SECTION 02 41 13 DEMOLITION.

Demolition areas are to be frequently watered or sprayed for dust control with water or a biodegradable dust suppressant; used oil or other oils are not acceptable dust suppressants.

D. Excavation must be according to an Excavation Plan per SECTION 31 23 16 EXCAVATION.

Excavated areas are to be frequently watered or sprayed for dust control with water or a biodegradable dust suppressant; used oil or other oils are not acceptable dust suppressants.

E. Sampling and Analysis Coordination:

1. Excavation Plan must include sampling and analysis coordination with the

ENGINEER/CONSTRUCTION MANAGER for stockpiles and sides and bottoms of sub decision unit excavations.

2. When specified depths are reached, area WORK must pause for a period up to four (4) weeks for confirmatory sampling and analysis.

F. CONTRACTOR must submit the Demolition, Excavation, and Construction WORK Plans in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES and within the periods indicated in the Contract Documents or within 14 days prior to the start of associated WORK.

3.02 HEALTH AND SAFETY

A. The CONTRACTOR must prepare Health and Safety Documentation in accordance with

SECTION 01 35 29 HEALTH AND SAFETY.

B. CONTRACTOR must submit the Health and Safety Documentation in accordance with

SECTION 01 33 00 SUBMITTAL PROCEDURES within the period indicated in the Contract

Documents.

COMPENDIUM 01 30 00 - 4

REQUIREMENTS

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT

3.03 ENVIRONMENTAL MITIGATION

A. The CONTRACTOR must implement environmental mitigation measures that include erosion and sediment control measures to prevent site erosion and mitigation measures to reduce or eliminate environmental impacts resulting directly or indirectly due to construction activities.

B. The environmental mitigation measures must be implemented in accordance with SECTION

01 57 13 ENVIRONMENTAL MITIGATION.

C. CONTRACTOR must submit the environmental mitigation requirements in accordance with

SECTION 01 33 00 SUBMITTAL PROCEDURES within the period indicated in the Contract

Documents.

3.04 TRAFFIC CONTROL PLAN

A. The CONTRACTOR must prepare a Traffic Control Plan in accordance with SECTION 01 31

13 PROJECT COORDINATION.

B. CONTRACTOR must submit the Traffic Control Plan in accordance with SECTION 01 33 00

SUBMITTAL PROCEDURES within the period indicated in the Contract Documents.

C. All traffic control signs, barricades, warning lights, devices, methods, and measures must comply with the QCVN 41:2019/BGTVT: National Technical Regulation on Traffic Signs and

Signals and applicable local regulations. CONTRACTOR is required to submit for approval a traffic control plan including all roadwork, detours, flagging requirements, passing areas, turnarounds, and modifications for construction activities.

3.05 WASTE MANAGEMENT PLAN

A. Waste management standards:

1. Government Decree on Waste and Scrap Management, 38/2015/ND-CP.

2. MONRE Circular on Scrap Recycle and Disposal, 34/2017/TT-BTNMT.

3. MONRE Circular on Hazardous Waste Management, 36/2015/TT-BTNMT.

4. National Technical Regulation on Hazardous Waste Thresholds, QCVN 07:2009/BTNMT.

5. National Technical Regulation on Industrial Wastewater, QCVN 40:2011/BTNMT.

6. National Technical Regulation on Domestic Wastewater, QCVN 14:2008/BTNMT.

B. The CONTRACTOR must prepare a Waste Management Plan (WMP) that specifies the proper storage, characterization, and disposal of liquid and solid waste generated during Contract implementation in conformance with the above standards. The WMP must address stockpiling, handling and transportation and disposal of all wastes derived during the WORK such as construction waste, groundwater, drill cuttings, personal protective equipment, and other waste. The WMP must include plans for disposal of all construction waste generated by the contractor from mobilization to demobilization.

C. The CONTRACTOR must plan to dispose of all solid wastes resulting from Contract implementation that were present on the Airbase before Contract implementation, including those wastes derived from site clearance and demolition, in an on-base area as shown on the

Contract Documents, as directed by the ENGINEER/CONSTRUCTION MANAGER, or to be identified by the CONTRACTOR and approved by Air Defense Air Force Command (ADAFC).

All other solid wastes derived from the Contract implementation will be disposed of outside the

Airbase in compliance with the standards and regulations specified in the Waste Management

Standards. The Contractor must decontaminate and test all waste materials for residual dioxin contamination on a volumetric basis before seeking COR approval for the disposal.

D. No construction-related materials, wastes, spills, or residues must be discharged from the project site to streets, drainage facilities or adjacent properties by wind or runoff. All debris, junk, and trash must be removed at the end of each day. All materials and/or equipment

COMPENDIUM 01 30 00 - 5

REQUIREMENTS

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT

storage areas where liquid construction materials are placed must be protected by a physical barrier capable of containing the entire volume of stored liquid materials. During active construction activities, portions of the barrier may be removed for access. However, the barrier materials must be readily accessible for replacement by onsite construction personnel. The barrier must be in place at all times during the absence of Contractor personnel at the storage site.

E. Uncontaminated construction debris must be placed in the Uncontaminated Construction

Debris Disposal Area (UCDDA). Any debris placed in the UCDDA must be tested with dioxin confirmatory sampling result under 40 ppt TEQ prior to placement.

F. Vegetation processing as indicated in SECTION 31 10 01 SITE PREPARATION AND

CLEARING.

G. CONTRACTOR must submit the Waste Management Plan in accordance with SECTION 01

33 00 SUBMITTAL PROCEDURES within the period indicated in the Contract Documents.

H. Off-site waste disposal approval form must be submitted as needed. Form required 3 weeks in advance of disposal date.

3.06 MOBILIZATION PLAN

A. The CONTRACTOR must prepare a Mobilization Plan in accordance with SECTION 01 71 13

MOBILIZATION AND DEMOBILIZATION.

B. CONTRACTOR must submit the Mobilization Plan in accordance with SECTION 01 33 00

SUBMITTAL PROCEDURES within the period indicated in the Contract Documents.

3.07 CONSTRUCTION QUALITY CONTROL PLAN

A. The CONTRACTOR must prepare a Construction Quality Control (CQC) Plan in accordance with SECTION 01 45 16.13 CQC.

B. CONTRACTOR must submit the CQC Plan in accordance with SECTION 01 33 00

SUBMITTAL PROCEDURES within the period indicated in the Contract Documents.

3.08 DECONTAMINATION AND DEMOBILIZATION PLANS

A. The CONTRACTOR must prepare Decontamination and Demobilization Plans detailing the disposition of personnel, equipment, and materials used during the contract. The

Decontamination and Demobilization Plans must describe how personnel and equipment which are in direct contact and/or are exposed to dioxin and/or other contaminants will be decontaminated, the decontamination criteria, the property disposition plan, the phase-out of

Contractor operations, and the timetable for completing all required actions in the

Decontamination and Demobilization Plan.

B. The CONTRACTOR must install, operate, and maintain personnel and equipment decontamination stations to perform decontamination of personnel and equipment and prevent the spreading of contamination. Stations must be utilized at key locations such that personnel and equipment that has come in contact with contaminated materials are cleaned prior to entering any clean area. The CONTRACTOR must submit to the OWNER or designee for approval a proposed personnel and equipment decontamination plan that presents proposed station locations, clearing procedures, traffic control, and any additional information necessary for implementation.

C. CONTRACTOR must submit the Decontamination and Demobilization Plans in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES within the period indicated in the

Contract Documents.

D. Demobilization will include removal of construction facilities, including all utilities, and equipment off the sites and final cleanup of the sites following completion.

E. The Contractor must prepare Demobilization Plan in accordance with SECTION 01 71 13

MOBILIZATION AND DEMOBILIZATION.

COMPENDIUM 01 30 00 - 6

REQUIREMENTS

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT

3.09 PRECONSTRUCTION CONFERENCE AND KICKOFF MEETING

A. Prior to the commencement of WORK at the Site, a preconstruction conference will be held at a mutually agreed time and place. The conference must be attended by the CONTRACTOR's

Project Manager, its superintendent, and its subcontractors as the CONTRACTOR deems appropriate.

B. Required attendees:

1. OWNER.

2. ENGINEER.

3. CONTRACTOR.

4. CONSTRUCTION MANAGER.

C. CONTRACTOR must bring the Preconstruction Conference submittals in accordance with

SECTION 01 33 00 SUBMITTAL PROCEDURES.

D. The purpose of the conference is to designate responsible personnel and establish a working relationship. Matters requiring coordination will be discussed and procedures for handling such matters established. The complete agenda will be furnished to the CONTRACTOR prior to the meeting date. However, the CONTRACTOR should be prepared to discuss all of the items listed below.

1. Status of CONTRACTOR's insurance and bonds.

2. CONTRACTOR's initial construction progress schedule.

3. Transmittal, review, and distribution of CONTRACTOR's submittals.

4. Processing applications for payment.

5. Maintaining record documents.

6. Critical WORK sequencing.

7. Field decisions and Change Orders.

8. Use of Site, office and storage areas, security, housekeeping, and OWNER's needs.

9. Major equipment deliveries and priorities.

10. CONTRACTOR's assignments for safety and first aid.

11. Daily Report Form which the ENGINEER/CONSTRUCTION MANAGER will furnish.

12. Submittal Transmittal Form which the ENGINEER/CONSTRUCTION MANAGER will furnish.

E. The ENGINEER/CONSTRUCTION MANAGER will preside at the preconstruction conference and will arrange for keeping and distributing the minutes to all persons in attendance.

F. The CONTRACTOR and its subcontractors should plan on the conference taking no less than

½ of 1 full working day. The conference will cover the items listed above, and a review of the

Drawings and Specifications, in extensive detail, with the ENGINEER/CONSTRUCTION

MANAGER and the OWNER.

G. A kickoff meeting will be held at award of the contract prior to the preconstruction conference to review preconstruction conference requirements. Attendees will include the CONTRACTOR and the ENGINEER/CONSTRUCTION MANAGER.

3.10 SITE MOBILIZATION MEETING

A. ENGINEER or CONSTRUCTION MANAGER will schedule meeting at the WORK site prior to

CONTRACTOR occupancy.

B. Attendance Required:

1. CONTRACTOR.

2. OWNER.

3. ENGINEER.

4. CONTRACTOR's superintendent.

5. Major subcontractors.

C. Agenda:

COMPENDIUM 01 30 00 - 7

REQUIREMENTS

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT

1. Use of premises by OWNER and CONTRACTOR.

2. OWNER's requirements.

3. Construction facilities and controls provided by OWNER.

4. Temporary utilities provided by OWNER.

5. Survey and building layout.

6. Security and housekeeping procedures.

7. Schedules.

8. Application for payment procedures.

9. Procedures for testing.

10. Procedures for maintaining record documents.

11. Requirements for start-up of equipment.

12. Inspection and acceptance of equipment put into service during construction period.

D. Record minutes and distribute copies within two days after meeting to participants, with two copies to ENGINEER/CONSTRUCTION MANAGER, OWNER, participants, and those affected by decisions made.

3.11 PROGRESS MEETINGS

A. The ENGINEER/CONSTRUCTION MANAGER will schedule and hold regular on-Site progress meetings at least bi-weekly and at other times as requested by

ENGINEER/CONSTRUCTION MANAGER or as required by progress of the WORK. The

CONTRACTOR, ENGINEER/ CONSTRUCTION MANAGER, and all subcontractors active on the Site must attend each meeting. CONTRACTOR may at its discretion request attendance by representatives of its suppliers, manufacturers, and other subcontractors.

B. ENGINEER or CONSTRUCTION MANAGER will make arrangements for meetings, prepare agenda with copies for participants, preside at meetings. The purpose of the meetings is to review the progress of the WORK, maintain coordination of efforts, discuss changes in scheduling, and resolve other problems that may develop. During each meeting, the

CONTRACTOR must present any issues that may impact its progress with a view to resolve these issues expeditiously.

C. Attendance Required:

1. CONTRACTOR.

2. OWNER.

3. ENGINEER.

4. CONSTRUCTION MANAGER.

5. CONTRACTOR's superintendent.

6. Major subcontractors.

D. Agenda:

1. Review minutes of previous meetings.

2. Review of outstanding action items.

3. Review of WORK progress.

4. Field observations, problems, and decisions.

5. Identification of problems that impede, or will impede, planned progress.

6. Review of submittals schedule and status of submittals.

7. Review of Request for Information (RFIs) log and status of responses.

8. Maintenance of progress schedule.

9. Corrective measures to regain projected schedules.

10. Planned progress during succeeding WORK period.

11. Maintenance of quality and WORK standards.

12. Effect of proposed changes on progress schedule and coordination.

13. Other business relating to WORK.

E. The ENGINEER/CONSTRUCTION MANAGER will keep and distribute minutes.

COMPENDIUM 01 30 00 - 8

REQUIREMENTS

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT

3.12 PRE-WORK MEETINGS

A. The Engineer CONSTRUCTION MANAGER will schedule pre-WORK meetings at various stages of the WORK at the CONSTRUCTION MANAGER's discretion. Review of WORK plans for transitioning WORK areas and construction elements within WORK areas.

3.13 REQUESTS FOR INTERPRETATION (RFI)

A. Definition: A request seeking one of the following:

1. An interpretation, amplification, or clarification of some requirement of Contract

Documents arising from inability to determine from them the exact material, process, or system to be installed; or when the elements of construction are required to occupy the same space (interference); or when an item of WORK is described differently at more than one place in Contract Documents.

2. A resolution to an issue which has arisen due to field conditions and affects design intent.

B. Preparation: CONTRACTOR must prepare an RFI immediately upon discovery of a need for interpretation of Contract Documents. Failure to submit a RFI in a timely manner is not a legitimate cause for claiming additional costs or delays in execution of the WORK.

1. Prepare a separate RFI for each specific item.

a. Review, coordinate, and comment on requests originating with subcontractors and/or materials suppliers.

2. Prepare in a format and with content acceptable to OWNER.

C. Reason for the RFI: Prior to initiation of an RFI, carefully study all Contract Documents to confirm that information sufficient for their interpretation is definitely not included.

1. Include in each request CONTRACTOR's signature attesting to good faith effort to determine from Contract Documents information requiring interpretation.

2. Unacceptable Uses for RFIs: Do not use RFIs to request the following:

a. Approval of submittals (use procedures specified in SECTION 01 33 00 SUBMITTAL

PROCEDURES).

b. Changes that entail change in Contract Time and Contract Sum (comply with provisions of the Conditions of the Contract).

3. Improper RFIs: Requests not prepared in compliance with requirements of this section, and/or missing key information required to render an actionable response. They will be returned without a response, with an explanatory notation.

4. Frivolous RFIs: Requests regarding information that is clearly indicated on, or reasonably inferable from, Contract Documents, with no additional input required to clarify the question. They will be returned without a response, with an explanatory notation.

a. The OWNER reserves the right to assess the CONTRACTOR for the costs (on time-and-materials basis) incurred by the ENGINEER/CONSTRUCTION MANAGER, and any of its consultants, due to processing of such RFIs.

D. Content: Include identifiers necessary for tracking the status of each RFI, and information necessary to provide an actionable response.

1. Official Project name and number, and any additional required identifiers established in

Contract Documents.

2. OWNER's, ENGINEER's, CONSTRUCTION MANAGER's and CONTRACTOR's names.

3. Discrete and consecutive RFI number, and descriptive subject/title.

4. Issue date and requested reply date.

5. Reference to particular Contract Document(s) requiring additional information/interpretation. Identify pertinent drawing and detail number and/or specification section number, title, and paragraph(s).

COMPENDIUM 01 30 00 - 9

REQUIREMENTS

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT

6. Annotations: Field dimensions and/or description of conditions which have engendered the request.

7. CONTRACTOR's suggested resolution: A written and/or a graphic solution, to scale, is required in cases where clarification of coordination issues is involved, for example;

routing, clearances, and/or specific locations of WORK shown diagrammatically in

Contract Documents. If applicable, state the likely impact of the suggested resolution on

Contract Time or the Contract Sum.

E. Attachments: Include sketches, coordination drawings, descriptions, photos, submittals, and other information necessary to substantiate the reason for the request.

F. Responses: Content of answered RFIs will not constitute in any manner a directive or authorization to perform extra WORK or delay activities. If in CONTRACTOR's belief it is likely to lead to a change to Contract Sum or Contract Time, promptly issue a notice to this effect, and follow up with an appropriate Change Order request to OWNER.

1. Response may include a request for additional information, in which case the original RFI will be deemed as having been answered, and an amended one is to be issued forthwith.

Identify the amended RFI with an R suffix to the original number.

3.14 PHOTOGRAPHIC DOCUMENTATION

A. CONTRACTOR must provide a competent professional commercial photographer experienced in shooting exterior/interior construction photos, in daylight and nighttime conditions, and in good and inclement weather to take construction record photographs periodically during course of the WORK.

B. The CONTRACTOR must conduct thorough pre-construction, construction, and post-construction site conditions surveys of the entire Project. Site conditions surveys must consist of photographs, and video recordings.

1. Photographic documentation as required for work documentation must be provided by the CONTRACTOR. The Contractor is able to provide photographic documentation within WORK areas that have been handed over by ADAFC. Photographic documentation is not permitted to show any Regiment facilities or operations. If showing

Regiment facilities in the background is unavoidable, these facilities must be blurred in all documentation.

C. Photographs and video recordings

1. CONTRACTOR, as a minimum, must document pre- and post-construction conditions by preparing video surveys of the following:

a. Roadways used to access the Site or haul materials and equipment to the Site.

b. WORK areas, including actual WORK sites, materials processing and stockpiling areas, access corridors, disposal areas, and staging areas.

c. Any WORK completed by other contractors at the Site that will be connected to or otherwise affected by the WORK.

d. Driveways, sidewalks, and buildings which might be affected by the WORK.

e. All adjacent structures including interior, if possible.

2. Supplement video surveys with photographs, as required, to thoroughly document the original condition and location of existing features and facilities.

3. Photograph from location to adequately illustrate condition of construction and state of progress. ENGINEER/CONSTRUCTION MANAGER reserves the right to select subject matter and vantage point from which photographs are to be taken.

a. At successive periods of photography, take at least one photograph from the same overall view as previously.

b. Consult with the ENGINEER/CONSTRUCTION MANAGER at each period of photography for instructions concerning views required.

4. Photos and video records must be provided digitally in a widely acceptable, readable format.

COMPENDIUM 01 30 00 - 10

REQUIREMENTS

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT

5. For Site construction, provide ground photographs with at least six (6) different views each month, taken at each stage of construction, for each scheduled Application for

Payment.

6. Digital Photograph Files:

a. No post-session electronic editing of images is allowed. Stored image must be actual image as captured without cropping or other edits.

b. High resolution photos are required showing fine details of pre-construction, construction, and post-construction conditions.

1) Factual presentation.

2) Every aspect of the site and adjacent properties must be captured.

3) Correct exposure and focus.

4) High resolution and sharpness.

5) Maximum depth-of-field.

6) Minimum distortion.

c. Date and time of capture must be embedded into image.

d. Archive using a commercially available photo management system that provides listing of photographs including date, keyword description, and direction of photograph.

e. The photographer must maintain digital photograph files for a period of the entire activities and then must convey the files to the ENGINEER/CONSTRUCTION

MANAGER upon substantial completion.

f. Photographer must agree to furnish digital files to OWNER and the ENGINEER/

CONSTRUCTION MANAGER. Photographer must also agree to participate as required in any litigation requiring the photographer as an expert witness.

7. Audio-Video Recordings:

a. Prior to beginning the WORK on Site or of a particular area of the WORK, and again within 10 days following date of Substantial Completion, videograph site and property adjacent to Site.

b. In the case of pre-construction recording, no WORK must begin in the area prior to

ENGINEER/CONSTRUCTION MANAGER's review and approval of content and quality of video for that area.

c. Particular emphasis must be directed to physical condition of existing vegetation, structures, equipment, floors, WORK areas of existing facilities, and pavements within all areas adjacent to and within all areas of WORK, inclusive of any rights-of-way or easements, and on Contractor storage and staging areas.

d. Video recording must be by a professional commercial videographer, experienced in shooting exterior and interior construction videos, in both good and inclement weather.

e. Video Format and Quality:

1) Widely acceptable, readable digital format, with sound.

2) Video:

(a) Produce bright, sharp, and clear images with accurate colors, free of distortion and other forms of picture imperfections.

(b) Electronically, and accurately display the month, day, year, and time of day of the recording.

3) Audio:

4) Audio documentation must be done clearly, precisely, and at a moderate pace.

5) Indicate date, activity name, and a brief description of the location of recording, including:

(a) Facility name.

(b) Street names or easements.

COMPENDIUM 01 30 00 - 11

REQUIREMENTS

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT

(c) Addresses of private property.

f. Direction of coverage, including engineering stationing, if applicable.

g. The CONTRACTOR must pay costs for specified photography and files.

COMPENDIUM 01 31 13 - 1

PROJECT

COORDINATION

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT

SECTION 01 31 13 - PROJECT COORDINATION

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Licenses and permits.

B. Roadway limitations.

C. Access.

D. CONTRACTOR's WORK and storage area.

E. Parking.

1.02 RELATED REQUIREMENTS

A. SECTION 01 32 16 - CONSTRUCTION PROGRESS SCHEDULE.

1.03 REFERENCE STANDARDS

A. Vietnamese Standards.

1. QVCN 41:2019/BGTVT: National Technical Regulation on Traffic Sign and Signals and applicable local regulations.

B. American Standards.

1. "Manual of Uniform Traffic Control Devices, Part 6, Temporary Traffic Control," published by U.S. Department of Transportation, Federal Highway Administration

(ANSI D6.1) for traffic control.

2. Subpart G, Part 1926, of the OSHA Safety and Health Standards for Construction.

1.04 SUBMITTALS

A. Traffic Control Plan, within 28 days from the Notice to Proceed.

1.05 QUALITY ASSURANCE

A. Comply with laws, regulations, and reference standards applying to the WORK under this section.

B. Comply with the requirements of authorities having jurisdiction.

1.06 GENERAL

A. WORK must be scheduled, sequenced, and performed in a manner that minimizes disruption to the operation and maintenance of existing facilities.

B. The CONTRACTOR must incorporate the construction and schedule constraints of this

Section in preparing the construction schedules required under SECTION 01 32 16

CONSTRUCTION PROGRESS SCHEDULE. The schedules must include the

CONTRACTOR’s activities necessary to satisfy all constraints of the Contract Documents.

C. It is the CONTRACTOR's responsibility to coordinate and plan the construction activities to integrate each schedule constraint into performance of the overall WORK.

1. The maximum outage time of any facility must be twenty-four (24) hours, unless permission for longer outages is obtained from the ENGINEER/CONSTRUCTION

MANAGER.

2. Working hours must be scheduled between 7:00 A.M. and 6:00 P.M., Monday through

Friday. Any variation from these periods must be approved by the

ENGINEER/CONSTRUCTION MANAGER.

COMPENDIUM 01 31 13 - 2

COORDINATION

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT

1.07 LICENSES AND PERMITS

A. The CONTRACTOR is responsible for obtaining all permits required to perform the WORK and pay all associated permit fees.

B. The CONTRACTOR must abide by the conditions of all permits and must obtain proof of satisfaction of conditions from issuers of permits prior to acceptance of the WORK by the

OWNER.

C. The Contractor is responsible for obtaining all applicable licenses and/or certifications for employees or equipment prior to initiating the WORK. The licenses/certifications to be obtained include, but are not limited to, operation license and project office registration in

Vietnam, equipment operator certifications, demolition/contractor licenses, and any other required proof of qualifications.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.01 ROADWAY LIMITATIONS

A. The CONTRACTOR must make its own investigation of the condition of available public and private roads and of clearances, restrictions, bridge load limits, and other limitations affecting transportation and ingress and egress to the site of the WORK. It is the

CONTRACTOR's responsibility to construct and maintain any hauling and access roads required for construction and operations, unless otherwise noted.

3.02 ACCESS

A. General:…