- Solicitation number
- 72044021B00001
About this file
This invitation for bids solicits fixed-price construction services for Phase 1 of dioxin remediation at Bien Hoa Airbase in Vietnam. The solicitation was issued by the United States Agency for International Development in Vietnam and seeks bids from eligible US and Vietnamese firms to provide civil works including excavation, hauling, treatment, storage, and site restoration across four contract line items. Bids are due on February 11, 2022 and will be publicly opened on February 16, 2022. The estimated total value of services required exceeds $50 million. The solicitation includes a pre-bid site visit on December 1, 2021 and requires any questions from bidders to be submitted by December 17, 2021. Award is subject to availability of funds and all work must comply with Geographic Code 937 requirements.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid_form
| USAID/VIETNAM CIVIL WORKS FOR DIOXIN REMEDIATION AT THE BIEN HOA AIRBASE AREA – PHASE I | ||||||
| ATTACHMENT J.2 BID FORM | ||||||
| CLIN | Bid Item No. | Bid Item Description | Units | Quantity | Unit Price (USD) | Total Amount (USD) |
| 1 | 00 GENERAL | $ - | ||||
| 01.00.01 | Mobilization | LS | 1 | $ - | $ - | |
| 01.00.02 | Environmental Mitigation | LS | 1 | $ - | $ - | |
| 01.00.03 | Health and Safety, Including PPE and Blood Monitoring | LS | 1 | $ - | $ - | |
| 01.00.04 | Traffic Control | LS | 1 | $ - | $ - | |
| 01.00.05 | Decontamination | LS | 1 | $ - | $ - | |
| 01.00.06 | Site Office | LS | 1 | $ - | $ - | |
| 01.00.07 | Project Management and Support | LS | 1 | $ - | $ - | |
| 01.00.08 | Bonds and Guarantees | LS | 1 | $ - | $ - | |
| 10 TREATMENT AREA | $ - | |||||
| 01.10.01 | PTSA - Clearing and Removal of Vegetation | LS | 1 | $ - | $ - | |
| 01.10.02 | PTSA - Remove Topsoil | LS | 1 | $ - | $ - | |
| 01.10.03 | PTSA - Levelling and Compaction | LS | 1 | $ - | $ - | |
| 01.10.04 | PTSA - Excavation of Base | m3 | 15,060 | $ - | $ - | |
| 01.10.05 | PTSA - Compaction of Base | m2 | 37,040 | $ - | $ - | |
| 01.10.06 | PTSA - Fill and Compact Berm | m3 | 8,110 | $ - | $ - | |
| 01.10.07 | PTSA - Non-Woven Geotextile | m2 | 37,980 | $ - | $ - | |
| 01.10.08 | PTSA - Double-Sided Textured HDPE Liner | m2 | 71,160 | $ - | $ - | |
| 01.10.09 | PTSA - Sumps, Piping, Pump Station, Access Points, and All Ancillary Items | LS | 1 | $ - | $ - | |
| 01.10.10 | PTSA - Concrete access road | LS | 1 | $ - | $ - | |
| 01.10.11 | PTSA - Excavate, Fill, and Compact Detention Pond Base | LS | 1 | $ - | $ - | |
| 01.10.12 | PTSA - Detention Ponds and Piping, and All Ancillary Items | LS | 1 | $ - | $ - | |
| 01.10.13 | Drainage - Clearing, Remove Vegetation | LS | 1 | $ - | $ - | |
| 01.10.14 | Drainage - Install Perimeter Concrete Lined Channel 1000 mm wide | LS | 1 | $ - | $ - | |
| 01.10.15 | Drainage - Install Perimeter Concrete Lined Channel 2000 mm wide | LS | 1 | $ - | $ - | |
| 01.10.16 | Drainage - Improve Existing Earthen Channel 1000 mm high | LS | 1 | $ - | $ - | |
| 01.10.17 | Drainage - Improve Existing Earthen Channel 1200 mm high | LS | 1 | $ - | $ - | |
| 01.10.18 | Drainage - 1000 mm by 1000 mm Box Culvert | EA | 3 | $ - | $ - | |
| 01.10.19 | Drainage - Double 1000 mm by 1000 mm Box Culvert | EA | 4 | $ - | $ - | |
| 01.10.20 | Monitoring Wells | EA | 4 | $ - | $ - | |
| 01.10.21 | Security Fence | LS | 1 | $ - | $ - | |
| 01.10.22 | Northern Control Gate | EA | 1 | $ - | $ - | |
| 01.10.23 | Southern Control Gate | EA | 1 | $ - | $ - | |
| 01.10.24 | Guard Shacks | EA | 3 | $ - | $ - | |
| 01.10.25 | Site Restoration | LS | 1 | $ - | $ - | |
| 20 DIG AND HAUL | $ - | |||||
| 01.20.01 | Dig and Haul - Clear, Chip and Stockpile of Vegetation | LS | 1 | $ - | $ - | |
| 01.20.02 | Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Soil - Excavation Depth up to 1.5m | m3 | 66,000 | $ - | $ - | |
| 01.20.03 | Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Soil - Excavation Depth >1.5 m | m3 | 64,700 | $ - | $ - | |
| 01.20.04 | Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Sediment | m3 | 18,800 | $ - | $ - | |
| 01.20.05 | Dig and Haul - Compaction at LTSA | m3 | 88,200 | $ - | $ - | |
| 01.20.06 | Dig and Haul - Unloading Low Concentration Material from LCSA; Transport, Placement and Grade LTSA | m3 | 30,000 | $ - | $ - | |
| 01.20.07 | Dig and Haul - Unloading, High Concentration Material from HCSA and HCTS; Transport, Placement and Grade in PTSA | m3 | 20,000 | $ - | $ - | |
| 01.20.08 | Monitoring Wells | EA | 3 | $ - | $ - | |
| 01.20.09 | Moveable Barrier Fence | LS | 1 | $ - | $ - | |
| 01.20.10 | Brick Fencing | m | 135 | $ - | $ - | |
| 01.20.11 | Guard Shacks | EA | 5 | $ - | $ - | |
| 01.20.12 | Site Restoration - Backfilling and Compaction of Borrow Materials | m3 | 131,400 | $ - | $ - | |
| 01.20.13 | Site Restoration - Topsoil | m2 | 194,000 | $ - | $ - | |
| 01.20.14 | Site Restoration - Sodding | m2 | 194,000 | $ - | $ - | |
| 30 ROADWAYS | $ - | |||||
| 01.30.01 | Access Road to Treatment area | LS | 1 | $ - | $ - | |
| 01.30.02 | Reconstruct SW-07 Road Section | LS | 1 | $ - | $ - | |
| 01.30.03 | Construction of Masonry Ditch | m | 7,200 | $ - | $ - | |
| 40 PROTECT, MAINTAIN, AND HANDOVER PROJECT ASSETS | $ - | |||||
| 01.40.01 | Maintainance of Installed Project Work - High Concentration Storage Area, High Concentration Temporary Storage, and Low Concentration Storage Area | LS | 1 | $ - | $ - | |
| 01.40.02 | Maintenance of Installed Project Work - Long Term Storage Area Including Drainage, LTSA Site Office, and all Associated Facilities | LS | 1 | $ - | $ - | |
| 01.40.03 | Operation and Maintenance of Treatment Area Components Including the PTSA, PTSA Detention Ponds, Drainage, Fencing, Guard Shacks, Access Roads, and all Associated Work | LS | 1 | $ - | $ - | |
| 01.40.04 | Grass cutting, and tree trimming alongside roadways, ditches, existing steel fencing | LS | 1 | $ - | $ - | |
| 01.40.05 | LTSA - Non-Woven Geotextile at base | LS | 1 | $ - | $ - | |
| 01.40.06 | LTSA - Final Cover | LS | 1 | $ - | $ - | |
| 50 STORAGE AND STAGING AREA DEMOLITION | $ - | |||||
| 01.50.01 | LCSA Demolition and Site Restoration | LS | 1 | $ - | $ - | |
| 01.50.02 | HCSA Demolition and Site Restoration | LS | 1 | $ - | $ - | |
| 01.50.03 | HCTS Demolition and Site Restoration | LS | 1 | $ - | $ - | |
| 01.50.04 | IM1 Staging Area Demolition | LS | 1 | $ - | $ - | |
| CLIN 1 SUBTOTAL | $ - | |||||
| 2 | 00 GENERAL | $ - | ||||
| 02.00.01 | Demobilization | LS | 1 | $ - | $ - | |
| CLIN 2 SUBTOTAL | $ - | |||||
| 3 | 20 DIG AND HAUL | $ - | ||||
| 03.20.01 | Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Soil - Excavation Depth up to 1.5m | m3 | 28,300 | $ - | $ - | |
| 03.20.02 | Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Soil - Excavation Depth >1.5 m | m3 | 30,100 | $ - | $ - | |
| 03.20.03 | Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Sediment | m3 | 11,300 | $ - | $ - | |
| 03.20.04 | Dig and Haul - Compaction at LTSA | m3 | 37,400 | $ - | $ - | |
| 03.20.05 | Hauling Treated Material to Stockpile | m3 | 50,000 | $ - | $ - | |
| 03.20.06 | Monitoring Wells | EA | 3 | $ - | $ - | |
| 03.20.07 | Site Restoration - Backfilling and Compaction of Borrow Materials | m3 | 58,400 | $ - | $ - | |
| 03.20.08 | Dig and Haul and Site Restoration - Unloading, Transport, Backfill and Compaction of Treated Material | m3 | 50,000 | $ - | $ - | |
| 03.20.09 | Temporary Steel Sheet Fence | m | 1,500 | |||
| 03.20.10 | On and Off-Base Gates | EA | 6 | $ - | $ - | |
| 30 ROADWAYS | $ - | |||||
| 03.30.01 | Construction of Masonry Ditch | m | 1,680 | $ - | $ - | |
| 03.30.02 | Hauling Road Maintance, Patching Type 1 | m2 | 20,000 | $ - | $ - | |
| 03.30.03 | Hauling Road Maintance, Patching Type 2 | m2 | 20,000 | $ - | $ - | |
| 03.30.04 | Hauling Road Maintance, Patching Type 3 | m2 | 20,000 | $ - | $ - | |
| 03.30.05 | Hauling Road Maintance, Patching Type 4 | m2 | 50,000 | $ - | $ - | |
| CLIN 3 SUBTOTAL | $ - | |||||
| 60 TOTAL DAY WORKS | $ 3,000,000 | |||||
| 03.60.01 | Total Day Works - The CONTRACTOR is not entitled to any part of the Day Work item, either partially or fully, unless specifically authorized by USAID | - | - | $ 3,000,000 | $3,000,000 | |
| CLIN 3 SUBTOTAL + TOTAL DAY WORKS | $ 3,000,000 | |||||
| 4 | 00 GENERAL | $ - | ||||
| 04.00.01 | Environmental Mitigation | LS | 1 | $ - | $ - | |
| 04.00.02 | Health and Safety, Including PPE and Blood Monitoring | LS | 1 | $ - | $ - | |
| 04.00.03 | Traffic Control | LS | 1 | $ - | $ - | |
| 04.00.04 | Decontamination | LS | 1 | $ - | $ - | |
| 04.00.05 | Site Office Operation and Maintenance | LS | 1 | $ - | $ - | |
| 04.00.06 | Project Management and Support | LS | 1 | $ - | $ - | |
| 04.00.07 | Bonds and Guarantees | LS | 1 | $ - | $ - | |
| 20 DIG AND HAUL | $ - | |||||
| 04.20.01 | Dig and Haul - Clear, Chip and Stockpile of Vegetation | LS | 1 | $ - | $ - | |
| 04.20.02 | Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Soil - Excavation Depth up to 1.5m | m3 | 18,360 | $ - | $ - | |
| 04.20.03 | Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Soil - Excavation Depth >1.5 m | m3 | 25,000 | $ - | $ - | |
| 04.20.04 | Dig and Haul - Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement and Grade of Sediment | m3 | 15,000 | $ - | $ - | |
| 04.20.05 | Dig and Haul - Compaction at LTSA | m3 | 23,400 | $ - | $ - | |
| 04.20.06 | Moveable Barrier Fence | LS | 1 | $ - | $ - | |
| 04.20.07 | Guard Shacks | EA | 6 | $ - | $ - | |
| 04.20.08 | Site Restoration - Topsoil | m2 | 70,340 | $ - | $ - | |
| 04.20.09 | Site Restoration - Sodding | m2 | 70,340 | $ - | $ - | |
| 30 ROADWAYS | $ - | |||||
| 04.30.01 | Construction of Masonry Ditch | m | 7,920 | $ - | $ - | |
| 40 PROTECT, MAINTAIN, AND HANDOVER PROJECT ASSETS | $ - | |||||
| 04.40.01 | Operation and Maintenance of Treatment Area Components Including the PTSA, PTSA Detention Ponds, Drainage, Fencing, Guard Shacks, Access Roads, and all Associated Work | LS | 1 | $ - | $ - | |
| 04.40.02 | Grass cutting, and tree trimming alongside roadways, ditches, existing steel fencing | LS | 1 | $ - | $ - | |
| 04.40.03 | LTSA - Non-Woven Geotextile at base | LS | 1 | $ - | $ - | |
| 04.40.04 | LTSA - Final Cover | LS | 1 | $ - | $ - | |
| CLIN 4 SUBTOTAL | $ - | |||||
| TOTAL BASE BID (CLIN 1 + CLIN 2 + CLIN 3 + TOTAL DAY WORKS + CLIN 4) | $ 3,000,000 |