20211203 SF30 Amendment_1 to IFB_72044021B00001 for USAID Civil Works P1 for Dioxin Remediation at Bien Hoa Airbase Area.pdf

PDF 274 KB Posted

Attached to
USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1
Solicitation number
72044021B00001
Issued by

About this file

This solicitation seeks bids for a construction contract to conduct dioxin remediation at Bien Hoa Airbase Area in Vietnam. The United States Agency for International Development (USAID) in Vietnam will award a fixed-price contract with optional periods of performance to remove and store contaminated soil and sediment from the airbase. Interested firms must be registered in the System for Award Management and hold required licenses. The estimated value of services and materials required exceeds $50 million. Bids are due by February 11, 2022 and will be publicly opened on February 16, 2022. A virtual pre-bid site visit was held on December 1, 2021 and the question deadline is December 17, 2021. The contractor will remove approximately 244,000 cubic meters of soil and 37,000 cubic meters of sediment over four years from designated storage and decision units using methods that minimize environmental impact.

View the file

Other files

File Type Posted
J.2-Bid_Form_IFB_Amendment_6.xlsx XLSX spreadsheet
20220216_Amendment_6_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.13_Compendium_IFB_Amendment_5.pdf PDF
20220214_Amendment_5_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.2-Bid_Form_IFB_Amendment_5.xlsx XLSX spreadsheet
20220126_Amendment_4_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.2-Bid_Form_IFB_Amendment_4.xlsx XLSX spreadsheet
J.4_10_Treatment_Area_IFB_Amendment+3.pdf PDF
J.2_Bid_Form_IFB_Amendment_3.xlsx XLSX spreadsheet
J.9_40_LTSA_Final_Cover_IFB_Amendment_3.pdf PDF
J.13_Compendium_IFB_Amendment_3.pdf PDF
20220122_Amendment_3_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.8_30_Roadways_IFB_Amendment_3.pdf PDF
J.2-Bid_form_IFB Amendment#2.xlsx XLSX spreadsheet
J.8-30_Roadways_Amendment 2.pdf PDF
J.13_Compendium_Amendment 2.pdf PDF
J.3_Civil_Works_Phase_1_Overview_Amendment 2.pdf PDF
J.12_Groundwater_Contours_Amendment 2.pdf PDF
J.11-IM2_LTSA_and_HCTS_Plans_and_Sections_Amendment 2.pdf PDF
J.10-IM1_LCSA_HCSA_and_Staging_Area_Plans_and_Sections_Amendment 2.pdf PDF
20220115 Amendment_2 to IFB_72044021B00001 for USAID Civil Works P1 for Dioxin Remediation at Bien Hoa Airbase Area.pdf PDF
J.5-Decision_Units_Amendment 2.pdf PDF
J.6-20_Dig_and_Haul_SW-07_Amendment 2.pdf PDF
20220115 Revised No. 2 lFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1.pdf PDF
20211203 Revised No. 1 lFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1.pdf PDF
20211201 CW1 Virtual Conference IFB No. 72044021B00001.pdf PDF
20211203 J.1_SF1442-14b IFB_72044021B00001 BH CW1_removed block 17.pdf PDF
20211117 lFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1.pdf PDF
J.18-BRANDING IMPLEMENTATION PLAN AND MARKING PLAN.pdf PDF
J.11-IM2_LTSA_and_HCTS_Plans_and_Sections.pdf PDF
J.9-40_LTSA_COVER.pdf PDF
J.3-Civil_Works_Phase_1_Overview.pdf PDF
J.13-Compendium.pdf PDF
J.1_SF1442-14b IFB_72044021B00001 BH CW1.pdf PDF
J.16-Site_wide_EMMP.pdf PDF
J.4-10_Treatment_area.pdf PDF
J.6-20_D_H_SW-07.pdf PDF
J.5-Decision_Units.pdf PDF
J.10-IM1_LCSA_HCSA_and_Staging_Area_Plans_and_Sections.pdf PDF
J.7-20_D_H_NF-04.pdf PDF
J.12-Groundwater Contours.pdf PDF
J.8-30_Roadways.pdf PDF
J.15-Site-wide_HASP_Sign_off_Page.docx DOCX document
J.2-Bid_form.xlsx XLSX spreadsheet
J.17-Site-wide_EMMP_Sign_off_Page.docx DOCX document
J.19-Certification of Key personnel.xlsx XLSX spreadsheet
J.14-Site_wide_HASP.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NO.

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NO.

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment of each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC- KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 10-83)

is required to sign this document and return copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY /s/

Contractor X one

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 STANDARD FORM 30

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(No., street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If applicable)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

(X)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 1

See Block 16 C USAID/Vietnam Office of Acquisition and Assistance (OAA) 15/F Tung Shing Building, 2 Ngo Quyen Hanoi, Vietnam

To all Offerors IFB No. 72044021B00001

X one

Invitation for Bids (IFB) No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1

The purpose of this amendment is to:

1. incorporate questions received during the virtual conference and answers thereto as an integral part of the IFB. See also the Revised No.

1 of IFB as attached; and,

2. include the slide presentation of the virtual conference held on December 1, 2021, as an integral part of this solicitation.

Except as so stated, all other terms and conditions in the original RFP remain the same.

Link to recorded site walk: https://drive.google.com/file/d/1OIbXSPTlmM_woa4R9q9dP5DuHH8oEgJG/view?usp=sharing

Suzanne H. Johnson

December 3, 2021

Attachment No. 1 Amendment No. 1 to IFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1

Questions Received Pertaining to IFB No. 72044021B00001 and Corresponding USAID Answers:

1. Is it correct that we will need to submit a bond with 30% contract value within 10 days of award? This is quite high.

USAID: That is correct. Bid guarantee at 20% of the base bid price, but not to exceed $3 million must be submitted with the Bid Package. Performance and Payment Bonds at 30% of the contract value then must be submitted within 10 days after the date of the Contract Award. Please refer to paragraph F.5.1 Bonds or Guarantees for Contract Performance.

2. Is there any mobilization advance payment to help offset the cost of the bond?

USAID: There is no mobilization advance payment authorized. Payments will be made based on the approved Schedule of Values (SOVs). Please refer to Section G.6 PAYMENT for more details.

3. Reference is made to Attachment J.1. STANDARD FORM 1442, Item 17. Please verify the number "28 calendar days". It seems incorrect. The Item should be filled by Offeror. Thanks

USAID: Thank you. The reference of ”28 Calendar days” in Block 17 of the SF 1442 is removed. The Bidders will fill out the information upon bid submission. A revised SF 1442 is attached with this amendment.

4. SAM is requested for JV, so financial is empty or get from "higher percent" member in JV? (SAM register procedure ask to fill form with financial report)

USAID: It is our understanding that the financial information required for JV’s in sam.gov registration is bank information and tax status (for the JV entity). While the JV’s agreement and arrangement are internal matters, it is our experience that the managing partner of the JV with a larger share of ownership also manages the finances. The bank account is usually an account opened by the JV entity.

5. Does USAID prefer US Contractor over local Contractor?

USAID: There is no preference. The IFB award is based on cost and cost related factors only as well as the apparent low bidder being deemed responsible and responsive.

6. Table 1. Estimated Annual Volume of Dig and Haul under Section C. 5 WORK COMPONENTS, the Year 4’s second Soil Quantity (red highlighted) is amended to 37,000 cubic meters instead of 387000 which is a typo.

Table 1. Estimated Annual Volume of Dig and Haul

PHASE 1

VOLUME (m3) STORAGE

SOURCE DECISION UNITS/ ACTIVITIES

SOIL SEDIMENT

Year 1 Dry Season

35,000 0

LTSA

NF-04A, NF-04B

30,000 0 Move low concentration material from LCSA to LTSA

20,000 0 PTSA Move high concentration material from HCTS and HCSA to PTSA

Year 2 Dry Season

14,000 1,000 LTSA SW-07E, SW-07A1, SW-07A2, NE-07, PI-02E

65,000 1,000 PTSA SW-07A1, SW-07A2, SW-7D, NE-07, ZT-02B, PI-02D, PI-02E

Year 3 Dry Season

18,000 LTSA NE-08A, NE-08B, NE-09, NE-15C, PI-02B1, PI-02C1

32,000 0 PTSA PI-02B1, PI-02C1,

Year 4 Dry Season (Option)

11,000 15,000 LTSA NE-11, NE-12, DONRE-A2-2B, NW-03C, NW-04A, PI-12, PI-15, PI-13A1

37,000 2,000 PTSA PI-02A (57%), DONRE-A1, DONRE-A2-3C, PI-12, PI-15

TOTAL 244,000 37,000

[End of Attachment 1] http://sam.gov/