J.3_Civil_Works_Phase_1_Overview_Amendment 2.pdf

PDF 6 MB Posted

Attached to
USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1
Solicitation number
72044021B00001
Issued by

About this file

This Invitation for Bid issued by the United States Agency for International Development in Vietnam solicits fixed-price bids for a construction contract to perform USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area - Phase 1. Bidders must provide construction services including site remediation and regrading across approximately 200 hectares of land at the Bien Hoa Airbase. The estimated total bid value exceeds $50 million. Questions are due by December 17, 2021 and bids must be submitted electronically by February 11, 2022. A virtual bid opening will be held on February 16, 2022. The award will be a single-award fixed-price contract with optional periods of performance in accordance with FAR Parts 14, 16, 17 and 36. Bidders must be registered in the System for Award Management and hold required Vietnamese licenses. Only US and Vietnamese firms are eligible under the specified geographic code.

View the file

Other files

File Type Posted
J.2-Bid_Form_IFB_Amendment_6.xlsx XLSX spreadsheet
20220216_Amendment_6_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.13_Compendium_IFB_Amendment_5.pdf PDF
20220214_Amendment_5_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.2-Bid_Form_IFB_Amendment_5.xlsx XLSX spreadsheet
20220126_Amendment_4_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.2-Bid_Form_IFB_Amendment_4.xlsx XLSX spreadsheet
J.4_10_Treatment_Area_IFB_Amendment+3.pdf PDF
J.2_Bid_Form_IFB_Amendment_3.xlsx XLSX spreadsheet
J.9_40_LTSA_Final_Cover_IFB_Amendment_3.pdf PDF
J.13_Compendium_IFB_Amendment_3.pdf PDF
20220122_Amendment_3_IFB_72044021B00001_USAID Civil Works P1 for Dioxin Remediation at BH Airbase.pdf PDF
J.8_30_Roadways_IFB_Amendment_3.pdf PDF
J.2-Bid_form_IFB Amendment#2.xlsx XLSX spreadsheet
J.8-30_Roadways_Amendment 2.pdf PDF
J.13_Compendium_Amendment 2.pdf PDF
J.12_Groundwater_Contours_Amendment 2.pdf PDF
J.11-IM2_LTSA_and_HCTS_Plans_and_Sections_Amendment 2.pdf PDF
J.10-IM1_LCSA_HCSA_and_Staging_Area_Plans_and_Sections_Amendment 2.pdf PDF
20220115 Amendment_2 to IFB_72044021B00001 for USAID Civil Works P1 for Dioxin Remediation at Bien Hoa Airbase Area.pdf PDF
J.5-Decision_Units_Amendment 2.pdf PDF
J.6-20_Dig_and_Haul_SW-07_Amendment 2.pdf PDF
20220115 Revised No. 2 lFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1.pdf PDF
20211203 SF30 Amendment_1 to IFB_72044021B00001 for USAID Civil Works P1 for Dioxin Remediation at Bien Hoa Airbase Area.pdf PDF
20211203 Revised No. 1 lFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1.pdf PDF
20211201 CW1 Virtual Conference IFB No. 72044021B00001.pdf PDF
20211203 J.1_SF1442-14b IFB_72044021B00001 BH CW1_removed block 17.pdf PDF
20211117 lFB No. 72044021B00001 USAID Civil Works for Dioxin Remediation at Bien Hoa Airbase Area – Phase 1.pdf PDF
J.18-BRANDING IMPLEMENTATION PLAN AND MARKING PLAN.pdf PDF
J.11-IM2_LTSA_and_HCTS_Plans_and_Sections.pdf PDF
J.9-40_LTSA_COVER.pdf PDF
J.3-Civil_Works_Phase_1_Overview.pdf PDF
J.13-Compendium.pdf PDF
J.1_SF1442-14b IFB_72044021B00001 BH CW1.pdf PDF
J.16-Site_wide_EMMP.pdf PDF
J.4-10_Treatment_area.pdf PDF
J.6-20_D_H_SW-07.pdf PDF
J.5-Decision_Units.pdf PDF
J.10-IM1_LCSA_HCSA_and_Staging_Area_Plans_and_Sections.pdf PDF
J.7-20_D_H_NF-04.pdf PDF
J.12-Groundwater Contours.pdf PDF
J.8-30_Roadways.pdf PDF
J.15-Site-wide_HASP_Sign_off_Page.docx DOCX document
J.2-Bid_form.xlsx XLSX spreadsheet
J.17-Site-wide_EMMP_Sign_off_Page.docx DOCX document
J.19-Certification of Key personnel.xlsx XLSX spreadsheet
J.14-Site_wide_HASP.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

kkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k

!E

A

C

D

A C

A

C

CA

B B

B

ABC

C

A B

B C

A C

AB

B C C B A

A

B

A

C

C1

A1

B1

A1

REV

BẢN

DESCRIPT ION

ĐIỀU CHỈNH

DAT E

NGÀY

BY

BỞI

PREPARED FOR

CHỦ ĐẦU T Ư

A&E BIEN HOA CONT RACT OR

NHÀ T HẦU T V &T K BIÊN HÒA

T rigon Assoc ia tes, IIc 1515 Poydra s St., Ste 2200 New Orlea ns, L A 70112 www.trigona ssoc ia tes.c om

ENGINEERING CONSU L T ING MANAGEMENT

PREPARED BY

NGƯ ỜI T HỰ C HIỆN:

CHECKED BY

NGƯ ỜI KIỂM T RA:

DESIGNER OF RECORD

CHỦ NHIỆM T HIẾT KẾ:

PROJECT NAME/ T ÊN DỰ ÁN:

60% DESIGN

IT EM/ HẠNG MỤC:

IFB AT T ACHMENT J.3

CIV IL WORKS - PHASE 1 OV ERV IEW

DRAWING T IT L E/ T ÊN BẢN V Ẽ:

CIV IL WORKS - PHASE 1 OV ERV IEW

DAT E/ NGÀY : SIZ E/ KHỔ: SCAL E/ T Ỉ L Ệ:

AS NOT ED

DRAWING NO/ BẢN V Ẽ SỐ:SHEET

T Ờ:

OF

CỦA: 01

A311-Ja n-2022

DIOXIN REMEDIAT ION AT BIEN HOA

AIRBASE AREA PROJECT - PHASE 1

DỰ ÁN XỬ L Ý Ô NHIỄM DIOXIN KHU V Ự C

SÂN BAY BIÊN HÒA - GIAI ĐOẠN 1

HU Y NH MINH T HIEN

L E T HI T HANH T HU Y

L ISBET H HABANS NAGRAT H

§̈¦G

§̈¦G

LT SA

G

UCDDA

G G

IM1 - ST AGING AREA

A&E OFFICE

IM1 OFFICE

IM2 OFFICE

PI-05

k k k k k k k k k k k k k k k k kk kk kk kk kk k k kk k k k k k k k k k k k k kk k k k k k k k k k k k k kk k k k k k k k kk k k k k kk k k k k k k kk k k k k k k k k k k k k k k kkk kk k k k k k k k k k k kk k k k k k k k k

!2B

3C

ZOOM SCALE 1: 1,000

G

PI-13A1

G

G

NW-04

G

NW-03

NE-07

G

NE-08

NE-15

NE-09

NE-11 NE-12

G

G

ZT-02

SW-07

DONRE-A2

PI-15

G

PI-12

DONRE-A1 G

PI-02

LCSA

HCSA

HCT S

PI-13

GATE/ CỔNG 10

§̈¦G

ZOOM SCALE 1: 2,000

G

A1 B1

B3

B1 B2

A2

A1

B1

C1

D

E

§̈¦G

- L T SA: L ONG-T ERM ST ORAGE AREA

/BÃI L Ư U GIỮ L ÂU DÀI

- L CSA: L OW CONCENT RAT ION ST ORAGE AREA

/BÃI L Ư U GIỮ NỒNG ĐỘ T HẤP

- HCSA: HIGH CONCENT RAT ION ST ORAGE AREA

/BÃI L Ư U GIỮ NỒNG ĐỘ CAO

- HCT S: HIGH CONCENT RAT ION T EMPORARY ST ORAGE

/BÃI L Ư U GIỮ T ẠM NỒNG ĐỘ CAO

- U CDDA: U NCONT AMINAT ED CONST RU CT ION DEBRIS

DISPOSAL AREA

/ BÃI ĐỔ CHẤT T HẢI KHÔNG NHIỄM

KEY NOTE/ GHI CHÚ:

01O-01

LEGEND/ CHÚ GIẢI

AIRBASE GAT E/ CỔNG SÂN BAY

AIRBASE BOU NDARY / RANH GIỚI SÂN BAY

DECISION U NIT BOU NDARY (DU S)/ RANH ĐƠN NGU Y ÊN

L T SA BOU NDARY / RANH GIỚI BÃI L T SA

HCT S/ HCSA

L CSA

U CDDA

SOIL T O T REAT MENT / ĐẤT MANG ĐI XỬ L Ý

SOIL T O ST ORAGE/ ĐẤT MANG ĐI L Ư U T RỮ

SEDIMENT T O T REAT MENT / BÙN MANG ĐI XỬ L Ý

SEDIMENT T O ST ORAGE/ BÙN MANG ĐI L Ư U T RỮ

ACTION LEVEL/ CẤP HÀ NH ĐỘNG

EXIST ING FENCING/ HÀNG RÀO HIỆN HỮU

FENCING T O BE CONST RU CT ED AT T REAT MENT AREA

/ HÀNG RÀO BẢO V Ệ KHU V Ự C XỬ L Ý

PRE-T REAT MENT ST ORAGE AREA (PT SA)

/ BÃI T ẬP KẾT T RƯ ỚC XỬ L Ý

ROAD T O BE U PGRADED AND MAINT AINED

/ ĐƯ ỜNG ĐƯ ỢC NÂNG CẤP V ÀO BẢO T RÌ

ROAD T O BE RECONST RU CT ED AND MAINT AINED

/ ĐƯ ỜNG ĐƯ ỢC XÂY L ẠI V À BẢO T RÌ

ROAD T O BE MAINT AINED (REPAIRED/ RECONST RU CT ED)

/ ĐƯ ỜNG ĐƯ ỢC BẢO T RÌ (SỬ A CHỮA / PHỤC HỒI)

T REAT ED MAT ERIAL ST ORAGE AREA (T MSA)

/ BÃI T ẬP KẾT SAU XỬ L Ý

k kk kk k kk kk k

GU ARD SHACK/ CHỐT BẢO V Ệ

OFF-BASE T EMPORARY ST EEL FENCING

/ HÀNG RÀO T ẠM NGOÀI SÂN BAY

§̈¦G

SU PPORT AREA/ KHU V Ự C HỖ T RỢ

T HIS DOCU MENT IS 60% DESIGN AND IS

NOT INT ENDED FOR CONST RU CT ION OR

PERMIT PU RPOSES

ENGINEER: L ISBET H HABANS NAGRAT H

L OU ISIANA L ICENSE NO. 36792

300 0 300150 M

PROJECTION/ HỆ TỌA ĐỘ:

V N-2000, CENT RAL MERIDIAN 1070 45', 3 DEGREE

/ V N-2000, KINH T U Y ẾN T RỤC 1070 45', 3 ĐỘ

SCALE/ TỈ LỆ: 1:5,000

GATE/ CỔNG 3

GATE/ CỔNG 2

PRE-T REAT MENT ST ORAGE AREA (PT SA)

/ BÃ I T ẬP KẾT T RƯỚ C XỬ LÝ

FENCING TO BE CONST RUCT ED

/ HÀNG RÀO SẼ ĐƯỢ C XÂY DỰNG

T REAT ED MAT ERIAL STORAGE AREA (T MSA)

/ BÃ I T ẬP KẾT SAU XỬ LÝ

GATE/ CỔNG 1

BLUE GATE

/ CỔNG XANH

File details come from the government source that posted it. Updated .