This document contains an aboveground storage tank inspection form and details of a related federal contract opportunity for maintenance and repair services. The inspection form provides a checklist for monthly inspections of aboveground storage tanks, related equipment, and containment areas. Items on the checklist include verifying tanks and piping are free of leaks, overfill prevention equipment operates correctly, and concrete structures remain intact without cracks.
The corresponding federal contract opportunity is a solicitation from the Naval Facilities Engineering Command to provide testing, calibration, adjustment, and repair services for cathodic protection systems, automatic tank gauging and fuel management systems, and associated equipment on aboveground and underground tanks, piers, and quay walls at the Naval Submarine Base New London in Groton, Connecticut. The contractor will be responsible for all labor, materials, equipment, transportation, supervision, and management to perform the required work.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABOVEGROUND STORAGE TANK INSPECTION FORM ‐ MONTHLY
Inspector:
NO N/A COMMENTS
For double‐walled or concrete‐encased tanks, is the interstice free of liquid? Remove liquid if found.
Is the spill bucket empty, free of visible leaks, and in good working condition?
Tank Location: Date and Time:
Is the primary tank free of water or has another preventative measure been taken?
For double‐walled or concrete‐encased tanks, is the interstitial monitoring equipment in good condition?
Inspect concrete exterior body of the tank for cleanliness, need of coating, or rusting where applicable. Is tank exterior in acceptable condition?
Visual inspect all tank top openings including nipples, manways, tank top overfill containers, and leak detection tubes. Is the sealant between all tank top openings and concrete intact and in good condition?
Tank ID #:
YES
Tank and Piping
If overfill equipment has a "test" button, does it activate the audible horn or light to confirm operation? If battery operated, replace battery if needed.
Is the tank level gauge legible and in good working condition?
Is the tank exterior and piping free of visible leaks? If no, explain.
Is the area around the tank free of visible signs of leakage?
Equipment on Tank
Concrete Exterior AST
Containment (Diking / Impounding)
Inspect all sides for cracks in concrete. Is the concrete free of any cracks in the exterior wider than 1/16 inch?
Additional Information:
Are piping connections to the tank (valves, fittings, pumps, etc.)
free of visible leaks? If no, describe.
Is overfill prevention equipment in good working condition? If equipped with a mechanical test mechanism, actuate the mechanism to confirm operation.
Is the containment free of excess liquid, debris, cracks, corrosion, erosion, fire hazards, and other integrity issues?
Is the system free of any other conditions that need to be addressed for continued safe operation?
If "NO" is marked for any item above, immediate corrective action may be required.
Other Conditions
Are berm drain valves closed and in good working condition?
Are containment egress pathways clear and gates / doors operable?
Do the ladders/platforms/walkways appear to be secure with no sign of severe corrosion or damage?