This document outlines a functional assessment plan for facility investment cathodic protection maintenance and repair services. Key details include performance objectives and standards for responding to service orders within specified timeframes, conducting preventative maintenance according to a schedule, and testing cathodic protection systems and automatic tank gauging equipment annually. The contractor must meet standards for sample sizes, response times, completion times and conduct a monthly performance review. The related federal contract opportunity is for testing, calibrating, adjusting and repairing cathodic protection, tank gauging and fuel management systems for above-ground and underground tanks at the Naval Submarine Base in New London, Connecticut. The contractor will provide all labor, materials, equipment, transportation and management to perform the work.

View the file

Other files

File Type Posted
N4008520R3006 002.pdf PDF
J-1502000-10 UNDERGRD STORAGE TANK INSP FORM MONTHLY-ANNUAL.pdf PDF
Amendment 1_site_visit.pdf PDF
J-1502000-9 STI 6th AST Annual.pdf PDF
J-150200-12 ELINS cathodic 2020.xls XLS spreadsheet
J-0200000-09 Charc Meter Reading.xlsx XLSX spreadsheet
1502000 F Facility Investment CATHODIC.pdf PDF
J-0200000-08 Specification Information.xlsx XLSX spreadsheet
20R3006_Cathodic Protection.pdf PDF
J-0200000-07 Asset Information.xlsx XLSX spreadsheet
J-0200000-11 SPCC Plan.pdf PDF
J-020000-05A Quality Inspection and Surveillance report.xlsx XLSX spreadsheet
1502000 C Facility Investment CATHODIC.pdf PDF
0200000 F Management and Administration v2.8.pdf PDF
J-1502000-06 Service Order Summary Report.xlsx XLSX spreadsheet
J-020000-05B On site Labor Summary Report (1).xlsx XLSX spreadsheet
0200000 C Management and Administration v2.9.pdf PDF
J-1502000-05 CATHODIC INVENTORY.xlsx XLSX spreadsheet
1502000 J Facility Investment CATHODIC.pdf PDF
0100000 C General Information Cathodic Protection.pdf PDF
J-1502000-03 BASE MAP 2019.pdf PDF
J-1502000-08 ABOVEGROUND STORAGE TANK INSP FORM MONTHLY.pdf PDF
J-0200000-04 Invoice Form.pdf PDF
NEPA_AST_UST_Cathodic2020_signed.pdf PDF
J-1502000-07 Maintenance Summary Report - Copy.xlsx XLSX spreadsheet
J-0200000-06 - Ser Provider Info.xlsx XLSX spreadsheet
0200000 J Management and Administration v2.6.pdf PDF
J-1502000-10 STI 6th AST Monthly.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FUNCTIONAL ASSESSMENT PLAN (FAP)

FACILITY INVESTMENT

1502000

UST/AST/CP 20-D-9607

FACILITY INVESTMENT FAP

Assessment Levels (AL) Assessment Frequency (Freq)

A – Annually

Q – Quarterly

M – Once per month

BW – Once every 13-16 days

W – Once per week

R – As required

Method of Assessment (MOA)

PS – Periodic Sampling

VCC – Validated Customer Complaints

UV – Unscheduled Visits

CE – Customer’s Evaluation

AL1

Start assessment at this Level

AL2

Add this Level if Contractor performance for AL1 is Unsatisfactory

AL3

Add this Level if Contractor performance at AL1 or AL2 is Unsatisfactory

Note: Return to appropriate Assessment Level when performance improves.

Note: The first method listed in the MOA column below is the primary assessment method.

Spec Item

Performance Objective Performance Standard MOA

Assessment Level Sample Size

Freq

AL1 AL2 AL3

UOM

(total)

Normal Reduced

3.1 Service Orders

The Contractor shall perform service order work in a timely manner and ensure that cathodic protection systems and storage tanksare restored to a safe, normal working condition and function properly.

Service order work is responded to and completed within the specified time.

Cathodic Protection systems are restored to normal working condition, including recertification if applicable.

When repair is complete, the Cathodic Protection systems does not present danger to personnel or equipment.

PS

VCC

N/A

Trouble

Calls

(2)

10%

5%

M

3.1.1 Emergency Service Orders

The Contractor shall respond to emergency service orders and arrest emergent conditions to minimize and mitigate damage to facilities, ground structures, personal property equipment, and installed equipment and systems

Emergency service orders responded to within two hours of receipt of call.

Emergency service orders are arrested within 24 hours of receipt of call.

Work is continued without interruption until emergent condition is arrested.

Item

Performance Objective Performance Standard MOA

Assessment Level Sample Size

Freq

AL1 AL2 AL3

UOM

(total)

Normal Reduced and danger to personnel. (NOT IN CONTRACT)

3.1.2 Urgent Service Orders

The Contractor shall complete urgent service orders in a timely manner and ensure facilities, ground structures, personal property equipment, and installed equipment and systems are restored to a safe, normal working condition and function properly.

Urgent service orders shall be responded to within 8 hours of notification and are completed within five working days.

Trouble

Calls

(2)

3.1.3 Routine Service Orders

The Contractor shall complete routine service orders in a timely manner and ensure facilities, ground structures, personal property equipment, and installed equipment and systems are restored to a safe, normal working condition and function properly.

Routine service orders shall be responded to within 5 days and completed within 30 calendar days.

(NOT IN CONTRACT)

3.2 Preventive Maintenance (PM)

Program The Contractor shall develop and implement a PM program for facilities, ground structures, personal property equipment, and installed equipment and systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.

PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.

Tanks/

CP

(77)

5%

3.2.1 Cathodic Protection Systems

The Contractor shall perform maintenance on cathodic protection systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

Maintenance is performed in accordance with Contractor's PM program and work schedule.

Repairs within the PM limit are accomplished prior to PM completion.

(20)

Item

Performance Objective Performance Standard MOA

Assessment Level Sample Size

Freq

AL1 AL2 AL3

UOM

(total)

Normal Reduced

Notification of repair work exceeding the PM limit is submitted to the KO within the specified time limit.

3.2.2 Automatic Tank Guaging and

Fuel Management Systems The Contractor shall perform PM on Automatic Tank Gauging Systems, Fuel Management Systems and associated parts (to include AST, UST and plumbing) to ensure proper operation, to minimize breakdowns, and to maximize useful life.

PM is accomplished per the Contractor's program and work schedule.

Repairs within the PM limit are accomplished prior to PM completion.

Notification of repair work exceeding the PM limit is submitted to the KO within the specified time limit.

Tanks

(56)

3.2.3 Propane Pipe Testing

The contractor shall perform propane pipe testing to ensure installed equipment and systems are fully functional and in normal working condition.

Testing is accomplished annually in accordance with the Contractor’s Schedule.

(1)

4 IDIQ Work IDIQ work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.

As

Require d

R

MONTHLY PERFORMANCE ASSESSMENT SUMMARY

Contract #: N40085-20-D-9607 Installation/Site: SUBASE NLON

Annex/sub-annex: 1502000 Facility Investment Month/Year:

Title

AL1 AL2/AL3 VCC Safety QMS review

Item E M N E M N Pos Neg Issues # Samples A U

3.1 Service Orders

3.1.1 Emergency Service Orders

3.1.2 Urgent Service Orders

3.1.3 Routine Service Orders

3.2 Preventive Maintenance

(PM) Program

3.2.1 Cathodic Protection Systems

3.2.2 Automatic Tank Gauging

and Fuel Management

Systems

3.2.3 Propane Pipe Testing

4 Non-Recurring Work TO

Comments:

Recommended Actions:

Technical Ratings (mark using "X")

E VG S M U

Overall Technical Rating for Recurring Work

Overall Technical Rating for Non-Recurring Work

COR Signature: Date:

E = Standards Exceeded; M = Standards Met; N = Standards Not Met

File details come from the government source that posted it. Updated .