This document contains an inventory of cathodic protection, fuel management, and water systems requiring maintenance and calibration services at the Naval Submarine Base New London in Groton, Connecticut. There are 13 cathodic protection systems across various piers and quay walls, 10 underground storage tanks ranging in capacity from 1,000 to 30,000 gallons, and 47 above-ground storage tanks holding fuels, oils, waste oils, and waters from 275 to 500,000 gallons. Additionally, the inventory lists 7 propane systems and 3 water towers requiring testing.
The related federal contract opportunity solicitation seeks proposals to test, calibrate, adjust, and repair the cathodic protection, automatic tank gauging, and fuel management systems on the above-ground and underground tanks, associated piping, piers and quay walls. The contractor will provide all labor, materials, equipment, transportation, supervision, and management to perform the work for the Department of the Navy Naval Facilities Engineering Command. The period of performance and pricing terms are not specified.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Inventory
| CP SYSTEMS | |||||
| CUSTOMERS | CP | Rectifiers | |||
| Pier 6 | CNIC | 1 | No | ||
| Pier 8 | CNIC | 1 | No | ||
| Pier 10 | CNIC | 1 | Yes (2) | ||
| Pier 12 | CNIC | 1 | Yes | UST/AST Cathodic Protection | |
| Pier 15 | CNIC | 1 | No | ||
| Pier 17 | CNIC | 1 | No | ||
| Pier 31 | CNIC | 1 | No | ||
| Pier 32 | CNIC | 1 | Yes | ||
| Pier 33 | CNIC | 1 | Yes | ||
| Quay Wall Pier 4 | CNIC | 1 | Yes | CP = Cathodic Protection System = | Requires contractor to test and record readings, PM equipment/ repair up to (PM) limit . |
| Quay Wall Pier 8 | CNIC | 1 | Yes | Refer to inspection checklist for CP inspection frequencies. | |
| Quay Wall Pier 13 | CNIC | 1 | Yes | ||
| Quay Wall Pier 32 | CNIC | 1 | Yes | FM = Fuel Management System = | Requires contractor to inspect tank/ record data /PM equipment/ repair up to (PM) limit. |
| Average Pier length = 470LF | |
| Quay walls approximately 3200LF | |
| TOTAL AMOUNT OF SYSTEMS | 13 |
| UST | CONTENTS | CAPACITY (GALLONS) | ||||
| CUSTOMER | CP | FM | ||||
| B-29-1 | CNIC | 0 | 1 | B29, Power Plant | FUEL OIL | 30,000 |
| B-29-2 | CNIC | 0 | 1 | B29, Power Plant | FUEL OIL | 30,000 |
| B-29-3 | CNIC | 0 | 1 | B29, Power Plant | FUEL OIL | 30,000 |
| B-29-4 | CNIC | 0 | 1 | B29, Power Plant | FUEL OIL | 30,000 |
| B-325-4 | CNIC | 0 | 1 | Weapons | FUEL OIL | 5,000 |
| B-428-1 | CNIC | 1 | 1 | NEX Gas Station | GASOLINE | 10,000 |
| B-428-9 | CNIC | 1 | 1 | NEX Gas Station | GASOLINE | 20,000 |
| B-428-11 | CNIC | 0 | 1 | NEX Gas Station | E-85 | 5,000 |
| B-524 | CNIC | 0 | 1 | Weapons. | FUEL OIL | 1,500 |
| CT-383 | CNIC | 1 | 1 | Child Care Center | FUEL OIL | 1,000 |
| TOTAL UST | 3 | 10 |
| AST | ||||||
| CUSTOMERS | CP | FM | Location | |||
| AFA-1A | CNIC | 0 | 1 | Admiral Fife Caretaker House | FUEL OIL | 500 |
| AFA-2A | CNIC | 0 | 1 | Admiral Fife Guest House | FUEL OIL | 350 |
| B-29 REC | CNIC | 0 | 1 | B29, Power Plant | Reclamation | 30,000 |
| B-29A-1 | CNIC | 0 | 1 | B29, Gen. Day Tank | FUEL OIL | 500 |
| B-29A-2 | CNIC | 0 | 1 | B29, Gen. Day Tank | FUEL OIL | 500 |
| B-33A | CNIC | 0 | 1 | Supply Warehouse | FUEL OIL | 2,000 |
| B-77A | CNIC | 0 | 1 | Communications | Diesel | 270 |
| B-141A | CNIC | 0 | 1 | NSMRL | FUEL OIL | 300 |
| PP-141A-1 | CNIC | 0 | 1 | Fire Department | FUEL OIL | 550 |
| PP-141A-2 | CNIC | 0 | 1 | Fire Department | FUEL OIL | 550 |
| B-174A | CNIC | 0 | 1 | NSSF | FUEL OIL | 1,000 |
| B-175A-1 | CNIC | 0 | 1 | NSSF | Diesel | 550 |
| B-175A-2 | CNIC | 0 | 1 | NSSF | FUEL OIL | 2,000 |
| B-176A | CNIC | 0 | 1 | NSSF | FUEL OIL | 1,000 |
| B-181A | CNIC | 0 | 1 | PWD Self-Help | FUEL OIL | 1,000 |
| B-355A | CNIC | 0 | 1 | DRMO | FUEL OIL | 1,000 |
| B-408A | CNIC | 0 | 1 | Supply | FUEL OIL | 1,000 |
| B-410A | CNIC | 0 | 1 | Dolphin Express | FUEL OIL | 1,000 |
| B-428A-10 | CNIC | 0 | 1 | Car Wash | FUEL OIL | 1,000 |
| B-436A | CNIC | 0 | 1 | SLC/EB | FUEL OIL | 1,000 |
| B-451A | CNIC | 0 | 1 | Shops | FUEL OIL | 2,000 |
| B-460A-1 | CNIC | 0 | 1 | PWD Transportation | FUEL OIL | 10,000 |
| B-460A-3 | CNIC | 0 | 1 | MWR | WASTE OIL | 800 |
| B-461A | CNIC | 0 | 1 | Package Store | FUEL OIL | 800 |
| B-518A | CNIC | 0 | 1 | Subschool | DIESEL | 500 |
| B-530A-1 | CNIC | 0 | 1 | MWR Golf Course | FUEL OIL | 275 |
| B-553A-2 | CNIC | 0 | 1 | Rear of B-553 outside | Waste water | 15,000 |
| B-553A-3 | CNIC | 0 | 1 | Rear of B-553 outside | Waste water | 15,000 |
| B-553A-4 | CNIC | 0 | 1 | Rear of B-553 outside | Waste water | 15,000 |
| B-553A-5 | CNIC | 0 | 1 | Rear of B-553 outside | Waste water | 15,000 |
| B-553A-6 | CNIC | 0 | 1 | Rear of B-553 outside | Waste water | 9,000 |
| B-553A-7 | CNIC | 0 | 1 | Rear of B-553 outside | Waste water | 9,000 |
| B-553A-1 | CNIC | 0 | 1 | Inside of B-553 | Waste water | 45,000 |
| B-553A-10 | CNIC | 0 | 1 | Inside of B-553 | Waste water | 15,000 |
| B-553A-11 | CNIC | 0 | 1 | Inside of B-553 | Waste water | 10,000 |
| B-553A-12 | CNIC | 0 | 1 | Inside of B-553 | Waste water | 10,000 |
| B-553A-13 | CNIC | 0 | 1 | Inside of B-553 | Waste water | 10,000 |
| B-555A-1 | CNIC | 0 | 1 | Golf Course/MWR | FUEL OIL | 550 |
| B-563A-1 | CNIC | 0 | 1 | CHRIMP fire pump | DIESEL | 200 |
| B-569A-1 | CNIC | 0 | 1 | Liberty Center | FUEL OIL | 500 |
| B-571A | CNIC | 0 | 1 | USS Nautilus | FUEL OIL | 2,000 |
| B-602A-1 | CNIC | 0 | 1 | Crane Maint. (north) | FUEL OIL | 3,000 |
| B-602A-2 | CNIC | 0 | 1 | Crane Maint. (south) | DIESEL | 4,000 |
| B-602A-3 | CNIC | 0 | 1 | Crane Maint. (waste oil) | WASTE OIL | 275 |
| B-1005A | CNIC | 0 | 1 | MWR- Dolphin-Mart | FUEL OIL | 1,000 |
| Pier 2A-1 | CNIC | 0 | 1 | Quaywall, Port Services | DIESEL | 2,000 |
| Pier 2A-2 | CNIC | 0 | 1 | Quaywall, Port Services | GASOLINE | 2,000 |
| WT -# 444 | CNIC | 1 | 0 | Water tower - Rock Lake | WATER | 500,000 |
| WT - # 480 | CNIC | 1 | 0 | Water tower - Hospital | WATER | 750,000 |
| WT - # TP73 | CNIC | 1 | 0 | Water tower - Trident Park | WATER | 300,000 |
| AST Totals | 3 | 47 |
| PROPANE SYSTEM TESTING | ||||
| CUSTOMERS | CP | FM | Location | |
| B-520A-1 | CNIC | 0 | 0 | Rear of Building 520 |