0200000 F Management and Administration v2.8.pdf
PDF 203 KB Posted
- Solicitation number
- N40085-20-R-3006
About this file
This document outlines deliverables and submission requirements for a management and administration contract. Key deliverables include sign-in sheets, minutes, permits, licenses, quality management and inspection plans, property management plans, safety plans and reports, hazardous material inventories and environmental reports. Submission deadlines range from daily to annual, with most deliverables due monthly or quarterly. The contract also requires daily, weekly and monthly flat file submissions with asset, meter and personnel updates. This document establishes detailed reporting requirements for a facilities support services contract managed by the Naval Facilities Engineering Command.
The related federal opportunity is a solicitation from the Naval Facilities Engineering Command to provide aboveground and underground storage tank maintenance and repair services at the Naval Submarine Base in Groton, Connecticut. Services include testing, calibrating, adjusting and repairing cathodic protection, automatic tank gauging and fuel management systems on tanks, piping, piers and quay walls. Contractors must provide all labor, materials, equipment, transportation and management to perform the work.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0200000 – Management and Administration
SECTION F: DELIVERIES OR PERFORMANCE
Section F – 0200000
Management and Administration
DELIVERABLES
Annex/
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
0200000/
2.2.1.2
N/A Request to Work
Outside
Government’s
Regular Working
Hours
At least seven calendar days prior to requested day.
KO and
COR
1 As required
0200000/
2.3.1
N/A Sign-In Sheets and
Minutes
Within two working days.
KO, COR
and all attendees
1 As required
0200000/
2.3.1
N/A Final Revision of
Minutes
Within two working days.
KO, COR
and all attendees
1 As required
0200000/
2.3.4
N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
1 As specified
0200000/
2.3.5
N/A Certificate of
Insurance
At least 30 calendar days prior to start of contract performance.
KO and
COR
1 As specified
0200000/
2.6.6.2
J-0200000-06 Service Provider
Flat-file
By the end of the following work day when updates are required
KO and
COR
1 As required
0200000/
2.6.6.2
J-0200000-07 Asset Flat-file By the end of the following work day when updates are required
KO and
COR
1 As required
0200000/
2.6.6.2
J-0200000-08 Asset Specification
Flat-file
By the end of the following work day when updates are required
KO and
COR
1 As required
0200000/
2.6.6.2
J-0200000-09 Characteristic
Meter Flat-file
By the end of the following work day when updates are required
KO and
COR
1 As required
0200000/
2.6.6.2
J-0200000-05 Sample Delimited
Flat-file
At least 30 calendar days prior to start of contract performance.
KO and
COR
1 As specified
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
0200000/
2.6.7.1
N/A Quality
Management Plan
At least 30 calendar days prior to start of contract performance and within 15 calendar days prior to any changes.
KO and
COR
1 As specified
0200000/
2.6.7.2
N/A QC Inspection File Within five calendar days of completion/ termination of the contract.
KO and
COR
1 As specified
0200000/
2.6.7.3
J-0200000-
05A
Contractor Quality
Inspection and
Surveillance
Report
First work day of each month.
KO and
COR
1 Monthly
0200000/
2.6.8
N/A Property
Management Plan
At least 30 calendar days prior to start of contract performance.
KO and
COR
1 As specified
0200000/
2.7.1
N/A List of Key
Personnel and
Qualifications
At least 30 calendar days prior to start of contract performance.
KO and
COR
1 As specified
0200000/
2.7.1
N/A Organizational
Chart
At least 15 calendar days prior to start of contract performance.
KO and
COR
1 As specified
0200000/
2.7.2.6
N/A Proof of Legal
Residency
Prior to be admitted to site of work.
KO and
COR
1 As specified
0200000/
2.7.3
N/A Contractor Labor
Hours (eCMRA)
Report
No later than 31
October.
KO and
COR
1 Annually for labor executed during the period of performance during each
Government fiscal year
(FY)
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
0200000/
2.8.1
N/A Employee List Upon request. KO and
COR
1 As required
0200000/
2.8.8
N/A Personnel Security
Investigation (PSI), Fingerprint Card
(FD87), and OF-
306 Declaration for
Federal
Employment
Prior to employee access to sensitive unclassified information.
KO, COR,
and
Security
Manager
1 As required
0200000/
2.9.1
N/A Accident
Prevention Plan
At least 30 calendar days prior to start of contract performance and
15 calendar days prior to any changes.
KO and
COR
1 As specified
0200000/
2.9.2
N/A Activity Hazard
Analysis
Together with the
Accident
Prevention Plan and for changes.
KO and
COR
1 As specified
0200000/
2.9.3
N/A Compliance Plans, Programs, and
Procedures
Together with the
Accident
Prevention Plan and for changes.
KO and
COR
1 As specified
0200000/
2.9.5
J-0200000-05 NAVFAC
Contractor Incident
Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
1 As required
0200000/
2.9.5
J-0200000-05 Weight Handling
Equipment
Accident Report
Within 15 working days of accident.
KO and
COR
1 As required
0200000/
2.9.5
J-0200000-05 Crane and Rigging
Gear Near Miss
Report
Within 15 working days of accident.
KO and
COR
1 As required
0200000/
2.9.7
J-0200000-
05B
Monthly On-Site
Labor Report
First work day of each month.
KO and
COR
1 Monthly
0200000/
2.9.8
N/A OSHA Citations and Violations
Corrective Action
Report
Within 48 hours after receiving a citation.
KO and
1 As required
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
0200000/
2.9.10
N/A Safety
Certifications
At least 15 calendar days prior to start of contract performance and prior to expiration of certifications.
KO and
COR
1 As specified
0200000/
2.10.1.1
N/A Water
Conservation Plan
At least 30 calendar days prior to start of contract performance and
15 calendar days prior to any changes.
KO and
COR
1 As specified
0200000/
2.10.2.3
N/A Solid Waste
Management
Reports
Within three months after start of contract performance and annually by
October 10th thereafter
KO and
COR
1 As specified
0200000/
2.10.2.3
N/A Recycling Weight
Ticket Receipts
As Specified KO and
COR
2 Quarterly
0200000/
2.10.2.7
N/A Spill Report Within 48 hours of spill occurrence
KO and
COR
1 As required
0200000/
2.10.2.8
J-0200000-05 Emergency
Planning and
Community Right-
To-Know Act
(EPCRA) Report
At least 15 calendar days prior to start of contract performance and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
2 As specified
0200000/
2.10.2.8
J-0200000-05 Contractor
Hazardous
Material Inventory
Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
2 Annually
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
0200000/
2.10.2.12
N/A Asbestos
Containing
Material (ACM)
Written notification within 24 hours of discovery
KO and
COR
2 As specified
0200000/
2.10.2.13
J-0200000-05 Hazardous Air
Pollutant (HAP)
Monthly Data
First work day of each month.
KO and
COR
1 Monthly
0200000/
2.10.2.13
J-0200000-05 Hazardous Air
Pollutant (HAP)
Semi-annual
Report
Semi-annually by
July 10th and
January 10th
KO and
COR
1 Semi-
Annually
0200000/
2.10.3
N/A Sustainable
Procurement and
Practices Plan
At least 15 calendar days prior to start of contract performance and within 15 calendar days after exercised option periods.
KO and
COR
1 Annually
0200000/
2.10.3
N/A Sustainable
Delivery of
Services Report
Within five calendar days after each contract period.
KO and
COR
1 Annually
0200000/
2.10.3.2
N/A Recovered
Material
Certification
As specified KO and
COR
1 When a product containing recovered materials is equal to or better than the original and could be used.
0200000/
2.14.1
N/A Detailed Scope of
Work and Detailed
Estimate
Within two work days
KO and
COR
2 As required
0200000/
2.15.2.1
N/A Non-Recurring
Work Proposals
Within two working days following receipt of request
KO and
1 As required
Deliverables Form Preparation Instructions
Deliverable Title: Request to Work Outside Government’s Regular Working Hours
Form Attachment No.: N/A
Government Approval Required: ___ Yes X No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s comments and resubmit the request via email to recipients on the distribution list. Continue this cycle until the Government notifies the Contractor of Government acceptance.
Deliverables Form Preparation Instructions
Deliverable Title: Emergency Planning and Community Right-To-Know Act (EPCRA) Report
Form Attachment No.: J-0200000-05
Government Approval Required: X Yes ___ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
2. Include the following:
a. EPCRA Plans and Procedures:
1) Hazardous Materials Planned for Use: Include an inventory of hazardous materials planned for use, including estimated quantities, and a copy of the corresponding material safety data sheets (MSDS) for hazardous materials expected to be used for this contract during each calendar year. The inventory shall include all information required to complete the Contractor Hazardous
Material Inventory Log shown in the Form Attachment. This report shall be submitted to the KO and Environmental Compliance Office via the KO.
2) Plan for protecting personnel and property during the transport, storage, and use of the materials.
3) Emergency procedures for spill response and disposal, including a site map with approximate quantities on site at any given time. The site map, showing where the hazardous substances are stored, shall be attached to the inventory.
4) Approved labeling system to identify contents of all containers on-site.
b. Hazardous Materials Actually Used: Include an inventory of the actual hazardous materials used, including include quantities, to the KO and Environmental Compliance
Office via the KO. The inventory shall include all information required to complete the
Contractor Hazardous Material Inventory Log shown in the Form Attachment.
3. Submit additional information to the Government as requested to support EPCRA reporting requirements.
File details come from the government source that posted it. Updated .