This document is a Horizontal Alignment Review Report and a Vertical Alignment Review Report for FEDERAL HIGHWAY ADMINISTRATION WESTERN FEDERAL LANDS HIGHWAY DIVISION PROJECT ID FLAP Canyon MULTI(1) Indiana & Orchard Shared Roadway.

The Horizontal Alignment Review Report provides details on the alignment, including the station, northing, easting, and element type (linear, circular, etc.) for the roadway. The Vertical Alignment Review Report includes the station, elevation, and vertical alignment elements such as tangent grade, tangent length, and parabolic curve details for the same roadway project.

This information appears to support the related federal contract opportunity, Solicitation Number 69056724B000009, for the ID FLAP CANYON MULTI(1), Indiana and Orchard Shared Roadway project. The solicitation is an Invitation for Bidders (IFB) with two bid schedules, and the Plans, Physical Data, and Construction Contract Administration Document are provided as attachments.

View the file

Other files

File Type Posted
UPDATED_Bid Tab_ID FLAP CANYON MULTI(1).pdf PDF
Bid Tab_ID FLAP CANYON MULTI(1).pdf PDF
BidSum_ID FLAP CANYON MULTI(1).pdf PDF
QA_06-24-2024.pdf PDF
QA_06-20-2024_A.pdf PDF
QA_06-20-2024.pdf PDF
QA_06-18-2024.pdf PDF
Amendment A001.pdf PDF
QA_06-04-2024.pdf PDF
Physical Data.zip ZIP file
ID FLAP Canyon MULTI(1)_XYZ asphalt-MAIN 02.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XS-APPR 01.pdf PDF
ID FLAP Canyon MULTI(1)_Clearing Limits-APPR 01.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XYZ asphalt-MAIN 01-A.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_3025A1_Bridge-Inspection-Report.pdf PDF
ID FLAP Canyon MULTI(1)_XYZ base-APPR 01.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Earthwork-MAIN 01.pdf PDF
ID FLAP Canyon MULTI(1)_GM3623 Final Foundation and Geotechnical Recommendations Memo.pdf PDF
IFB_69056724B000009_ID FLAP CANYON MULTI(1).pdf PDF
ID FLAP Canyon MULTI(1)_XYZ base-MAIN 01-A.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Staking Notes-MAIN 01-A.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Earthwork-MAIN 02.pdf PDF
ID FLAP Canyon MULTI(1)_Staking Notes-MAIN 01-B.xlsx XLSX spreadsheet
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
ID FLAP Canyon MULTI(1)_plans.pdf PDF
ID FLAP Canyon MULTI(1)_Staking Notes-MAIN 02.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Staking Notes-APPR 01.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_proposed-MAIN 01-02.pdf PDF
ID FLAP Canyon MULTI(1)_XYZ asphalt-MAIN 01-B.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XYZ base-MAIN 02.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_control-points.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Earthwork-approaches.pdf PDF
ID FLAP Canyon MULTI(1)_XS-MAIN 02.pdf PDF
ID FLAP Canyon MULTI(1)_ROW-plans-stamped.dgn.pdf PDF
ID FLAP Canyon MULTI(1)_XS-MAIN 01.pdf PDF
ID FLAP Canyon MULTI(1)_XYZ base-MAIN 01-B.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Horizontal Alignment Review Report for APPR 01 for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

ID FLAP Canyon MULTI(1)

Indiana & Orchard Shared Roadway

Horizontal Alignment Review Report Report Created: Thursday, March 28, 2024

Time: 11:35:09 AM

Project: 2D Design SurvFt Description:

File Name: c:\pw-work\d0458583\ID FLAP Canyon MULTI(1)_DRWY.dgn Last Revised: 3/28/2024 11:34:08

Note: All units in this report are in feet unless specified otherwise.

Alignment Name: DW_Murphys Neck Alignment Description:

Alignment Style: Alignment\Baseline Station Northing Easting

Element: Linear

START ( START ) 100.000 704452.433 2368391.004

PC ( PC ) 120.240 704433.985 2368382.677

Tangential Direction: S24.296°W

Tangential Length: 20.240

Element: Circular

PC ( PC ) 120.240 704433.985 2368382.677

HPI ( HPI ) 137.821 704417.962 2368375.443

CC ( CC ) 704442.215 2368364.448

PT ( PT ) 149.085 704423.081 2368358.624

Radius: 20.000 Delta: 82.634° Right

Degree of Curvature (Arc): 286.479° Length: 28.845

Tangent: 17.581 Chord: 26.409

Middle Ordinate: 4.979 External: 6.629

Back Tangent Direction: S24.296°W Back Radial Direction: N65.704°W

Chord Direction: S65.613°W Ahead Radial Direction: N16.931°E

Ahead Tangent Direction: N73.069°W

Element: Linear

PT ( PT ) 149.085 704423.081 2368358.624

END ( END ) 200.000 704437.909 2368309.915

Tangential Direction: N73.069°W

Tangential Length: 50.916

Vertical Alignment Review Report for APPR 01

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

ID FLAP Canyon MULTI(1)

Indiana & Orchard Shared Roadway

Vertical Alignment Review Report Report Created: Thursday, March 28, 2024

Time: 11:35:42 AM

Project: 2D Design SurvFt Description:

File Name: c:\pw-work\d0458583\ID FLAP Canyon MULTI(1)_DRWY.dgn Last Revised: 3/28/2024 11:34:08

Note: All units in this report are in feet unless specified otherwise.

Horizontal Alignment: DW_Murphys Neck Horizontal Description:

Horizontal Style: Alignment\Baseline

Vertical Alignment: DW_Murphys Neck Vertical Description:

Vertical Style: Alignment\Baseline Station Elevation

Element: Linear

START 114.864 2539.780

VPI 118.415 2539.709

Tangent Grade: -0.020 Tangent Length: 3.551

Element: Linear

VPI 118.415 2539.709

VPC 175.904 2532.813

Tangent Grade: -0.120 Tangent Length: 57.490

Element: Symmetrical Parabola

VPC 175.904 2532.813

VPI 180.904 2532.213

VPT 185.904 2532.063

Length: 10.000

Entrance Grade: -0.120 Exit Grade: -0.030 r = 100 * (g2 - g1) / L: 89.963 K = l / (g2 - g1): 1.112

Middle Ordinate: 0.112

Element: Linear

VPT 185.904 2532.063

END 200.000 2531.640

Tangent Grade: -0.030

Horizontal Alignment: DW_Murphys Neck Horizontal Description:

Horizontal Style: Alignment\Baseline Tangent Length: 14.096