ID FLAP Canyon MULTI(1)_Earthwork-MAIN 01.pdf

PDF 112 KB Posted

Attached to
ID FLAP CANYON MULTI(1), Indiana and Orchard Shared Roadway
Solicitation number
69056724B000009
Issued by

About this file

This document is an Earthwork Quantities Report for the MAIN 01 alignment of the FEDERAL HIGHWAY ADMINISTRATION WESTERN FEDERAL LANDS HIGHWAY DIVISION PROJECT ID FLAP Canyon MULTI(1) Indiana & Orchard Shared Roadway. The report provides detailed quantities for various earthwork materials and activities such as fill, cut, wedge layer, pavement layers, turf establishment, and topsoil stripping along the project alignment from station 10550.018 to 23467.394.

The related federal contract opportunity is Solicitation Number 69056724B000009 for the ID FLAP CANYON MULTI(1), Indiana and Orchard Shared Roadway project. This is an Invitation for Bidders (IFB) with two bid schedules, where only one schedule will be awarded. The Invitation for Bidders (IFB), Plans, Physical Data, and the Construction Contract Administration Document per FAR 36.211 are provided as attachments.

View the file

Other files

File Type Posted
UPDATED_Bid Tab_ID FLAP CANYON MULTI(1).pdf PDF
Bid Tab_ID FLAP CANYON MULTI(1).pdf PDF
BidSum_ID FLAP CANYON MULTI(1).pdf PDF
QA_06-24-2024.pdf PDF
QA_06-20-2024_A.pdf PDF
QA_06-20-2024.pdf PDF
QA_06-18-2024.pdf PDF
Amendment A001.pdf PDF
QA_06-04-2024.pdf PDF
Physical Data.zip ZIP file
ID FLAP Canyon MULTI(1)_XYZ asphalt-MAIN 02.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XS-APPR 01.pdf PDF
ID FLAP Canyon MULTI(1)_Clearing Limits-APPR 01.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XYZ asphalt-MAIN 01-A.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_3025A1_Bridge-Inspection-Report.pdf PDF
ID FLAP Canyon MULTI(1)_XYZ base-APPR 01.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_GM3623 Final Foundation and Geotechnical Recommendations Memo.pdf PDF
IFB_69056724B000009_ID FLAP CANYON MULTI(1).pdf PDF
ID FLAP Canyon MULTI(1)_XYZ base-MAIN 01-A.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Staking Notes-MAIN 01-A.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Earthwork-MAIN 02.pdf PDF
ID FLAP Canyon MULTI(1)_Staking Notes-MAIN 01-B.xlsx XLSX spreadsheet
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
ID FLAP Canyon MULTI(1)_plans.pdf PDF
ID FLAP Canyon MULTI(1)_Staking Notes-MAIN 02.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Staking Notes-APPR 01.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_proposed-MAIN 01-02.pdf PDF
ID FLAP Canyon MULTI(1)_XYZ asphalt-MAIN 01-B.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XYZ base-MAIN 02.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_control-points.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Earthwork-approaches.pdf PDF
ID FLAP Canyon MULTI(1)_XS-MAIN 02.pdf PDF
ID FLAP Canyon MULTI(1)_ROW-plans-stamped.dgn.pdf PDF
ID FLAP Canyon MULTI(1)_XS-MAIN 01.pdf PDF
ID FLAP Canyon MULTI(1)_proposed-APPR 01.pdf PDF
ID FLAP Canyon MULTI(1)_XYZ base-MAIN 01-B.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Earthwork Quantities Report for MAIN 01 for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

ID FLAP Canyon MULTI(1)

Indiana & Orchard Shared Roadway

Quantities Report by Named Boundary Report Created: Wednesday, February 21, 2024

Time: 9:51:58 AM

Named Boundary Group: MAIN 01

Alignment Name: MAIN 01

Input Grid Factor: Note: All units in this report are in feet, square feet and cubic feet unless specified otherwise.

Station Named Boundary Name Material Count Length Top Sloped Area Volume

10550.018 100+80 to 106+00

Fill: 552.230

DNC:

Turf Establishment: 3096.228 Cut: 299.696

Wedge Layer 1: 1267.564 775.650 Pavement Layer 4: 20429.454 37228.799 Pavement Layer 2: 16917.897 2817.813 Pavement Layer 1: 16916.466 2817.830

Volumes_Fill: 2114.196 1964.707 Volumes_Cut: 19129.844 27686.473

Baseline: 520.007 Edge of widening: 1200.035

DNC: 1039.994

Edge of Widen: 520.028

XS_TL_Edge of Pavt 1: 1042.247 XS_TL_Edge of Pavt 2: 1042.247

Edge of Shld: 1099.139 XS_TL_Edge of Pavt 4: 1015.010

XS_TL_Subgrade: 1587.474 XS_TL_Edge of Widen 1: 1040.002 XS_TL_Edge of Widen 2: 1040.002

XS_TL_Edge of Pavt: 517.373 Volumes_Topsoil Stripping Limits: 574.656

Prop Clearing: 578.384 Cut: 204.412 Fill: 348.138

Edge of widening: 44.000

11950.000 106+00 to 120+00

Cut: 2154.151 Turf Establishment: 12346.268

DNC:

Wedge Layer 1: 8371.286 4200.763

Fill: 1557.434 Pavement Layer 2: 11209.363 1866.628

Station Named Boundary Name Material Count Length Top Sloped Area Volume Pavement Layer 1: 11204.550 1866.640 Pavement Layer 4: 15905.907 16550.711

Volumes_Fill: 1886.115 654.136 Volumes_Cut: 26174.785 20695.868

Edge of widening: 2799.964

DNC: 2799.960

Edge of Widen: 2800.018 XS_TL_Edge of Pavt 1: 2800.027 XS_TL_Edge of Pavt 2: 2800.027

Edge of Shld: 5615.976 XS_TL_Subgrade: 8397.317

XS_TL_Edge of Widen 1: 2800.018 XS_TL_Edge of Widen 2: 2800.018

XS_TL_Edge of Pavt 4: 1405.465 Edge of widening: 582.383

Volumes_Topsoil Stripping Limits: 2409.606 Prop Clearing: 2408.389

Cut: 1967.217 Fill: 376.770

Baseline:

XS_TL_Edge of Pavt:

13950.000 120+00 to 140+00 Cut: 1764.132 Fill: 871.348

Turf Establishment: 16407.675

DNC:

Pavement Layer 4: 15055.168 10205.779 Pavement Layer 2: 15444.327 2571.968

Wedge Layer 1: 6563.538 2090.250 Pavement Layer 1: 15443.769 2571.993

Volumes_Fill: 1662.731 296.695 Volumes_Cut: 27779.325 13225.322

Edge of widening: 4000.000

DNC: 4000.000

Edge of Widen: 4000.000 XS_TL_Edge of Pavt 1: 4000.000 XS_TL_Edge of Pavt 2: 4000.000

Edge of Shld: 8011.012 XS_TL_Subgrade: 12363.426

XS_TL_Edge of Widen 1: 4000.000 XS_TL_Edge of Widen 2: 4000.000

XS_TL_Edge of Pavt 4: 1999.901 Volumes_Topsoil Stripping Limits: 3291.427

Prop Clearing: 3291.487 Cut: 2253.565 Fill: 832.042

Edge of widening:

Baseline:

XS_TL_Edge of Pavt:

15950.000 140+00 to 160+00 Cut: 1709.658 Fill: 926.224

Turf Establishment: 15513.457

DNC:

Wedge Layer 1: 6884.671 1973.218 Pavement Layer 4: 14578.530 9770.700 Pavement Layer 2: 15682.853 2611.965 Pavement Layer 1: 15683.445 2611.997

Volumes_Fill: 1870.605 381.710 Volumes_Cut: 27127.929 13562.934

Edge of widening: 4000.000

DNC: 4000.000

Edge of Widen: 4000.000 XS_TL_Edge of Pavt 1: 4000.000 XS_TL_Edge of Pavt 2: 4000.000

Edge of Shld: 8008.000 XS_TL_Subgrade: 12299.531

XS_TL_Edge of Widen 1: 4000.000 XS_TL_Edge of Widen 2: 4000.000

XS_TL_Edge of Pavt 4: 2000.048 Cut: 2419.287

Volumes_Topsoil Stripping Limits: 3134.210 Prop Clearing: 3134.210

Fill: 617.043 Edge of widening:

Baseline:

XS_TL_Edge of Pavt:

17950.000 160+00 to 180+00 Cut: 942.135 Fill: 1438.630

DNC:

Turf Establishment: 18480.892

Wedge Layer 1: 6027.409 1096.283 Pavement Layer 4: 16328.289 11337.906 Pavement Layer 2: 15211.487 2533.311 Pavement Layer 1: 15206.841 2533.325

Volumes_Fill: 2176.168 386.549 Volumes_Cut: 28361.198 12247.608

Edge of widening: 4000.000

DNC: 4000.000

Edge of Widen: 4000.000 XS_TL_Edge of Pavt 1: 4000.000

XS_TL_Edge of Pavt 2: 4000.000

Edge of Shld: 8002.014 XS_TL_Edge of Widen 1: 4000.000 XS_TL_Edge of Widen 2: 4000.000

XS_TL_Subgrade: 11037.146 XS_TL_Edge of Pavt 4: 1998.955

Volumes_Topsoil Stripping Limits: 3682.084 Prop Clearing: 3682.159

Cut: 2230.131 Fill: 1188.338

Edge of widening:

Baseline:

XS_TL_Edge of Pavt:

19950.000 180+00 to 200+00

Pavement Layer 2: 13635.114 2270.978 Pavement Layer 1: 13632.618 2270.983

Fill: 457.969 Cut: 3964.242

Turf Establishment: 16913.450

DNC:

Wedge Layer 1: 17075.289 9764.389 Pavement Layer 4: 21749.249 28084.502

Volumes_Fill: 614.695 92.131 Volumes_Cut: 35793.945 37348.906

Edge of widening: 4000.000

DNC: 4000.000

Edge of Widen: 4000.000 XS_TL_Edge of Pavt 1: 4000.000 XS_TL_Edge of Pavt 2: 4000.000

Edge of Shld: 8004.016 XS_TL_Subgrade: 13797.299

XS_TL_Edge of Widen 1: 4000.000 XS_TL_Edge of Widen 2: 4000.000

XS_TL_Edge of Pavt 4: 1999.417 Volumes_Topsoil Stripping Limits: 3272.951

Prop Clearing: 3273.029 Cut: 3098.971 Fill: 147.530

Edge of widening:

Baseline:

XS_TL_Edge of Pavt:

21950.000 200+00 to 220+00

Cut: 2820.597 Turf Establishment: 18297.988

DNC:

Pavement Layer 1: 14129.140 2353.395

Wedge Layer 1: 10171.670 3359.576

Pavement Layer 2: 14128.304 2353.389 Volumes_Fill: 8.033 0.065

Pavement Layer 4: 15476.386 10718.145 Volumes_Cut: 28442.590 16703.497

Edge of widening: 4000.000

DNC: 3999.998

Edge of Widen: 3999.998 XS_TL_Edge of Pavt 1: 3999.998 XS_TL_Edge of Pavt 2: 3999.998

Edge of Shld: 8001.997 XS_TL_Subgrade: 13735.330

XS_TL_Edge of Widen 1: 3999.998 XS_TL_Edge of Widen 2: 3999.998

XS_TL_Edge of Pavt 4: 1996.322 Volumes_Topsoil Stripping Limits: 3500.144

Prop Clearing: 3500.190 Cut: 3500.144 Fill:

Fill:

Edge of widening:

Baseline:

XS_TL_Edge of Pavt:

23467.394 220+00 to end

Pavement Layer 1: 8094.785 1347.858 Pavement Layer 2: 8093.118 1347.860

Cut: 2982.561 Pavement Layer 4: 11488.865 12889.439 Turf Establishment: 11073.751

DNC:

Wedge Layer 1: 9062.054 6538.323

Volumes_Fill: 17.836 5.993 Volumes_Cut: 19782.628 20016.441

Edge of widening: 3034.788

DNC: 2294.996

Edge of Widen: 2294.996 XS_TL_Edge of Pavt 1: 2294.996 XS_TL_Edge of Pavt 2: 2294.996

Edge of Shld: 4591.993 XS_TL_Subgrade: 6895.247

XS_TL_Edge of Widen 1: 2294.996 XS_TL_Edge of Widen 2: 2294.996

XS_TL_Edge of Pavt 4: 795.583 Cut: 1888.503

Volumes_Topsoil Stripping Limits: 1863.427 Prop Clearing: 1863.427

Fill:

Fill:

Edge of widening:

Baseline:

XS_TL_Edge of Pavt: