This document is an Earthwork Quantities Report for the MAIN 01 alignment of the FEDERAL HIGHWAY ADMINISTRATION WESTERN FEDERAL LANDS HIGHWAY DIVISION PROJECT ID FLAP Canyon MULTI(1) Indiana & Orchard Shared Roadway. The report provides detailed quantities for various earthwork materials and activities such as fill, cut, wedge layer, pavement layers, turf establishment, and topsoil stripping along the project alignment from station 10550.018 to 23467.394.
The related federal contract opportunity is Solicitation Number 69056724B000009 for the ID FLAP CANYON MULTI(1), Indiana and Orchard Shared Roadway project. This is an Invitation for Bidders (IFB) with two bid schedules, where only one schedule will be awarded. The Invitation for Bidders (IFB), Plans, Physical Data, and the Construction Contract Administration Document per FAR 36.211 are provided as attachments.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Earthwork Quantities Report for MAIN 01 for
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PROJECT
ID FLAP Canyon MULTI(1)
Indiana & Orchard Shared Roadway
Quantities Report by Named Boundary Report Created: Wednesday, February 21, 2024
Time: 9:51:58 AM
Named Boundary Group: MAIN 01
Alignment Name: MAIN 01
Input Grid Factor: Note: All units in this report are in feet, square feet and cubic feet unless specified otherwise.
Station Named Boundary Name Material Count Length Top Sloped Area Volume
10550.018 100+80 to 106+00
Fill: 552.230
DNC:
Turf Establishment: 3096.228 Cut: 299.696
Wedge Layer 1: 1267.564 775.650 Pavement Layer 4: 20429.454 37228.799 Pavement Layer 2: 16917.897 2817.813 Pavement Layer 1: 16916.466 2817.830
Volumes_Fill: 2114.196 1964.707 Volumes_Cut: 19129.844 27686.473
Baseline: 520.007 Edge of widening: 1200.035
DNC: 1039.994
Edge of Widen: 520.028
XS_TL_Edge of Pavt 1: 1042.247 XS_TL_Edge of Pavt 2: 1042.247
Edge of Shld: 1099.139 XS_TL_Edge of Pavt 4: 1015.010
XS_TL_Subgrade: 1587.474 XS_TL_Edge of Widen 1: 1040.002 XS_TL_Edge of Widen 2: 1040.002
XS_TL_Edge of Pavt: 517.373 Volumes_Topsoil Stripping Limits: 574.656
Prop Clearing: 578.384 Cut: 204.412 Fill: 348.138
Edge of widening: 44.000
11950.000 106+00 to 120+00
Cut: 2154.151 Turf Establishment: 12346.268
DNC:
Wedge Layer 1: 8371.286 4200.763
Fill: 1557.434 Pavement Layer 2: 11209.363 1866.628
Station Named Boundary Name Material Count Length Top Sloped Area Volume Pavement Layer 1: 11204.550 1866.640 Pavement Layer 4: 15905.907 16550.711
Volumes_Fill: 1886.115 654.136 Volumes_Cut: 26174.785 20695.868
Edge of widening: 2799.964
DNC: 2799.960
Edge of Widen: 2800.018 XS_TL_Edge of Pavt 1: 2800.027 XS_TL_Edge of Pavt 2: 2800.027
Edge of Shld: 5615.976 XS_TL_Subgrade: 8397.317
XS_TL_Edge of Widen 1: 2800.018 XS_TL_Edge of Widen 2: 2800.018
XS_TL_Edge of Pavt 4: 1405.465 Edge of widening: 582.383
Volumes_Topsoil Stripping Limits: 2409.606 Prop Clearing: 2408.389
Cut: 1967.217 Fill: 376.770
Baseline:
XS_TL_Edge of Pavt:
13950.000 120+00 to 140+00 Cut: 1764.132 Fill: 871.348
Turf Establishment: 16407.675
DNC:
Pavement Layer 4: 15055.168 10205.779 Pavement Layer 2: 15444.327 2571.968
Wedge Layer 1: 6563.538 2090.250 Pavement Layer 1: 15443.769 2571.993
Volumes_Fill: 1662.731 296.695 Volumes_Cut: 27779.325 13225.322
Edge of widening: 4000.000
DNC: 4000.000
Edge of Widen: 4000.000 XS_TL_Edge of Pavt 1: 4000.000 XS_TL_Edge of Pavt 2: 4000.000
Edge of Shld: 8011.012 XS_TL_Subgrade: 12363.426
XS_TL_Edge of Widen 1: 4000.000 XS_TL_Edge of Widen 2: 4000.000
XS_TL_Edge of Pavt 4: 1999.901 Volumes_Topsoil Stripping Limits: 3291.427
Prop Clearing: 3291.487 Cut: 2253.565 Fill: 832.042
Edge of widening:
Baseline:
XS_TL_Edge of Pavt:
15950.000 140+00 to 160+00 Cut: 1709.658 Fill: 926.224
Turf Establishment: 15513.457
DNC:
Wedge Layer 1: 6884.671 1973.218 Pavement Layer 4: 14578.530 9770.700 Pavement Layer 2: 15682.853 2611.965 Pavement Layer 1: 15683.445 2611.997
Volumes_Fill: 1870.605 381.710 Volumes_Cut: 27127.929 13562.934
Edge of widening: 4000.000
DNC: 4000.000
Edge of Widen: 4000.000 XS_TL_Edge of Pavt 1: 4000.000 XS_TL_Edge of Pavt 2: 4000.000
Edge of Shld: 8008.000 XS_TL_Subgrade: 12299.531
XS_TL_Edge of Widen 1: 4000.000 XS_TL_Edge of Widen 2: 4000.000
XS_TL_Edge of Pavt 4: 2000.048 Cut: 2419.287
Volumes_Topsoil Stripping Limits: 3134.210 Prop Clearing: 3134.210
Fill: 617.043 Edge of widening:
Baseline:
XS_TL_Edge of Pavt:
17950.000 160+00 to 180+00 Cut: 942.135 Fill: 1438.630
DNC:
Turf Establishment: 18480.892
Wedge Layer 1: 6027.409 1096.283 Pavement Layer 4: 16328.289 11337.906 Pavement Layer 2: 15211.487 2533.311 Pavement Layer 1: 15206.841 2533.325
Volumes_Fill: 2176.168 386.549 Volumes_Cut: 28361.198 12247.608
Edge of widening: 4000.000
DNC: 4000.000
Edge of Widen: 4000.000 XS_TL_Edge of Pavt 1: 4000.000
XS_TL_Edge of Pavt 2: 4000.000
Edge of Shld: 8002.014 XS_TL_Edge of Widen 1: 4000.000 XS_TL_Edge of Widen 2: 4000.000
XS_TL_Subgrade: 11037.146 XS_TL_Edge of Pavt 4: 1998.955
Volumes_Topsoil Stripping Limits: 3682.084 Prop Clearing: 3682.159
Cut: 2230.131 Fill: 1188.338
Edge of widening:
Baseline:
XS_TL_Edge of Pavt:
19950.000 180+00 to 200+00
Pavement Layer 2: 13635.114 2270.978 Pavement Layer 1: 13632.618 2270.983
Fill: 457.969 Cut: 3964.242
Turf Establishment: 16913.450
DNC:
Wedge Layer 1: 17075.289 9764.389 Pavement Layer 4: 21749.249 28084.502
Volumes_Fill: 614.695 92.131 Volumes_Cut: 35793.945 37348.906
Edge of widening: 4000.000
DNC: 4000.000
Edge of Widen: 4000.000 XS_TL_Edge of Pavt 1: 4000.000 XS_TL_Edge of Pavt 2: 4000.000
Edge of Shld: 8004.016 XS_TL_Subgrade: 13797.299
XS_TL_Edge of Widen 1: 4000.000 XS_TL_Edge of Widen 2: 4000.000
XS_TL_Edge of Pavt 4: 1999.417 Volumes_Topsoil Stripping Limits: 3272.951
Prop Clearing: 3273.029 Cut: 3098.971 Fill: 147.530
Edge of widening:
Baseline:
XS_TL_Edge of Pavt:
21950.000 200+00 to 220+00
Cut: 2820.597 Turf Establishment: 18297.988
DNC:
Pavement Layer 1: 14129.140 2353.395
Wedge Layer 1: 10171.670 3359.576
Pavement Layer 2: 14128.304 2353.389 Volumes_Fill: 8.033 0.065
Pavement Layer 4: 15476.386 10718.145 Volumes_Cut: 28442.590 16703.497
Edge of widening: 4000.000
DNC: 3999.998
Edge of Widen: 3999.998 XS_TL_Edge of Pavt 1: 3999.998 XS_TL_Edge of Pavt 2: 3999.998
Edge of Shld: 8001.997 XS_TL_Subgrade: 13735.330
XS_TL_Edge of Widen 1: 3999.998 XS_TL_Edge of Widen 2: 3999.998
XS_TL_Edge of Pavt 4: 1996.322 Volumes_Topsoil Stripping Limits: 3500.144
Prop Clearing: 3500.190 Cut: 3500.144 Fill:
Fill:
Edge of widening:
Baseline:
XS_TL_Edge of Pavt:
23467.394 220+00 to end
Pavement Layer 1: 8094.785 1347.858 Pavement Layer 2: 8093.118 1347.860
Cut: 2982.561 Pavement Layer 4: 11488.865 12889.439 Turf Establishment: 11073.751
DNC:
Wedge Layer 1: 9062.054 6538.323
Volumes_Fill: 17.836 5.993 Volumes_Cut: 19782.628 20016.441
Edge of widening: 3034.788
DNC: 2294.996
Edge of Widen: 2294.996 XS_TL_Edge of Pavt 1: 2294.996 XS_TL_Edge of Pavt 2: 2294.996
Edge of Shld: 4591.993 XS_TL_Subgrade: 6895.247
XS_TL_Edge of Widen 1: 2294.996 XS_TL_Edge of Widen 2: 2294.996
XS_TL_Edge of Pavt 4: 795.583 Cut: 1888.503
Volumes_Topsoil Stripping Limits: 1863.427 Prop Clearing: 1863.427
Fill:
Fill:
Edge of widening:
Baseline:
XS_TL_Edge of Pavt: