ID FLAP CANYON MULTI(1), Indiana and Orchard Shared Roadway
Solicitation number
69056724B000009
Issued by

About this file

This document appears to be a set of questions and answers related to a federal contract opportunity for the ID FLAP CANYON MULTI(1), Indiana and Orchard Shared Roadway project. The contract is being solicited by the Department of Transportation Federal Highway Administration. The Q&A addresses topics such as the dewatering requirements, the timing for installing the box culvert, the management of the SWPPP, the acceptable concrete culvert methods, the grading designation for the roadway aggregate, and the required seed type for turf establishment. The document also provides guidance on accessing the Interested Vendors List for this contract opportunity.

View the file

Other files

File Type Posted
UPDATED_Bid Tab_ID FLAP CANYON MULTI(1).pdf PDF
Bid Tab_ID FLAP CANYON MULTI(1).pdf PDF
BidSum_ID FLAP CANYON MULTI(1).pdf PDF
QA_06-20-2024_A.pdf PDF
QA_06-20-2024.pdf PDF
QA_06-18-2024.pdf PDF
Amendment A001.pdf PDF
QA_06-04-2024.pdf PDF
Physical Data.zip ZIP file
ID FLAP Canyon MULTI(1)_XYZ asphalt-MAIN 02.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XS-APPR 01.pdf PDF
ID FLAP Canyon MULTI(1)_Clearing Limits-APPR 01.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XYZ asphalt-MAIN 01-A.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_3025A1_Bridge-Inspection-Report.pdf PDF
ID FLAP Canyon MULTI(1)_XYZ base-APPR 01.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Earthwork-MAIN 01.pdf PDF
ID FLAP Canyon MULTI(1)_GM3623 Final Foundation and Geotechnical Recommendations Memo.pdf PDF
IFB_69056724B000009_ID FLAP CANYON MULTI(1).pdf PDF
ID FLAP Canyon MULTI(1)_XYZ base-MAIN 01-A.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Staking Notes-MAIN 01-A.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Earthwork-MAIN 02.pdf PDF
ID FLAP Canyon MULTI(1)_Staking Notes-MAIN 01-B.xlsx XLSX spreadsheet
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
ID FLAP Canyon MULTI(1)_plans.pdf PDF
ID FLAP Canyon MULTI(1)_Staking Notes-MAIN 02.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Staking Notes-APPR 01.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_proposed-MAIN 01-02.pdf PDF
ID FLAP Canyon MULTI(1)_XYZ asphalt-MAIN 01-B.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XYZ base-MAIN 02.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_control-points.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Earthwork-approaches.pdf PDF
ID FLAP Canyon MULTI(1)_XS-MAIN 02.pdf PDF
ID FLAP Canyon MULTI(1)_ROW-plans-stamped.dgn.pdf PDF
ID FLAP Canyon MULTI(1)_XS-MAIN 01.pdf PDF
ID FLAP Canyon MULTI(1)_proposed-APPR 01.pdf PDF
ID FLAP Canyon MULTI(1)_XYZ base-MAIN 01-B.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No.ID FLAP CANYON MULTI(1)

Project: Indiana and Orchard Shared Roadway

# General Technical Question Answer Date

1 X I am looking for the contact information of the COR on the project Indiana and Orchard

Shared Roadway.

The Government has not appointed a COR at this time. 6/4/24

2 X What is the intention of the dewatering item? We are assuming this item is for dewatering for the demo/install of the Box Culvert.

see subsection 602.03 and Subsection 209.06 of the FP‐14 6/18/24

3 X Please confirm if the contractor is to plan to install the box culvert while irrigation water is off (October‐April) or if the intent is to bypass the canal and install the culvert while irrigation water is on.

see Sub‐section 108.01(b) of the SCR's. 6/18/24

4 X Typically, there is an item for filing the SWPPP, inspections, etc… On this contract there are only items for install of BMP’s. Is there a pay item where the management of the

SWPPP is intended to fall under?

No. See FP‐14 Subsection 109.05, Scope of Payment 6/18/24

5 X For the concrete box culvert, would a cast‐in place method be accepted instead of precast?

The Government will not be evaluating proposed design changes before contract award. Please submit bids according to the solicitation documents.

6/18/24

6 X

What is the grading designation for the roadway aggregate? I have found table 703‐2 but I am unsure if we are to be planning to use C, D, or E gradation base material. Can you please clarify?

See FP‐14 Sub‐section 703.06 Crushed Aggregate 6/20/24

7 X

No information about type of seed is provided. Please advise what type of seed is required for turf establishment. See Sub‐section 713.04 of the SCR’s 6/20/24

8 X How do I find the interested vendors list for 69056724B000009 – ID FLAP CANYON

MULTI(1) ?

To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract

Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866‐606‐8220.

6/24/24

Check General or Technical

File details come from the government source that posted it. Updated .