ID FLAP Canyon MULTI(1)_plans.pdf
PDF 28 MB Posted
- Solicitation number
- 69056724B000009
About this file
This document appears to be the plans for the ID FLAP CANYON MULTI(1), Indiana and Orchard Shared Roadway project. The related federal contract opportunity is Solicitation Number 69056724B000009, which is an Invitation for Bidders (IFB) for this project. The IFB, plans, physical data, and Construction Contract Administration Document per FAR 36.211 are posted as attachments. The project has two bid schedules, but only one schedule will be awarded. The Department of Transportation Federal Highway Administration is the procuring agency for this opportunity.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLUMBIA
BRITISH
W A
S H I N
G T
O N
M O
N T A
N A
W Y
O M I N
G
O R
E G
O N
NEVADA UTAH
UNITED STATES
CANADA
Lake
Orielle
Pend
Reservoir
American Falls
R
I V
E R
S A
E K
N
PARK
NATIONAL
YELLOWSTONE
d'Alene
Coeur
Moscow
Lewiston
FALLS
IDAHO
POCATELLO
Twin Falls
Home
Mountain
BOISE
IDAHO KEY MAP
IDAHO
93 15
84 15 91 89
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
Project Location
Shoulder widening and box culvert
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
J.23-24
J.3-22
J.1-2
I.5-I.7
I.4
I.3
I.2
I.1
H.5
H.4
H.3
H.2
H.1
G.22-27
G.2-21
G.1
F.22-23
F.2-21
F.1
E.19
E.6-18
E.2-5
E.1
D.26-27
D.25
D.6-24
D.4-5
D.2-3
D.1
C.1-3
B.1-6
A.3
A.2
A.1
STANDARD DRAWINGS
PERMANENT TRAFFIC CONTROL PLAN
TABULATION OF QUANTITIES
STANDARD DRAWINGS
SINGLE LANE CLOSURE LAYOUT WITH FLAGGERS
BIPARTISAN INFRASTRUCTURE LAW SIGN
TEMPORARY TRAFFIC CONTROL DETOUR PLAN
TABULATION OF QUANTITIES
STANDARD DRAWING
3-SIDED BOX CULVERT STRUCTURAL DETAILS
102+13 CULVERT ELEVATIONS
102+13 CULVERT PLAN AND PROFILE
TABULATION OF DRAINAGE QUANTITIES
STANDARD DRAWINGS
EROSION CONTROL
TABULATION OF QUANTITIES
STANDARD DRAWINGS
REMOVAL PLAN
TABULATION OF QUANTITIES
PLAN-PROFILE MURPHY'S NECK FOOTPATH
APPROACHES
APPROACH ROAD DATA TABLE
APPROACH ROAD DETAILS
BARB-LESS WIRE FENCE DETAILS
CONSTRUCTION STAGING SITE
PLAN-PLAN
PLAN-PROFILE
TABULATION OF QUANTITIES
SURVEY CONTROL
TYPICAL SECTIONS
SUMMARY OF QUANTITIES
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
TITLE SHEET
J. PERMANENT TRAFFIC CONTROL
I. TEMPORARY TRAFFIC CONTROL
H. DRAINAGE
G. EROSION CONTROL
F. REMOVAL PLAN
E. APPROACH ROADS
D. PLAN-PROFILE
C. TYPICAL SECTIONS
B. SUMMARY OF QUANTITIES
A. GENERAL INFORMATION
SHEET INDEX
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
IDAHO
CANYON COUNTY
SHARED ROADWAY
INDIANA AND ORCHARD
SCHEDULE B LENGTH 4.06 MILES
SCHEDULE A LENGTH 2.55 MILES
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
PLANS FOR PROPOSED PROJECT
ID FLAP CANYON MULTI(1)
N e (max)
V
ADT (2044)
ADT (2024)
4%
50 MPH
Indiana Ave
IDAHO 55
IDAHO
e (max)
V
ADT (2044)
ADT (2024)
4% (Farmway Road to Indiana Avenue)
(Riverside Road to Farmway Road)2%
45 MPH (Farmway Road to Indiana Avenue)
(Riverside Road to Farmway Road)40 MPH
11152
Orchard Avenue
Scale in miles
04 4 8 12 16
SCALE IN MILES
PROJECT MANAGER
W. SCHMIDT
PROJECT LOCATION
BOISE
Deer Flat
National
Wildlife
Refuge Lake
Lowell
S n a k e R iv e r
Nampa
Caldwell
A D
A C
O U
N T
Y
C A
N Y
O N C
O U
N T
Y
GEM COUNTY
B O
IS
E C
O U
N T Y
A D
A C
O U
N T Y
See Sheet A.3
APPROVED:
Western Federal Lands Highway Division
Chief of Engineering, DATE
:4
A
M
A p r il
T it le
S h e e t c p w
-w o rk \d
\I
D F
L A
P C a n y o n M
U L
T I( p ln g e n
.d g n
PROJECT
NUMBER
SHEET
A.1
ID FLAP CANYON MULTI(1)
C
.g
:E <C M
Ll Llc (l) es abut.
ADT
AH
appr.
BK
b.f.
BM
BP
br.
brg.
btwn cc or c. to c.
ll.
cir.
CMP
col.
cone.
conn.
constr. jt.
cont.
cs ctrs.
CUFT
culv.
CUYD
D
DHV
dia.
diaph.
dist.
drwg(s).
E e e.f.
El. 94.16 elev.
emb.
EOP
EQ oreq.
EW
exc.
exp. jt.
f.f.
fin.
fig.
ftg.
ga.
galv.
ID
IE
jt.
KSI
L lat.
LNFT
long.
LPSM
Ls It. or LT
LW
total central angle curve central angle diameter spiral central angle abutment average daily traffic ahead approach back back face bench mark balance point bridge bearing between center to center centerline clear corrugated metal pipe column concrete connection construction joint continuous point of curve to spiral centers cubic foot (feet) culvert cubic yard(s) diameter design hourly volume diameter diaphragm distance drawing(s) east superelevation rate each face elevation in feet elevation embankment edge of pavement equation edge of water excavation expansion joint front face finish flange footing gage (gauge) galvanized inside diameter invert elevation joint thousand pounds per square inch length of curve latitude linear foot (feet) longitudinal lump sum length of spiral left low water
NOTE:
M.L.
M.P.
matt.
max.
MGAL
min.
man.
N
NC
o.c.
o. too.
OD
OG
OHWM
PC
PCC
PCS
PI
pl.
POC
POS
POT
PS
PSF
PSI
PSC
PST
PT
pvmt.
R R.
R/W rdwy.
reinf.
reqd.
rt. or RT rte.
s
SADT
SC
sect.
shldr.
SLRY
spa.
SQFT
SQYD
SRS
ss
ST
STA, Sta.
std.
stgr.
stiff.
struc.
STS
T T.
TBM
thd.
TS
Ts typ.
V vph
VPI
w main line mile post material maximum thousand gallon minimum monument north normal crown on center out to out outside diameter original ground ordinary high water mark point of curve point of compound curve point of curve to spiral point of intersection plate point on curve point on spiral point on tangent point of tangent to spiral pounds per square foot pounds per square inch point of spiral to curve point of spiral to tangent point of tangent pavement radius range right-of-way roadway reinforcement required right route south seasonal average daily traffic point of spiral to curve section shoulder slurry unit spacing, spaces or spaced square foot square yard point of spiral to reverse spiral point of spiral to spiral (no curve) point of spiral to tangent station standard stringer stiffener structural point of spiral to tangent spiral tangent distance township temporary bench mark thread point of tangent to spiral tangent distance (spiraled curve) typical design speed (velocity) vehicles per hour vertical point of intersection west
1. Other symbols used in the plans will be shown in a legend on the appropriate plan sheet.
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
¼ Section Line
¼ Section Corner (Found, Projected)
½6 Section Line
½6 Section Corner (Found, Projected)
Property Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Paved, Gravel)
Railroad
Trail
Fiber Roll
Silt Fence
Sandbag
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservior; Marshland
Spring or Seep
Treeline; Individual Trees
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Boulder; Well; Antenna; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Control Point (Terrestrial and GPS)
~ 1
---0--0
~1
½6 ½6 0 @
SEC. SEC.
--P/L -------P/L -----
////////NP////////////////NP////////////
//// NWR//// NWR//// NWR//// NWR////
'V 'V 'V 'V 'V 'V 'V 'V 'V 'V 'V
---------- O O O ~ -----...... 0 0 O ..,~ -----
,,,,,---------- 0 l )
-a:
G
.2_ w .2_
G
.'i'_
WV
CP GPS
North Arrow -------1$~------ z
EXISTING
Slope Stake Limits
Construction Limits
Bottom of Ditch
Fence
Top of Cut - · - · · · • • • • • • Toe of Fill
- no symbol -
)f-- -X- -X----l(
PROJECT
ID FLAP CANYON MULTI(l)
PROPOSED
SHEET
NUMBER
A.2
Gate with Fence
Cattleguard
Guardrail
)f-------1: ~ - ~ Jf------l( ~ cr ----u-- ----u-- ----u- ■ ■ ■
Concrete Barrier and Guard Wall
Retaining Wall wall face
V V V V V ' ' ' ' ' Signs (single, double post; portable) u- 0-0 --.-- ..... " Delineators cf: i Pipe Culvert (arrow shows flow) ----------'\,- 'v-
Pipe Culvert with End Section [:>----------'\,- ► 'v-
Pipe Culvert with Headwall ~---------'\,- I 'v- I
Pipe Culvert with Drop Inlet ([)1\-----------"'v-- @) 'v-
" - r Box Culvert J--------, / " Underdrain --IUDI UD
Overhead/ Above Ground Utilities ---P---P- --P P--
Underground Utilities - - --1 w 1- - --1 w 1-- ---1 w 1-------1 w 1--
FM = force main, FO = fiber optic, G = gas, IRR = irrigation, 0 = oil, P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, STEAM= steam, T = telephone, TV= CATV, W = water
Poles (Power, Telephone, Joint Use, --c=J-- ---0- --[Il}-
Light, Support w/Anchor) ---¢f ----o----1
TP
Miscellaneous Utility Features ~ ■
EM= electric meter, TP = telephone pedestal, TV= CATV pedestal, UP = transformer or junction box, WF = water fountain
Building
Right-of-Way Line
Permanent Easement
Construction Easement
Riprap
NO SCALE
L_
- - - - r/w - -----RIW--
- - - - P/E - --PIE-----
- no symbol - --TCE-----
A A Section A-A l J
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
WFLHD DETAIL
PLAN SYMBOLS AND
ABBREVIATIONS
DETAIL APPROVED FOR USE 11/2001 I DETAIL
REVISED: 9/2005 1/2007 10/2009 10/2014 I w 101-1 6/2022
Scale in miles
01000 1000 2000 3000 4000
SCALE IN FEET
N
BEGIN PROJECT
BEGIN PROJECT
END SHOULDER WIDENING
Forest Canal
END PROJECT
END SHOULDER WIDENING
.4 m il e s t o C a ld w a ll
I D
7 miles to Nampa, ID
STAGING SITE ENTRANCE
BEGIN SHOULDER WIDENING
LAKE LOWELL
DEER FLAT
NATIONAL
WILDLIFE
REFUGE
ORCHARD AVENUE
IN
D
IA
N
A A
V E
N U
E
ROOSEVELT AVENUE
Deer Flat
National Wildlife Refuge
Visitor Center
R
IV
E R S
ID
E R
O A
D
Mallard
Park
S M
O N
T A
N A
A V
E
F A
R M
W A
Y R
D
La ke L ow el l
R ec re at io n
A re a
BEGIN ROADWAY
RECONSTRUCTION
"MAIN 01" 100+80
(SCHEDULE A & B)
BEGIN PERMANENT
TRAFFIC CONTROL
"MAIN 02" 11+17
(SCHEDULE B)
"MAIN 02" 90+64.87
(SCHEDULE A & B)
Three-sided precast reinforced concrete box culvert installation
"MAIN 01" 102+01.29 to 102+26.40
(SCHEDULE A & B)
LAKE SHORE DRIVE
LONESTAR ROAD
S
T
H A
V E
L A
K E
A V
E N
U E
"MAIN 01" 235+57.68 =
BEGIN SHOULDER WIDENING
END ROADWAY RECONSTRUCTION
"MAIN 01" 235+00
(SCHEDULE A & B)
"MAIN 02" 90+20
(SCHEDULE B)
"MAIN 01" 106+00
(SCHEDULE A & B)
ROOSEVELT AVENUE
N = 694283.56
E = 2382630.54
See Sheet D.25
(SCHEDULE A & B)
"MAIN 02" 11+55
(SCHEDULE B)
VICINITY MAP
:5
A p r il
D
D e s ig n S u r v F t p w
-w o rk \d
\I
D F
L A
P C a n y o n M
U L
T I( p ln g e n
.d g n
PROJECT
NUMBER
ID FLAP CANYON MULTI(1) A.3
Sheet and Description
SECTION D SECTION F SECTION G SECTION H SECTION I SECTION J -
PLAN-PROFILE REMOVAL PLAN EROSION CONTROL DRAINAGE TEMPORARY TRAFFIC
CONTROL
PERMANENT TRAFFIC
CONTROL ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 810 90 900
A0140 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 12,072 928 13,000
A0160 15706-0200 SOIL EROSION CONTROL, CHECK
DAM (FIBER ROLL) EACH 18 2 20
A0180 15706-1100 SOIL EROSION CONTROL, INLET See footnote on Sheet
PROTECTION TYPE A EACH 1 8 9 G.1
A0200 15706-1600 SOIL EROSION CONTROL,
STABILIZED CONSTRUCTION EXIT EACH 1 1
A0220 15802-0000 WATERING FOR DUST CONTROL LPSM All ALL
A0240 20101-0000 CLEARING AND GRUBBING ACRE 6.7 0.3 7.0
A0260 20301-0400 REMOVAL OF BRIDGE EACH 1 1
A0280 20301-1100 REMOVAL OF GATE EACH 1 1
A0300 20302-0700 REMOVAL OF FENCE See footnote on Sheet
LNFT 3,580 3,420 7,000 F.1
A0320 20315-0000 SAWCUTTING PAVEMENT LNFT 23,951 249 24,200
A0340 20401-0000 ROADWAY EXCAVATION CUYD 6,324 676 7,000
A0360 20701-0400 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE D SQYD 2,495 105 2,600
A0380 20820-0000 DEWATERING LPSM All ALL
A0400 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 10,932 568 11,500
A0420 30302-1000 DITCH RECONDITIONING LNFT 600 600
A0440 40301-0000 ASPHALT CONCRETE PAVEMENT TON 2,775 225 3,000
A0460 41201-0000 TACK COAT TON 5.3 0.2 5.5
A0480 60210-0400 END SECTION FOR 12-INCH PIPE
CULVERT EACH 10 10
A0500 60220-0000 PRECAST REINFORCED CONCRETE
BOX CULVERT (20 FEET SPAN,
7.6 FEET RISE 3-SIDED) LNFT 50 50
A0520 60406-0000 INLET ADJUSTMENT EACH 1 1 2
A0540 60704-0000 CLEANING CULVERT IN PLACE EACH 8 8
A0560 61108-1000 ADJUST WATER VALVE EACH 5 5
MileStone: 100 pct Date Completed: In Progress Report Date: 04/29/24
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-A pr
-2
2:
P
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
C
U se rs \y th ao
.t ru on g\
D es kt op
\P ro je ct s\
ID
F
LA
P C an yo n
M U
LT
I(
1) \E st im at es
\1 su m m ar y2
0.
xl sm ]S he et
PROJECT
B.1ID FLAP CANYON MULTI(1)
PLAN-PROFILE REMOVAL PLAN EROSION CONTROL DRAINAGE TEMPORARY TRAFFIC
CONTROL
PERMANENT TRAFFIC
CONTROL ALLOWANCE Bid Schedule
A0580 61901-0553 FENCE, BARB-LESS WIRE, 4
STRAND LNFT 3,355 45 3,400
A0600 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 24
A0620 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 30-INCH WIDTH HOUR 24
A0640 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 24
A0660 62301-0000 GENERAL LABOR HOUR 24
A0680 62401-0300 FURNISHING AND PLACING
TOPSOIL, 4-INCH DEPTH SQYD 380 20 400
A0700 62502-0000 TURF ESTABLISHMENT SQYD 380 20 400
A0720 63308-3000 OBJECT MARKER, TYPE 3 EACH 4 4
A0740 63316-1000 REMOVE AND RESET SIGN EACH 40 5 45
A0760 63316-2000 REMOVE AND RESET DELINEATOR EACH 2 2
A0780 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (YELLOW) LNFT 21,214 86 21,300
A0800 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (WHITE) LNFT 49,982 218 50,200
A0820 63401-0400 PAVEMENT MARKINGS, TYPE B,
BROKEN (YELLOW) LNFT 3,571 429 4,000
A0840 63403-0900 PAVEMENT MARKINGS, TYPE I SQFT 74 6 80
A0860 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 (8 FEET WIDE) EACH 8 2 10
A0880 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 130 130
A0900 63502-1600 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE B EACH 10 10
A0920 63502-1700 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE C EACH 7 7
A0940 63502-2000 TEMPORARY TRAFFIC CONTROL,
PORTABLE CHANGEABLE MESSAGE
SIGN EACH 2 2
A0960 63503-0700 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS LNFT 1,040 60 1,100
A0980 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 419.5 30.5 450.0
-A pr -2
2:
P M
MileStone: 100 pct Date Completed: In Progress Report Date: 04/29/24
C
U se rs \y th ao
.t ru on g\
D es kt op
\P ro je ct s\
ID
F
LA
P C an yo n
M U
LT
I(
1) \E st im at es
\1 su m m ar y2
0.
xl sm ]S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
PROJECT
B.2ID FLAP CANYON MULTI(1)
PLAN-PROFILE REMOVAL PLAN EROSION CONTROL DRAINAGE TEMPORARY TRAFFIC
CONTROL
PERMANENT TRAFFIC
CONTROL ALLOWANCE Bid Schedule
A1000 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 5,040 560 5,600
A1020 63507-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR DAY 140 140
A1040 63507-0700 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR DAY 160 160
A1060 63701-0000 FIELD OFFICE EACH 1
A1080 64502-0000 LOCATE UTILITIES (POTHOLING) EACH 23 2 25
A1100 64620-0400 REMOVE AND RESET MAILBOX EACH 27 3 30
A1120 64704-1600 MITIGATION, STREAMBED CHANNEL
RECONSTRUCTION CUYD 215 215
-A pr -2
2:
P M
MileStone: 100 pct Date Completed: In Progress Report Date: 04/29/24
C
U se rs \y th ao
.t ru on g\
D es kt op
\P ro je ct s\
ID
F
LA
P C an yo n
M U
LT
I(
1) \E st im at es
\1 su m m ar y2
0.
xl sm ]S he et
3)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
PROJECT
B.3ID FLAP CANYON MULTI(1)
PLAN-PROFILE REMOVAL PLAN EROSION CONTROL DRAINAGE TEMPORARY TRAFFIC
CONTROL
PERMANENT TRAFFIC
CONTROL ALLOWANCE Bid Schedule
B0020 15101-0000 MOBILIZATION LPSM ALL
B0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
B0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
B0080 15401-0000 CONTRACTOR TESTING LPSM ALL
B0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
B0120 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 810 90 900
B0140 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 22,351 649 23,000
B0160 15706-0200 SOIL EROSION CONTROL, CHECK
DAM (FIBER ROLL) EACH 48 2 50
B0180 15706-1100 SOIL EROSION CONTROL, INLET See footnote on Sheet
PROTECTION TYPE A EACH 1 9 10 G.1
B0200 15706-1600 SOIL EROSION CONTROL,
STABILIZED CONSTRUCTION EXIT EACH 2 2
B0220 15802-0000 WATERING FOR DUST CONTROL LPSM All ALL
B0240 20101-0000 CLEARING AND GRUBBING ACRE 10.4 0.3 10.7
B0260 20301-0400 REMOVAL OF BRIDGE EACH 1 1
B0280 20301-1100 REMOVAL OF GATE EACH 1 1
B0300 20302-0700 REMOVAL OF FENCE See footnote on Sheet
LNFT 3,580 4,320 7,900 F.1
B0320 20315-0000 SAWCUTTING PAVEMENT LNFT 38,538 462 39,000
B0340 20401-0000 ROADWAY EXCAVATION CUYD 10,194 806 11,000
B0360 20701-0400 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE D SQYD 2,495 105 2,600
B0380 20820-0000 DEWATERING LPSM All ALL
B0400 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 17,218 782 18,000
B0420 30302-1000 DITCH RECONDITIONING LNFT 700 700
B0440 40301-0000 ASPHALT CONCRETE PAVEMENT TON 4,200 300 4,500
B0460 41201-0000 TACK COAT TON 8.0 8.0
B0480 41801-1000 ASPHALT CONCRETE PAVEMENT Contract Quantity
PATCH, TYPE 1 SQYD 17.0 17.0
B0500 41801-2000 ASPHALT CONCRETE PAVEMENT Contract Quantity
PATCH, TYPE 2 SQYD 171.0 171.0
B0520 60210-0400 END SECTION FOR 12-INCH PIPE
CULVERT EACH 12 12
B0540 60210-0600 END SECTION FOR 18-INCH PIPE
CULVERT EACH 2 2
-A pr -2
2:
P M
MileStone: 100 pct Date Completed: In Progress Report Date: 04/29/24
C
U se rs \y th ao
.t ru on g\
D es kt op
\P ro je ct s\
ID
F
LA
P C an yo n
M U
LT
I(
1) \E st im at es
\1 su m m ar y2
0.
xl sm ]S he et
4)
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
PROJECT
B.4ID FLAP CANYON MULTI(1)
PLAN-PROFILE REMOVAL PLAN EROSION CONTROL DRAINAGE TEMPORARY TRAFFIC
CONTROL
PERMANENT TRAFFIC
CONTROL ALLOWANCE Bid Schedule
B0560 60220-0000 PRECAST REINFORCED CONCRETE
BOX CULVERT (20 FEET SPAN,
7.6 FEET RISE 3-SIDED) LNFT 50 50
B0580 60405-0000 MANHOLE ADJUSTMENT (WATER) EACH 3 3
B0600 60406-0000 INLET ADJUSTMENT EACH 1 1 2
B0620 60704-0000 CLEANING CULVERT IN PLACE EACH 12 12
B0640 61108-1000 ADJUST WATER VALVE EACH 8 8
B0660 61901-0553 FENCE, BARB-LESS WIRE, 4
STRAND LNFT 3,355 45 3,400
B0680 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 40
B0700 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 30-INCH WIDTH HOUR 40
B0720 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 40
B0740 62301-0000 GENERAL LABOR HOUR 40
B0760 62401-0300 FURNISHING AND PLACING
TOPSOIL, 4-INCH DEPTH SQYD 380 20 400
B0780 62502-0000 TURF ESTABLISHMENT SQYD 380 20 400
B0800 63308-3000 OBJECT MARKER, TYPE 3 EACH 4 4
B0820 63316-1000 REMOVE AND RESET SIGN EACH 47 8 55
B0840 63316-2000 REMOVE AND RESET DELINEATOR EACH 2 2
B0860 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (YELLOW) LNFT 29,172 328 29,500
B0880 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (WHITE) LNFT 79,156 344 79,500
B0900 63401-0400 PAVEMENT MARKINGS, TYPE B,
BROKEN (YELLOW) LNFT 9,243 257 9,500
B0920 63403-0900 PAVEMENT MARKINGS, TYPE I SQFT 194 200
B0940 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 (8 FEET WIDE) EACH 8 2 10
B0960 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 130 130
B0980 63502-1600 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE B EACH 10 10
B1000 63502-1700 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE C EACH 7 7
-A pr -2
2:
P M
MileStone: 100 pct Date Completed: In Progress Report Date: 04/29/24
C
U se rs \y th ao
.t ru on g\
D es kt op
\P ro je ct s\
ID
F
LA
P C an yo n
M U
LT
I(
1) \E st im at es
\1 su m m ar y2
0.
xl sm ]S he et
5)
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
PROJECT
B.5ID FLAP CANYON MULTI(1)
PLAN-PROFILE REMOVAL PLAN EROSION CONTROL DRAINAGE TEMPORARY TRAFFIC
CONTROL
PERMANENT TRAFFIC
CONTROL ALLOWANCE Bid Schedule
B1020 63502-2000 TEMPORARY TRAFFIC CONTROL,
PORTABLE CHANGEABLE MESSAGE
SIGN EACH 2 2
B1040 63503-0700 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS LNFT 1,040 60 1,100
B1060 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 419.5 30.5 450.0
B1080 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 6,480 720 7,200
B1100 63507-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR DAY 180 180
B1120 63507-0700 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR DAY 200 200
B1140 63701-0000 FIELD OFFICE EACH 1
B1160 64502-0000 LOCATE UTILITIES (POTHOLING) EACH 23 2 25
B1180 64620-0400 REMOVE AND RESET MAILBOX EACH 32 3 35
B1200 64704-1600 MITIGATION, STREAMBED CHANNEL
RECONSTRUCTION CUYD 215 215
-A pr -2
2:
P M
MileStone: 100 pct Date Completed: In Progress Report Date: 04/29/24
C
U se rs \y th ao
.t ru on g\
D es kt op
\P ro je ct s\
ID
F
LA
P C an yo n
M U
LT
I(
1) \E st im at es
\1 su m m ar y2
0.
xl sm ]S he et
6)
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
PROJECT
B.6ID FLAP CANYON MULTI(1)
Roadway aggregate, Method 2, 24-inch compacted depth depth placed in two lifts with tack coat between lifts
Asphalt concrete pavement, 4-inch compacted
Slope stake limit Slope stake limit
2% 2%
Profile grade
10 to 15-inch compacted depth
Roadway aggregate, Method 2, two lifts with tack coat between lifts
4-inch compacted depth, placed in
Asphalt concrete pavement, See Section H box culvert reinforced concrete
Three-sided precast
Profile grade
2% 2%
R /W
P
/E o r
T C
E
C o n s tr u c ti o n l im it
R /W
P
/E o r
T C
E
C o n s tr u c ti o n l im it 6-inch compacted depth
Roadway aggregate, Method 2, 4%
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
4-inch depth
Furnishing and placing topsoil, 4-inch depth placing topsoil, Furnishing and shoulder taper offset
See Table C-1 for shoulder taper offset
See Table C-1 for
See Table C-1 for shoulder taper offset See Table C-1 for shoulder taper offset
2% 2%
Slope stake limit
Conserved suitable roadway excavation
R /W
P
/E o r
T C
E
C o n s tr u c ti o n l im it
Slope stake limit
Conserved suitable roadway excavation
Conserved streambed material
R /W
P
/E o r
T C
E
C o n s tr u c ti o n l im it
Separation-stabilization geotextile, class 1, type D pavement
Top of existing
Sawcut vertical
Tack coat
Top of subgrade
Top of proposed pavement
CL
1'11.13' 4' to
11'11'10.64' 4' to
1'
Traveled lane Traveled lane shldr.
Paved shldr.
Paved shldr.
Gravel shldr.
Gravel
1:2
1:
Varies Varies
"MAIN 01"
102+27.13 to 106+00
100+80 to 102+01.13
"MAIN 01"
[2]
102+01.13 to 102+27.13
CL
50' culvert width
11.13' to 13.21'11'11'10.64' to 12.64'
Paved Shoulder Traveled lane Traveled lane Paved Shoulder
"APPR 01"
[1]
1+15 to 2+00
1:
(m ax
1:4 (m ax.)
CL
6'
Varies ment establish-
Turf
Varies ment establish-
Turf
1:
1:2
CUT SECTION
1:
1:2 :1
:1
Varies 1' 12.64' 4' to
CUT SECTION
Varies1'13.21' 4' to
[2] Station range represents outer limits of skewed box culvert. See Section H for box culvert layout.
[1] See Section E for plan and profile.
FOOTNOTE:
PAVEMENT CONNECTION
:3
P
A p r il
T
Y P
IC
A
L S
E C
T
IO
N
O R
C H p w
-w o rk \d
\I
D F
L A
P C a n y o n M
U L
T I( p ln ty p .d g n
Sheet 1 of 3
(Schedule A & B)
TYPICAL SECTION
PROJECT
C.1 pavement
Sawcutting
See table C-2 for compacted depth
Roadway aggregate, Method 2 placed in two lifts with tack coat between lifts
Asphalt concrete pavement, 4-inch compacted depth
2% 2%
See table C-2 for compacted depth
Roadway aggregate, Method 2 placed in two lifts with tack coat between lifts
Asphalt concrete pavement, 4-inch compacted depth
2% 2%
R /W
P
/E o r
T C
E
C o n s tr u c ti o n l im it
R /W
P
/E o r
T C
E
C o n s tr u c ti o n l im it
R /W
P
/E o r
T C
E
C o n s tr u c ti o n l im it
R /W
P
/E o r
T C
E
C o n s tr u c ti o n l im it
Slope stake limit Slope stake limit
Slope stake limit Slope stake limit
Conserved suitable roadway excavation Conserved suitable roadway excavation pavement
Sawcutting shoulder taper offset
See table C-4 for for lane shift
See table C-3 for lane shift
See table C-3
CL
Traveled lane Traveled lane shldr.
Paved shldr.
Paved shldr.
Gravel shldr.
Gravel
Varies Varies
"MAIN 01"
[1]
106+00 to 235+00
CUT SECTION
1:2
Varies 1' 4' Varies1'4'
CUT SECTION
(typ.)
1'
4'11'11'4'1'
1:
1:1
:1
1:2
1:2
1:
1:
1' 1'
1'1'
[1] See Section D for breaks in shoulder widening.
FOOTNOTE:
:3
A p r il
T
Y P
IC
A
L S
E C
T
IO
N
O R
C p w
-w o rk \d
\I
D F
L A
P C a n y o n M
U L
T I( p ln ty p .d g n
Sheet 2 of 3
(Schedule A & B)
TYPICAL SECTION
PROJECT
C.2 pavement
Sawcutting
10-inch compacted depth
Roadway aggregate, Method 2 placed in two lifts with tack coat between lifts
Asphalt concrete pavement, 4-inch compacted depth
2% 2%
10-inch compacted depth
Roadway aggregate, Method 2 placed in two lifts with tack coat between lifts
Asphalt concrete pavement, 4-inch compacted depth
2% 2%
R /W
P
/E o r
T C
E
C o n s tr u c ti o n l im it
R /W
P
/E o r
T C
E
C o n s tr u c ti o n l im it
R /W
P
/E o r
T C
E
C o n s tr u c ti o n l im it
R /W
P
/E o r
T C
E
C o n s tr u c ti o n l im it
Slope stake limit Slope stake limit
Slope stake limit Slope stake limit See patch detail pavement
Sawcutting
8-inch compacted roadway aggregate depth
4-inch compacted asphalt concrete pavement depth
Asphalt concrete pavement patch, type 1, 4-inch compacted depth
Asphalt concrete pavement patch, type 2, Conserved suitable roadway excavation Conserved suitable roadway excavation pavement
Sawcutting
CL
Traveled lane Traveled lane shldr.
Paved shldr.
Paved shldr.
Gravel shldr.
Gravel Varies
Varies
CUT SECTION
1:2
Varies 1' 4' Varies1'4'
CUT SECTION
1'4'11'11'4'1'
"MAIN 02"
11+55 to 90+20
PATCH DETAIL
27+58 to 27+88 (Type 1)
24+50 to 27+58 (Type 2)
"MAIN 02"
CL
11'
5'
1:
1:1
:1
1:2
1:2
1:
1:
1. See Section D for breaks in shoulder widening.
NOTE:
:3
A p r il
T
Y P
IC
A
L S
E C
T
IO
N
O R
C p w
-w o rk \d
\I
D F
L A
P C a n y o n M
U L
T I( p ln ty p .d g n
Sheet 3 of 3
(Schedule B)
TYPICAL SECTION
PROJECT
C.3
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ORTHOMETRIC
ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
14104 703581.040 2366932.244 2568.406 43°35'35.399819"N 116°43'22.387688"W 2510.771 0.999889223 5/8" ir w/fhwa alum cap 1.
21101 704047.126 2366948.797 2567.582 43°35'40.004507"N 116°43'22.236931"W 2509.946 0.999889253 5/8" ir w/fhwa alum cap
21102 704661.429 2366909.932 2554.228 43°35'46.066484"N 116°43'22.862762"W 2496.5895 0.999889914 5/8" ir w/fhwa alum cap
21103 704730.254 2367453.460 2539.619 43°35'46.808954"N 116°43'15.488300"W 2481.9926 0.999890292 5/8" ir w/fhwa alum cap
21104 704626.583 2368063.755 2540.365 43°35'45.855516"N 116°43'07.179229"W 2482.7526 0.999889897 5/8" ir w/fhwa alum cap
21105 704307.271 2368678.672 2540.111 43°35'42.772901"N 116°42'58.773345"W 2482.5132 0.999889549 5/8" ir w/fhwa alum cap
21106 704158.895 2369294.693 2551.417 43°35'41.378300"N 116°42'50.379644"W 2493.8333 0.999888648 5/8" ir w/fhwa alum cap
21107 703967.794 2369873.320 2552.409 43°35'39.557325"N 116°42'42.487421"W 2494.8399 0.999888262 5/8" ir w/fhwa alum cap
21108 703777.440 2370551.636 2542.334 43°35'37.754942"N 116°42'33.240930"W 2484.7803 0.999888349 5/8" ir w/fhwa alum cap
21109 703669.551 2370938.281 2544.674 43°35'36.733542"N 116°42'27.970527"W 2487.1289 0.999888012 5/8" ir w/fhwa alum cap
21110 703436.317 2371773.717 2555.990 43°35'34.525205"N 116°42'16.582748"W 2498.4635 0.999886987 5/8" ir w/fhwa alum cap
21111 703328.191 2372278.107 2554.497 43°35'33.514586"N 116°42'09.712640"W 2496.9815 0.999886767 5/8" ir w/fhwa alum cap
21112 703120.682 2372901.142 2539.591 43°35'31.535805"N 116°42'01.215106"W 2482.0891 0.99988712 5/8" ir w/fhwa alum cap
21113 702673.381 2374500.750 2556.283 43°35'27.298607"N 116°41'39.412050"W 2498.815 0.999885404 5/8" ir w/fhwa alum cap
21114 702177.060 2377181.311 2571.976 43°35'22.696424"N 116°41'02.915879"W 2514.5611 0.999883127 5/8" ir w/fhwa alum cap
21115 702201.779 2379080.071 2579.220 43°35'23.150535"N 116°40'37.121962"W 2521.8425 0.99988171 5/8" ir w/fhwa alum cap
21116 702151.186 2380166.874 2537.751 43°35'22.770374"N 116°40'22.348335"W 2480.3943 0.999883082 5/8" ir w/fhwa alum cap
21117 701565.041 2380111.360 2550.434 43°35'16.975793"N 116°40'23.014115"W 2493.077 0.999882507 5/8" ir w/fhwa alum cap
21118 699890.986 2380136.676 2560.689 43°35'00.446386"N 116°40'22.417566"W 2503.336 0.999882003 5/8" ir w/fhwa alum cap
21119 697841.190 2380079.052 2627.667 43°34'40.197221"N 116°40'22.891114"W 2570.3199 0.999878834 5/8" ir w/fhwa alum cap
21120 695879.615 2380055.200 2669.257 43°34'20.822971"N 116°40'22.919198"W 2611.9201 0.99987686 5/8" ir w/fhwa alum cap
21121 695270.418 2380046.645 2677.243 43°34'14.805873"N 116°40'22.943509"W 2619.9086 0.999876483 5/8" ir w/fhwa alum cap
21122 694212.782 2380006.259 2648.597 43°34'04.356696"N 116°40'23.332509"W 2591.2664 0.999877874 5/8" ir w/fhwa alum cap
21123 693619.196 2380438.096 2639.223 43°33'58.542016"N 116°40'17.378050"W 2581.9032 0.99987808 5/8" ir w/fhwa alum cap
21203 702861.012 2366117.032 2553.908 43°35'28.194860"N 116°43'33.349222"W 2496.2572 0.999890397 5/8" ir w/fhwa alum cap
COORDINATE SYSTEM : Idaho West SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18
EPOCH DATE : 2010.000
CADD SYSTEM COORDINATE SYSTEM : ID83/2011-WF NSRS11(NAD83/2011) Idaho, West Zone, US Foot
PROJECT : Indiana and Orchard Shared Roadway DATE OF FIELD WORK :Multiple entries
DATE OF FINAL ADJUSTMENT :11/22/2021
PROJECT UNITS : US SURVEY FOOT
-D ec -2
7:
A M
C
U se rs \y th ao
.t ru on g\
D es kt op
\P ro je ct s\
ID
F
LA
P C an yo n
M U
LT
I(
1) \9
5%
In di an a_
O rc ha rd s_ co nt ro ls he et .x ls x]
Sh ee t
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
PROJECT
D.1ID FLAP CANYON MULTI(1)
SHEET
SURVEY CONTROL
:1
A p r il
E
A R
T H
W O
R K
T A
B L
E p w
-w o rk \d
\I
D
F L
A P
C a n y o n
M U
L T
I( p ln
D
O rc h a rd
.d g n
Sheet 1 of 2
TABULATION OF QUANTITIES
PROJECT
D.2
:2
A p r il
T
A B
U L
A T
IO
N
O F
Q U
A N
T
IT
IE
S p w
-w o rk \d
\I
D
F L
A P
C a n y o n
M U
L T
I( p ln
D
O rc h a rd
.d g n
Sheet 2 of 2
TABULATION OF QUANTITIES
PROJECT
D.3
.0
R T
.0
R T
.0
L T
.0
L T
.0
R T
W
JH
H&T
JH
P I N
E
P I N
E
P I N
E
WV
CP
21102
5/8" IR W/FHWA ALUM CAP
JB
JB
N
See Section H
Three-sided precast reinforced concrete box culvert at Forest Canal
E = 2367016.62
N = 704679.06
"MAIN 01" 100+80
SCHEDULE A & B
BEGIN ROADWAY RECONSTRUCTION
BEGIN PROJECT
Slope stake limits to be constructed
"MAIN 01" Line
Edges of gravel shoulder
Edges of paved shoulder
Existing ground
Profile grade
EL 2549.40
End culvert
102+26.40
EL 2549.81
Begin culvert
102+01.29
Construction limit
Construction limit for culvert
Slope stake limits e = NC
L = 232.53'
T = 116.74'
R = 1,050.00'
Δ = 12°41'19" (RT)
PI 103+04.55
N80°36'35"E
.8
98+00 99+00 100+00 101+00 102+00 103+00
2,540 2,540
2,550 2,550
2,560 2,560
,5
.8
,5
.9
-1.65%
-3.80%
-3.50%
.6
.0
.8
.0
' VC100
46K =
'551SSD =
' VC120
65K =
'3023HLSD =
,5
.4
ORCHARD AVENUE
R
IV
E R
S
ID
E R
O A
D
LEGEND:
HLSD = Headlight Sight Distance
Asphalt concrete pavement surfacing
Roadway aggregate surfacing 3. Field adjust fence location as directed by the CO.
2. Do not disturb existing culverts unless otherwise noted.
1. See Section F for utility owner contact information, and removal and reset of utility work.
NOTE:
(SCHEDULE A & B)
100+80 TO 103+50
PLAN-PROFILE ORCHARD AVENUE
:3
A p ri l
P la n -P ro fi le
O rc h a rd A v e n u e t o p w
-w o rk
\d \I D
F
L A
P C a n y o n M
U L T
I( p ln
D
O rc h a rd
.d g n
PROJECT
D.4
R T
.0
, L
T .0
6.
0%
R T
2.
0%
L T
.9
L T
.8
L T
.4
L T
.8
L T
S86°42'06"E S84°41'39"E
O
U T
L E
T
I
N L E
T
O
U T
L E
T
I
N L E
T
O
U T
L E
T
I
N L E
T
Y T I L I T U
D
I R
B
G N I N R A W
TP
O
U T
L E
T
JH
O
U T L E T
I
N L E
T
SP
O
U T
L E
T
TP
SP
SP
SP
IN
L E T
X2
SP
X
WF
SP
SP
CP
21103
/8
I
R W
/F H
W A
A L
U M
C A
P
24" SPRUCE
O
U T
L E
T
SP
SP
24" SPRUCE
JH
H&T
I
N L E
T
TP
TP
24" PINE
48" COTTONWOOD
N
106+00
Orchard Avenue
Begin shoulder widening
End roadway reconstruction
Slope stake limits
Edges of paved shoulder
Edges of gravel shoulder
"MAIN 01" Line to be constructed
Existing ground
Profile grade
See Section H
Ditch reconditioning
Cleaning culvert in place
106+20
Tie to existing
Begin fence, barb-less wire, 4-strand
106+85, 26' RT
Protect culvert in place e = N/A
'232.53L =
'116.74T =
'1,050.00R =
(RT)12°41'19"Δ =
103+04.55PI
e = N/A '175.19L = '87.60T = '5,000.00R =
(RT)02°00'27"Δ =
107+27.97PI
e = N/A '214.44L = '108.42T = '590.00R =
(RT)20°49'29"Δ =
110+18.01PI
.3
.5
2,530 2,530
2,540 2,540
2,550 2,550
2,560 2,560
,5
.3
5-3.80%
-1.58%
.5
.0
' VC150
68K =
'784HLSD =
ORCHARD AVENUE
LEGEND:
HLSD = Headlight Sight Distance
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
104+00 105+00 106+00 107+00 108+00 109+00
(SCHEDULE A & B)
103+50 TO 109+00
PLAN-PROFILE ORCHARD AVENUE
:2
A p ri l
P la n -P ro fi le
O rc h a rd A v e n u e t o p w
-w o rk
\d \I D
F
L A
P C a n y o n M
U L T
I( p ln
D
O rc h a rd
.d g n
PROJECT
D.5
L T
.0
L T
.2
L T
.6
L T
O
U T L E
T
I
N L E
T
CP
I
R W
F
H W
A A
L U
M C
A P
N
.0
L T
.0
L T
.4
L T
S84 °41 '39
"E
S63°52'10"E e = N/A
'214.44L =
'108.42T =
'590.00R =
(RT)20°49'29"Δ =
110+18.01PI
e = N/A '257.18L = '128.60T = '7,000.00R =
(LT)02°06'18"Δ =
114+08.93PI
S65°58'29"E
9 1
SP
SP
SP
CP
/8
" IR
W /F
H W
A A
L U
M C
A P
SP
N
Edges of paved shoulder
Edges of gravel shoulder
Edges of paved shoulder Edges of gravel shoulder
"MAIN 01" Line to be constructed
"MAIN 01" Line to be constructed
Slope stake limits
Slope stake limits
"APPR 01"
"APPR 01"
Tie to existing End fence, barb-less wire, 4-strand
117+75, 25' RT
Begin fence, barb-less wire, 4-strand
115+10, 18' RT
End fence, barb-less wire, 4-strand
115+00, 18' RT
"APPR 01" 1+00
"MAIN 01" 115+04 =
115+23, 25' RT
114+80, 27' RT
Field adjust as directed by CO Fence, barb-less wire, 4-strand 112+80, 28.5' RTField adjust as directed by CO
Fence, barb-less wire, 4-strand
111+33.30, 26' RT
e = N/A '257.18L = '128.60T = '7,000.00R =
(LT)02°06'18"Δ =
114+08.93PI
e = N/A '230.90L = '115.68T = '1,500.00R =
(LT)08°49'11"Δ =
119+02.81PI
.1
9 1
ORCHARD AVENUE
ORCHARD AVENUE
B e g in l a n e s h if t ta p e r
R T
B e g in s h o u ld e r ta p e r
E n d l a n e s h if t ta p e r
B e g in l a n e s h if t ta p e r
E n d l a n e s h if t ta p e r
FOOTPATH
NECK
MURPHY'S
FOOTPATH
MURPHY'S NECK
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
.1
R T
E n d s h o u ld e r ta p e r
R T
B e g in s h ld r ta p e r
.5
.3
R T
E n d s h ld r ta p e r
:0
A p ri l
P la n -P la n O rc h a rd
A v e n u e t o p w
-w o rk
\d \I D
F
L A
P C a n y o n M
U L T
I( p ln
D
O rc h a rd
.d g n
(SCHEDULE A & B)
109+00 TO 120+60
PLAN-PLAN ORCHARD AVENUE
PROJECT
D.6
L T
.0
L
T
.0
L
T
.6
R
T
S74°47'39"E
TP161
CP
I
R W
F
H W
A A
L U
M C
A P
TP
M
ETER
W
ATER
M
ETER
W
ATER
N
.0
R T
, L
T F
A R
M W
A Y R
O A
D
.0
R T
L T
.4
L T
.8
R T
8.
0%
R T
P I
.0
Y T I L I
I
R
I
N R A
W
G A
S
PLASTIC
P L
A S
T I C
O
U T
L E
T
IN
L E
T
SP
SP
O
U T
L E
T
SP
X X
CP
I
R W
F
H W
A A
L U
M C
A P
I
N L E
T
TP
TP
Y T I L I
I
R
I
N R A
W
G A
S
P L
A S
T
IC
N
Edges of paved shoulder
Edges of paved shoulder
Edges of gravel shoulder
Edges of gravel shoulder
"MAIN 01" Line to be constructed
"MAIN 01" Line to be constructed
Slope stake limits
Slope stake limits
See Section H
Ditch reconditioning
129+80
See Section H
Ditch reconditioning
Cleaning culvert in place
130+20
127+20, LT
Tie to Farmway Road
End shoulder widening
127+80, LT
Tie to Farmway Road
Begin shoulder widening
S74°47'39"E S74°24'34"E
ORCHARD AVENUE
ORCHARD AVENUE
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
:2
F e b r u a r y
P la n
P la n
O r c h a r d
A v e n u e t o p w
-w o rk \d
\I
D
F L
A P
C a n y o n
M U
L T
I( p ln
D
O rc h a rd
.d g n
(SCHEDULE A & B)
120+60 TO 132+20
PLAN-PLAN ORCHARD AVENUE
PROJECT
D.7
R T
7.
0%
R T
.3
R T
E
C L I P S
E D
R I V
E
L T
12"
P L
A S
T I C
PC
Y P
C , S
K I N
N E
R P
L S
3RAIL PLASTIC
TP+
R
A I L P
L A
S T I C
U G V
A U
L T
CP
I
R W
F
H W
A A
L U
M C
A P
Y T I L I
I
R
I
N R A
W
G A
S
++ PLPL
PLASTIC
N
6.
0%
R T
6.
0%
R
T
M
O O
N S
T R
U C
K D
R I V
E
L T
R
T
S74°24'34"E
S74°24'34"E
SP
WV
3 RAIL PLASTIC
CP
I
R W
F
H W
A A
L U
M C
A P
+1
PC
Y P
C , P
L S
N
Edges of paved shoulder
Edges of paved shoulder
Edges of gravel shoulder
Edges of gravel shoulder
"MAIN 01" Line to be constructed
"MAIN 01" Line to be constructed
Slope stake limits
Slope stake limits
See Section H
End section for 12" pipe culvert
Ditch reconditioning
136+20
137+25, LT
Tie to Eclipse Drive
End shoulder widening
138+07, LT
Tie to Eclipse Drive
Begin shoulder widening
ORCHARD AVENUE
ORCHARD AVENUE
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
:0
M a r c h
P la n
P la n
O r c h a r d
A v e n u e t o p w
-w o rk \d
\I
D
F L
A P
C a n y o n
M U
L T
I( p ln
D
O rc h a rd
.d g n
(SCHEDULE A & B)
132+20 TO 143+80
PLAN-PLAN ORCHARD AVENUE
PROJECT
D.8
L
T
.0
R T
.8
R
T
.8
R
T
O
U T
L E
T
I
N L E
T
O
U T
L E
T
I
N L E
T
Y T I L I
I
R
I
N R A
W
G A
S
SP
3 RAIL PLASTIC
SP
L O
G
SP
O U
T L E
T A
P P
R O
X I
M A
T E
WV
I
N L E
T
SP
B
R O
K E
SP++
SP
SP
O
U T
L E
T
I
N L E
T
SP+
Y T I L I
I
R
I
N R A
W
G A
S
N
.8
L
T
R
T
R
T
.0
R
T
.5
R
T
R
T
, L
T .0
, L
T .8
.0
R
T
S74°24'34"E
SP
O
U T
L E
T
I
R W
F
H W
A A
L U
M C
A P
M E
T A
L
I
N L E
T
METAL
SP
METAL
JB
SP
3 RAIL PLASTIC
G A
S
Y T I L I
I
R
I
N R A
W
IR
P
P C
Y T I L I
I
R
I
N R A
W
G A
S
P A
V E
R
+ P A
V E
R
SP
VALVE
WATER
I
R R I G
A T I O
N V
A L V
E C
O V
E R
CP
I
R W
F
H W
A A
L U
M C
A P
SP
+SP
SP
N
Edges of paved shoulder
Edges of paved shoulder
Edges of gravel shoulder
Edges of gravel shoulder
"MAIN 01" Line to be constructed
"MAIN 01" Line to be constructed
See Section H
Ditch reconditioning
143+95
See Section H
Ditch reconditioning
Cleaning culvert in place
150+00
Slope stake limits
Slope stake limits
Protect culvert in place
S74°24'34"E
ORCHARD AVENUE
ORCHARD AVENUE
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
:2
F e b r u a r y
P la n
P la n
O r c h a r d
A v e n u e t o p w
-w o rk \d
\I
D
F L
A P
C a n y o n
M U
L T
I( p ln
D
O rc h a rd
.d g n
(SCHEDULE A & B)
143+80 TO 155+40
PLAN-PLAN ORCHARD AVENUE
PROJECT
D.9
6.
0%
R
T
5.
7%
R
T
, L
T
.7
R
T
.0
R
T
, L
T .7
P I
.5
I
N L E
T
O
U T
L E
T
+PLASTIC RAIL
METAL
SP
Y T I L I
I
R
I
N R A
W
GAS
METAL
O
U T
L E
T
I
N L E
T
METAL
IR
PLASTIC RAIL
TP
X X
CP
I
R W
F
H W
A A
L U
M C
A P
N
.5
R
T
W I D
G E
O N A
V E
N U
E
L T
(O S
P R
E Y
P L
A C
E
L
T
S74°24'34"E S74°15'35"E
P I
.1
S74°17'59"ES74°15'35"E
O
U T
L E
T
I
N L E
T
CP
Y T I L I
I
R
I
N R A
W
GAS
N
Slope stake limits
Edges of paved shoulder
Edges of paved shoulder
Edges of gravel shoulder
Edges of gravel shoulder
"MAIN 01" Line to be constructed
"MAIN 01" Line to be constructed
See Section H
Ditch reconditioning
156+70
See Section H
Ditch reconditioning in place
Cleaning culvert
161+50
See Section H
End section for 12-inch pipe culvert
Ditch reconditioning
Cleaning culvert in place
165+15
Slope stake limits
ORCHARD AVENUE
ORCHARD AVENUE
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
:2
F e b r u a r y
P la n
P la n
O r c h a r d
A v e n u e t o p w
-w o rk \d
\I
D
F L
A P
C a n y o n
M U
L T
I( p ln
D
O rc h a rd
.d g n
(SCHEDULE A & B)
155+40 TO 167+00
PLAN-PLAN ORCHARD AVENUE
PROJECT
D.10
(T
A L
A V
E
L
T
.0
R
T
S74°17'59"E
Y T I L I
I
R
I
N R A
W
GAS
Y T I L I
I
R
I
N R A
W
GAS
N
.0
L
T
.0
L
T
1 1
S74°17'59"E
PC
R
PC
CP
I
R W
F
H W
A A
L U
M C
A P
SP
IR
1\2
"IR
N
Slope stake limits
Slope stake limits
Edges of paved shoulder
Edges of paved shoulder
Edges of gravel shoulder
Edges of gravel shoulder
"MAIN 01" Line to be constructed
"MAIN 01" Line to be constructed
171+60, LT
Tie to Teal Ave.
End shoulder widening
172+40, LT
Tie to Teal Ave.
Begin shoulder widening e = N/A
'361.53L =
'180.89T =
'4,000.00R =
(LT)05°10'43"Δ =
179+54.81PI
.9
PC
ORCHARD AVENUE
ORCHARD AVENUE
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
:2
F e b ru a ry
P la n -P la n O rc h a rd
A v e n u e t o p w
-w o rk
\d \I D
F
L A
P C a n y o n M
U L T
I( p ln
D
O rc h a rd
.d g n
(SCHEDULE A & B)
167+00 TO 178+60
PLAN-PLAN ORCHARD AVENUE
PROJECT
D.11
.0
L T
.6
L
T
S
T
H A
V E
N U
E
L T
.0
R T
S79°28'42"E
O
U T
L E
T
Y T I L I
I R
I N R A
W
G A
S
I
N L E
T
IR
Y
P C
PLASTIC RAIL
SP
CP
I
R W
F
H W
A A
L U
M C
A P
SP
PLASTIC RAIL
SP
N e = N/A
L = 361.53'
T = 180.89'
R = 4,000.00'
Δ = 05°10'43" (LT)
PI 179+54.81
.4
S79°28'42"E
SP
SP
SP
SP
SP SP
N
Slope stake limits
Slope stake limits
Edge of paved shoulder
Edges of paved shoulder
Edges of gravel shoulder
Edges of gravel shoulder
"MAIN 01" Line to be constructed
"MAIN 01" Line to be constructed
See Section H End section for 12-inch pipe culvert Ditch reconditioning Cleaning culvert in place 181+90
182+72, LT
Tie to S. 10th Avenue Begin shoulder widening
181+80, LT
Tie to S. 10th Avenue End shoulder widening
Tie to existing Begin fence, barb-less wire, 4-strand, 182+45, 25' RT
Fence, barb-less wire, 4-strand
ORCHARD AVENUE
ORCHARD AVENUE
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
:0
A p ri l
P la n -P la n O rc h a rd
A v e n u e t o p w
-w o rk
\d \I D
F
L A
P C a n y o n M
U L T
I( p ln
D
O rc h a rd
.d g n
(SCHEDULE A & B)
178+60 TO 190+20
PLAN-PLAN ORCHARD AVENUE
PROJECT
D.12
(M
L L
A R
D P
A R
K
L
T
S79°28'42"E
O
U T
L E
T
I
N L E
T
SP
VALVE
WATER
SP
SP
AC
.5
R
E F E
R E
N C
E M
O N
U M
E N
T
Y T I L I
I R
I N R A
W
G A
S
G
G
V A
L V
E L I D
S
G A
S H
I G
H L I N
E
AC
.5
R
E F E
R E
N C
E M
O N
U M
N E
T
N
O
U T
L E
T
IN
L E
T
Y T I L I
I R
I N R A
W
GAS
N
Edge of paved shoulder
Edges of paved shoulder Edges of gravel shoulder
Edge of gravel shoulder
"MAIN 01" Line to be constructed
"MAIN 01" Line to be constructed
Slope stake limits
Slope stake limit
See Section H
End section for 12-inch pipe culvert
Ditch reconditioning
Cleaning culvert in place
193+10
195+00, LT
Tie to Passero Ridge development
End shoulder widening
S H I P
W A
T C
H A
V E
Fence, barb-less wire, 4-strand
Fence, barb-less wire, 4-strand
S79°28'42"E
ORCHARD AVENUE
ORCHARD AVENUE
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
:0
A p r il
P la n
P la n
O r c h a r d
A v e n u e t o p w
-w o rk \d
\I
D
F L
A P
C a n y o n
M U
L T
I( p ln
D
O rc h a rd
.d g n
(SCHEDULE A & B)
190+20 TO 201+80
PLAN-PLAN ORCHARD AVENUE
PROJECT
D.13
S79°28'42"E
P L S
3" RM
Y T I L I
I R
I N R A W
GAS
WATER24"
CP
21114
5/8" IR
W/FHWA ALUM CAP
3" RM
N
(M O
N T
A N
A A
V E
N U
E
L
T e = N/A
L = 463.40'
T = 232.49'
R = 2,300.00'
Δ = 11°32'38" (LT)
PI 205+91.23
.7
6 2
N88°58'40"E
" B
U R
IE
D
IN
L E T
O U
T L E T
DI
IN
L E T
BC
B C
S /S
J-
J- B P
L S
VALVE
WATER+
Y T I L I T U
D E I R U B
G N I N R A W
GAS
N
Slope stake limit
Slope stake limits
Edges of paved shoulder
Edges of paved shoulder
Edges of gravel shoulder
Edges of gravel shoulder
"MAIN 01" Line to be constructed
"MAIN 01" Line to be constructed
203+80, LT
Tie to Passero Ridge development Begin shoulder widening
209+00, LT
Tie to Montana Avenue End shoulder widening
209+90, LT
Tie to Montana Avenue Begin shoulder widening
Tie to existing End fence, barb-less wire, 4-strand
205+30, 26' RT
e = N/A '463.40L = '232.49T = '2,300.00R =
(LT)11°32'38"Δ =
205+91.23PI
.1
PT
ORCHARD AVENUE
ORCHARD AVENUE
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
:0
A p ri l
P la n -P la n O rc h a rd
A v e n u e t o p w
-w o rk
\d \I D
F
L A
P C a n y o n M
U L T
I( p ln
D
O rc h a rd
.d g n
(SCHEDULE A & B)
201+80 TO 213+40
PLAN-PLAN ORCHARD AVENUE
PROJECT
D.14
.0
L
T
N88°58'40"E
O
U T
L E
T
I
N L E
T
Y T I L I T U
D E I R U B
G N I N R A W
GAS
O
U T
L E
T
N
.0
L
T
.4
L
T (V
A L
L I
H I
L A
N E
R
T
R
T
, LT 2
, LT
N88°58'40"E
O
U T
L E
T
I
N L E
T
CP
21115
I
R W
F
H W
A A
L U
M C
A P
VINYL
Y T I L I T U
D E I R U B
G N I N R A W
G A
S
N
Slope stake limits
Edges of paved shoulder
Edges of paved shoulder
Edges of gravel shoulder
Edges of gravel shoulder
"MAIN 01" Line to be constructed
"MAIN 01" Line to be constructed
Slope stake limits
See Section H
End section for 12-inch pipe culvert
Ditch reconditioning
Cleaning culvert in place
219+40
222+17, RT
Tie to Valli Hi Lane
End shoulder widening
222+70, RT
Tie to Valli Hi Lane
Begin shoulder widening
224+00, RT
Tie to existing pavement
Begin shoulder widening
224+81, RT
Tie to existing pavement
End shoulder widening
223+35, LT
Tie to existing pavement
End shoulder widening
ORCHARD AVENUE
ORCHARD AVENUE
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
:2
F e b r u a r y
P la n
P la n
O r c h a r d
A v e n u e t o p w
-w o rk \d
\I
D
F L
A P
C a n y o n
M U
L T
I( p ln
D
O rc h a rd
.d g n
(SCHEDULE A & B)
213+40 TO 225+00
PLAN-PLAN ORCHARD AVENUE
PROJECT
D.15
, LT
B I L L
O W W
A Y
N89°46'20"E
PC
+JB
+ PC
PC
PC
PC
PC
Y T I L I T U
D E I R U B
G N I N R A W
GAS
CP
21115
I
R W
F
H W
A A
L U
M C
A P
N
N89°46'20"E
12" OUTLET
APPROACH
FIELD
I
N L E
T
P
V C
24" CONCRETE
+ CONCRETE
GPS
21116
5/8" IR W/FHWA ALUM CAP
VALVE
WATER
VALVE
WATER
SD
VALVE
WATER
VALVE
WATER
R
A I L P
L A
S T I C
TP
STEEL
Y T I L I T U
D E I R U B
G N I N R A W
GAS
PLASTIC
Y T I L I T U
D E I R U B
G N I N R A W
G A
S
SD
VINYL
R
A I L P
L A
S T I C
SD
DI
+DIDI
+DI
TP
JB
22 23
N
Slope stake limit
Edges of paved shoulder
Edge of paved shoulder
Edges of gravel shoulder
Edge of gravel shoulder
"MAIN 01" Line to be constructed
"MAIN 01" Line to be constructed
235+00, RT
Orchard Avenue
End shoulder widening
EL 2539.00
E 2380144.79
N 702220.86
"MAIN 02" 90+64.87 (SCHEDULE B)
"MAIN 01" 235+57.68 (SCHEDULES A & B)=
END PROJECT
227+95, LT
Tie to Billow Way
End shoulder widening
Slope stake limits
"MAIN 02"
234+85, RT
See Section H
Inlet adjustment
225+52, LT
Tie to existing shoulder
Begin shoulder widening
N '0
E
ORCHARD AVENUE
ORCHARD AVENUE
P I
.2
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
:1
A p r il
P la n P la n O r c h a r d A v e n u e t o
.6 p w
-w o rk \d
\I
D
F L
A P
C a n y o n
M U
L T
I( p ln
D
O rc h a rd
.d g n
(SCHEDULE A & B)
225+00 TO 235+57.68
PLAN-PLAN ORCHARD AVENUE
PROJECT
D.16
L
T
N00°48'14"E
N01°14'08"E
10 11 12 13
E M
O
U T
L E
T
S T
E E
L
J B
I
N L E
T
O U
T L E
T B
U R I E
D
G P S
N
L
T
.2
R
T
1010 11 12 13
N00°48'14"E
I
N L E
T B
U R I E
D
S P
E E
D L I
M I T
S T
O P A
H E
A D
T P
R L
Y T I L I T U D E I R U B G N I N R A W
P H
O N
E V
A U
L T
N
Edges of paved shoulderEdges of gravel shoulder
Slope stake limits
Slope stake limits
"MAIN 02" Line to be constructed
"MAIN 02" Line to be constructed
Edges of paved shoulder
Edges of gravel shoulderBEGIN CONSTRUCTION
See Section H
End sections for 12-inch pipe culvert
Cleaning culvert in place
Ditch reconditioning
13+60
11+55
Match existing
Begin shoulder widening
INDIANA AVENUE
INDIANA AVENUE
R O
O S
E V
E L
T A
V E
P I
.1
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
E = 2380053.61
N = 694273.53
NOTE: Protect all culverts in place unless otherwise noted.
"MAIN 02" 11+17.00
SCHEDULE B
:3
A p r il
P la n
P la n
I n d ia n a A v e n u e t o p w
-w o rk
\d \I
D F
L A
P C a n y o n M
U L
T I( p ln
D
I n d ia n a .d g n
(SCHEDULE B)
11+17 TO 19+60
PLAN-PLAN INDIANA AVENUE
PROJECT
D.17
.0
R
T
.5
R
T
.0
R
T
20 2520 21 22 23 24 25
R U
B B
E R , O
U T
L E
T
I
N L E
T
Y T I L I T U D E I R U B G N I N R A W
P H
O N
E V
A U
L T
C R
U S
H E
D
C O
N C
R E
T E D
I T
C H
P C
C .L .S . C
P T R
E D
P H
O N
E V
A U
L T
+ + C P
I
R W
F
H W
A A
L U
M C
A P
T P
N
R T
.7
L T
20 25
N00°48'14"E N00°55'40"E
20 21 22 23 24 25
N00°55'40"E
26 27 28 29 30 31
T P
O
U T
L E
T
I
N L E
T
F I L L E
D
L A
N D
S C
A P
E L
A N
D S
C A
P E
L A
N D
S C
A P
E
C P
I
R W
F
H W
A A
L U
M C
A P
R U
B B
E R , O
U T
L E
T
I
N L E
T
T
O P O
F P I P
E
C R
U S
H E
D
N
"MAIN 02" Line to be constructed
"MAIN 02" Line to be constructed
Slope stake limits
Slope stake limit
Edges of paved shoulder
Edge of paved shoulder
Edges of gravel shoulder
Edge of gravel shoulder
25+40, RT
Tie to Horizon Ridge subdivision
End shoulder widening
5' x 30'
Asphalt Concrete Pavement Patch, Type 1
27+58 to 27+88
5' x 308'
Pavement Patch, Type 2
Asphalt Concrete
24+50 to 27+58
N00°55'40"E N00°26'53"E
26 27 28 29 30 31
INDIANA AVENUE
INDIANA AVENUE
P I
.9
P I
.9
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
Asphalt Concrete Pavement Patch, Type 1
Asphalt Concrete Pavement Patch, Type 2
:1
F e b r u a r y
P la n
P la n
I n d ia n a A v e n u e t o p w
-w o rk
\d \I
D F
L A
P C a n y o n M
U L
T I( p ln
D
I n d ia n a .d g n
(SCHEDULE B)
19+60 TO 31+20
PLAN-PLAN INDIANA AVENUE
PROJECT
D.18
.7
L T
.3
L T
N00°26'53"E
T P
I
N L E
T B
U R
R I E
D
N
.2
L
T
L
O N
E S
T A
R R
O A
D
R
T
4037 38 39 40 41 42
C
O N
C R
E T
E
O
U T
L E
T
O U
T L E
T
C O
N C
R E
T E
O
U T
L E
T
I
N L E
T
I
N L E
T
Y T I L I T U D E I R U B G N I N R A W
U G G
A S
S T
O P I
N D I A
N A L
O N
E S
T A
R
+A P P
R O
A C
H
F I E
L D
Y T I L I T U D E I R U B G N I N R A W
G A
S
F P
F P
A R
R O
W
Y T I L I T U D E I R U B G N I N R A W
G A
S
Y T I L I T U D E I R U B G N I N R A W
U G
G A
S
N
Do not disturb
Existing irrigation standpipe
Do not disturb
Existing irrigation ditch
"MAIN 02" Line to be constructed
"MAIN 02" Line to be constructed
Slope stake limits
Edge of paved shoulder
Edges of paved shoulder
Edge of gravel shoulder
Edges of gravel shoulder
38+05, RT
Tie to Lone Star Road
Begin shoulder widening
Slope stake limits See Section H
End sections for 18-inch pipe culvert
Cleaning culvert in place
Ditch reconditioning
33+90
N00°26'53"E N00°38'07"E
37 38 39 40 41 42
INDIANA AVENUE
INDIANA AVENUE
P I
.4
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
:1
F e b r u a r y
P la n
P la n
I n d ia n a A v e n u e t o p w
-w o rk
\d \I
D F
L A
P C a n y o n M
U L
T I( p ln
D
I n d ia n a .d g n
(SCHEDULE B)
31+20 TO 42+80
PLAN-PLAN INDIANA AVENUE
PROJECT
D.19
.0
R
T
C
M P
O
U T
L E
T
I
N L E
T
O
U T
L E
T
C P
I
R W
F
H W
A A
L U
M C
A P
I
N L E
T
F I E
L D A
P P
R O
A C
H
T
O P O
F P I P
E
.6
.4
N
.1
R
T
.5
L T
.5
R
T
N00°38'07"E
I N
L E
T
I
N L E
T
W V
W V
F I E
L D A
P P
R O
A C
H
F I E
L D A
P P
R O
A C
H
A P
R O
X I
M A
T E
I
N L E
T
O
U T
L E
T
I
N L E
T
T P
.9
Y T I L I T U D E I R U B G N I N R A W
G A
S
Y T I L I T U D E I R U B G N I N R A W
G A
S
N
Do not disturb
Existing irrigation ditch
Do not disturb
Existing irrigation standpipe
"MAIN 02" Line to be constructed
"MAIN 02" Line to be constructed
Edges of paved shoulder
Edges of paved shoulder
Edges of gravel shoulder
Edges of gravel shoulder
Slope stake limits
Slope stake limits
See Section H
Cleaning culvert in place
51+00
N00°38'07"E
INDIANA AVENUE
INDIANA AVENUE
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
:1
F e b r u a r y
P la n
P la n
I n d ia n a A v e n u e t o p w
-w o rk
\d \I
D F
L A
P C a n y o n M
U L
T I( p ln
D
I n d ia n a .d g n
(SCHEDULE B)
42+80 TO 54+40
PLAN-PLAN INDIANA AVENUE
PROJECT
D.20
R
T
.2
R
T
.6
R
T
Y T I L I T U D E I R U B G N I N R A W
G A
S
O
U T
L E
T
F I E
L D A
P P
R O
A C
H
W V
I N
L E
T
O
U T
L E
T
W V+
W V
N
.0
R
T
.1
L T
.9
L T
N00°38'07"E
E M
W V
P U
M P
O
U T
L E
T
I
N L E
T
I
N L E
T +
I
N L E
T +
I
N L E
T
M D
R S F I
K
D I
+ J
B
W A T E R8
N
Do not disturb
Existing irrigation ditch
Do not disturb
Existing irrigation ditch
Do not disturb
Existing irrigation ditch
Do not disturb
Existing irrigation ditch
"MAIN 02" Line to be constructed
"MAIN 02" Line to be constructed
Edges of paved shoulder
Edges of paved shoulder
Edges of gravel shoulder
Edges of gravel shoulder
Slope stake limits
Slope stake limits
N00°38'07"E
INDIANA AVENUE
INDIANA AVENUE
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
:1
F e b r u a r y
P la n
P la n
I n d ia n a A v e n u e t o p w
-w o rk
\d \I
D F
L A
P C a n y o n M
U L
T I( p ln
D
I n d ia n a .d g n
(SCHEDULE B)
54+40 TO 66+00
PLAN-PLAN INDIANA AVENUE
PROJECT
D.21
N00°38'07"E
Y T I L I T U D E I R U B G N I N R A W
G A
S
I
R O
N
W A T E R8
C
O N
C R
E T
E
W F
Y T I L I T U D E I R U B G N I N R A W
G A
S
C P
8 5 I
R W
F
H W
A A
L U
M C
A P
N
.8
L T
.0
R
T
W F
B
R O
K E
N
W
V
I
N L E
T
O
U T
L E
T
.5
N
Do not disturb
Existing irrigation standpipe
Do not disturb
Existing irrigation standpipe
"MAIN 02" Line to be constructed
"MAIN 02" Line to be constructed
Slope stake limits Edges of paved shoulder
Edges of paved shoulder
Edges of gravel shoulder
Edges of gravel shoulder
Slope stake limits
N00°38'07"E
INDIANA AVENUE
INDIANA AVENUE
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
:1
F e b r u a r y
P la n
P la n
I n d ia n a A v e n u e t o p w
-w o rk
\d \I
D F
L A
P C a n y o n M
U L
T I( p ln
D
I n d ia n a .d g n
(SCHEDULE B)
66+00 TO 77+60
PLAN-PLAN INDIANA AVENUE
PROJECT
D.22
8.
0%
R
T
D U
C T I L E iR
O N P I P
E
C O
R R
R I G
A T
E M
E T
A L P I P
E
C O
N C
R E
T E
B
U R
R I E
D
+ 1 I
N L E
T
Y T I L I T U D E I R U B G N I N R A W
G A
SW
F
W A T E R8
O
U T
L E
T
PLASTIC
T P
E M
Y T I L I T U D E I R U B G N I N R A W
G A
S
N
.2
R
T
N00°38'07"E
P U
M P H
O U
S E
J B
S T
O P A
H E
A D
S P
E E
D
C O
N C
R E
T E P
V C
B U
R I E
D
Y T I L I T U D E I R U B G N I N R A W
G A
S
P M
P
W
+P C
R P
C , C
O N
T R
O L P
O I N
T
I
R O
N
G P S
I
R W
F
H W
A A
L U
M C
A P
++E
M
.0
.4
N
Do not disturb
Existing irrigation ditch
"MAIN 02" Line to be constructed
"MAIN 02" Line to be constructed
Slope stake limits
Slope stake limits
Edges of paved shoulder
Edges of paved shoulder
Edges of gravel shoulder
Edges of gravel shoulder
See Section H
Cleaning culvert in place
81+35
Do not disturb
Existing irrigation ditch
N00°38'07"E
INDIANA AVENUE
INDIANA AVENUE
LEGEND:
Asphalt concrete pavement surfacing
Roadway aggregate surfacing
:3
A p r il
P la n
P la n
I n d ia n a A v e n u e t o p w
-w o rk
\d \I
D F
L A
P C a n y o n M
U L
T I( p ln
D
I n d ia n a .d g n
(SCHEDULE B)
77+60 TO 89+20
PLAN-PLAN INDIANA AVENUE
PROJECT
D.23
+1 O
U T
L E
T
A P P
R O
A C
H
F I E
L D
12" INLET
S T
O P
S T
O P
C O
N C
R E
T E
G P S
S T
O P
STOP
3 RAIL PLASTIC
STOP
S T
E E
L
P L
A S
T I C
V I N
Y L
3 RAIL PLASTIC
VINYL
D I
D
ID
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .