ID FLAP Canyon MULTI(1)_3025A1_Bridge-Inspection-Report.pdf

PDF 2 MB Posted

Attached to
ID FLAP CANYON MULTI(1), Indiana and Orchard Shared Roadway
Solicitation number
69056724B000009
Issued by

About this file

This document is a Bridge Inspection Report for a bridge with the ID number 3025A1 located on Orchard Ave over the Burris Lateral in Canyon Highway District No. 4. The report details the condition of the bridge deck, superstructure, substructure, and other components, noting several areas in need of maintenance such as a spall exposing rebar on the south exterior girder and longitudinal cracks in the legs of several of the interior girders. The report provides the bridge's overall condition appraisal, geometric data, and inspection history, indicating it was last inspected in March 2022 and is due for its next inspection in 2024.

The related federal contract opportunity is Solicitation Number 69056724B000009 for the ID FLAP CANYON MULTI(1), Indiana and Orchard Shared Roadway project. This is an Invitation for Bidders (IFB) with two bid schedules, only one of which will be awarded. The IFB, plans, physical data, and construction contract administration documents are available as attachments. The procuring agency is the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
UPDATED_Bid Tab_ID FLAP CANYON MULTI(1).pdf PDF
Bid Tab_ID FLAP CANYON MULTI(1).pdf PDF
BidSum_ID FLAP CANYON MULTI(1).pdf PDF
QA_06-24-2024.pdf PDF
QA_06-20-2024_A.pdf PDF
QA_06-20-2024.pdf PDF
QA_06-18-2024.pdf PDF
Amendment A001.pdf PDF
QA_06-04-2024.pdf PDF
Physical Data.zip ZIP file
ID FLAP Canyon MULTI(1)_XYZ asphalt-MAIN 02.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XS-APPR 01.pdf PDF
ID FLAP Canyon MULTI(1)_Clearing Limits-APPR 01.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XYZ asphalt-MAIN 01-A.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XYZ base-APPR 01.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Earthwork-MAIN 01.pdf PDF
ID FLAP Canyon MULTI(1)_GM3623 Final Foundation and Geotechnical Recommendations Memo.pdf PDF
IFB_69056724B000009_ID FLAP CANYON MULTI(1).pdf PDF
ID FLAP Canyon MULTI(1)_XYZ base-MAIN 01-A.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Staking Notes-MAIN 01-A.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Earthwork-MAIN 02.pdf PDF
ID FLAP Canyon MULTI(1)_Staking Notes-MAIN 01-B.xlsx XLSX spreadsheet
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
ID FLAP Canyon MULTI(1)_plans.pdf PDF
ID FLAP Canyon MULTI(1)_Staking Notes-MAIN 02.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Staking Notes-APPR 01.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_proposed-MAIN 01-02.pdf PDF
ID FLAP Canyon MULTI(1)_XYZ asphalt-MAIN 01-B.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XYZ base-MAIN 02.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_control-points.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Earthwork-approaches.pdf PDF
ID FLAP Canyon MULTI(1)_XS-MAIN 02.pdf PDF
ID FLAP Canyon MULTI(1)_ROW-plans-stamped.dgn.pdf PDF
ID FLAP Canyon MULTI(1)_XS-MAIN 01.pdf PDF
ID FLAP Canyon MULTI(1)_proposed-APPR 01.pdf PDF
ID FLAP Canyon MULTI(1)_XYZ base-MAIN 01-B.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bridge ID Number: 3025A1

Street Name: Orchard Ave

Waterway: Burris Lateral

Location: E 240' Riverside

Canyon Highway District No. 4 Bridge Inspection Report

Commentary DECK: Concrete deck is in fair condition. Surface abrasion up to 3/16 inches deep prior to asphalt overlay.

Chipseal has sealed prior 1/16 inch longitudinal cracks in deck above beam joints. Asphalt wearing surface covering deck is in very good condition.

CURBS: Concrete curbs are in good condition.

SUPERSTRUCTURE: Structure consists of 8 prestressed double tees, in satisfactory condition. Surface scaling and light efflorescence underside top flange of double tees. Moisture seepage occurring between girders. High waterline touches bottom 4 inches of girder legs. 8 inch x 4 inch spall on underside of interior flange of south exterior girder near midspan, exposing mesh flange reinforcing. Longitudinal crack in bottom of legs (3" from bottom) of 3 southern tees (6 legs total) extending from east abutment to midspan; no spalling.

SUBSTRUCTURE: Reinforced concrete substructure is in good condition. Sedimentation along both abutments to within 1 foot of girder bottoms.

WINGWALLS: Concrete wingwalls are in good condition.

ROADWAY APPROACHES: Asphalt approaches are in very good condition. 1/8" transverse crack at east end of stucture.

EMBANKMENT: Canal embankments are in good condition.

CHANNEL/CHANNEL PROTECTION: Dirt and sand channel is in good condition.

SIGNS: Standard hazard markers all 4 corners.

UTILITIES: Overhead power south. Telephone conduit south edge of bridge.

WORK ACCOMPLISHED: None.

Inspector: Hughes Engineering 3/17/2022

MAINTENANCE RECOMMENDATIONS:

1) Seal transverse crack in asphalt at east end of structure.

Latitude 43d 35' 46.5" Longitude 116d 43' 19.5"

Condition

Appraisal

(36) Traffic Saftey Features:

Bridge Rail: 0 Substandard Transition: 0 Substandard Approach Rail: 0 Substandard Approach Rail Ends: 0 Substandard

Inspections

Last Inspection: 3/24/2020 This Inspection: 3/17/2022 Next Inspection: 2024 Inspection Frequency: 24 months Inspector: Hughes Engineering

Age and Service

Year Built: 1965

Year Reconstructed:

Year of ADT: 5/14/2001

Truck ADT:

Geometric Data

Wearing Surface

Concrete: 0 inches

Timber: 0 inches

Posting Information

Restricted:

Posting:

Max Axle:

Type 3:

Type 3S2:

Type 3-3:

(43) Structure Type: 502-Prestressed Concrete

(34) Skew: 0 degrees

Total SF: 770 sf

Drawings on File: Old NBIS MK #27530

(58) Deck: 5 Fair

(59) Superstructure: 6 Satisfactory

(60) Substructure: 7 Good

(61) Channel/Channel Protection: 7 Good

(62) Culvert: NA

Deficiency: Not Deficient

Street Name: Orchard Ave

Waterway: Burris Lateral

Location: E 240' Riverside

Canyon Highway District No. 4 Bridge Inspection Report

Sufficiency Rating: 63.0% Height from Footing: UNDET

(66) Inventory Rating*: 19 tons

(67) Structure Condition: 4 Tolerable

(68) Deck Geometry: 5 Above min tolerable

(69) Underclearance(vert hor): NA

(71) Waterway Adequacy: 8 Equal Desirable criteria

(72) Approach Roadway Align: 8 Equal Desirable criteria

(28) Lanes on: 2

(29) Average Daily Traffic: 1118

*conservative estimate

(51) Curb to curb Width: 30.2 ft

(48) Maximum Span Length: 18.8 ft

(49) Structure Length: 23.7 ft

(108) Wearing Surface: bituminous

(52) Width Out to Out: 32.5 ft

(32) Approach Roadway Width: 22 ft

(19) Detour Length: 2 mile(s)

Bridge ID number: 3025A1

Asphalt: 3.0 inches

Granular: 0 inches

Latitude: 43d 35' 46.5" Longitude: 116d 43' 19.5"

Canyon Highway District No. 4 Field Inspection Report Photos

Date: 3/17/2022 Roadway: Orchard Ave

Bridge Number: 3025A1 Feature Intersected: Burris Lateral

Looking east

Looking north

Description:

Roadway: Orchard Ave Feature Intersected: Burris Lateral

Canyon Highway District No. 4 Field Inspection Report Photos

Date: 3/17/2022 Bridge Number: 3025A1

Description:

Looking upstream (south)

Description:

Looking downstream (north)

Close-up of spall in top flange of south exterior girder

Roadway: Orchard Ave Feature Intersected: Burris Lateral

Underside view looking north

Canyon Highway District No. 4

Date: 3/17/2022 Bridge Number: 3025A1

Roadway: Orchard Ave Feature Intersected: Burris Lateral Date: 3/17/2022

Canyon Highway District No. 4

Close-up of longitudinal crack in interior leg of south exterior girder

Bridge Number: 3025A1

2022-05-18T13:37:42-0600
David J Hughes, PE