This document is a set of questions and answers related to the federal contract opportunity for the ID FLAP CANYON MULTI(1), Indiana and Orchard Shared Roadway project. The questions cover various aspects of the project, such as the contact information for the Contracting Officer's Representative (COR), dewatering requirements, installation of the box culvert, stormwater pollution prevention plan (SWPPP) management, and roadway aggregate grading. The responses reference the relevant sections of the Solicitation and the Federal Acquisition Regulation (FAR). The key details are:
The project involves the construction of a shared roadway, including the installation of a box culvert. The contractor is required to submit bids according to the solicitation documents and the Government will not be evaluating proposed design changes. The contractor is responsible for managing the SWPPP, but there is no specific pay item for this, as it is covered under the Scope of Payment. The required seed type for turf establishment is specified in the Supplementary Contract Requirements (SCR).
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.ID FLAP CANYON MULTI(1)
Project: Indiana and Orchard Shared Roadway
# General Technical Question Answer Date
1 X I am looking for the contact information of the COR on the project Indiana and Orchard
Shared Roadway.
The Government has not appointed a COR at this time. 6/4/24
2 X What is the intention of the dewatering item? We are assuming this item is for dewatering for the demo/install of the Box Culvert.
see subsection 602.03 and Subsection 209.06 of the FP‐14 6/18/24
3 X Please confirm if the contractor is to plan to install the box culvert while irrigation water is off (October‐April) or if the intent is to bypass the canal and install the culvert while irrigation water is on.
see Sub‐section 108.01(b) of the SCR's. 6/18/24
4 X Typically, there is an item for filing the SWPPP, inspections, etc… On this contract there are only items for install of BMP’s. Is there a pay item where the management of the
SWPPP is intended to fall under?
No. See FP‐14 Subsection 109.05, Scope of Payment 6/18/24
5 X For the concrete box culvert, would a cast‐in place method be accepted instead of precast?
The Government will not be evaluating proposed design changes before contract award. Please submit bids according to the solicitation documents.
6/18/24
6 X
What is the grading designation for the roadway aggregate? I have found table 703‐2 but I am unsure if we are to be planning to use C, D, or E gradation base material. Can you please clarify?
See FP‐14 Sub‐section 703.06 Crushed Aggregate 6/20/24
7 X No information about type of seed is provided. Please advise what type of seed is required for turf establishment.
See Sub‐section 713.04 of the SCR’s 6/20/24
Check General or Technical