ID FLAP Canyon MULTI(1)_Earthwork-approaches.pdf
PDF 117 KB Posted
- Solicitation number
- 69056724B000009
About this file
This document is an Earthwork Quantities Report for the ID FLAP Canyon MULTI(1) federal highway project. It provides detailed information on the earthwork requirements for select approaches along the roadway, including pavement layer lengths, areas, and volumes for cut and fill work. The report covers multiple stations and named boundary groups, with specifics on pavement layers, edge of widening, approach road match lines, and baseline information.
The related federal contract opportunity is an Invitation for Bidders (IFB) solicitation from the Department of Transportation Federal Highway Administration for the ID FLAP Canyon MULTI(1), Indiana and Orchard Shared Roadway project. The IFB, plans, physical data, and construction contract administration documents are provided as attachments. This appears to be a construction services contract with two bid schedules, where only one schedule will be awarded.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Earthwork Quantities Report for Select
Approaches for
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PROJECT
ID FLAP Canyon MULTI(1)
Indiana & Orchard Shared Roadway
Quantities Report by Named Boundary Report Created: Tuesday, November 7, 2023
Time: 2:46:07 PM
Named Boundary Group: MAIN 01
Alignment Name: MAIN 01
Input Grid Factor: Note: All units in this report are in feet, square feet and cubic feet unless specified otherwise.
Station Named Boundary Name Material Count Length Top Sloped Area Volume
10027.085 DRWY 178+18
Pavement Layer 3: 195.797 78.767 Pavement Layer 1: 37.851 6.308
Volumes_Cut: 158.055 91.709 Edge of widening: 24.112
Approach road match line: 93.815
10035.453 DRWY 182+36
Pavement Layer 3: 245.112 111.280 Pavement Layer 1: 39.551 13.178
Volumes_Fill: 2.692 Volumes_Cut: 218.264 66.108
Edge of widening: 35.354 Approach road match line: 102.452
10038.345 DRWY 143+19
Pavement Layer 3: 229.815 105.648 Pavement Layer 1: 32.017 10.667
Volumes_Fill: 15.066 0.642 Volumes_Cut: 185.193 51.336
Edge of widening: 32.156 Approach road match line: 91.708
10042.300 DRWY 219+25
Pavement Layer 1: 44.830 14.936 Pavement Layer 3: 229.592 101.455
Volumes_Cut: 182.949 93.898 Edge of widening: 41.414
Approach road match line: 104.827 Volumes_Fill:
10043.795 DRWY 178+44
Pavement Layer 1: 581.763 96.306 Pavement Layer 3: 1163.508 288.859
Volumes_Cut: 582.037 418.296 Edge of widening: 38.127
Approach road match line: 104.389 Volumes_Fill:
10046.534 DRWY 172+03
Station Named Boundary Name Material Count Length Top Sloped Area Volume Pavement Layer 3: 297.718 132.657 Pavement Layer 1: 54.353 18.111
Volumes_Fill: 1.347 0.031 Volumes_Cut: 239.903 86.349
Edge of widening: 45.980 Approach road match line: 115.987
10051.045 DRWY 161+78
Pavement Layer 3: 264.818 119.816 Pavement Layer 1: 44.018 14.667
Volumes_Cut: 220.164 90.865 Edge of widening: 48.911
Approach road match line: 102.578 Volumes_Fill:
10051.124 DRWY 104+02
Pavement Layer 3: 473.782 285.892 Pavement Layer 1: 50.001 16.651
Volumes_Fill: 228.644 109.309 Volumes_Cut: 193.965 93.661
Edge of widening: 49.950 Approach road match line: 145.658
Baseline: 30.419
10052.063 DRWY 144+15
Pavement Layer 3: 444.550 205.445 Pavement Layer 1: 64.853 21.611
Volumes_Fill: 10.523 2.414 Volumes_Cut: 369.853 146.346
Edge of widening: 53.306 Approach road match line: 151.853
Baseline:
10055.945 DRWY 145+00
Pavement Layer 3: 526.109 244.081 Pavement Layer 1: 72.421 24.130
Volumes_Fill: 0.011 0.000 Volumes_Cut: 457.189 173.363
Edge of widening: 54.919 Approach road match line: 164.119
Baseline:
10068.535 DRWY 131+84
Pavement Layer 3: 1028.216 489.685 Pavement Layer 1: 93.633 31.185
Volumes_Fill: 129.352 19.759 Volumes_Cut: 808.307 257.664
Edge of widening: 70.425 Approach road match line: 203.924
Baseline:
10072.346 DRWY 105+60
Pavement Layer 3: 1166.425 978.592 Pavement Layer 1: 396.137 131.980
Volumes_Fill: 4.664 Volumes_Cut: 776.975 885.982
Edge of widening: 64.579 Approach road match line: 208.715
Baseline:
10073.371 DRWY 118+79
Pavement Layer 3: 399.253 182.678 Pavement Layer 1: 59.795 19.923
Volumes_Fill: 137.943 16.023 Volumes_Cut: 201.214 69.332
Edge of widening: 64.515 Approach road match line: 136.769
Baseline:
10110.000 DRWY 101+11
Pavement Layer 3: 1514.650 377.525 Pavement Layer 1: 757.325 125.867
Volumes_Cut: 756.789 291.002 Baseline: 100.013
Edge of widening: 100.000 Approach road match line: 159.906
Volumes_Fill:
10121.326 Murphys Neck
DNC:
Cut: 89.594 Fill: 880.943
Pavement Layer 4: 676.715 284.225 Turf Establishment: 856.959 Pavement Layer 3: 46.153 19.072 Pavement Layer 1: 16.001 5.332
Volumes_Fill: 1208.893 1755.085 Foreslope: 184.820
Volumes_Cut: 272.983 99.706 Edge of widening: 106.725
Centerline 1: 81.559 Centerline: 81.559
Edge of Widen 1: 163.288 Edge of Widen: 163.119 Edge of Pavt 1: 163.119 Edge of Shld 1: 163.119
Edge of Shld: 240.357 Volumes_Topsoil Stripping Limits: 173.253
Prop Clearing: 173.728 Fill: 148.965 Cut: 24.288
Approach road match line: 36.147
Baseline: 85.106
10129.066 DRWY 104+41
Pavement Layer 3: 3504.327 2615.354 Pavement Layer 1: 865.029 288.164
Volumes_Fill: 975.390 245.336 Volumes_Cut: 1663.513 1602.034
Edge of widening: 125.746 Approach road match line: 399.914
Baseline: 29.154
DNC:
Cut:
Fill:
Pavement Layer 4:
Turf Establishment:
Foreslope:
Centerline 1:
Centerline:
Edge of Widen 1:
Edge of Widen:
Edge of Pavt 1:
Edge of Shld 1:
Edge of Shld:
Volumes_Topsoil Stripping Limits:
Prop Clearing:
Fill:
Cut:
10170.000 DRWY 101+92
Pavement Layer 3: 746.936 186.582 Pavement Layer 1: 373.468 62.207
Volumes_Cut: 373.383 188.031 Edge of widening: 59.663
Approach road match line: 90.856 Baseline: 16.960
Volumes_Fill:
DNC:
Cut:
Fill:
Pavement Layer 4:
Turf Establishment:
Foreslope:
Centerline 1:
Centerline:
Edge of Widen 1:
Edge of Widen:
Edge of Pavt 1:
Edge of Shld 1:
Edge of Shld:
Volumes_Topsoil Stripping Limits:
Prop Clearing:
Fill:
Cut:
10170.000 DRWY 101+92 LT
Pavement Layer 3: 321.687 160.680
Volumes_Fill: 3.869 0.176 Volumes_Cut: 317.873 111.244
Baseline: 81.519 Edge of widening: 60.337
Approach road match line: 85.762 Pavement Layer 1:
DNC:
Cut:
Fill:
Pavement Layer 4:
Turf Establishment:
Foreslope:
Centerline 1:
Centerline:
Edge of Widen 1:
Edge of Widen:
Edge of Pavt 1:
Edge of Shld 1:
Edge of Shld:
Volumes_Topsoil Stripping Limits:
Prop Clearing:
Fill:
Cut:
10210.000 DRWY 102+35 LT
Pavement Layer 3: 376.728 187.980
Volumes_Fill: 56.737 8.297 Volumes_Cut: 319.900 107.881
Baseline: 62.990 Edge of widening: 40.419
Approach road match line: 89.791 Pavement Layer 1:
DNC:
Cut:
Fill:
Pavement Layer 4:
Turf Establishment:
Foreslope:
Centerline 1:
Centerline:
Edge of Widen 1:
Edge of Widen:
Edge of Pavt 1:
Edge of Shld 1:
Edge of Shld:
Volumes_Topsoil Stripping Limits:
Prop Clearing:
Fill:
Cut:
10210.000 DRWY 102+35
Pavement Layer 3: 392.834 195.797
Volumes_Fill: 82.219 14.569 Volumes_Cut: 310.838 121.379
Edge of widening: 39.581 Approach road match line: 93.757
Baseline: 23.768 Pavement Layer 1:
DNC:
Cut:
Fill:
Pavement Layer 4:
Turf Establishment:
Foreslope:
Centerline 1:
Centerline:
Edge of Widen 1:
Edge of Widen:
Edge of Pavt 1:
Edge of Shld 1:
Edge of Shld:
Volumes_Topsoil Stripping Limits:
Prop Clearing:
Fill:
Cut:
10490.000 DRWY 104+99
Pavement Layer 3: 819.006 474.588 Pavement Layer 1: 66.569 22.177
Volumes_Fill: 288.554 55.926 Volumes_Cut: 463.546 218.005
Baseline: 115.000 Edge of widening: 80.000
Approach road match line: 184.012
DNC:
Cut:
Fill:
Pavement Layer 4:
Turf Establishment:
Foreslope:
Centerline 1:
Centerline:
Edge of Widen 1:
Edge of Widen:
Edge of Pavt 1:
Edge of Shld 1:
Edge of Shld:
Volumes_Topsoil Stripping Limits:
Prop Clearing:
Fill:
Cut:
Quantities Report by Named Boundary Report Created: Monday, October 30, 2023
Time: 1:43:36 PM
Named Boundary Group: MAIN 02
Alignment Name: MAIN 02
Input Grid Factor: Note: All units in this report are in feet, square feet and cubic feet unless specified otherwise.
Station Named Boundary Name Material Count Length Top Sloped Area Volume
1970.000 DRWY 19+93
Pavement Layer 3: 248.470 115.670 Pavement Layer 1: 47.125 15.699
Volumes_Cut: 209.148 86.263 Baseline: 60.000
Edge of widening: 60.000 Approach road match line: 110.901
2032.185 DRWY 20+58
Pavement Layer 1: 452.743 75.087 Pavement Layer 3: 905.486 225.217
Volumes_Cut: 451.992 243.433 Baseline: 72.185
Edge of widening: 62.185 Approach road match line: 127.837
2110.000 DRWY 21+03
Pavement Layer 1: 113.447 18.905 Pavement Layer 3: 610.840 247.963
Volumes_Cut: 498.053 208.232 Baseline: 87.815
Edge of widening: 77.815 Approach road match line: 198.865
6370.000 DRWY 63+94
Pavement Layer 1: 417.411 68.912 Pavement Layer 3: 834.821 206.696
Volumes_Cut: 418.553 194.875 Baseline: 75.507
Edge of widening: 60.000 Approach road match line: 115.775