This document is an Earthwork Quantities Report for MAIN 02 of a Federal Highway Administration Western Federal Lands Highway Division project, ID FLAP Canyon MULTI(1), in Indiana. The report provides detailed quantities for various construction elements such as pavement layers, turf establishment, cut and fill volumes, along with alignment and boundary information. The related federal contract opportunity is an Invitation for Bidders (IFB) for the ID FLAP CANYON MULTI(1), Indiana and Orchard Shared Roadway project. The IFB includes two bid schedules, with only one schedule to be awarded. The solicitation is posted by the Department of Transportation Federal Highway Administration, and the attachments include the IFB, plans, physical data, and the Construction Contract Administration Document per FAR 36.211.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Earthwork Quantities Report for MAIN 02 for
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PROJECT
ID FLAP Canyon MULTI(1)
Indiana & Orchard Shared Roadway
Quantities Report by Named Boundary Report Created: Monday, October 30, 2023
Time: 11:50:21 AM
Named Boundary Group: MAIN 02
Alignment Name: MAIN 02
Input Grid Factor: Note: All units in this report are in feet, square feet and cubic feet unless specified otherwise.
Station Named Boundary Name Material Count Length Top Sloped Area Volume
2950.000 10+00 to 30+00
Pavement Layer 4: 23374.141 18364.972 Pavement Layer 1: 12887.639 2146.506 Pavement Layer 2: 12887.638 2146.478 Turf Establishment: 14786.157
Cut: 2188.710 Fill: 51.973
DNC:
Wedge Layer 1: 8717.031 2812.765
Volumes_Fill: 101.222 6.937 Volumes_Cut: 24783.077 22157.666
Baseline: 2000.000 Edge of widening: 4000.000
DNC: 3230.000
Edge of Widen: 3229.908
XS_TL_Edge of Pavt 1: 3229.910 XS_TL_Edge of Pavt 2: 3229.910
Edge of Shld: 6182.696 XS_TL_Edge of Pavt 4: 1814.921
XS_TL_Subgrade: 4644.868 XS_TL_Edge of Widen 1: 3229.908 XS_TL_Edge of Widen 2: 3229.908 XS_TL_Edge of Widen 3: 3229.908
Volumes_Topsoil Stripping Limits: 2952.955 Prop Clearing: 2952.913
Cut: 2832.928 Fill: 80.015
4950.000 30+00 to 50+00 Pavement Layer 1: 12785.400 2129.998
Cut: 1714.073 Fill: 162.722
DNC:
Pavement Layer 4: 23286.827 18277.650 Pavement Layer 2: 12785.400 2129.971 Turf Establishment: 14427.913
Station Named Boundary Name Material Count Length Top Sloped Area Volume Wedge Layer 1: 7579.153 2197.978
Volumes_Fill: 334.325 27.961 Volumes_Cut: 24241.928 22083.932
Baseline: 2000.000 Edge of widening: 4000.000
DNC: 3194.997
Edge of Widen: 3194.997
XS_TL_Edge of Pavt 1: 3194.997 XS_TL_Edge of Pavt 2: 3194.997
Edge of Shld: 6154.651 XS_TL_Edge of Pavt 4: 1781.666
XS_TL_Subgrade: 4611.328 XS_TL_Edge of Widen 1: 3194.997 XS_TL_Edge of Widen 2: 3194.997 XS_TL_Edge of Widen 3: 3196.997
Cut: 2499.813 Volumes_Topsoil Stripping Limits: 2949.755
Prop Clearing: 2949.755 Fill: 359.974
6950.000 50+00 to 70+00 Pavement Layer 1: 16012.226 2666.658
Cut: 2249.965
DNC:
Turf Establishment: 19220.514 Pavement Layer 2: 16012.225 2666.635 Pavement Layer 4: 29122.841 22799.297
Wedge Layer 1: 10937.621 2895.303 Volumes_Fill: 17.301 0.280
Volumes_Cut: 30478.628 28228.933 Baseline: 2000.000
Edge of widening: 4000.000
DNC: 4000.000
Edge of Widen: 4000.000 XS_TL_Edge of Pavt 1: 4000.000 XS_TL_Edge of Pavt 2: 4000.000
Edge of Shld: 7662.087 XS_TL_Edge of Pavt 4: 1889.236
XS_TL_Subgrade: 6110.764 XS_TL_Edge of Widen 1: 4000.000 XS_TL_Edge of Widen 2: 4000.000 XS_TL_Edge of Widen 3: 4000.000
Volumes_Topsoil Stripping Limits: 3662.163 Prop Clearing: 3662.163
Cut: 3662.163 Fill:
Fill:
Station Named Boundary Name Material Count Length Top Sloped Area Volume
8979.564 70+00 to 90+00
Cut: 2374.067 Fill: 797.281
Pavement Layer 1: 16166.279 2693.309
DNC:
Pavement Layer 4: 30015.662 23468.606 Turf Establishment: 20495.994 Pavement Layer 2: 16166.278 2693.289
Wedge Layer 1: 10241.980 3043.088 Volumes_Fill: 915.016 155.801
Volumes_Cut: 31453.477 28895.025 Baseline: 2029.564
Edge of widening: 4059.128
DNC: 4039.978
Edge of Widen: 4039.978 XS_TL_Edge of Pavt 1: 4039.978 XS_TL_Edge of Pavt 2: 4039.978
Edge of Shld: 7909.458 XS_TL_Edge of Pavt 4: 1993.998
XS_TL_Subgrade: 6085.958 XS_TL_Edge of Widen 1: 4039.978 XS_TL_Edge of Widen 2: 4039.978 XS_TL_Edge of Widen 3: 4039.978
Volumes_Topsoil Stripping Limits: 3870.387 Prop Clearing: 3870.387
Cut: 3368.600 Fill: 391.667