This document contains a series of questions and answers related to a federal contract opportunity for the ID FLAP CANYON MULTI(1), Indiana and Orchard Shared Roadway project. The key details are:

The contract opportunity is an Invitation for Bidders (IFB) issued by the Department of Transportation Federal Highway Administration. It includes two bid schedules, with only one schedule to be awarded. The IFB, plans, physical data, and construction contract administration documents are provided as attachments.

The questions cover topics such as the contracting officer's representative, dewatering requirements, installation of the box culvert during irrigation season, and pay items for SWPPP management. The government provides responses clarifying the requirements, referencing relevant sections of the specifications. The government also indicates they will not evaluate proposed design changes before contract award.

View the file

Other files

File Type Posted
UPDATED_Bid Tab_ID FLAP CANYON MULTI(1).pdf PDF
Bid Tab_ID FLAP CANYON MULTI(1).pdf PDF
BidSum_ID FLAP CANYON MULTI(1).pdf PDF
QA_06-24-2024.pdf PDF
QA_06-20-2024_A.pdf PDF
QA_06-20-2024.pdf PDF
Amendment A001.pdf PDF
QA_06-04-2024.pdf PDF
Physical Data.zip ZIP file
ID FLAP Canyon MULTI(1)_XYZ asphalt-MAIN 02.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XS-APPR 01.pdf PDF
ID FLAP Canyon MULTI(1)_Clearing Limits-APPR 01.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XYZ asphalt-MAIN 01-A.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_3025A1_Bridge-Inspection-Report.pdf PDF
ID FLAP Canyon MULTI(1)_XYZ base-APPR 01.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Earthwork-MAIN 01.pdf PDF
ID FLAP Canyon MULTI(1)_GM3623 Final Foundation and Geotechnical Recommendations Memo.pdf PDF
IFB_69056724B000009_ID FLAP CANYON MULTI(1).pdf PDF
ID FLAP Canyon MULTI(1)_XYZ base-MAIN 01-A.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Staking Notes-MAIN 01-A.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Earthwork-MAIN 02.pdf PDF
ID FLAP Canyon MULTI(1)_Staking Notes-MAIN 01-B.xlsx XLSX spreadsheet
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
ID FLAP Canyon MULTI(1)_plans.pdf PDF
ID FLAP Canyon MULTI(1)_Staking Notes-MAIN 02.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Staking Notes-APPR 01.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_proposed-MAIN 01-02.pdf PDF
ID FLAP Canyon MULTI(1)_XYZ asphalt-MAIN 01-B.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_XYZ base-MAIN 02.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_control-points.xlsx XLSX spreadsheet
ID FLAP Canyon MULTI(1)_Earthwork-approaches.pdf PDF
ID FLAP Canyon MULTI(1)_XS-MAIN 02.pdf PDF
ID FLAP Canyon MULTI(1)_ROW-plans-stamped.dgn.pdf PDF
ID FLAP Canyon MULTI(1)_XS-MAIN 01.pdf PDF
ID FLAP Canyon MULTI(1)_proposed-APPR 01.pdf PDF
ID FLAP Canyon MULTI(1)_XYZ base-MAIN 01-B.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No.ID FLAP CANYON MULTI(1)

Project: Indiana and Orchard Shared Roadway

# General Technical Question Answer Date

1 X I am looking for the contact information of the COR on the project Indiana and Orchard

Shared Roadway.

The Government has not appointed a COR at this time. 6/4/24

2 X What is the intention of the dewatering item? We are assuming this item is for dewatering for the demo/install of the Box Culvert.

see subsection 602.03 and Subsection 209.06 of the FP‐14 6/18/24

3 X Please confirm if the contractor is to plan to install the box culvert while irrigation water is off (October‐April) or if the intent is to bypass the canal and install the culvert while irrigation water is on.

see Sub‐section 108.01(b) of the SCR's. 6/18/24

4 X Typically, there is an item for filing the SWPPP, inspections, etc… On this contract there are only items for install of BMP’s. Is there a pay item where the management of the

SWPPP is intended to fall under?

No. See FP‐14 Subsection 109.05, Scope of Payment 6/18/24

5 X For the concrete box culvert, would a cast‐in place method be accepted instead of precast?

The Government will not be evaluating proposed design changes before contract award. Please submit bids according to the solicitation documents.