140904_Final_RFP_QnA_166-174.pdf

PDF 549 KB Posted

Attached to
SOCOM Wide Mission Support (SWMS) Group C Federal contract opportunity
Solicitation number
H92222-14-R-0019
Issued by
United States Special Operations Command

About this file

Final SWMS Group C RFP Q A's

View the file

Other files for this federal contract opportunity

Other files attached to SOCOM Wide Mission Support (SWMS) Group C, newest first.
File Type Posted
H92222-14-R-0019_Amendment_0005.doc DOC document
Amend_05_Atch_1_Revision_2_9-9-2014.pdf PDF
Final_Group_C_QnA_181-183.pdf PDF
Amend_04_Atch_3_Pricing_Rev_4_9-8-2014.xlsx XLSX spreadsheet
H92222-14-R-0019_Amendment_0004.doc DOC document
H92222-14-R-0019_Amendment_0003.doc DOC document
140905_Final_RFP_QnA_175-180.pdf PDF
Amend_03_Atch_3_Pricing_Rev_3_9-5-2014.xlsx XLSX spreadsheet
H92222-14-R-0019_Amendment_0002.doc DOC document
Amend_02_Atch_3_Pricing_Rev_2_9-3-2014.xlsx XLSX spreadsheet
Group_C_Final_RFP_QA_157-165.pdf PDF
Amend_01_Atch_7a_Revision_1_8-20-14.pdf PDF
Amend_01_Atch_2_Group_DD254_Rev_1.pdf PDF
H92222-14-D-0019_Amend_0001.doc DOC document
Amend_01-Summary_of_Changes_RFP_Attachments.pdf PDF
Amend_01_Atch_5a_Rev_1_8-20-14.pdf PDF
Amend_01_Atch_6a_Revision_1_8-20-14.pdf PDF
Amend_01_Atch_1_Revision_1_8-20-14.pdf PDF
Amend_01_Atch_7b_J8S_DD254_Rev_1.pdf PDF
Amend_01_Atch_5b_SORDAC_DD254_Rev_1.pdf PDF
140825_FBO_Group_C_QnA_80-156.pdf PDF
Amend_01_Atch_3_Pricing_Rev_1_8-22-2014.xlsx XLSX spreadsheet
RFP_QA_57-79.pdf PDF
RFP_QA_1-56.pdf PDF
Atch_2_Group_C_DD254.pdf PDF
Atch_12_Modified_SF1408.doc DOC document
Atch_5a_SORDAC_SOW.pdf PDF
Atch_11_Client_Auth.doc DOC document
Atch_8_Group_C_PPI.doc DOC document
Atch_5b_SORDAC_TO_DD254.pdf PDF
Atch_7a_J8-S_Analytical_and_Technical_Support_SOW.pdf PDF
Atch_6a_SOFM_SOW.pdf PDF
Atch_10_Consent_Letter.doc DOC document
Atch_9_Group_C_PPQ.doc DOC document
Final_Group_C_RFP.doc DOC document
Exhibit_A_CDRLS.pdf PDF
Atch_7b_J8-S_DD254.pdf PDF
Atch_3_Pricing_Template.xlsx XLSX spreadsheet
Atch_6b_SOFM_DD254.pdf PDF
Atch_1_Group_C_SOW.pdf PDF
140714_Group_C_Labor_Categories_Rev_1.pdf PDF
140710_Group_C_Labor_Categories.pdf PDF
Group_C_Draft_RFP_Sample_SOO.doc DOC document
Draft_H92222-14-R-0019_SWMS_Group_C_SOFM_SOW.doc DOC document
DRAFT_H92222-14-R-0019_SWMS_Group_C.doc DOC document
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# RFP Ref. Question/Comment Response Amend # 166 subk In the Subcontractor’s sealed package do they need to show the buildup of all labor rates for all Task Orders, or only for the positions we are allocating to them in a particular Task Order?

Only the positions the prime is proposing be performed by the subcontractor

N/A

167 SORDAC TO Would the government please confirm the start date for Subtask 2 of the SORDAC task order? The RFP (L.2.4.2.1) states a start date of July 18, 2015, which is a Saturday, but the SORDAC SOW (Section 3.2) states a start date of July 19, 2015, which is a Sunday.

The current task order ends 18 July 2015. Subtask 2 personnel will be expected to begin performance on 20 Jul 2015 (Monday). Amendment 0002 updates the date.

168 Atch 9 How does the Government want to bidders to use Attachment 9 PPQ as a personal reference? The form is very much geared to a specific contract and not to personal past performance of an individual. Are we allowed to make changes to the form so it fits a personal reference or can we not use the form and just submit a formal letter of reference? Please clarify

The Government is not looking for personal past performance of an individual.

N/A

169 General The last round of questions refers to Amendment 002 to be released.

Pending the actual release of the Amendment would the government please consider allowing the bidder 10 calendar days after the release for the bids to be due? This ensures the bidders have time to make changes to their proposal if necessary.

The due date is 10 September 2014 N/A

170 RFP H.3. (f) Contractor shall, at its own expense, be responsible for obtaining any and all licenses, certifications, authorizations, approvals, and permits, and for complying with any applicable Federal, national, state, and municipal laws, codes, and regulations, and any applicable foreign work permits, authorizations, and/or visas in connection with the performance of any applicable task order Is there any historical data available as it relates to these expenses? Should these be included in estimated costs?

The items identified are representative of business expenses necessary for performance of any contract. SOCOM has no historical data available. All anticipated expenses should be included in your proposed cost.

N/A

171 L4.3 & L4.5 Given the apparent contradiction below, is it safe to assume that having the subs complete a sealed package with only attachment 3 will be compliant?

a. L4.3 “The offeror, and any subcontractors proposed, shall submit detailed substantiation for all direct labor rates for which there is no available

FPRA”

b. L4.5 “. If subcontractors are being proposed, the Offeror will provide the same level of detail requested of the prime for all proposed direct labor hours and direct labor and indirect rates by completing Attachment 3.”

Amendment 0002 includes revised language to clarify. 02

172 Amend 02 When will Amendment 0002 be posted? Discussion: In the response to Question 161 posted on August 28, there is a reference to a second amendment, Amendment 0002. The date of the amendment is needed to complete the Acknowledgement of Amendments in Section 14 of SF 33.

The amendment will be posted to FBO once final reviews are accomplished.

N/A

173 Page Count Question: Will the Government allow offerors to include the Quality Control Plan (QCP) as an addendum to Volume 1? Discussion: L.2.3.h says “Describe your plan for quality control and furnish a quality control plan (QCP).” (emphasis added). It goes on to say the QCP is part of the page count and will be incorporated into the resultant contract. Inasmuch as QCPs can run 30-50 pages and Sub-factor 1 is limited to 44 pages, will the Government allow offerors to include the QCP as a separate document?

The QCP is included in the Sub-factor 1 page count; the government does not desire a 30-50 page QCP. The government is looking for a concise to the point quality control plan that addresses the items identified in L2.3.h.

N/A

174 Atch 3 Does the Government wish offerors to protect (password) the pricing template (RFP Attachment 3) that is required to be submitted with the proposal?

No. N/A

H92222-14-R-0019 Final Group C Q&A's (Questions 166-174)

POSTED TO FBO 9-4

File details come from the government source that posted it. Updated .