[G]_Project_Exhibits-Index_7-2-25.pdf

PDF 159 KB Posted

Attached to
Collins Street Complete Street - Phase I
Solicitation number
25-014EN-FC-IFB
Issued by
Hillsborough County, Florida

About this file

This is an Exhibits Index document prepared by the City of Plant City, Florida, for the Collins Street Complete Street Improvements—Phase I project (IFB 25-014EN-FC-IFB). The project encompasses approximately 1/4 mile of S. Collins Street improvements from E. Laura Street to south of E. Alabama Street, including roadway reconstruction, drainage work, concrete curb and sidewalk installation, utility relocations, traffic signalization, landscape and hardscape enhancements, and potable water main replacement. Key design documents were prepared by Kimley-Horn and Associates (roadway, signing, pavement marking, signalization, lighting, and landscape/hardscape/irrigation plans dated 2/10/2025), with supplementary exhibits including a geotechnical report by Terracon Consultants, a soil and groundwater management plan by Madrid CPWG, and utility work schedules from TECO, Charter Communications, and Frontier Communications. The project incorporates by reference the FY2024-25 Standard Plans for Road and Construction from the Florida Department of Transportation. The bid was released on August 18, 2025, with questions due by September 8, 2025, and proposals due by October 9, 2025. The contractor must achieve substantial completion within 365 calendar days from the Notice to Proceed and coordinate concurrent utility relocations and underground work throughout the project schedule.

The project requires a State of Florida General Contractor's License and FDOT Prequalification. The procurement involves multiple bid categories across road and drainage, watermain replacement, hardscape, landscape, irrigation, signalization, and lighting work, indicating a substantial municipal infrastructure investment, though no specific budget amount is disclosed in this exhibits index. Consulting firms already engaged include Kimley-Horn & Associates as Engineer of Record, Dewberry for watermain relocation, Madrid Engineering Group for groundwater and soil management, and Rummel, Klepper & Kahl, LLP for construction engineering and inspection. No specific set-aside designations for disadvantaged enterprises were noted in the documentation.

View the file

Other files

File Type Posted
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#6_Revision).pdf PDF
[Z]_Approved_Products_List-July2024.pdf PDF
[C]_General_Specifications_10-29-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[A]_Project_Specifications-Index_10-29-25.pdf PDF
[A]_Project_Specifications-Index_7-2-25.pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#4_Revision).pdf PDF
Collins_Street_Complete_Street_-_Phase_I_(Addendum_#2_Revision).pdf PDF
2025-02-07_-_Collins_Street_Complete_Street_Improvements_-_Phase_1_Contract.pdf PDF
[O]_611_Collins_Street_Site_Exhibit_7-2-25.pdf PDF
[M]_Plans_1.28.22_-_Collins_St_Watermain_7-2-25.pdf PDF
[L]_2025.02.11_-_Collins_Street_Landscape_SS_7-2-25.pdf PDF
[K]_2025.02.10_Collins_Lighting_Phase1_Signed_7-2-25.pdf PDF
[J]_2025.02.10_Collins_Signals_S&S_7-2-25.pdf PDF
[I]_2025.02.10_Collins_SPM_Phase1_Signed_7-2-25.pdf PDF
[H]_2025.02.10_Collins_Rdwy_Phase1_Signed_7-2-25.pdf PDF
[G]_Project_Exhibits-Index_7-2-25.pdf PDF
[E]_Watermain_Replacement_Technical_Specification_7-2-25.pdf PDF
[D]_General_Requirements_7-2-25.pdf PDF
[C]_General_Specifications_7-2-25.pdf PDF
[B]_Scope_of_Work_7-2-25.pdf PDF
[A]_Project_Specifications-Index_7-2-25.pdf PDF
Outside_Consultant_List_REV12-20-24.pdf PDF
RW_Use_Permit_Application_Form.pdf PDF
CSX_RR_TROE_Locations.pdf PDF
UWS_Charter.pdf PDF
NOA_-_PWS_General_Permit.pdf PDF
UWS_Frontier.pdf PDF
H4185018_Collins_Street_Core_Report_S&S.pdf PDF
UWS-TECO.pdf PDF
H4185018_Collins_St_Mast_Arms_S&S.pdf PDF
Soil_&_Groundwater_Management_Plan.pdf PDF
ERP_Exemption.pdf PDF
Traffic_Cabinet_-_Special_Requirements.pdf PDF
Bid_Form_-_Watermain_Replacement.xlsx XLSX spreadsheet
Worksheet_for_Construction_Agreement_11-8-24.docx DOCX document
Bid_Form_-_Road_&_Drainage.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibits Index

Item Description Author Date Roadway Plans Kimley-Horn and Associates 2/10/2025 Signing and P’vmt. Marking Plans Kimley-Horn and Associates 2/10/2025 Signalization Plans Kimley-Horn and Associates 2/10/2025 Lighting Plans Kimley-Horn and Associates 2/10/2025 Landscape, Hardscape, and Irrigation Plans

Kimley-Horn and Associates 2/10/2025

Watermain Replacement Dewberry │ Hydro 262025 Soil & Groundwater Management Plan

Madrid CPWG 11/2024

611 Collins Street Site City of Plant City 7/1/2025 CSX Railroad TROE Location Sketch City of Plant City 10/23/2024 ERP – Exemption Letter SWFWMD 5/31/2021 NOA – PWS General Permit FL DOH-Hillsborough 2/28/2022 Geotechnical Report - Cores Terracon Consultants, Inc. 7/25/2019 Geotechnical Report – Mast Arms Terracon Consultants, Inc. 10/30/2019 Utility Work Schedule TECO 2/2021 Utility Work Schedule Charter Communications 2/2021 Utility Work Schedule Frontier Communications 2/2021 Right / Way Use Permit Application City of Plant City 9/6/2023 FY2024-25 Standard Plans for Road and Construction (incorporated by reference)

Florida Department of Transportation

Copy available at: https://www.fdot.gov/design/standardplans/2025/standard-plans---fy-2024-25

CITY OF PLANT CITY

ENGINEERING

302 W.REYNOLDS ST.

PLANT CITY, FL 33563

Collins Street Complete Street

Improvements-Phase I

25-014EN-FC-IFB

https://www.fdot.gov/design/standardplans/2025/standard-plans---fy-2024-25 https://www.fdot.gov/design/standardplans/2025/standard-plans---fy-2024-25

File details come from the government source that posted it. Updated .