This is Amendment 0006 to solicitation N4008023R0022 for a $750M Small Business Anchor Multiple Award Construction Project at Marine Barracks Washington, specifically for the P-2203 Quarters 6 Whole House Revitalization project. The amendment provides responses to pre-proposal inquiries, attachments including a hazmat report and revised plumbing specification, and incorporates an updated 2.14.2025 wage determination.

Key clarifications include: use of Keim Soldalit Mineral coating for exterior brick, EMT conduit requirements for electrical and fire alarm systems, confirmation that food service equipment in adjacent buildings is not in scope, prohibition of exterior scaffolding while allowing interior scaffolding, and specification that plaster must be replaced with plaster due to historic landmark status. The amendment also removes language requiring joint venture offerors to submit relevant experience from all partners. Technical details include lighting fixture specifications, fire alarm system requirements (Notifier AM2020), and clarification that the mechanical enclosure is part of the base bid. The amendment indicates final DOEE review and approval of stormwater management plans is pending but expected before contract award.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

J 1 21

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0006 18-February-2025

6. ISSUED BY Code N40080 7. ADMINISTERED BY (If other than item 6.) Code Naval Facilities Engineering Systems Command 1314 Hardwood Street, SE Washington Navy Yard, DC 20374-5018

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

N4008023R0022 ACQR: 6070919

9B. DATED (SEE ITEM 11)

13-January-2025

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MO`LECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

$750M SMALL BUSINESS ANCHOR MULTIPLE AWARD CONSTRUCTION PROJECT NAVFAC WASHINGTON

N40080-23-R-0022 ACQR: 6070919

P-2203, QUARTERS 6 WHOLE HOUSE REVITALIZATION

MARINE BARRACKS WASHINGTON, WASHINGTON, DC

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

SF 30 BLOCK 14 CONTINUATION PAGE

The purpose of this amendment is to provide the following:

1. Provide responses to Outstanding PPIs

2. Provide Attachments

3. Incorporate 2.14.2025 Wage Determination

All other terms and conditions remain unchanged.

1. PRE-PROPOSAL INQUIRIES RESPONSES

12. The existing coating on the exterior of the building is Keim Mineral Coating. The specification does not mention "mineral coating" as an option. Should Keim Mineral Coatings be used in lieu of simple exterior paint over the existing brick?

GOVERNMENT RESPONSE: Yes, please use Keim Soldalit Mineral coating.

13. How far is the building 9 FACP from the basement of Quarters 6?

GOVERNMENT RESPONSE: Building 9 is about 500 feet from Quarters 6, on the south side of the Marine Barracks site.

14. Is type MC-FPLP or AFC cable acceptable for fire alarm branch installation?

GOVERNMENT RESPONSE: Follow UFC 3-600-01, NFPA 70, NFPA 72, and construction documents.

Conduit to be EMT.

15. Who is responsible for repair of wall, ceilings, and other openings needed to install electrical pathways.

GOVERNMENT RESPONSE: The contractor. Delegation of work is the responsibility of the general contractor.

16. Can you provide approved manufacturers list or part numbers for light fixtures?

GOVERNMENT RESPONSE: Below are basis of design fixture, these fixtures are not required and equivalent fixtures that meet the performance are acceptable:

Fixture 19: Indy L8/LRM8 Series Fixture 20: Juno FMLR White Led Low Profile Flush Mount 11” Round Fixture 21: Lithonia Lighting Low-Profile Curved-Basket LED Wraparound LBL4, 4’ Length, Narrow Housing Fixture 22: Lithonia Lighting Low-Profile Curved-Basket LED Wraparound LBL4, 4’ Length, Narrow Housing Fixture 23: Williams WMAUD LED Architectural Wall Mount Up/Down Fixture 24: Lumenwerx Aera 3” downlight round recessed; AE3RR TLMP SW Fixture 25: HectorFinch Zac Spot Light product code WL421 Antique Brass Fixture 26: Kelvix CH-222 extruded aluminum mounting channel & Kelvix Uniform Static White (indoor) white light tape HectorFinch Zac Spot Light product code WL421 Antique Brass 52 inches Fixture 27: Visual Comfort & Co 18” Cabinet Maker’s Picture Light Item #SL 2705AN Brass Finish Fixture 28: Castell 6 Globe Linear LED Pendant, Aged Brass LC005139 Fixture 29: Big Ass Fans Haiku Fixture 30: Hinkley DAX small adjustable Led Sconce, Finish: Heritage Brass Fixture 31: WAC Lighting LEDme Step Light Model: WL-LED200 Finish WT

17. Who is the current Fire Alarm MNS manufacturer? What Fire Alarm system manufactures are acceptable to be installed with the current system? (Connection to building 9)?

GOVERNMENT RESPONSE: Notifier AM2020, building 9 access to fire alarm control panel was not provided.

19. Is Type MC cable acceptable for electrical branch distribution?

GOVERNMENT RESPONSE: EMT shall be used for branch circuits and feeders above suspended ceilings or exposed where not subject to physical damage. Although MC is allowed for branch circuits only in the following dry locations: new construction in exposed locations; renovations in exposed locations; concealed in renovations in existing areas where walls and ceilings are not disturbed; and cable trays.

20. Which type of MNS radio transmitter system is currently being used?

GOVERNMENT RESPONSE: Existing drawings indicate Notifier UDACT in building 9 is the fire alarm communications equipment.

21. Is EMT needed for telecom distribution? Is free air cable acceptable?

GOVERNMENT RESPONSE: EMT is needed for telecom distribution.

22. Please provide the name of the temperature controls contractor and system for this facility.

GOVERNMENT RESPONSE: See 23 09 00, paragraph 1.1.1.

23. There is no specification for the domestic water pipe, fittings

GOVERNMENT RESPONSE: Please see spec 22 00 00 REV1, included in this amendment.

25. Sheet CS181, detail C4/CS101 of the Base Bid drawing set indicates Basement Wall Waterproofing, but project specifications do not include below-grade waterproofing specifications. Please advise.

GOVERNMENT RESPONSE: The specifications for below-grade waterproofing are provided on Drawing

# CS002.

26. B05_A100, Keynote 03.01, indicates “Ref: Structural”. Bid Option 5 drawing set does not include structural plans. Please advise.

GOVERNMENT RESPONSE: Disregard keynote 03.01 on B05_A100.

27. SUB-CLIN 0001AB, indicates “Subtotal of Base Price for the entire project site work outside facility’s 5 foot line”.

A. Does this include the Mechanical Enclosure SOW?

B. Can a marked-up drawing/image be provided for pricing accuracy?

GOVERNMENT RESPONSE: The mechanical enclosure is part of the base price.

28. The SOW shown under “Key” on the Base Bid drawing S101; references sheet S505 and S504. These sheets are not available in the Base Bid drawing package or in the Bid Options drawing package. Please advise.

GOVERNMENT RESPONSE: On sheet S101, reference to S505 should be to S502. Reference to 5/S504 should be to 5/S500.

31. PD101, General Note #4 states that all concealed ACM pipe insulation is to be assumed ACM and to reference Section 028200 of the specifications. In referencing Section 028200, no assumed quantities of ACM pipe insulation can be located. Can the Government provide an assumed quantity of pipe insulation to be abated for bidding purposes?

GOVERNMENT RESPONSE: Response to be provided in a forthcoming amendment.

32. MD102, General Note #2 states that all concealed ACM pipe insulation is to be assumed ACM and to reference Section 028200 of the specifications. In referencing Section 028200, no assumed quantities of ACM pipe insulation can be located. Can the Government provide an assumed quantity of pipe insulation to be abated for bidding purposes?

GOVERNMENT RESPONSE: Response to be provided in a forthcoming amendment.

33. On sheet A-101, within the “Estimated Quantities” schedule, it states “(Base Bid-Total of all Floors)”, however, not all of the keynotes shown in this schedule are shown on the base bid series of architectural drawings. Please confirm the applicable keynote quantities for the base bid.

GOVERNMENT RESPONSE: A-101 does not include an Estimated Quantities schedule. A/E assumes that reference is for sheet A-100. The following noted quantities shall be adjusted:

-2.32 – All work for this note is a part of Bid Option 2. A quantity of 26 LF shall be indicated within that drawing package.

-2.62 – All work for this note is a part of Bid Option 5. A quantity of 491 SF shall be indicated within that drawing package.

-9.18 – All work for this note is a part of Bid Option 5. A quantity of 7 SF shall be indicated within that drawing package.

34. During the 2010-2011 Renovation, a mineral coating was applied to the exterior masonry. Referencing Section 099000, it does not list anything in regarding the existing coatings. For bidding purposes, would a mineral coating product be preferred to match the existing coatings applied?

GOVERNMENT RESPONSE: Please use KEIM Soldalit.

35. During the site visit we noticed MC type electrical cable in the attic. Due to the complexity of the project and to reduce the amount of plaster disruption is MC cable acceptable for the electrical and fire alarm systems?

GOVERNMENT RESPONSE: For power EMT shall be used for branch circuits and feeders above suspended ceilings or exposed where not subject to physical damage. Although MC is allowed for branch circuits only in the following dry locations: new construction in exposed locations; renovations in exposed locations; concealed in renovations in existing areas where walls and ceilings are not disturbed; and cable trays.

For fire alarm systems all conductors must be installed in conduit, EMT minimum

36. Please confirm that Section 250511 only applies to the mechanical controls portion of the project

GOVERNMENT RESPONSE: It generally applies to any controls system and any contractor computers connected to said systems.

37. Can pictures be provided of the concrete beams and underside of slab shown on 1/S101?

GOVERNMENT RESPONSE: See below

38. Can pictures be provided of all exterior elevations of the building?

GOVERNMENT RESPONSE: Unfortunately, the Government cannot provide pictures at this time.

Please propose in accordance with the plans and specifications.

39. Can pictures be provided of the attic area?

GOVERNMENT RESPONSE: Unfortunately, the Government cannot provide pictures at this time. Please propose in accordance with the plans and specifications.

40. Can pictures be provided of the courtyards?

GOVERNMENT RESPONSE: Unfortunately, the Government cannot provide pictures at this time. Please propose in accordance with the plans and specifications.

41. In terms of security, does the Government allow to enclose the public site on G St. SE when work start?

GOVERNMENT RESPONSE: Contractor will not be able to enclose the construction area on the north side of Q6 on G Street. Additional laydown area will be provided within the Q6 garden area, utilizing an enclosed tent structure.

42. Please provide the HVAC controls in the building.

GOVERNMENT RESPONSE: See 23 09 00, paragraph 1.1.1.

43. Please provide pictures of all areas, inside and outside, mechanical room, etc.

GOVERNMENT RESPONSE: Unfortunately, the Government cannot provide pictures at this time. Please propose in accordance with the plans and specifications.

44. Does the facility not need installation on the Food Service equipment?

GOVERNMENT RESPONSE: No, the food service equipment in the adjacent building is not part of the scope.

46. We are submitting or proposal as a JV under the SBA approved mentor protégé relationship. The RFP States: “ JV offers who fail to submit relevant experience by all JV partners may be considered less favorably “ However:13 C.F.R. § 124.513(f) which states “[t]he partners to the joint venture in the aggregate must demonstrate the past performance, experience, business systems, and certifications necessary to perform the contract” and “procuring activity must consider work done and qualifications held individually by each partner to the joint venture as well as any work done by the joint venture itself previously.”entirety of 13 C.F.R. § 124.513(f), the rule “directs agencies to ‘consider work done and qualifications held individually by each partner to the joint venture’ and in that consideration, prohibits agencies from requiring the protégé or 8(a) participant partner to individually meet the same criteria as the mentor or non-8(a) partner.”

GOVERNMENT RESPONSE: Factor 1 – Experience: Remove “JV Offerors who fail to submit relevant experience by all JV partners may be considered less favorably” from the Basis of Evaluation.

47. Is it 1 EA of food service equipment? Can you please provide food service drawing to match the quantities with the specs.

GOVERNMENT RESPONSE: No, the food service equipment in the adjacent building is not part of the scope.

49. How far is the building 9 FACP from the basement of Quarters 6?

GOVERNMENT RESPONSE: Approximately 500 feet from Quarters 6, straight across field. FA comms wiring between buildings does not follow that route.

50. Is type MC-FPLP or AFC cable acceptable for fire alarm branch installation?

GOVERNMENT RESPONSE: Follow UFC 3-600-01, NFPA 70, NFPA 72, and construction documents.

Conduit to be EMT.

51. Can you provide approved manufacturers list or part numbers for light fixtures

GOVERNMENT RESPONSE: Below are basis of design fixture, these fixtures are not required and equivalent fixtures that meet the performance are acceptable:

Fixture 19: Indy L8/LRM8 Series Fixture 20: Juno FMLR White Led Low Profile Flush Mount 11” Round Fixture 21: Lithonia Lighting Low-Profile Curved-Basket LED Wraparound LBL4, 4’ Length, Narrow Housing Fixture 22: Lithonia Lighting Low-Profile Curved-Basket LED Wraparound LBL4, 4’ Length, Narrow Housing Fixture 23: Williams WMAUD LED Architectural Wall Mount Up/Down Fixture 24: Lumenwerx Aera 3” downlight round recessed; AE3RR TLMP SW Fixture 25: HectorFinch Zac Spot Light product code WL421 Antique Brass Fixture 26: Kelvix CH-222 extruded aluminum mounting channel & Kelvix Uniform Static White (indoor) white light tape HectorFinch Zac Spot Light product code WL421 Antique Brass 52 inches Fixture 27: Visual Comfort & Co 18” Cabinet Maker’s Picture Light Item #SL 2705AN Brass Finish Fixture 28: Castell 6 Globe Linear LED Pendant, Aged Brass LC005139 Fixture 29: Big Ass Fans Haiku Fixture 30: Hinkley DAX small adjustable Led Sconce, Finish: Heritage Brass Fixture 31: WAC Lighting LEDme Step Light Model: WL-LED200 Finish WT

52. Who is the current Fire Alarm MNS manufacturer? What Fire Alarm system manufactures are acceptable to be installed with the current system? (Connection to building 9)

GOVERNMENT RESPONSE: Notifier AM2020, building 9 access to fire alarm control panel was not provided.

54. Is Type MC cable acceptable for electrical branch distribution?

GOVERNMENT RESPONSE: EMT shall be used for branch circuits and feeders above suspended ceilings or exposed where not subject to physical damage. Although MC is allowed for branch circuits only in the following dry locations: new construction in exposed locations; renovations in exposed locations; concealed in renovations in existing areas where walls and ceilings are not disturbed; and cable trays.

55. Which type of MNS radio transmitter system is currently being used?

GOVERNMENT RESPONSE: Existing drawings indicate Notifier UDACT in building 9 is the fire alarm communications equipment.

56. Is EMT needed for telecom distribution? Is free air cable acceptable?

GOVERNMENT RESPONSE: EMT is needed for telecom distribution.

57. Sheet CS181, detail C4/CS101 of the Base Bid drawing set indicates Basement Wall Waterproofing, but project specifications do not include below-grade waterproofing specifications. Please advise.

GOVERNMENT RESPONSE: As noted in Details # C3 and # C4 on Drawing # CS181, the specifications for below-grade waterproofing are provided on Drawing # CS002.

58. B05_A100, Keynote 03.01, indicates “Ref: Structural”. Bid Option 5 drawing set does not include structural plans. Please advise.

GOVERNMENT RESPONSE: Disregard keynote 03.01 on B05_A100.

59. SUB-CLIN 0001AB, indicates “Subtotal of Base Price for the entire project site work outside facility’s 5 foot line”.

a. Does this include the Mechanical Enclosure SOW?

b. Can a marked-up drawing/image be provided for pricing accuracy?

GOVERNMENT RESPONSE: The mechanical enclosure is included in the base bid

60. The SOW shown under “Key” on the Base Bid drawing S101; references sheet S505 and S504. These sheets are not available in the Base Bid drawing package or in the Bid Options drawing package. Please advise.

GOVERNMENT RESPONSE: Disregard keynote 03.01 on sheet B05_A100

71. Existing hardscaping and landscaping is to be salvaged as needed. It may not be practicable to salvage and re-use all hardscaping and landscaping. What are the products in the area outlined?

GOVERNMENT RESPONSE: In general, the existing ground surface within the proposed LOD is stone pavers and small shrubbery and vegetative ground cover, that is roughly similar to that shown in photographs # C5 and #C6 on Drawing # CS181. We recommend that the contractors visit the site to visually inspect and evaluate the existing site conditions firsthand. Either way, the existing hardscaping and landscaping within the proposed LOD shall be removed as needed for the proposed construction and returned to its original condition or better at the end of construction. This may be done by salvaging and replacing the existing conditions with the salvaged materials; and/or demolishing and replacing the existing conditions with new, equal or better materials. Additionally, per DOEE requirement for the LOD area on the north side of the MBW perimeter wall, the following shall apply:

Existing landscaping and shrubbery shall be removed and replaced with same or similar species 6” – 8” high, as approved by owner. The construction contractor shall procure the services of DC-registered and licensed landscape architect, and submit a finished landscape plan for approval prior to construction, for entire front yard as affected by the proposed storm drain construction. Include root pruning for any impacted trees with the same landscape plan.

72. Is the stormwater management and sediment and erosion control plan approved and permit in hand?

GOVERNMENT RESPONSE: Final DOEE review and approval is still pending, but anticipated to be completed prior to contract award.

73. Keynote 2.93 states that existing attic access ladder is to remain. This ladder is in very poor condition.

Should the Contractor plan on replacing it in kind?

GOVERNMENT RESPONSE: Attic ladder replacement is included in Bid Option 5. Refer to note 11.01 on sheet B05_A-113

74. Keynote 9.04 calls for replacing plaster ceilings and walls removed with plaster. Is it acceptable to replace plaster assemblies with gyp wall board assemblies?

GOVERNMENT RESPONSE: No, plaster is to be replaced with plaster as it is a character-defining feature of this National Historic Landmark site.

76. Is a hazardous materials survey available for the building. The only notes dealing specifically with asbestos are pertaining to piping insulation but, given the age of the building, it can be assumed that other materials contain asbestos. Please advise what materials and quantities should be assumed to contain asbestos.

GOVERNMENT RESPONSE: See attached Hazmat report dated 10/15/2021.

77. Is a hazardous materials survey available for the building. Given the age of the building, it can be assumed that many materials contain lead . Please advise what materials and quantities should be assumed to contain lead.

GOVERNMENT RESPONSE: See attached Hazmat report dated 10/15/2021.

78. Are all of the kitchen appliances listed in the appliance schedule to be Contractor Furnished and Contractor installed?

GOVERNMENT RESPONSE: Yes, appliances listed in the appliance schedule are to be contractor-furnished and contractor-installed.

80. Can you provide photos of the site?

GOVERNMENT RESPONSE: Unfortunately, the Government cannot provide pictures at this time. Please propose in accordance with the plans and specifications.

81. Will we be allowed to have interior or exterior scaffolding during this project?

GOVERNMENT RESPONSE: Interior scaffolding is acceptable. Exterior scaffolding will be prohibited.

83. All existing mechanical systems to be replaced?

GOVERNMENT RESPONSE: Refer to MD sheets.

84. Is there termite damage on existing Framing repairs?

GOVERNMENT RESPONSE: Termite damage has been addressed in past repairs and additional damage may be uncovered during the project. Refer to bidding documents for extent of repair scope to be included for bidding.

2. ATTACHMENTS

- AMENDMENT 0006 – MBW Q6 Hazmat Report

- AMENDMENT 0006 – Spec 22 00 00 REV1

3. REVISED WAGE DETERMINATION

General Decision Number: DC20250002 02/14/2025

Superseded General Decision Number: DC20240002

State: District of Columbia

Construction Type: Building

County: District of Columbia Statewide.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours |

| | spent performing on the | | | contract in 2025. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2025. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2025 1 01/10/2025 2 01/24/2025 3 02/14/2025

ASBE0024-007 10/01/2024

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 40.77 20.17+a

Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

ASBE0024-008 10/01/2024

Rates Fringes

ASBESTOS WORKER: HAZARDOUS

MATERIAL HANDLER.................$ 24.46 10.19+a

Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

ASBE0024-014 10/01/2024

Rates Fringes

FIRESTOPPER......................$ 30.21 10.43+a

Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

BRDC0001-002 04/28/2024

Rates Fringes

BRICKLAYER.......................$ 37.50 14.38

CARP0197-011 05/01/2024

Rates Fringes

CARPENTER, Includes Drywall Hanging, Form Work, and Soft Floor Laying-Carpet..............$ 34.41 14.33

CARP0219-001 05/01/2024

Rates Fringes

MILLWRIGHT.......................$ 38.61 16.89

CARP0474-006 05/01/2024

Rates Fringes

PILEDRIVERMAN....................$ 36.60 14.47

ELEC0026-016 06/05/2023

Rates Fringes

ELECTRICIAN, Includes Installation of HVAC/Temperature Controls........$ 53.00 21.35

ELEC0026-017 09/02/2024

Rates Fringes

ELECTRICAL INSTALLER (Sound & Communication Systems).........$ 32.60 12.92

SCOPE OF WORK: Includes low voltage construction, installation, maintenance and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local area networks) and ISDN (Integrated systems digital network).

WORK EXCLUDED: The installation of computer systems in industrial applications such as assembly lines, robotics and computer controller manufacturing systems. The installation of conduit and/or raceways shall be installed by Inside Wiremen. On sites where there is no Inside Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 feet. Fire alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work.

* ELEV0010-001 01/01/2025

Rates Fringes

ELEVATOR MECHANIC................$ 57.16 38.435+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.

b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

IRON0005-005 06/01/2024

Rates Fringes

IRONWORKER, STRUCTURAL AND

ORNAMENTAL.......................$ 37.86 25.86

IRON0005-012 05/01/2024

Rates Fringes

IRONWORKER, REINFORCING..........$ 31.88 23.78

LABO0011-009 06/01/2023

LABORER: Skilled................$ 28.95 7.70

FOOTNOTE: Potmen, power tool operator, small machine operator, signalmen, laser beam operator, waterproofer (excluding roofing), open caisson, test pit, underpinning, pier hole and ditches, laggers and all work associated with lagging that is not expressly stated, strippers, operator of hand derricks, vibrator operators, pipe layers, or tile layers, operators of jackhammers, paving breakers, spaders or any machine that does the same general type of work, carpenter tenders, scaffold builders, operators of towmasters, scootcretes, buggymobiles and other machines of similar character, operators of tampers and rammers and other machines that do the same general type of work, whether powered by air, electric or gasoline, builders of trestle scaffolds over one tier high and sand blasters, power and chain saw operators used in clearing, installers of well points, wagon drill operators, acetylene burners and licensed powdermen, stake jumper,demolition.

MARB0002-004 04/28/2024

Rates Fringes

MARBLE/STONE MASON...............$ 44.30 20.92

INCLUDING pointing, caulking and cleaning of All types of masonry, brick, stone and cement EXCEPT pointing, caulking, cleaning of existing masonry, brick, stone and cement (restoration work)

MARB0003-006 04/28/2024

Rates Fringes

TERRAZZO WORKER/SETTER...........$ 33.41 13.94

MARB0003-007 04/28/2024

Rates Fringes

TERRAZZO FINISHER................$ 28.09 12.29

MARB0003-008 04/28/2024

TILE SETTER......................$ 33.41 13.94

MARB0003-009 04/28/2024

Rates Fringes

TILE FINISHER....................$ 28.09 12.29

PAIN0051-014 06/01/2023

Rates Fringes

GLAZIER

Glazing Contracts $2 million and under...........$ 30.52 13.85 Glazing Contracts over $2 million.....................$ 34.76 13.85

PAIN0051-015 06/01/2023

Rates Fringes

PAINTER

Brush, Roller, Spray and Drywall Finisher............$ 27.46 11.56

PLAS0891-005 07/01/2023

Rates Fringes

PLASTERER (Including Fireproofing)....................$ 31.83 8.96

PLAS0891-006 02/01/2024

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 30.25 13.60

PLUM0005-010 08/01/2024

Rates Fringes

PLUMBER..........................$ 51.25 22.46+a

a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.

PLUM0602-008 08/01/2024

Rates Fringes

PIPEFITTER, Includes HVAC Pipe Installation................$ 52.27 23.79+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.

ROOF0030-016 07/01/2024

Rates Fringes

ROOFER...........................$ 34.76 14.91

SFDC0669-002 01/01/2025

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 42.32 26.39

SHEE0100-015 11/01/2023

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 47.92 22.72+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day

* SUDC2009-003 05/19/2009

LABORER: Common or General......$ 13.04 ** 2.80

LABORER: Mason Tender - Cement/Concrete..................$ 15.40 ** 2.85

LABORER: Mason Tender for pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking and cleaning of new or replacement masonry, brick, stone and cement.................$ 11.67 **

POINTER, CAULKER, CLEANER,

Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 18.88

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.75) or 13658 ($13.30). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION

End of Amendment

File details come from the government source that posted it. Updated .