This is Amendment 0004 to solicitation N4008023R0022 for the $750M Small Business Anchor Multiple Award Construction Project at Marine Barracks Washington, specifically for the P-2203 Quarters 6 Whole House Revitalization project. The amendment is effective January 24, 2025 and is issued by Naval Facilities Engineering Systems Command in Washington DC.

The amendment provides responses to four Pre-Proposal Inquiries (PPIs) and incorporates a revised wage determination. Key clarifications include: PPIs are due by 12:00 PM local time, 14 calendar days before the proposal due date; the Experience Factor 1 requirements remain unchanged regarding teaming agreements with non-MACC holders; past project experience must follow original RFP criteria for DOD Housing buildings; and the 14-year recency request for past performance was denied. The project involves constructing a multi-rise, mixed-use facility with 125 rooms for unaccompanied enlisted housing, dining hall, fitness center, armory, and NCO club.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0004 24-January-2025

6. ISSUED BY Code N40080 7. ADMINISTERED BY (If other than item 6.) Code Naval Facilities Engineering Systems Command 1314 Hardwood Street, SE Washington Navy Yard, DC 20374-5018

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

N4008023R0022 ACQR: 6070919

9B. DATED (SEE ITEM 11)

13-January-2025

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MO`LECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

$750M SMALL BUSINESS ANCHOR MULTIPLE AWARD CONSTRUCTION PROJECT NAVFAC WASHINGTON

N40080-23-R-0022 ACQR: 6070919

P-2203, QUARTERS 6 WHOLE HOUSE REVITALIZATION

MARINE BARRACKS WASHINGTON, WASHINGTON, DC

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

N40080-23-R-0022

ACQR: 6070919

SF 30 BLOCK 14 CONTINUATION PAGE

The purpose of this amendment is to provide the following:

1. Provide PPI Responses

2. Incorporate Revise Wage Determination

All other terms and conditions remain unchanged.

PPI RESPONSES

1. Can you please clarify what time PPIs are due? The solicitation states PPIs are due no later than 14 calendar days prior to the proposal due date but does not provide a time.

GOVERNMENT RESPONSE: All inquiries must be made in writing and shall be submitted via email to Lindsay Brown at lindsay.m.brown14.civ@us.navy.mil and Elle Al-Ajmi at elleana.a.al-ajmi.civ@us.navy.mil by 12:00 PM local time, 14 calendar days prior to the proposal due date.

2. Section of the RFP: RFP, Non-Price Evaluation Factors: Factor 1: Experience; Paragraph: 3; Page Number: 6

QUESTION: This RFI is to request that the Navy reconsider the requirements for the Experience Evaluation Factor (Factor

1) and allow MACC holders to enter into a TEAMING Agreement with another non-MACC contractor and use that contractor’s experience to demonstrate the requisite experience for this Solicitation.

Therefore, KTR requests that the Navy modify Factor 1 Experience to allow an Offeror to use the experience of a non- MACC holder with whom the Offeror has a “TEAMING AGREEMENT”.

GOVERNMENT RESPONSE: Factor 1: Experience criteria remains unchanged. Propose in accordance with the

RFP.

3. Section of the RFP: RFP, Non-Price Evaluation Factors: Factor 1: Experience; Paragraph: 5; Page Number: 6

QUESTION: Would offerors be allowed to submit past projects that were interior and/or exterior renovation of buildings not considered DOD Housing buildings (i.e., office space)

GOVERNMENT RESPONSE: Factor 1: Experience criteria remains unchanged. Propose in accordance with the

RFP.

4. Section of the RFP: RFP, Non-Price Evaluation Factors: Factor 1: Experience; Paragraph: 8; Page Number: 9

QUESTION: Would the government consider changing the recency requirements to projects that were performed in the past 14 years?

GOVERNMENT RESPONSE: Factor 1: Experience criteria remains unchanged. Propose in accordance with the

RFP.

ATTACHMENTS

- AMENDMENT 0004 - WD MOD 2 dtd 1-24-25

End of Amendment