ATTACHMENT G - Construction Experience Project Data Sheet.docx

DOCX document 27 KB Posted

Attached to
N40080-23-R-0022 ACQR: 6070919 - P2203, Quarters 6 Whole House Revitalization, Marine Barracks, Washington, D. C.
Solicitation number
FY-25-6070919
Issued by

About this file

This is a Construction Experience Project Data Sheet template (Attachment G) used to collect detailed information about past construction projects from offerors responding to solicitation N40080-23-R-0022 for the Quarters 6 rehabilitation project at Marine Barracks, Washington D.C.

The template requires offerors to document up to five construction projects, including information about the firm's role (prime contractor, subcontractor, or joint venture), contract details, project dates, types of work performed (new installation, replacement, repair), contract type (firm-fixed price, design-build, design-bid-build), award amounts, and detailed descriptions of project relevancy and self-performed work. The form specifically captures information about roofing warranties, sustainable features, LEED certifications, and design efforts for design-build projects. This is a standard template form that does not contain specific project information or requirements.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| DOR |_| Other:_______

Firm Name:

Address:

Phone Number:

UEI Number:

Point of Contact:

Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Subcontractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

Design Completion Date (mm/dd/yy):

5. Type of work:

|_| ___ New Installation - Percentage of project work performed:_________ |_| ___ Replacement - Percentage of project work performed: _______ |_| ___ Repair - Percentage of project work performed:______ |_| ___ Other (explain):_____________________________- Percentage of project work performed: _________

Roof Warranty: Y / N Duration of Warranty: ________________

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Design Project:

A/E Design Fee: Total Construction Value:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| RFP Development |_| Designer of Record |_| Engineering Services |_| Full Plans & Specs

|_| Other (explain):

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

10. Provide a detailed description of what work your firm self-performed on this project:

11. Other Information

File details come from the government source that posted it. Updated .