ATTACHMENT A - MBW Q6 Renovation-IFC - Specs.pdf

PDF 10 MB Posted

Attached to
N40080-23-R-0022 ACQR: 6070919 - P2203, Quarters 6 Whole House Revitalization, Marine Barracks, Washington, D. C.
Solicitation number
FY-25-6070919
Issued by

About this file

This is a technical specifications document (Attachment A) for the renovation of Marine Barracks Washington Quarter 6 facility. The document outlines detailed construction and engineering specifications for a multi-rise, mixed-use steel frame building that will house unaccompanied enlisted personnel quarters, dining facilities, a fitness center, armory, and NCO club.

The specifications cover requirements for 125 rooms with semi-private baths in a 2+0 configuration, along with community spaces including laundry facilities, lounges, administrative offices, housekeeping areas, and public restrooms. The fitness center portion includes specifications for group exercise rooms, weight rooms, and administrative spaces. The building's exterior is specified to have brick cladding, consistent with the architectural requirements for this Naval Facilities Engineering Command (NAVFAC) project.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK ORDER NO. 1700167

Contract NO. N40080-18-D-0004

SPECIFICATIONS

Final Submission

MBW QUARTERS 6 RENOVATION

Marine Barracks Washington – Washington, DC

PREPARED BY:

MTFA Architecture

3200 Lee Highway Arlington, Virginia 22207

Architectural: James P. Clark, FAIA Civil: Paul Noursi, PE Mechanical: Anne Juran, PE Geotechnical: Steven Donahue, PE Electrical: Kyle Urda, PE Fire Protection: Adam Paterson, PE Plumbing: Anne Juran, PE Specifications: James P. Clark, FAIA Structural: Doug Bond, PE ATFP: Jason Florek, PE

Submitted By: James P. Clark, FAIA, LEED AP BD+C Date: 19 Dec 2023

Principle

Project Manager: Alex Lee Date: DD MMM YYYY

Approved By: Date: 06 Dec 2024 Christine Rutkowski PE

Design Production Director

UNCLASSIFIED / FOR OFFICIAL USE ONLY (U/FOUO)

alexz Snapshot

MBW Quar t er s 6 Renovat i ons Wor k Or der No. 1700167

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 02/ 11, CHG 1: 08/ 14 LI ST OF DRAWI NGS

00 22 13. 00 20 02/ 14, CHG 3: 11/ 18 SUPPLEMENTARY I NSTRUCTI ONS TO OFFERORS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 08/ 15, CHG 2: 08/ 21 SUMMARY OF WORK

01 14 00 11/ 11, CHG 13: 08/ 21 WORK RESTRI CTI ONS

01 20 00 11/ 20, CHG 2: 08/ 21 PRI CE AND PAYMENT PROCEDURES

01 30 00 11/ 20, CHG 1: 08/ 21 ADMI NI STRATI VE REQUI REMENTS

01 31 23. 13 20 05/ 17, CHG 7: 11/ 21 ELECTRONI C CONSTRUCTI ON AND FACI LI TY

SUPPORT CONTRACT MANAGEMENT SYSTEM

01 32 17. 00 20 05/ 18, CHG 3: 08/ 20 COST- LOADED NETWORK ANALYSI S SCHEDULES

( NAS)

01 33 00 08/ 18, CHG 4: 02/ 21 SUBMI TTAL PROCEDURES

01 33 29 02/ 21 SUSTAI NABI LI TY REQUI REMENTS AND

REPORTI NG

01 35 26 11/ 20, CHG 1: 08/ 21 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 02/ 19 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00. 00 20 11/ 11, CHG 8: 02/ 21 QUALI TY CONTROL

01 45 35 11/ 20 SPECI AL I NSPECTI ONS

01 50 00 11/ 20, CHG 1: 08/ 21 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND

CONTROLS

01 57 19 11/ 15, CHG 4: 08/ 20 TEMPORARY ENVI RONMENTAL CONTROLS

01 57 19. 01 20 11/ 15, CHG 5: 08/ 21 SUPPLEMENTAL TEMPORARY ENVI RONMENTAL

CONTROLS

01 58 00 08/ 19, CHG 4: 05/ 22 PROJECT I DENTI FI CATI ON

01 74 19 02/ 19, CHG 2: 08/ 21 CONSTRUCTI ON WASTE MANAGEMENT AND

DI SPOSAL

01 78 00 05/ 19, CHG 1: 08/ 21 CLOSEOUT SUBMI TTALS

01 78 23 08/ 15, CHG 2: 08/ 21 OPERATI ON AND MAI NTENANCE DATA

01 78 24. 00 20 02/ 15, CHG 3: 08/ 21 FACI LI TY ELECTRONI C OPERATI ON AND

MAI NTENANCE SUPPORT I NFORMATI ON ( eOMSI )

01 91 00. 15 20 02/ 21, CHG 1: 05/ 21 TOTAL BUI LDI NG COMMI SSI ONI NG

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 05/ 10, CHG 2: 02/ 19 DEMOLI TI ON

02 42 51 11/ 19 CARPET REMOVAL AND RECLAMATI ON

02 42 91 11/ 18 REMOVAL AND SALVAGE OF HI STORI C AND/ OR

EXI STI NG CONSTRUCTI ON MATERI ALS

02 82 00 11/ 18, CHG 1: 11/ 19 ASBESTOS REMEDI ATI ON

02 83 00 11/ 18 LEAD REMEDI ATI ON

02 84 16 05/ 20 HANDLI NG OF LI GHTI NG BALLASTS AND

LAMPS CONTAI NI NG PCBs AND MERCURY

02 84 33 05/ 20 REMOVAL AND DI SPOSAL OF

POLYCHLORI NATED BI PHENYLS ( PCBs)

DI VI SI ON 03 - CONCRETE

03 01 00 02/ 18 REHABI LI TATI ON OF CONCRETE

03 30 00 02/ 19 CAST- I N- PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 03 00 11/ 17 CONSERVATI ON TREATMENT FOR PERI OD

PROJECT TABLE OF CONTENTS Page 1

MASONRY

04 20 00 11/ 15, CHG 2: 05/ 19 UNI T MASONRY

DI VI SI ON 05 - METALS

05 12 00 08/ 18 STRUCTURAL STEEL

05 52 00 02/ 18, CHG 1: 02/ 20 METAL RAI LI NGS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 08/ 16 ROUGH CARPENTRY

06 20 00 08/ 16, CHG 2: 11/ 18 FI NI SH CARPENTRY

06 61 16 08/ 20 SOLI D SURFACI NG FABRI CATI ONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 21 13 02/ 16, CHG 2: 08/ 20 BOARD I NSULATI ON

07 31 26 08/ 09 SLATE SHI NGLES

07 41 13. 16 08/ 09 COPPER ROOF PANELS

07 54 19 02/ 13, CHG 3: 02/ 21 POLYVI NYL- CHLORI DE ROOFI NG

07 60 00 05/ 17, CHG 2: 11/ 18 FLASHI NG AND SHEET METAL

07 61 15. 00 20 08/ 16, CHG 2: 11/ 18 ALUMI NUM STANDI NG SEAM ROOFI NG

07 92 00 08/ 16, CHG 3: 11/ 18 JOI NT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 08/ 20 STEEL DOORS AND FRAMES

08 31 00 05/ 17, CHG 1: 08/ 18 ACCESS DOORS AND PANELS

08 52 00 08/ 20 WOOD WI NDOWS

08 71 00 02/ 16, CHG 3: 08/ 20 DOOR HARDWARE

08 81 00 05/ 19 GLAZI NG

08 91 00 08/ 20 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 01 90. 50 05/ 09, CHG 1: 08/ 17 PREPARATI ON OF HI STORI C WOOD AND METAL

SURFACES FOR PAI NTI NG

09 22 00 02/ 10, CHG 2: 08/ 18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 23 00 08/ 16, CHG 1: 11/ 18 FLAT AND ORNAMENTAL PLASTERI NG

09 29 00 08/ 16, CHG 4: 02/ 20 GYPSUM BOARD

09 30 10 08/ 20 CERAMI C, MARBLE, QUARRY, AND TERRA

COTTA TI LI NG

09 51 00 08/ 20 ACOUSTI CAL CEI LI NGS

09 64 29 08/ 16, CHG 2: 11/ 18 WOOD STRI P AND PLANK FLOORI NG REPAI R

AND REFI NI SHI NG

09 65 00 08/ 10, CHG 3: 08/ 18 RESI LI ENT FLOORI NG

09 68 00 11/ 17, CHG 2: 08/ 20 CARPETI NG

09 90 00 02/ 21 PAI NTS AND COATI NGS

DI VI SI ON 11 - EQUI PMENT

11 31 13 08/ 17, CHG 1: 08/ 18 KI TCHEN EQUI PMENT

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

14 21 24 01/ 22 ELECTRI C TRACTI ON RESI DENCE ELEVATOR

14 24 25 01/ 22 HYDRAULI C PLATFORM LI FT

DI VI SI ON 21 - FI RE SUPPRESSI ON

PROJECT TABLE OF CONTENTS Page 2

21 13 13 08/ 20 WET PI PE SPRI NKLER SYSTEMS, FI RE

PROTECTI ON

DI VI SI ON 22 - PLUMBI NG

22 00 00 11/ 15, CHG 4: 05/ 21 PLUMBI NG, GENERAL PURPOSE

22 05 48. 00 20 04/ 06, CHG 1: 05/ 15 MECHANI CAL SOUND AND VI BRATI ON CONTROL

22 14 29. 00 40 05/ 17 SUMP PUMPS

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 03 00. 00 20 08/ 10, CHG 3: 08/ 18 BASI C MECHANI CAL MATERI ALS AND METHODS

23 05 93 11/ 15 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR

HVAC

23 07 00 02/ 13 THERMAL I NSULATI ON FOR MECHANI CAL

SYSTEMS

23 08 00. 00 20 02/ 21, CHG 1: 05/ 21 COMMI SSI ONI NG OF MECHANI CAL AND

PLUMBI NG SYSTEMS

23 09 00 02/ 19, CHG 3: 05/ 21 I NSTRUMENTATI ON AND CONTROL FOR HVAC

23 09 13 11/ 15, CHG 2: 05/ 21 I NSTRUMENTATI ON AND CONTROL DEVI CES

FOR HVAC

23 09 23. 02 02/ 19, CHG 1: 02/ 20 BACNET DI RECT DI GI TAL CONTROL FOR HVAC

AND OTHER BUI LDI NG CONTROL SYSTEMS

23 11 20 05/ 20 FACI LI TY GAS PI PI NG

23 21 13. 00 20 04/ 06, CHG 2: 11/ 19 LOW TEMPERATURE WATER ( LTW) HEATI NG

SYSTEM

23 21 23 08/ 17 HYDRONI C PUMPS

23 30 00 05/ 20 HVAC AI R DI STRI BUTI ON

23 52 43. 00 20 05/ 15, CHG 2: 08/ 18 LOW PRESSURE WATER HEATI NG BOI LERS

( UNDER 800, 000 BTU/ HR OUTPUT)

23 64 10 11/ 16, CHG 2: 08/ 18 WATER CHI LLERS, VAPOR COMPRESSI ON TYPE

23 64 26 08/ 09, CHG 5: 11/ 19 CHI LLED, AND HOT WATER PI PI NG SYSTEMS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11 05/ 21 CYBERSECURI TY FOR FACI LI TY- RELATED

CONTROL SYSTEMS

DI VI SI ON 26 - ELECTRI CAL

26 20 00 08/ 19, CHG 3: 11/ 21 I NTERI OR DI STRI BUTI ON SYSTEM

26 29 23 02/ 20, CHG 1: 05/ 21 ADJUSTABLE SPEED DRI VE ( ASD) SYSTEMS

UNDER 600 VOLTS

26 51 00 05/ 20 I NTERI OR LI GHTI NG

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 08/ 11 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG

SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 76 08/ 20 I NTERI OR FI RE ALARM AND MASS

NOTI FI CATI ON SYSTEM, ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 23 00. 00 20 02/ 11, CHG 2: 08/ 15 EXCAVATI ON AND FI LL

PROJECT TABLE OF CONTENTS Page 3

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 16 19 05/ 18 CONCRETE CURBS, GUTTERS AND SI DEWALKS

32 92 19 08/ 17 SEEDI NG

32 93 00 08/ 17, CHG 1: 08/ 21 EXTERI OR PLANTS

DI VI SI ON 33 - UTI LI TI ES

33 40 00 11/ 21 STORMWATER UTI LI TI ES

33 46 13 05/ 20 FOUNDATI ON DRAI NAGE

33 46 16 05/ 18 SUBDRAI NAGE PI PI NG

33 61 13. 13 02/ 16 PREFABRI CATED UNDERGROUND HYDRONI C

ENERGY DI STRI BUTI ON

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 4

DOCUMENT 00 01 15

LI ST OF DRAWI NGS

02/ 11, CHG 1: 08/ 14

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

Cont r act dr awi ngs ar e as f ol l ows:

DRAWI NG

NO.

NAVFAC DWG NO. TI TLE

G- 001 13148115 COVER SHEET

G- 002 13148116 GENERAL NOTES, ABBREVI ATI ONS, AND SYMBOLS

CS002 13148117 GENERAL NOTES

CS003 13148118 LEGEND AND ABBREVI ATI ONS

CS021 13148119 EXI STI NG CONDI TI ONS SI TE SURVEY PLAN

CS022 13148120 SUPPLEMENTED EXI STI NG CONDI TI ONS SI TE PLAN

CS051 13148121 DEMOLI TI ON PLAN

CS101 13148122 SI TE PLAN

CS181 13148123 SI TE PLAN NOTES & SI TE DETAI LS

CS182 13148124 SI TE DETAI LS

CS501 13148125 STORM DRAI N PROFI LES- 1

CS502 13148126 STORM DRAI N PROFI LES- 2

CS503 13148127 FOUNDATI ON DRAI N PROFI LES

CS701 13148128 I MPERVI OUS AREA MAPERS AND SWM CALCULATI ONS

CS801 13148129 EROSI ON SEDI MENT CONTROL PLAN

CS811 13148130 EROSI ON & SEDI MENT CONTROL NARRATI VE & DETAI LS

CS812 13148131 EROSI ON & SEDI MENT CONTROL DETAI LS

CS813 13148132 EROSI ON AND SEDI MENT CONTROL DETAI LS 2

CS901 13148133 ONSI TE SOI L BORI NG LOCATI ON MAP AND LOGS

CS902 13148134 ONSI TE GEOTECHNI CAL NOTES AND REQUI REMENTS

S- 001 13148135 DESI GN NOTES

DOCUMENT 00 01 15 Page 1

DRAWI NG

NO.

NAVFAC DWG NO. TI TLE

S- 002 13148136 DESI GN NOTES

SD100 13148137 BASEMENT DEMO PLAN

SD101 13148138 FI RST FLOOR DEMO PLAN

S- 100 13148139 BASEMENT FLOOR PLAN

S- 101 13148140 FI RST FLOOR PLAN

S- 103 13148141 THI RD FLOOR PLAN

S- 104 13148142 ATTI C PLAN

S- 201 13148143 MECHANI CAL ENCLOSURE PLAN

S- 500 13148144 SECTI ONS AND DETAI LS

S- 501 13148145 SECTI ONS AND DETAI LS

S- 502 13148146 SECTI ONS AND DETAI LS

S- 503 13148147 SECTI ONS AND DETAI LS

AD100 13148148 BASEMENT FLOOR PLAN - DEMO

AD101 13148149 FI RST FLOOR PLAN - DEMO

AD102 13148150 SECOND FLOOR PLAN - DEMO

AD103 13148151 THI RD FLOOR PLAN - DEMO

AD104 13148152 ATTI C PLAN - DEMO

AD202 13148153 EAST ELEVATI ON - DEMO

AD204 13148154 WEST ELEVATI ON - DEMO

A- 100 13148155 BASEMENT FLOOR PLAN

A- 101 13148156 FI RST FLOOR PLAN

A- 102 13148157 SECOND FLOOR PLAN

A- 103 13148158 THI RD FLOOR PLAN

A- 104 13148159 ATTI C FLOOR PLAN

A- 105 13148160 ROOF PLAN

A- 110 13148161 BASEMENT REFLECTED CEI LI NG PLAN

A- 111 13148162 FI RST FLOOR REFLECTED CEI LI NG PLAN

A- 112 13148163 SECOND FLOOR REFLECTED CEI LI NG PLAN

A- 113 13148164 THI RD FLOOR REFLECTED CEI LI NG PLAN

A- 201 13148165 NORTH ELEVATI ON

A- 202 13148166 EAST ELEVATI ON

A- 203 13148167 SOUTH ELEVATI ON

A- 204 13148168 WEST ELEVATI ON

DOCUMENT 00 01 15 Page 2

NO.

NAVFAC DWG NO. TI TLE

A- 301 13148169 BUI LDI NG SECTI ONS

A- 401 13148170 EAST COURTYARD PLANS AND DETAI LS

A- 501 13148171 SECTI ON AND PLAN DETAI LS

A- 502 13148172 SECTI ON AND PLAN DETAI LS

A- 515 13148173 ROOFI NG DETAI LS

A- 601 13148174 DOOR TYPES AND SCHEDULE / PARTI TI ON SCHEDULE

A- 611 13148175 FI NI SH SCHEDULE

GI 001 13148176 BUI LDI NG CODE SUMMARY

GI 101 13148177 LI FE SAFETY - BASEMENT AND FI RST FLOOR PLANS

GI 102 13148178 LI FE SAFETY - SECOND AND THI RD FLOOR PLANS

FA001 13148179 SYMBOLS AND ABBREVI ATI ONS

FD101 13148180 FI RE ALARM DEMO - BASEMENT FLOOR PLAN

FD102 13148181 FI RE ALARM DEMO - FI RST, SECOND, THI RD FLOOR PLANS

FD103 13148182 FI RE ALARM DEMO - ATTI C

FD111 13148183 FI RE PROTECTI ON DEMO - BASEMENT FLOOR PLAN

FD112 13148184 FI RE PROTECTI ON DEMO - FI RST, SECOND, THI RD FLOOR

PLANS

FA101 13148185 FI RE ALARM - BASEMENT FLOOR PLAN

FA102 13148186 FI RE ALARM - FI RST, SECOND, THI RD FLOOR PLAN

FA501 13148187 FI RE ALARM DETAI LS

FX001 13148188 SYMBOLS & ABBREVI ATI ONS

FX101 13148189 FI RE PROTECTI ON - BASEMENT FLOOR PLAN

FX102 13148190 FI RE PROTECTI ON - FI RST, SECOND, THI RD FLOOR PLANS

M- 001 13148191 SYMBOLS & ABBREVI ATI ONS

MD101 13148192 BASEMENT DUCTWORK FLOOR PLAN - DEMOLI TI ON

MD102 13148193 BASEMENT PI PI NG FLOOR PLAN - DEMOLI TI ON

MD103 13148194 FI RST, SECOND, AND THI RD FLOOR PLAN - DEMOLI TI ON

MD104 13148195 ATTI C FLOOR & ROOF PLAN - DEMOLI TI ON

M- 101 13148196 BASEMENT FLOOR PLAN - DUCTWORK

M- 102 13148197 BASEMENT FLOOR PLAN - PI PI NG

M- 103 13148198 FI RST FLOOR PLAN

M- 104 13148199 SECOND & THI RD FLOOR PLAN

DOCUMENT 00 01 15 Page 3

NO.

NAVFAC DWG NO. TI TLE

M- 105 13148200 ATTI C & ROOF FLOOR PLAN

M- 401 13148201 ENLARGED DETAI LS

M- 402 13148202 PI PE CHASE

M- 501 13148203 DETAI LS

M- 502 13148204 DETAI LS

M- 601 13148205 SCHEDULES

M- 602 13148206 SCHEDULES

M- 701 13148207 SYMBOLS AND ABBREVI ATI ONS

M- 702 13148208 HEATI NG WATER PLANT

M- 703 13148209 CHI LLED WATER PLANT

M- 704 13148210 DOAS- 1 AND DOAS- 2

M- 705 13148211 MI SCELLANEOUS

M- 801 13148212 FCU RI SER DI AGRAM

P- 001 13148213 SYMBOLS & ABBREVI ATI ONS

P- 002 13148214 DETAI LS

PD101 13148215 BASEMENT FLOOR PLAN - DEMOLI TI ON

P- 101 13148216 BASEMENT FLOOR PLAN

P- 801 13148217 WASTE & VENT, DOMESTI C RI SERS

E- 001 13148218 SYMBOLS & ABBREVI ATI ONS

ED101 13148219 POWER DEMOLI TI ON - BASEMENT AND ROOF FLOOR PLAN

ED102 13148220 POWER DEMOLI TI ON - FI RST FLOOR PLAN

ED103 13148221 POWER DEMOLI TI ON - SECOND, THI RD, AND ATTI C FLOOR

PLAN

ED104 13148222 LI GHTI NG DEMOLI TI ON - BASEMENT FLOOR PLAN

E- 101 13148223 POWER PLAN - BASEMENT AND ROOF FLOOR PLAN

E- 102 13148224 POWER PLAN - FI RST FLOOR PLAN

E- 103 13148225 POWER PLAN - SECOND, THI RD AND ATTI C FLOOR PLAN

E- 104 13148226 LI GHTI NG PLAN - BASEMENT FLOOR PLAN

E- 601 13148227 SCHEDULES

E- 602 13148228 SCHEDULES

E- 603 13148229 SCHEDULES

E- 604 13148230 SI NGLE LI NE DI AGRAM

BO1_SD100 13148231 BASEMENT DEMO PLAN

DOCUMENT 00 01 15 Page 4

NO.

NAVFAC DWG NO. TI TLE

BO1_SD101 13148232 FI RST FLOOR DEMO PLAN

BO1_S- 100 13148233 BASEMENT FLOOR PLAN

BO1_S- 101 13148234 FI RST FLOOR PLAN

BO1_S- 102 13148235 SECOND FLOOR PLAN

BO1_S- 103 13148236 THI RD FLOOR PLAN

BO1_S- 200 13148237 ENLARGED DETAI LS

BO1_S- 500 13148238 SECTI ONS AND DETAI LS

BO1_S- 501 13148239 SECTI ONS AND DETAI LS

BO1_AD100 13148240 BASEMENT FLOOR PLAN - DEMO

BO1_A- 100 13148241 BASEMENT FLOOR PLAN

BO1_A- 102 13148242 SECOND FLOOR PLAN AND FI RST & SECOND FLOOR REFLECTED

CEI LI NG PLAN

BO1_A- 110 13148243 BASEMENT REFLECTED CEI LI NG PLAN

BO1_A- 501 13148244 SECTI ON PLAN AND DETAI LS

BO1_MD101 13148245 PI PI NG - BASEMENT FLOOR PLAN

BO1_M- 101 13148246 BASEMENT FLOOR PLAN - DUCTWORK

BO1_M- 102 13148247 BASEMENT FLOOR PLAN - PI PI NG

BO1_M- 401 13148248 ENLARGED DETAI LS

BO1_M- 701 13148249 CONTROLS

BO1_M- 801 13148250 RI SER

BO1_PD101 13148251 BASEMENT FLOOR PLAN - DEMOLI TI ON

BO1_P- 101 13148252 BASEMENT FLOOR PLAN

BO1_E- 101 13148253 POWER - BASEMENT FLOOR PLAN

BO2_CS051 13148254 SI TE DEMOLI TI ON PLAN

BO2_CS101 13148255 SI TE PLAN

BO2_CS502 13148256 STORM DRAI N PROFI LES- 2

BO2_CS503 13148257 FOUNDATI ON DRAI N PROFI LE

BO2_CS801 13148258 EROSI ON AND SEDI MENT CONTROL PLAN

BO2_SD100 13148259 BASEMENT DEMO PLAN

BO2_SD101 13148260 FI RST FLOOR DEMO PLAN

BO2_S- 100 13148261 BASEMENT FLOOR PLAN

BO2_S- 101 13148262 FI RST FLOOR PLAN

BO2_S- 500 13148263 SECTI ONS AND DETAI LS

DOCUMENT 00 01 15 Page 5

NO.

NAVFAC DWG NO. TI TLE

BO2_AD100 13148264 BASEMENT AND FI RST FLOOR PLAN - DEMO

BO2_AD201 13148265 SOUTH, EAST, AND WEST ELEVATI ONS - DEMO

BO2_A- 100 13148266 BASEMENT AND FI RST FLOOR PLAN

BO2_A- 201 13148267 SOUTH, EAST, AND WEST ELEVATI ONS

BO2_A- 503 13148268 SECTI ON AND PLAN DETAI LS

BO3_S- 102 13148269 SECOND FLOOR PLAN

BO3_S- 103 13148270 THI RD FLOOR PLAN

BO3_S- 105 13148271 ROOF PLAN

BO3_S- 500 13148272 SECTI ONS AND DETAI LS

BO3_AD105 13148273 DEMOLI TI ON ROOF PLAN

BO3_A- 102 13148274 SECOND FLOOR NEW WORK AND DEMO PLAN

BO3_A- 105 13148275 ROOF PLAN

BO3_A- 202 13148276 SOUTH, EAST, AND WEST ELEVATI ONS

BO3_A- 411 13148277 ROOF ELEVATI ONS

BO3_A- 412 13148278 ROOF ELEVATI ONS

BO3_A- 511 13148279 ROOFI NG DETAI LS

BO3_A- 512 13148280 ROOFI NG DETAI LS

BO3_A- 513 13148281 ROOFI NG DETAI LS

BO3_ED101 13148282 POWER DEMOLI TI ON - ROOF FLOOR PLAN

BO4_AD100 13148283 BASEMENT FLOOR PLAN - DEMO

BO4_AD101 13148284 FI RST FLOOR PLAN - DEMO

BO4_AD102 13148285 SECOND FLOOR PLAN - DEMO

BO4_AD103 13148286 THI RD FLOOR PLAN - DEMO

BO4_AD201 13148287 NORTH ELEVATI ON - DEMO

BO4_AD202 13148288 EAST ELEVATI ON - DEMO

BO4_AD203 13148289 SOUTH ELEVATI ON - DEMO

BO4_AD204 13148290 WEST ELEVATI ON - DEMO

BO4_A- 100 13148290 BASEMENT FLOOR PLAN

BO4_A- 101 13148292 FI RST FLOOR PLAN

BO4_A- 102 13148293 SECOND FLOOR PLAN

BO4_A- 103 13148294 THI RD FLOOR PLAN

BO4_A- 201 13148295 NORTH ELEVATI ON

BO4_A- 202 13148296 EAST ELEVATI ON

DOCUMENT 00 01 15 Page 6

NO.

NAVFAC DWG NO. TI TLE

BO4_A- 203 13148297 SOUTH ELEVATI ON

BO4_A- 204 13148298 WEST ELEVATI ON

BO4_A- 602 13148299 WI NDOW TYPES AND SCHEDULE

BO4_A- 603 13148300 WI NDOW DETAI LS

BO5_A- 102 13148301 SECOND FLOOR PLAN

BO5_AD100 13148302 BASEMENT FLOOR PLAN - DEMO

BO5_AD101 13148303 FI RST FLOOR PLAN - DEMO

BO5_AD102 13148304 SECOND FLOOR PLAN - DEMO

BO5_AD103 13148305 THI RD FLOOR PLAN - DEMO

BO5_A- 100 13148306 BASEMENT FLOOR PLAN

BO5_A- 101 13148307 FI RST FLOOR PLAN

BO5_A- 103 13148308 THI RD FLOOR PLAN

BO5_A- 110 13148309 BASEMENT REFLECTED CEI LI NG PLAN

BO5_A- 111 13148310 FI RST FLOOR REFLECTED CEI LI NG PLAN

BO5_A- 113 13148311 THI RD FLOOR REFLECTED CEI LI NG PLAN

BO6_A- 101 13148312 FI RST FLOOR PLAN

BO6_A- 102 13148313 SECOND FLOOR PLAN

BO6_A- 103 13148314 THI RD FLOOR PLAN

BO6_A- 111 13148315 FI RST FLOOR REFLECTED CEI LI NG PLAN

BO6_A- 112 13148316 SECOND FLOOR REFLECTED CEI LI NG PLAN

BO6_PD102 13148317 FI RST, SECOND, THI RD FLOOR PLANS - DEMOLI TI ON

BO6_P- 102 13148318 FI RST, SECOND, THI RD FLOOR PLANS

BO6_P- 801 13148319 WASTE & VENT, DOMESTI C RI SERS

BO7_A- 100 13148320 BASEMENT AND FI RST FLOOR PLANS

BO7_TD101 13148321 TELECOMMUNI CATI ON DEMO PLAN - BASEMENT FLOOR PLAN

BO7_TD102 13148322 TELECOMMUNI CATI ON DEMO PLAN - FI RST, SECOND, THI RD

FLOOR PLAN

BO7_TD103 13148323 TELECOMMUNI CATI ON DEMO PLAN - ROOF PLAN

BO7_T- 101 13148324 TELECOMMUNI CATI ON PLAN - BASEMENT FLOOR PLAN

BO7_T- 102 13148325 TELECOMMUNI CATI ON PLAN - FI RST, SECOND, THI RD FLOOR

PLAN

BO8_S- 101 13148326 FI RST FLOOR PLAN

BO8_AD100 13148327 FLOOR PLANS AND WEST ELEVATI ON - DEMO

DOCUMENT 00 01 15 Page 7

NO.

NAVFAC DWG NO. TI TLE

BO8_A- 100 13148328 FLOOR PLANS AND WEST ELEVATI ON

BO8_M- 101 13148329 BASEMENT FLOOR PLAN - DUCTWORK

BO8_ED102 13148330 BASEMENT FLOOR PLAN - DUCTWORK

BO8_E- 101 13148331 POWER DEMOLI TI ON - BASEMENT AND ROOF FLOOR PLAN

BO8_E- 102 13148332 POWER PLAN - FI RST FLOOR PLAN

BO8_T- 101 13148333 TELECOMMUNI CATI ON PLAN - BASEMENT FLOOR PLAN

BO9_AD101 13148334 FI RST AND SECOND FLOOR PLANS - DEMO

BO9_AD105 13148335 DEMOLI TI ON ROOF PLAN

BO9_A- 101 13148336 FI RST AND SECOND FLOOR PLANS

BO9_A- 105 13148337 ROOF PLAN

BO9_A- 514 13148338 ROOFI NG DETAI LS

BO9_FD112 13148339 FI RE PROTECTI ON DEMOLI TI ON - FI RST, SECOND, THI RD

FLOOR PLANS

BO9_FX102 13148340 FI RE PROTECTI ON - FI RST, SECOND, THI RD FLOOR PLANS

B010 AD101 13151647 ENLARGED KI TCHEN PLAN AND RCP - DEMO

B010 A101 13151648 ENLARGED KI TCHEN PLAN AND RCP

B010 A201 13151649 KI TCHEN ELEVATI ONS

B010 A202 13151650 I NTERI OR ELEVATI ONS

B010 A501 13151651 MI LLWORK SECTI ONS AND DETAI LS

B010 A502 13151652 MI LLWORK SECTI ONS AND DETAI LS

B010 A503 13151653 MI LLWORK SECTI ONS AND DETAI LS

B010 A504 13151654 MI LLWORK SECTI ONS AND DETAI LS

B010A 611 13151655 SCHEDULES

B010 M- 101 13151656 FI RST FLOOR PLAN KI TCHEN

B010 P- 101 13151657 FI RST FLOOR PLAN KI TCHEN

B010 P- 801 13151658 WASTE & VENT, DOMESTI C RI SERS

B010 E- 101 13151659 POWER PLAN - BASEMENT AND FI RST FLOOR PLAN

B010 E- 101 13151660 LI GHTI NG PLAN - FI RST FLOOR PLAN

DOCUMENT 00 01 15 Page 8

NO.

NAVFAC DWG NO. TI TLE

B010 E- 501 13151661 DETAI LS

B010 E- 601 13151662 SCHEDULES

- - End of Document - -

DOCUMENT 00 01 15 Page 9

THI S PAGE I NTENTI ONALLY LEFT BLANK

DOCUMENT 00 01 15 Page 10

DOCUMENT 00 22 13. 00 20

SUPPLEMENTARY I NSTRUCTI ONS TO OFFERORS

02/ 14, CHG 3: 11/ 18

PART 1 GENERAL

1. 1 CONTRACT LI NE I TEMS

The t er ms Of f er or and Bi dder and ver si ons t her eof ( of f er / bi d) have t he same def i ni t i on as used wi t hi n t hi s cont r act .

Pr ovi de t he Cont r act Li ne I t em ( CLI N) l ump sum pr i ce f or t he f ol l owi ng i t ems:

CLI N 0001 - BASE BI D PRI CE. Pr i ce i ncl udes t he f ol l owi ng:

Pr i ce f or t he ent i r e wor k , compl et e t o t he 5 f oot l i ne out si de of t he bui l di ng, i n accor dance wi t h t he dr awi ngs and speci f i cat i ons, but excl udi ng wor k descr i bed i n Cont r act Li ne I t em ( CLI N) 0002, 0003, and 0004, 0005, 0006, 0007, 0008, 0009, 0010 and 0011.

BASE BI D: REPLACE THE MECHANI CAL, FI RE PROTECTI ON, AND ELECTRI CAL

SYSTEMS; REPLACE ALL PLUMBI NG I N BASEMENT; PROVI DE SI TE WORK

ASSOCI ATED AND COI NCI DENT WI TH THE EXTERI OR CHI LLER AND ENCLOSURE; AND

ALL ARCHI TECTURAL AND STRUCTURAL REPAI RS ASSOCI ATED WI TH SYSTEMS

REPLACEMENT.

CLI N DESCRI PTI ON TOTAL PRI CE FOR 0001

0001A $__________

CLI N 0002 BI D OPTI ON 1 - BASEMENT BRI CK PRESERVATI ON ACTI VI TI ES

Pr i ce i ncl udes t he f ol l owi ng:

PROVI DE REPAI RS TO BASEMENT BRI CK MASONRY WALLS I NCLUDI NG ALL ASSOCI ATED

STRUCTURAL, CI VI L, AND MECHANI CAL WORK AT AND BELOW THE BASEMENT FLOOR

SLAB; PROVI DE STRUCTURAL REPAI RS TO FI RST FLOOR STRUCTURE AT BASEMENT

WALLS AND MAI N I NTERI OR STAI R ON ALL LEVELS.

CLI N DESCRI PTI ON TOTAL PRI CE FOR 0002

0002 $______________________________

CLI N 0003 BI D OPTI ON 2 - FOUNDATI ON DRAI N

Pr i ce i ncl udes t he f ol l owi ng:

PROVI DE FOUNDATI ON DRAI N AT SOUTH AND WEST PERI METERS OF BUI LDI NG; REMOVE

AND RECONSTRUCT EXTERI OR STAI R WI TH ASSOCI ATED ARCHI TECTURAL AND

STRUCTURAL WORK.

CLI N DESCRI PTI ON TOTAL PRI CE FOR 0003

DOCUMENT 00 22 13. 00 20 Page 1

0003 $______________________________

CLI N 0004 BI D OPTI ON 3 - ROOFI NG

Pr i ce i ncl udes t he f ol l owi ng:

REPLACE OF ALL ROOFI NG AND ROOF DRAI NAGE SYSTEMS ( EXCLUDI NG WEST AND EAST

WI NGS) ; REPAI R REMOVE ANY EXI STI NG ABANDONED ROOFTOP EQUI PMENT; PROVI DE

TERRACE ROOF DECK AT SECOND FLOOR.

CLI N DESCRI PTI ON TOTAL PRI CE FOR 0004

0004 $______________________________

CLI N 0005 BI D OPTI ON 4 - EXTERI OR ENVELOPE

Pr i ce i ncl udes t he f ol l owi ng:

REPLACE ALL EXI STI NG WI NDOWS; PROVI DE VARI OUS EXTERI OR ENVELOPE REPAI RS

I NCLUDI NG MASONRY, PAI NTED FI NI SHES, WOOD, AMONG OTHERS.

CLI N DESCRI PTI ON TOTAL PRI CE FOR 0005

0005 $______________________________

CLI N 0006 BI D OPTI ON 5 - I NTERI OR FI NI SH REPAI R AND PRESERVATI ON ACTI VI TI ES

Pr i ce i ncl udes t he f ol l owi ng:

PROVI DE I NTERI OR FI NI SHES THROUGHOUT HOUSE; PROVI DE RESTORATI ON AND

PRESERVATI ON ACTI VI TI ES FOR I NTERI OR HI STORI C FABRI C.

CLI N DESCRI PTI ON TOTAL PRI CE FOR 0006

DOCUMENT 00 22 13. 00 20 Page 2

0006 $______________________________

CLI N 0007 BI D OPTI ON 6 - PLUMBI NG

Pr i ce i ncl udes t he f ol l owi ng:

REPLACE PLUMBI NG SYSTEM ON FLOORS 1, 2, AND 3; PROVI DE ASSOCI ATED

ARCHI TECTURAL REPAI RS.

CLI N DESCRI PTI ON TOTAL PRI CE FOR 0007

0007 $______________________________

CLI N 0008 BI D OPTI ON 7 - TELECOM

Pr i ce i ncl udes t he f ol l owi ng:

REPLACE TELECOMMUNI CATI ONS SYSTEM ON ALL FLOORS; PROVI DE ASSOCI ATED

ARCHI TECTURAL REPAI RS.

CLI N DESCRI PTI ON TOTAL PRI CE FOR 0008

0008 $______________________________

CLI N 0009 BI D OPTI ON 8 - EXTERI OR AND I NTERI OR LI FT

Pr i ce i ncl udes t he f ol l owi ng:

REPLACE EXI STI NG CONVEYI NG SYSTEM I N- KI ND; PROVI DE ASSOCI ATED

ARCHI TECTURAL, ELECTRI CAL, STRUCTURAL, AND TELECOM WORK.

CLI N DESCRI PTI ON TOTAL PRI CE FOR 0009

0009 $______________________________

CLI N 0010 BI D OPTI ON 9 - CABANA & KI TCHEN ROOF

Pr i ce i ncl udes t he f ol l owi ng:

PROVI DE I NTERI OR FI NI SH REPAI RS FOR CABANA ( WEST WI NG) ; REPLACE METAL

ROOFI NG SYSTEMS AND ROOF DRAI NAGE SYSTEMS FOR CABANA AND EAST KI TCHEN

WI NGS.

CLI N DESCRI PTI ON TOTAL PRI CE FOR 0010

0010 $______________________________

CLI N 0011 BI D OPTI ON 10 - KI TCHEN

Pr i ce i ncl udes t he f ol l owi ng:

PROVI DE MAJOR RENOVATI ON OF THE FOLLOWI NG SPACES: PANTRY 109, KI TCHEN 110,

PORCH 111 AND HALL 112. EACH SPACE WI LL RECEI VED NEW MI LLWORK AND

I NTERI OR FI NI SHES AS SCHEDULED, FLOORI NG I N HALL 112 WI LL REMAI N.

PLUMBI NG AND ELECTRI CAL RENOVATI ONS WI LL OCCUR AS WELL, WI TH ALL MAJOR

DOCUMENT 00 22 13. 00 20 Page 3

APPLI ANCES AND PLUMBI NG LOCATED I N THE SAME LOCATI ON I N THE KI TCHEN WI TH

MI NOR ALTERATI ONS I N LOCATI ON I N THE BUTLER' S PANTRY.

CLI N DESCRI PTI ON TOTAL PRI CE FOR 0011

0010 $______________________________

1. 2 GENERAL BI D NOTES

a. Awar d wi l l be made on t he t ot al sum of Cont r act Li ne I t ems 0001 and t he sum of t he ext ensi ons under Cont r act Li ne I t em 0002, 0003, and 0004, 0005, 0006, 0007, 0008, 0009 and 0010. For CLI N 0002, 0003, and 0004, 0005, 0006, 0007, 0008, 0009, 0010 and 0011 ent er t he bi d opt i on pr i ces and ext ended t ot al s i n spaces pr ovi ded.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

- - End of Document - -

DOCUMENT 00 22 13. 00 20 Page 4

SECTI ON 01 11 00

SUMMARY OF WORK

08/ 15, CHG 2: 08/ 21

PART 1 GENERAL

1. 1 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s Sal vage Pl an; G

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

The wor k i ncl udes i mmedi at e r epai r s t o r est or e t he bui l di ng f unct i on and mai nt enance i t ems t o keep t he exi st i ng bui l di ng syst ems at opt i mum per f or mance i ncl udi ng but not l i mi t ed t o St r uct ur al and Ar chi t ect ur al r epai r and pr eser vat i on, r oof i ng, f i r e pr ot ect i on, f enest r at i on, mechani cal , el ect r i cal and i nci dent al r el at ed wor k.

1. 2. 2 Locat i on

The wor k i s l ocat ed at 801 G St r eet SE on t he Mar i ne Bar r acks Washi ngt on ( MBW) i nst al l at i on i n Washi ngt on, D. C. . The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .

1. 3 OCCUPANCY OF PREMI SES

Bui l di ng( s) wi l l be occupi ed dur i ng per f or mance of wor k under t hi s Cont r act . Occupancy not i f i cat i ons wi l l be post ed i n a pr omi nent l ocat i on i n t he wor k ar ea.

Bef or e wor k i s st ar t ed, ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur e, means of access, space f or st or age of mat er i al s and equi pment , and use of appr oaches, cor r i dor s, and st ai r ways.

1. 4 EXI STI NG WORK

I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

SECTI ON 01 11 00 Page 1

1. 5 LOCATI ON OF UNDERGROUND UTI LI TI ES

Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.

Cont act l ocal ut i l i t y l ocat i ng ser vi ce a mi ni mum of 48 hour s pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day. Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.

I dent i f y and mar k al l ot her ut i l i t i es not managed and l ocat ed by t he l ocal ut i l i t y compani es. Scan t he const r uct i on s i t e wi t h Gr ound Penet r at i ng Radar ( GPR) , el ect r omagnet i c, or soni c equi pment , and mar k t he sur f ace of t he gr ound or paved sur f ace wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound or encased obst r uct i on not i ndi cat ed, or speci f i ed t o be r emoved, t hat i s i ndi cat ed or di scover ed dur i ng scanni ng, i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.

1. 5. 1 Not i f i cat i on Pr i or t o Excavat i on

Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng excavat i on wor k.

1. 6 NAVY AND MARI NE CORPS ( NMCI ) COORDI NATI ON REQUI REMENTS

1. 6. 1 NMCI Cont r act or Access

Al l ow t he NMCI Cont r act or access t o t he f aci l i t y t owar ds t he end of const r uct i on ( f i ni shes 90 per cent compl et e, r ough- i n 100 per cent compl et e, I nsi de Pl ant ( I SP) / Out si de Pl ant ( OSP) i nf r ast r uct ur e i n pl ace) t o pr ovi de equi pment i n t he t el ecommuni cat i ons r ooms and make f i nal connect i ons.

Coor di nat e ef f or t s wi t h t he NMCI Cont r act or t o f aci l i t at e j oi nt use of bui l di ng spaces dur i ng t he f i nal phases of const r uct i on. Af t er t he Cont r act i ng Of f i cer has f aci l i t at ed coor di nat i on meet i ngs bet ween t he t wo cont r act or s, wi t hi n one week, i ncor por at e t he ef f or t of addi t i onal coor di nat i on wi t h t he NMCI Cont r act or i nt o t he const r uct i on schedul e t o demonst r at e a pl an f or mai nt ai ni ng t he cont r act dur at i on.

1. 7 SALVAGE MATERI AL AND EQUI PMENT

I t ems desi gnat ed by t he Cont r act i ng Of f i cer t o be sal vaged r emai n t he pr oper t y of t he Gover nment . Segr egat e, i t emi ze, del i ver and of f - l oad t he sal vaged pr oper t y at t he Gover nment desi gnat ed.

Pr ovi de a sal vage pl an, l i s t i ng mat er i al and equi pment t o be sal vaged, and t hei r st or age l ocat i on. Mai nt ai n pr oper t y cont r ol r ecor ds f or mat er i al or equi pment desi gnat ed as sal vage. Pr ovi de a syst em f or pr oper t y cont r ol i n t he sal vage pl an. St or e and pr ot ect sal vaged mat er i al s and equi pment unt i l di sposi t i on by t he Cont r act i ng Of f i cer .

SECTI ON 01 11 00 Page 2

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

- - End of Sect i on - -

SECTI ON 01 11 00 Page 3

SECTI ON 01 11 00 Page 4

SECTI ON 01 14 00

WORK RESTRI CTI ONS

11/ 11, CHG 13: 08/ 21

PART 1 GENERAL

1. 1 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Li st of Cont act Per sonnel

1. 2 SPECI AL SCHEDULI NG REQUI REMENTS

a. The base wi l l be c l osed f or al l const r uct i on act i v i t i es ever y Fr i day dur i ng t he mont hs of May, June, Jul y, and August t o accommodat i ve t he par ade season.

1. 3 CONTRACTOR ACCESS AND USE OF PREMI SES

1. 3. 1 Act i v i t y Regul at i ons

Ensur e t hat Cont r act or per sonnel empl oyed on t he Act i v i t y become f ami l i ar wi t h and obey Act i v i t y r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear appr opr i at e per sonal pr ot ect i ve equi pment ( PPE) i n desi gnat ed ar eas. Do not ent er any r est r i ct ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Ensur e al l Cont r act or equi pment , i ncl ude del i ver y vehi c l es, ar e c l ear l y i dent i f i ed wi t h t hei r company name.

1. 3. 1. 1 Subcont r act or s and Per sonnel Cont act s

Pr ovi de a l i s t of cont act per sonnel of t he Cont r act or and subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.

1. 3. 1. 2 I nst al l at i on Access

Obt ai n access t o Navy i nst al l at i ons t hr ough par t i c i pat i on i n t he Def ense

SECTI ON 01 14 00 Page 1

Bi omet r i cs I dent i f i cat i on Syst em ( DBI DS) . Requi r ement s f or Cont r act or empl oyee r egi st r at i on, and t r ansi t i on f or empl oyees cur r ent l y under Navy Commer ci al Access Cont r ol Syst em ( NCACS) , ar e avai l abl e at ht t ps: / / www. cni c. navy. mi l / om/ dbi ds. ht ml . No f ees ar e associ at ed wi t h obt ai ni ng a DBI DS cr edent i al .

Par t i c i pat i on i n t he DBI DS i s not mandat or y, and Cont r act or per sonnel may appl y f or One- Day Passes at t he Base Vi s i t or Cont r ol Of f i ce t o access an i nst al l at i on.

1. 3. 1. 2. 1 Regi st r at i on f or DBI DS

Regi st r at i on f or DBI DS i s avai l abl e at ht t ps: / / www. cni c. navy. mi l / om/ dbi ds. ht ml . Pr ocedur e i ncl udes:

a. Pr esent a l et t er or of f i c i al awar d document ( i . e. DD For m 1155 or SF 1442) f r om t he Cont r act i ng Of f i cer , t hat pr ovi des t he pur pose f or access, t o t he base Vi s i t or Cont r ol Cent er r epr esent at i ve.

b. Pr esent val i d i dent i f i cat i on, such as a passpor t or Real I D Act - compl i ant st at e dr i ver ' s l i cense.

c. Pr ovi de compl et ed SECNAV FORM 5512/ 1 t o t he base Vi s i t or Cont r ol Cent er r epr esent at i ve t o obt ai n a backgr ound check. Thi s f or m i s avai l abl e f or downl oad at ht t ps: / / www. cni c. navy. mi l / om/ dbi ds. ht ml .

d. Upon successf ul compl et i on of t he backgr ound check, t he Gover nment wi l l compl et e t he DBI DS enr ol l ment pr ocess, whi ch i ncl udes Cont r act or empl oyee phot o, f i nger pr i nt s, base r est r i ct i on and sever al ot her assessment s.

e. Upon successf ul compl et i on of t he enr ol l ment pr ocess, t he Cont r act or empl oyee wi l l be i ssued a DBI DS cr edent i al , and wi l l be al l owed t o pr oceed t o wor ksi t e.

1. 3. 1. 2. 2 DBI DS El i gi bi l i t y Requi r ement s

Thr oughout t he l engt h of t he cont r act , t he Cont r act or empl oyee must cont i nue t o meet backgr ound scr een st andar ds. Per i odi c backgr ound scr eeni ngs ar e conduct ed t o ver i f y cont i nued DBI DS par t i c i pat i on and i nst al l at i on access pr i v i l eges. DBI DS access pr i v i l eges wi l l be i mmedi at el y suspended or r evoked i f at any t i me a Cont r act or empl oyee becomes i nel i gi bl e.

An adj udi cat i on pr ocess may be i ni t i at ed when a backgr ound scr een f ai l ur e r esul t s i n di squal i f i cat i on f r om par t i c i pat i on i n t he DBI DS, and Cont r act or empl oyee does not agr ee wi t h t he r eason f or di squal i f i cat i on.

The Gover nment i s t he f i nal aut hor i t y.

1. 3. 1. 2. 3 DBI DS Not i f i cat i on Requi r ement s

a. I mmedi at el y r epor t i nst ances of l ost or st ol en badges t o t he Cont r act i ng Of f i cer .

b. I mmedi at el y col l ect DBI DS cr edent i al s and not i f y t he Cont r act i ng Of f i cer i n wr i t i ng under t he f ol l owi ng ci r cumst ances:

( 1) An empl oyee has depar t ed t he company wi t hout havi ng pr oper l y r et ur ned or sur r ender ed t hei r DBI DS cr edent i al s.

SECTI ON 01 14 00 Page 2

( 2) Ther e i s a r easonabl e basi s t o concl ude t hat an empl oyee, or f or mer empl oyee, mi ght pose a r i sk, compr omi se, or t hr eat t o t he saf et y or secur i t y of t he I nst al l at i on or anyone t her ei n.

1. 3. 1. 2. 4 One- Day Passes

Per sonnel appl y i ng f or One- Day passes at t he Base Vi s i t or Cont r ol Of f i ce ar e subj ect t o dai l y mandat or y vehi c l e i nspect i on, and wi l l have l i mi t ed access t o t he i nst al l at i on. The Gover nment i s not r esponsi bl e f or any cost or l ost t i me associ at ed wi t h obt ai ni ng dai l y passes or added vehi c l e i nspect i ons i ncur r ed by non- par t i c i pant s i n t he DBI DS. One day passes can be i ssued t o per sonnel who wi l l wor k on base f or 14 days or l ess.

Per sonnel who wi l l wor k on base f or 15 days or mor e must obt ai n a DBI DS cr edent i al .

1. 3. 1. 3 Empl oyee Li st

The Cont r act or must pr ovi de t o t he Cont r act i ng of f i cer , i n wr i t i ng, t he names of t wo desi gnat ed r epr esent at i ves aut hor i zed t o r equest per sonnel and vehi c l e passes f or empl oyees and subcont r act or ' s empl oyees pr i or t o commencement of wor k under t hi s cont r act . The Cont r act or must adher e t o t he r equi r ement s of " I mpor t ant Cl ar i f i cat i ons - Cont r act or s - How t o Gai n Access, " dat ed 31 Oct ober 1995, i n obt ai ni ng access t o t he Naval Ai r St at i on compl ex f or t he l i f e of t he cont r act . A copy of t hese r equi r ement s wi l l be pr ovi ded at t he pr econst r uct i on meet i ng.

1. 3. 1. 4 Per sonnel Ent r y Appr oval

Fai l ur e t o obt ai n ent r y appr oval wi l l not af f ect t he cont r act pr i ce or t i me of compl et i on.

1. 3. 1. 5 No Smoki ng Pol i cy

Smoki ng i s pr ohi bi t ed wi t hi n and out si de of al l bui l di ngs on i nst al l at i on, except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.

1. 3. 2 Wor ki ng Hour s

Regul ar wor ki ng hour s wi l l consi st of an 8 1/ 2 hour per i od est abl i shed by t he Cont r act i ng Of f i cer , bet ween 7 a. m. and 3: 30 p. m. , Monday t hr ough Fr i day, excl udi ng Gover nment hol i days.

1. 3. 3 Wor k Out si de Regul ar Hour s

Wor k out si de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .

Make appl i cat i on 15 cal endar days pr i or t o such wor k t o al l ow ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess, gi v i ng t he speci f i c dat es, hour s, l ocat i on, t ype of wor k t o be per f or med, cont r act number and pr oj ect t i t l e. Based on t he j ust i f i cat i on pr ovi ded, t he Cont r act i ng Of f i cer may appr ove wor k out si de r egul ar hour s. Dur i ng per i ods of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer . Make ut i l i t y cut over s af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days unl ess di r ect ed ot her wi se.

SECTI ON 01 14 00 Page 3

1. 3. 4 Occupi ed and Exi st i ng Bui l di ng

The Cont r act or shal l be wor ki ng i n an exi st i ng bui l di ng whi ch i s occupi ed.

Do not ent er t he bui l di ng wi t hout pr i or appr oval of t he Cont r act i ng Of f i cer .

The exi st i ng bui l di ngs and t hei r cont ent s must be kept secur e at al l t i mes. Pr ovi de t empor ar y c l osur es as r equi r ed t o mai nt ai n secur i t y as di r ect ed by t he Cont r act i ng Of f i cer .

The Gover nment wi l l r emove and r el ocat e ot her Gover nment pr oper t y i n t he ar eas of t he bui l di ng schedul ed t o r ecei ve wor k.

1. 3. 5 Ut i l i t y Cut over s and I nt er r upt i ons

a. Make ut i l i t y cut over s and i nt er r upt i ons af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days. Conf or m t o pr ocedur es r equi r ed i n par agr aph WORK OUTSI DE REGULAR HOURS.

b. Ensur e t hat new ut i l i t y l i nes ar e compl et e, except f or t he connect i on, bef or e i nt er r upt i ng exi st i ng ser vi ce.

c. I nt er r upt i on t o wat er , sani t ar y sewer , st or m sewer , t el ephone ser vi ce, el ect r i c ser vi ce, ai r condi t i oni ng, heat i ng, f i r e al ar m, compr essed ai r , ar e consi der ed ut i l i t y cut over s pur suant t o t he par agr aph WORK

OUTSI DE REGULAR HOURS.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 14 00 Page 4

SECTI ON 01 20 00

PRI CE AND PAYMENT PROCEDURES

11/ 20, CHG 2: 08/ 21

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EP 1110- 1- 8 ( 2016) Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e

1. 2 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Ear ned Val ue Repor t ; G

1. 3 EARNED VALUE REPORT

1. 3. 1 Dat a Requi r ed

Thi s Cont r act r equi r es t he use of a cost - l oaded Net wor k Anal ysi s Schedul e ( NAS) . Schedul e of Pr i ces must not be used wi t h cost - l oaded Net wor k Anal ysi s Schedul e ( NAS) . Use Ear ned Val ue Repor t der i ved f r om cost - l oaded NAS. Wi t hi n 15 cal endar days of Cont r act Awar d, pr epar e and del i ver t o t he Cont r act i ng Of f i cer a Ear ned Val ue Repor t ( const r uct i on Cont r act ) as di r ect ed by t he Cont r act i ng Of f i cer . Schedul e of Pr i ces must have cost summar i zed and t ot al s pr ovi ded f or each const r uct i on cat egor y. Pr ovi de a det ai l ed br eakdown of t he Cont r act pr i ce, gi v i ng quant i t i es f or each of t he var i ous k i nds of wor k, uni t pr i ces and ext ended pr i ces. Cont r act or over head and pr of i t i ncl udi ng sal ar i es f or f i el d of f i ce per sonnel , i f appl i cabl e, must be pr opor t i onat el y spr ead over al l pay i t ems and not i ncl uded as i ndi v i dual pay i t ems.

1. 3. 2 Payment Schedul e I nst r uct i ons

Payment s wi l l not be made unt i l t he Ear ned Val ue Repor t f r om t he cost - l oaded NAS has been submi t t ed t o and accept ed by t he Cont r act i ng Of f i cer .

Addi t i onal l y, t he Ear ned Val ue Repor t must be separ at ed as f ol l ows:

a. Pr i mar y Faci l i t i es Cost Br eakdown:

Def i ned as wor k on t he pr i mar y f aci l i t i es out t o t he 5 f oot l i ne.

Wor k out t o t he 5 f oot l i ne i ncl udes const r uct i on encompassed wi t hi n a

SECTI ON 01 20 00 Page 1 t heor et i cal l i ne 5 f oot f r om t he f ace of ext er i or wal l s and i ncl udes at t endant const r uct i on, such as pad mount ed HVAC cool i ng equi pment , cool i ng t ower s, and t r ansf or mer s pl aced beyond t he 5 f oot l i ne.

b. Suppor t i ng Faci l i t i es Cost Br eakdown:

Def i ned as s i t e wor k, i ncl udi ng i nci dent al wor k, out s i de t he 5 f oot l i ne.

1. 3. 3 Schedul e Requi r ement s f or HVAC TAB

The f i el d wor k r equi r ement s i n Sect i on 23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC must be br oken down i n t he Ear ned Val ue Repor t f r om t he cost - l oaded NAS by separ at e l i ne i t ems whi ch r ef l ect measur abl e del i ver abl es. The val ue f or each pay i t em l i st ed bel ow wi l l be est abl i shed on a case by case basi s f or each Cont r act . The l i ne i t ems ar e as f ol l ows:

a. Appr oval of Desi gn Revi ew Repor t : The TABS Agency i s r equi r ed t o conduct a r evi ew of t he pr oj ect pl ans and speci f i cat i ons t o i dent i f y any f eat ur e, or t he l ack t her eof , t hat woul d pr ecl ude successf ul t est i ng and bal anci ng of t he pr oj ect HVAC syst ems. Submi t t he r esul t i ng f i ndi ngs t o t he Gover nment t o al l ow cor r ect i on of t he desi gn. The pr ogr ess payment wi l l not be i ssued unt i l t he r epor t i s r evi ewed and appr oved.

b. Appr oval of t he pr e- f i el d engi neer i ng r epor t : The TABS Agency submi t s a r epor t whi ch out l i nes t he scope of f i el d wor k. The r epor t must cont ai n det ai l s of what syst ems wi l l be t est ed, pr ocedur es t o be used, sampl e r epor t f or ms f or r epor t i ng t est r esul t s and a qual i t y cont r ol checkl i st of wor k i t ems t hat must be compl et ed bef or e TABS f i el d wor k commences.

c. Season I f i el d wor k: I ncr ement al payment s ar e i ssued as t he TABS f i el d wor k pr ogr esses. The TABS Agency mobi l i zes t o t he pr oj ect s i t e and execut es t he f i el d wor k as out l i ned i n t he pr e- f i el d engi neer i ng r epor t . The HVAC wat er and ai r syst ems ar e bal anced and oper at i onal dat a must be col l ect ed f or one seasonal condi t i on ( ei t her summer or wi nt er dependi ng on pr oj ect t i mi ng) .

d. Appr oval of Season I r epor t : On compl et i on of t he Season I f i el d wor k, t he dat a i s compi l ed i nt o a r epor t and submi t t ed t o t he Gover nment . The r epor t i s r evi ewed, and appr oved, af t er ensur i ng compl i ance wi t h t he pr e- f i el d engi neer i ng r epor t scope of wor k.

e. Compl et i on of Season I f i el d QA check: Cont r act QC and Gover nment r epr esent at i ves meet t he TABS Agency at t he j obsi t e t o r et est por t i ons of t he syst ems r epor t ed i n t he Season I r epor t . The pur pose of t hese t est s ar e t o val i dat e t he accur acy and compl et eness of t he pr evi ousl y submi t t ed Season I r epor t .

f . Appr oval of Season I I r epor t : The TABS Agency compl et es al l Season I I f i el d wor k, whi ch i s nor mal l y compr i sed mai nl y of t aki ng heat t r ansf er t emper at ur e r eadi ngs, i n t he season opposi t e of t hat under whi ch Season I per f or mance dat a was compi l ed. Compi l e t hi s dat a i nt o a r epor t and submi t t o t he Gover nment . On compl et i on of submi t t al r evi ew t o ensur e compl i ance wi t h t he pr e- f i el d engi neer i ng r epor t scope, pr ogr ess payment i s i ssued. Pr ogr ess payment i s l ess t han t hat i ssued f or t he Season I r epor t s i nce most of t he wat er and ai r

SECTI ON 01 20 00 Page 2 bal anci ng wor k ef f or t i s compl et ed under Season I .

1. 4 CONTRACT MODI FI CATI ONS

I n conj unct i on wi t h t he Cont r act Cl ause DFARS 252. 236- 7000 Modi f i cat i on Pr oposal s- Pr i ce Br eakdown, and wher e act ual owner shi p and oper at i ng cost s of const r uct i on equi pment cannot be det er mi ned f r om Cont r act or account i ng r ecor ds, base equi pment use r at es upon t he appl i cabl e pr ovi s i ons of t he

EP 1110- 1- 8.

1. 5 CONTRACTOR' S I NVOI CE AND CONTRACT PERFORMANCE STATEMENT

1. 5. 1 Cont ent of I nvoi ce

Request s f or payment wi l l be pr ocessed i n accor dance wi t h t he Cont r act Cl ause FAR 52. 232- 27 Pr ompt Payment f or Const r uct i on Cont r act s and FAR

52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s. I nvoi ces not compl et ed i n accor dance wi t h cont r act r equi r ement s wi l l be r et ur ned t o t he Cont r act or f or cor r ect i on of t he def i c i enci es. The r equest s f or payment shal l i ncl ude t he document s l i s t ed bel ow.

a. The Cont r act or ' s i nvoi ce, on NAVFAC For m 7300/ 30 f ur ni shed by t he Gover nment , showi ng i n summar y f or m, t he basi s f or ar r i v i ng at t he amount of t he i nvoi ce. For m 7300/ 30 must i ncl ude cer t i f i cat i on by Qual i t y Cont r ol ( QC) Manager as r equi r ed by t he Cont r act .

b. The Ear ned Val ue Repor t f r om t he cost - l oaded NAS.

c. Cont r act or ' s Mont hl y Est i mat e f or Voucher and Cont r act or s Cer t i f i cat i on ( NAVFAC For m 4330) wi t h Subcont r act or and suppl i er payment cer t i f i cat i on. Ot her document s, i ncl udi ng but not l i mi t ed t o, t hat need t o be r ecei ved pr i or t o pr ocessi ng payment i ncl ude t he f ol l owi ng submi t t al s as r equi r ed. These i t ems ar e st i l l r equi r ed mont hl y even when a pay voucher i s not submi t t ed.

d. Mont hl y Wor k- hour r epor t .

e. Updat ed Const r uct i on Pr ogr ess Schedul e and t abul ar r epor t s r equi r ed by t he cont r act .

f . Cont r act or Saf et y Sel f Eval uat i on Checkl i st .

g. Updat ed submi t t al r egi st er .

h. Sol i d Wast e Di sposal Repor t .

i . Cer t i f i ed payr ol l s.

j . Updat ed t est i ng l ogs.

k. Ot her suppor t i ng document s as r equest ed.

1. 5. 2 Submi ssi on of I nvoi ces

I f DFARS Cl ause 252. 232- 7006 Wi de Ar ea Wor kFl ow Payment I nst r uct i ons i s i ncl uded i n t he Cont r act , pr ovi de t he document s l i s t ed i n above par agr aph CONTENT OF I NVOI CE i n t hei r ent i r et y as at t achment s i n Wi de Ar ea Wor k Fl ow ( WAWF) f or each i nvoi ce submi t t ed. The maxi mum si ze of each WAWF at t achment i s t wo megabyt es, but t her e ar e no l i mi t s on t he number of

SECTI ON 01 20 00 Page 3 at t achment s. I f a document cannot be at t ached i n WAWF due t o syst em or s i ze r est r i ct i on, pr ovi de i t as i nst r uct ed by t he Cont r act i ng Of f i cer .

Mont hl y i nvoi ces and suppor t i ng f or ms f or wor k per f or med t hr ough t he anni ver sar y awar d dat e of t he Cont r act must be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n 5 cal endar days of t he dat e of i nvoi ce. For exampl e, i f Cont r act awar d dat e i s t he 7t h of t he mont h, t he dat e of each mont hl y i nvoi ce must be t he 7t h and t he i nvoi ce must be submi t t ed by t he 12t h of t he mont h.

1. 5. 3 Fi nal I nvoi ce

a. A f i nal i nvoi ce must be accompani ed by t he cer t i f i cat i on r equi r ed by DFARS 252. 247. 7023 Tr anspor t at i on of Suppl i es by Sea, and t he Cont r act or ' s Fi nal Rel ease. I f t he Cont r act or i s i ncor por at ed, t he Fi nal Rel ease must cont ai n t he cor por at e seal . An of f i cer of t he cor por at i on must s i gn and t he cor por at e secr et ar y must cer t i f y t he Fi nal Rel ease.

b. For f i nal i nvoi ces bei ng submi t t ed v i a WAWF, t he or i gi nal Cont r act or ' s Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea must be pr ovi ded di r ect l y t o t he r espect i ve Cont r act i ng Of f i cer pr i or t o submi ssi on of t he f i nal i nvoi ce.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .