AMENDMENT 0007 - P2203 PRICE SCHEDULE REV1.pdf

PDF 75 KB Posted

Attached to
N40080-23-R-0022 ACQR: 6070919 - P2203, Quarters 6 Whole House Revitalization, Marine Barracks, Washington, D. C.
Solicitation number
FY-25-6070919
Issued by

About this file

This is a price schedule for solicitation N40080-23-R-0022 regarding the P-2203 Quarters 6 Renovation project at Marine Barracks, Washington. The schedule contains 11 line items including a base price (Line Item 1) broken into three sub-components for work within 5 feet of the building, sitework outside the 5-foot line, and asbestos-containing material abatement of mechanical piping (1,500 LF). Line Items 2-11 are optional components covering basement brick preservation, foundation drain, roofing, exterior envelope, interior finish repair, plumbing (including 700 LF of ACM abatement), telecom work, exterior/interior life safety, cabana/kitchen roofing, and kitchen renovations.

The contract has a 490-day duration after award, with prices valid for 90 days from proposal receipt. The government will evaluate offers based on the total price of all line items (1-11) but reserves the right to exercise the options within 90 days of award without changing the completion date. Offerors must provide firm fixed prices for all items, with no economic price adjustments permitted. Performance bonds must cover 100% of the aggregate amount if options are exercised. The government may reject materially unbalanced offers where prices are significantly under or over cost for different components.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

SOLICITATION NO.: N40080-23-R-0022

ACQR: 6070919

REV1 dated 2/20/2025

P-2203, QUARTERS 6 RENOVATION

MARINE BARRACKS, WASHINGTON

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used with the contract.

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item

Description Quantity Unit Unit Price Total Price

1 BASE PRICE (Total of Line Items 1A-1C): Total Price for the entire work for P-2203, Q6 MBW, complete in accordance with drawings, plans, and specifications, but excluding the work indicated or specified under any other Priced Line Item.

JOB

1A Subtotal of Base Price for the entire work for P2203, complete to the 5 foot line outside of the building, in accordance with the drawing and specifications, but excluding the work indicated or specified under any other Priced Line Item.

1B Subtotal of Base Price for the entire project sitework, outside the facility’s 5 foot line, complete in accordance with the drawings and specifications, but excluding the work indicated or specified under any other Priced Line Item.

1C Subtotal of Base Price for Asbestos- Containing Material (ACM) abatement associated with the concealed mechanical piping.

Exclude the work indicated or specified under any other Priced Line Item.

1500 LF $__________ $

2 Option 1 - Price for providing all work in connection with Basement Brick Preservation Activities, complete in accordance with the BO1 drawing sheets, but excluding the work indicated or specified under any other Priced Line Item.

1 JOB $_____________

3 Option 2 - Price for providing all work in connection with Foundation Drain, complete in accordance with the BO2 drawing sheets, but excluding the work indicated or specified under any other Priced Line Item.

1 JOB $_____________

4 Option 3 - Price for providing all work in connection with Roofing, complete in accordance with the BO3 drawing sheets, but excluding the work indicated or specified under any other Priced Line Item.

1 JOB $_____________

5 Option 4 - Price for providing all work in connection with Exterior Envelope, complete in accordance with the BO4 drawing sheets, but excluding the work indicated or specified under any other Priced Line Item.

1 JOB $_____________

6 Option 5 - Price for providing all work in connection with Interior Finish Repair & Preservation Activities, complete in accordance with the BO5 drawing sheets, but excluding the work indicated or specified under any other Priced Line Item.

1 JOB $_____________

7 Option 6 PRICE (Total of Line Items 7A-7B): Total Price for providing all work in connection with Plumbing, complete in accordance with the BO6 drawing sheets, but excluding the work indicated or specified under any other Priced Line Item.

1 JOB $_____________

7A Subtotal of Option 6 Price for providing all work in connection with Plumbing, complete in accordance with the BO6 drawing sheets, but excluding the work indicated or specified under any other Priced Line Item.

1 JOB $_____________

7B Subtotal of Option 6 Price for Asbestos-Containing Material (ACM) abatement associated with the concealed plumbing piping.

Exclude the work indicated or specified under any other Priced Line Item.

700 LF $__________ $_____________

8 Option 7 - Price for providing all work in connection with Telecom, complete in accordance with the BO7 drawing sheets, but excluding the work indicated or specified

9 Option 8 - Price for providing all work in connection with Exterior & Interior Life, complete in accordance with the BO8 drawing sheets, but excluding the work indicated or specified under any other Priced Line Item.

1 JOB $_____________

10 Option 9 - Price for providing all work in connection with Cabana & Kitchen Roofing, complete in accordance with the BO9 drawing sheets, but excluding the work indicated or specified under any other Priced Line Item.

1 JOB $_____________

11 Option 10 - Price for providing all work in connection with Kitchen, complete in accordance with the BO10 drawing sheets, but excluding the work indicated or specified

Notes:

1. The Offeror shall provide a price for all items on the Price Schedule. The Government will evaluate offers based on the total evaluated price, which is the sum of Line Items 1-11.

2. The lump sum price above shall be deemed to include all costs required for the specified work, in accordance with the drawings and specifications, including all labor, materials, equipment, tools, management, supervision, and related items.

3. A firm fixed proposed price is required for all Line Items. No provision is made for economic price adjustment.

4. Failure to enter a price for any of the Items will result in the proposal being rejected as unacceptable.

5. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.

6. The Offeror’s price is valid for 90 days from the receipt of proposals.

7. Total Contract duration is 490 calendar days after contract award.

8. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for Line Item 1. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the Option(s).

9. The Government reserves the unilateral right to award Line Items 2-11 to the Contractor at the proposed price within 90 calendar days after the contract award. The Contract Completion Date (CCD) does not change if any or all the bid options are awarded.

10. If Line Items 2-11 are exercised after award, additional bonding and consent of surety is required.

Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.