This is a table of contents document for Tinker Air Force Base General Requirements, effective January 2022, which outlines the organizational structure of construction specifications and contracting requirements applicable to work performed on Tinker AFB.
The document is organized into two primary divisions. Division 00 addresses Procurement and Contracting Requirements, containing four main sections: General Requirements for Construction on Tinker Air Force Base (00 70 00), General Safety Requirements for Construction on Tinker Air Force Base (00 71 00), General Environmental Requirements for Construction on Tinker Air Force Base (00 72 00), and Special Provisions for Working on Tinker AFB (00 80 00 and 00 80 05), with the latter section specifically addressing work on or near the airfield. Division 01 covers General Requirements and includes eight subsections addressing small project construction progress schedules, submittal procedures, design data for design-after-award projects, sources for reference publications, quality control, contractor facilities, closeout submittals, and operation and maintenance data. This table of contents serves as a guide to the detailed specifications that contractors must follow when bidding on or executing construction projects at Tinker Air Force Base.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tinker AFB Tinker General Requirements
January 2022 Page 1 TABLE OF CONTENTS
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 70 00
00 71 00
00 72 00
00 80 00 00 80 05
GENERAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE
BASE
GENERAL SAFETY REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR
FORCE BASE
GENERAL ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION ON
TINKER AIR FORCE BASE
SPECIAL PROVISIONS FOR WORKING ON TINKER AFB
SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE AIRFIELD ON
TINKER AFB
DIVISION 01 - GENERAL REQUIREMENTS
01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 33 16.00 10 DESIGN DATA (DESGIN AFTER AWARD)
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 50 00 CONTRACTOR FACILITIES
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA