AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
See Block #2
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
16 JUN 2011
4. REQUISITION/PURCHASE REQ.NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY ASC/WWYAC CODE FA8637 7. ADMINISTERED BY (If other than Item 6) CODE
USAF/AFMC
AERONAUTICAL SYSTEMS CENTER
2725 C STREET, BUILDING 553
WRIGHT-PATTERSON AFB OH 45433-7424
MARGARET L. BRADSHAW 937-904-5180
margaret.bradshaw@wpafb.af.mil
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
FA8637-10-R-6000
X
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X )
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM
10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUBJECT: LIGHT AIR SUPPORT RFP AMENDMENT FA8637-10-R-6000-0007
DUE DATE FOR RESPONSES: IAW PCOL
PROPOSAL EXTENSION REQUIRED: NONE
DISTRIBUTION: IAW FAR 15.206(C)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print).
16A. NAME AND TITLE OF SIGNER (Type or print)
MARCELLA J. WOLFE
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
(Signature of person authorized to sign)
BY________________________________________
(Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.13.0 FAR (48 CFR) 53.243 Created 16 Jun 2011 2:25 PM
SCHEDULE OF CHANGES
FA8637-10-R-6000 0007
1. This RFP Amendment 0007 modifies solicitation Section J, Exhibit B as specified herein and shown by attachment to this document. Changes are also made to Section L "Information to Offerors", and Section L Attachment L-4 "Statement of Objectives for Light Air Support Aircraft and Ground Training Devices", both provided under separate cover with changes marked for ease of review. This modification also corrects Section M regarding a missing reference to the evaluation of documentation and/or plans that support offerors submittals regarding first article test (FAT) of GTDs. Section M is also provided under separate cover.
2. In accordance with paragraph 1., the solicitation is specifically modified as follows:
a. SECTION J - CONTRACT ATTACHMENTS is modified to replace Exhibit B, CDRL B002 to incorporate revised language under the Block 16 "Remarks". Remarks paragraph 3 is changed to read:
"The Contractor shall develop/submit and provide draft training materials to the students in the Air Advisor Pilot and air Advisor Maintenance Training programs no later than 90 days before start of the first class.
Final training materials shall be submitted 30 days after receipt of approval. (Air Adv Trng PWS 1.3.1.1, 1.3.3)". The change page is provided as an attachment to this document.
b. SECTION L - INSTRUCTIONS TO OFFERORS is modified as follows:
(1) to amend paragraph 4.3.10 to insert the language "and submit with the proposal", and to delete the last sentence of that paragraph.
(2) to make a change to Subfactor 4 Ground Training Devices (GTDs) paragraph 4.4.4 "First Article Test (FAT)" to remove the last sentence in that paragraph, which is restrictive to the Government.
(3) to amend paragraph 8.3.20 to add "and GTDs" to the title, and amend the paragraph language to include references to the transportation and ferry plan, as well as GTDs.
c. SECTION L - ATTACHMENT 4 is modified to make a change to paragraph 3.4 "First Article Test (FAT)", to remove language that is restrictive to the Government.
d. SECTION M - M002 EVALUATION FACTORS is modified to make a change to paragraph
2.3.1.4 language to specifically address the evaluation of first article test documentation, which may include the contractor engineering approved FAT; or if FAT was not completed prior to proposal submittal, the planned date of completion and a FAT plan for the GTDs (or any part pf the GTDs that may need additional contractor testing). The correction to Section M language is made to bring it in line with existing Section L proposal requirements language.
3. The changes outlined above are made for the purpose of clarification. Offerors shall review their proposals for possible conflicts with the changes identified herein and provide a slip page with any necessary revision.
LIST OF ATTACHMENTS
FA8637-10-R-6000 0007
DOCUMENT PGS DATE TITLE
EXHIBIT B 1 10 JUN 2011 CDRL B002 "TRAINING MATERIALS"
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER ILSS
D. SYSTEM/ITEM E. CONTRACT/PR NO.
FA8637-10-R-6000
F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE O F DATA ITEM 3. SUBTITLE
B002 TRAINING MATERIALS
4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
ASC/WWYA
DI-ILSS-80872/T GTD PWS 8.6; OCONUS ICS PWS 8.8 AETC
PWS 1.3.1.1, 1.3.3, 1.3.4.1
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. Date of First Submission
14. DISTRIBUTION
LT C OTIME BLK16
a. ADDRESSEE
b. COPIES
8.APP CODE
A
11. AS OF DATE 13.Date of Subsequent
Submission ASREQ
Final
Draft Reg Repro
16. REMARKS PMO 1
ACO 1
.BLK 12:
. 1. The Contractor shall develop/submit and provide
. training materials to the user for the GTD
. Training Program 30 calendar days before the
. beginning of training. (GTD CLS PWS 8.6)
. 2. The Contractor shall develop/submit and provide
. training materials to the user for the Maintenance
. Training Program 60 calendar days before the
. beginning of training. (LAS OCONUS ICS PWS 8.8)
. 3. The Contractor shall develop/submit and provide
. draft training materials to the students in the Air
. Advisor Pilot and Air Advisor Maintenance
. Training Programs no later than 90 days before start of
. the first class. Final training materials shall be
. submitted 30 days after receipt of approval.
. (Air Adv Trng PWS 1.3.1.1, 1.3.3)
. 4. The Contractor shall develop/submit and provide
. aircraft and mission specific checklists within
. 60 workdays after contract award. (Air Adv Trng
. PWS 1.3.4.1)
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Dawn E. Walker 8/30/2010 Charles M. Vanderberg 8/9/2010 CM/DM SAPM-Deputy Light Attack Branch
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages