01 - Section L - FINAL Attachment 1 LAS RFP Cross Reference Matrix

222 KB Posted

Attached to
Light Air Support (LAS) Aircraft
Solicitation number
FA8637-10-R-6000
Issued by

About this file

Section L - FINAL Attachment 1 LAS RFP Cross Reference Matrix (RCRM) (30 April 2012) - Amendment 8

Text of this file

LAS RFP

CROSS REFERENCE MATRIX

(RCRM)

Contractor to fill in and submit with Proposal

FA8637-10-R-6000-0008

Section L, Attachment 1, Amendment 8

30 April 2012

Section L, Paragraph # Section M Evaluation

Factors

Proposal Reference with

Page and paragraph #

SOO, PWS short title to requirement and page, paragraph #

Contractor SOW or PWS page and paragraph #

CDRL CLIN

3. Executive Summary Not Evaluated

4. Volume I - Mission

Capability 1.1, 2.1, 2.2, and 2.3 (All)

4.1 Vol I Tab A Subfactor

1.1 Aircraft Technical

Rqmts

1.1, 2.3, 2.3.1, 2.3.1.1, 2.3.2

4.1.1 Acft Spec & FOM 2.3.1.1, 2.3.2

4.1.2 LAS Aircraft Spec 2.3.1.1, 2.3.2

4.1.3 FOM 2.3.1.1, 2.3.2

4.1.4 SRD/FOM Matrix 2.3.1.1, 2.3.2

4.1.5 FAT 2.3.1.1, 2.3.2

4.1.6 SOW 2.3.1.1, 2.3.2

4.2 Vol I Tab B Subfactor

1.2 ICS

2.3.1.2, 2.3.2

4.3 Vol I Tab C Subfactor

1.3 Pgm Mgt

2.3.1.3, 2.3.2

4.3.1 Aircraft CSOW 2.3.1.3.b, 2.3.2

4.3.2 IMP/IMS 2.3.1.3.d,e, 2.3.2

4.3.2.1 IMP 2.3.1.3.d, 2.3.2

4.3.2.2 IMS 2.3.1.3.e, 2.3.2

4.3.2.3 Delivery Sched 2.3.1.3.a, 2.3.2

4.3.2.4 Early Delivery 2.3.1.3, 2.3.2

4.3.3 CWBS 2.3.1.3.c, 2.3.2

4.3.4 RESERVED N/A

4.3.5 RESERVED N/A

4.3.5.1 RESERVED N/A

4.3.5.2 RESERVED N/A

4.3.5.2.1 RESERVED N/A

4.3.5.3 RESERVED N/A

4.3.6 Risk Mgt Plan 2.3.1.3.g, 2.3.2

4.3.7 Airworthiness Cert

Plan 2.3.1.3.h, 2.3.2

4.3.7.1 Checklist 2.3.1.3.h, 2.3.2

4.3.8 Mfg Quality 2.3.1.3.i, 2.3.2

(RCRM)

Contractor to fill in and submit with Proposal

FA8637-10-R-6000-0008

Section L, Attachment 1, Amendment 8

30 April 2012

Section L, Paragraph # Section M Evaluation

Factors

Proposal Reference with

Page and paragraph #

SOO, PWS short title to requirement and page, paragraph #

Contractor SOW or PWS page and paragraph #

CDRL CLIN

4.3.9 MRL 2.3.1.3.j, 2.3.2

4.3.10 Warranties 2.3.1.3.k, 2.3.2

4.3.11 Transportation &

Ferry 2.3.1.3.l, 2.3.2

4.3.12 Config Mgt 2.3.1.3.m, 2.3.2

4.3.13 AME 2.3.1.3.n, 2.3.2

4.3.14 CDRL 2.3.1.3.p, 2.3.2

4.3.15 Data Rights 2.3.1.3.q, 2.3.2

4.3.15.1 Pre-Award ID &

Assertion 3.0

4.3.15.2 Post Award Data 3.0

4.3.16 UID 1.1, 3.0

4.3.17 Subcontractor

Proposals/ACAs 3.0

4.4 GTD 2.3.1.4, 2.3.2

4.4.1 GTD SOO/PWS 2.3.1.4, 2.3.2

4.4.2 GTD CLS PWS 2.3.1.4, 2.3.2

4.4.3 GTD Specs 2.3.1.4, 2.3.2

4.4.4 RESERVED N/A

4.5 Vol I Tab E Subfactor

1.5 Air Adv Tng

2.3.1.5, 2.3.2

5 Vol II Past Performance 1.1, 1.5, 2.1, 2.2, 2.4 (All)

5.1 Past Perf General 2.4, 2.4.1

5.1.1 Relevance & Recency 2.4, 2.4.2. 2.4.3

5.2 Problem Resolution

Descriptions 2.4.3

5.3 Org Structure Change

History 2.4

(RCRM)

Contractor to fill in and submit with Proposal

FA8637-10-R-6000-0008

Section L, Attachment 1, Amendment 8

30 April 2012

Section L, Paragraph # Section M Evaluation

Factors

Proposal Reference with

Page and paragraph #

SOO, PWS short title to requirement and page, paragraph #

Contractor SOW or PWS page and paragraph #

CDRL CLIN

5.4 Format 2.4

5.5 Marking 2.4

6 Vol III Price 1.1. 2.5

6.1.1 Pricing Instructions 2.5.1

6.1.2 Reserved N/A

6.1.3 Price Info 2.5.1

6.1.4 Cost or Pricing Info

Rqmts 2.5.1

6.1.5 Rounding/Currency

/Inflation 2.5.1

6.1.6 Eval Qty 2.5.1

6.1.7 Eval Price 2.5.1.3

6.1.8 EP Workbook 2.5.1.3

6.1.8.1 Add'l Worksheets 2.5.1.3

6.1.8.2 Instr/Examples 2.5.1.3

6.2 Price Vol Org 2.5.1

6.2.1 Submittal Rqmts 2.5.1

6.3 Other Notes 2.5.1

7. Contract Volume 3.0

7.1 Model Contract/Reps &

Certs 1.1, 3

7.1.1 Sec A Solict/Contract

Form 3.0

7.1.2 Sec B Supplies or

Services and Prices/Costs 3.0

7.1.3 Sec C

Description/Specs/Work

Statement

3.0

7.1.4 Sec D Pkg/Marking 3.0

(RCRM)

Contractor to fill in and submit with Proposal

FA8637-10-R-6000-0008

Section L, Attachment 1, Amendment 8

30 April 2012

Section L, Paragraph # Section M Evaluation

Factors

Proposal Reference with

Page and paragraph #

SOO, PWS short title to requirement and page, paragraph #

Contractor SOW or PWS page and paragraph #

CDRL CLIN

7.1.5 Sec E Insp/Accep 3.0

7.1.6 Sec F Deliveries or

Performance 3.0

7.1.7 Sec G Contract Admin

Data 3.0

7.1.8 Sec H Special

Contract Reqmts 3.0

7.1.9 Sec I Contract Clauses 3.0

7.1.10 Sec J Contract

Attachments 3.0

7.1.11 Sec K Reps/Certs

Statement of Offerors 3.0

7.1.11.1 Meet All Rqmts 3.0

7.2 Table of Contents 3.0

7.3 Other Info Reqd 3.0

7.3.1 Auth Offeror

Personnel 3.0

7.3.2 Govt Offices 3.0

7.3.3 Company Address 3.0

7.3.4 Non Govt Advisors 3.0

7.3.5 Data Rights List 3.0

7.3.6 Exceptions to T & C 3.0

8. Vol V Contract Atch's 3.0

8.1 Applicable Docs 3.0

8.2 Exhibits 3.0

8.3 Section J Atchs Not Evaluated

8.3.1 Atch 1 Acft Spec 3.0

8.3.2 Atch 2 CBT GTD Spec 3.0

(RCRM)

Contractor to fill in and submit with Proposal

FA8637-10-R-6000-0008

Section L, Attachment 1, Amendment 8

30 April 2012

Section L, Paragraph # Section M Evaluation

Factors

Proposal Reference with

Page and paragraph #

SOO, PWS short title to requirement and page, paragraph #

Contractor SOW or PWS page and paragraph #

CDRL CLIN

8.3.3 Atch 3 BATD GTD

Spec 3.0

8.3.4 Atch 4 FTD GTD Spec 3.0

8.3.5 Atch 5 Acft SOW 3.0

8.3.6 Atch 6 GTD SOW 3.0

8.3.7 Atch 7 CONUS ICS

PWS

3.0

8.3.8 Atch 8 OCONUS ICS

PWS

3.0

8.3.9 Atch 9 CBT CLS PWS 3.0

8.3.10 Atch 10 BATD CLS

PWS

3.0

8.3.11 Atch 11 FTD CLS

PWS

3.0

8.3.12 Atch 12 Air Adv Pilot

Trng PWS 3.0

8.3.13 Atch 13 Air Adv

Maint Trng PWS 3.0

8.3.14 Atch 14 MIL-HDBK-

516B, Change 1 3.0

8.3.15 Atch 15 Alternate

Mission Equipment (AME) 3.0

8.3.16 Atch 16 Contractor

Reps and Certs 3.0

8.3.17 Atch 17 Contractor

Supplied Warranties 3.0

8.3.18 Atch 18 Contractor

Subcontracting Plan 3.0

(RCRM)

Contractor to fill in and submit with Proposal

FA8637-10-R-6000-0008

Section L, Attachment 1, Amendment 8

30 April 2012

Section L, Paragraph # Section M Evaluation

Factors

Proposal Reference with

Page and paragraph #

SOO, PWS short title to requirement and page, paragraph #

Contractor SOW or PWS page and paragraph #

CDRL CLIN

8.3.19 Atch 19 Contract

WBS

3.0

8.3.20 Atch 20 Acft and

GTD Insp and Test Plan 3.0

8.3.21 Atch 21 Reserved N/A

8.3.22 Atch 22 Contractor

IMP

3.0

8.3.23 Atch 23 Contractor

ACA

3.0

8.3.24 Atch 24 DD254 3.0

8.3.25 Atch 25 Haz

Material 3.0

8.3.26 Atch 26 Reserved

for ECPs Not Evaluated

8.3.27 Atch 27 Reserved

for Over & Above Not Evaluated

8.3.28 Atch 28 Reserved

for Special Studies Not Evaluated

8.3.29 Reserved Not Evaluated

8.3.30 Reserved Not Evaluated

8.3.31 Atch 31 Delivered

Acft Config 3.0

8.3.32 Atch 32 Cert of

Service Not Evaluated

8.3.33 Atch 33 Ltr of

Completion Not Evaluated

8.3.34 Atch 34 Summary

Pricing for IDIQ 3.0

8.3.35 Atch 35 Proposal

Adequacy Checklist Not Evaluated

8.3.36 Reserved Not Evaluated

8.3.37 Reserved Not Evaluated

9. Vol VI Supporting Docs According to topic

Other files

File Type Posted
5_-_Section_L_-_FINAL_Attachment_5_SOO_for_AC_ _GTD_(Afghan_D.O.)_-_Amendment_0010.pdf PDF
Section_J_-_FINAL_Attachment_34_Summary_Pricing_for_IDIQ_Contract_(29_May_2012)_-_Amendment_10.pdf PDF
Amendment_10 1 .pdf PDF
FA8637-10-R-6000-0009.pdf PDF
Section_L_-_FINAL_Attachment_04_LAS_SOO_for_LAS_Aircraft_and_GTD_(Basic_Contract)_--_(18_May_2012)_-_Amendment_9.pdf PDF
Section_L_-_FINAL_Attachment_05_SOO_for_AC_ _GTD_(Afghan_D.O.)_-_Amendment_0009.pdf PDF
Section_L_-_FINAL_Attachment_10_PWS_for_Air_Advisor_Pre-Deployment_Pilot_Maintenance_Training_(18_May_12)_-_Amendment 9.pdf PDF
(Section J Exhibit B-CDRL -B) Training CDRLs Final —
(Section J Exhibit A-CDRL -A) Administrative CDRLs Final —
Section L - FINAL Instructions to Offers Amendment 0009.pdf PDF
Section_L_-_FINAL_Attachment_09_PWS_for_OCONUS_Contractor_Logistics_Support_(CLS)_for_GTDs_--_(18_May_2012)_-_Amendment_9.pdf PDF
Section_J_-_FINAL_Attachment_34_Summary_Pricing_for_IDIQ_Contract_(18_May_2012)_-_Amendment_9.pdf PDF
Section_L_-_FINAL_Attachment_07_PWS_for_CONUS_Stationed_LAS_Aircraft_ICS_--_(18_May_2012)_-_Amendment_9.pdf.pdf PDF
Section L - Final Attachment 06 Model Delivery Order.pdf PDF
FA8637-12-D-6002 21 May 2012.pdf PDF
Section_L_-_FINAL_Attachment_08_PWS_for_OCONUS_Stationed_LAS_Aircraft_ICS_ _Maintenance_Training_--_(18_May_2012)_-_Amendment_9.pdf PDF
(Section J Exhibit C-CDRL -C) Sustainment CDRLs Final —
18 - Section L - FINAL Attachment 18 Past Performance Client Authorization Letter —
04 - Section L - FINAL Attachment 4 LAS SOO for LAS Aircraft and GTD —
24 - Section J - FINAL Attachment 24 DD254 - Amendment 8.pdf PDF
34 - Section J - FINAL Attachment 34 Summary Pricing for IDIQ Contract —
16 - Section L - FINAL Attachment 16 Past Performance Questionnaire —
C - Section J - FINAL Exhibit C-CDRL - Sustainment CDRLs —
00 - Section L - Instructions To Offerors —
21 - Section L - FINAL Attachment 21 Evaluation Price —
00 - Section M - Evaluation Factors for Award —
29 - Section L - FINAL Attachment 29 Model Contract Clauses to be filled-in by Contractor —
17 - Section L - FINAL Attachment 17 Past Performance Questionnaire Transmittal Letter —
FA8637-10-R-6000 0008.pdf PDF
FA8637-12-D-6002 LAS MODEL CONTRACT - As of Amendment 8.pdf PDF
22 - Section L - FINAL Attachment 22 Sample Evaluation Price —
15 - Section L - FINAL Attachment 15 Past Performance Facts Sheet —
07 - Section L - FINAL Attachment 7 PWS for CONUS Stationed LAS Aircraft ICS -- —
23 - Section L - FINAL Attachment 23 CEO Certification —
08 - Section L - FINAL Attachment 8 PWS for OCONUS Stationed LAS Aircraft ICS Maintenance Training -- —
20 - Section L - FINAL Attachment 20_Evaluation Price —
05 - Section L - FINAL Attachment 5 SOO for LAS Aircraft and GTDs —
09 - Section L - FINAL Attachment 9 PWS for OCONUS Contractor Logistics Support —
Amend 0008 Cover Letter.pdf PDF
A - Section J - FINAL Exhibit A-CDRL- Administrative CDRLs —
B - Section J - FINAL Exhibit B-CDRL - Training CDRLs —
06 - Section L - FINAL Attachment 6 Model Delivery Order - Amendment 8.pdf PDF
LAS Section M -- 09 June 11 - Amendment 7.pdf PDF
Section L - Attachment 4 LAS SOO for LAS Aircraft and GTD —
LAS Section L -- 09 June 11 - Amendment 7.pdf PDF
FA8637-10-R-6000-0007.pdf PDF
(Section J Exhibit B-CDRL-B) Training CDRL —
Section L - Attachment 9 PWS for OCONUS Contractor Logistics Support —
Section L - Attachment 7 Performance Work Statement —
FA8637-10-R-6000-0006.pdf PDF
Show 40 more

Latest 50 of 207 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .