20 - Section L - FINAL Attachment 20_Evaluation Price
197 KB Posted
- Attached to
- Light Air Support (LAS) Aircraft
- Solicitation number
- FA8637-10-R-6000
About this file
Section L - FINAL Attachment 20_Evaluation Price (EP) Workbook (30 April 2012) - Amd8
Text of this file
FA8637-10-R-6000-0008
Section L, Attachment 20
30 April 2012
Overall assumptions for puposes of developing an evaluated price
- One customer - FMS
Two OCONUS locations: Shindand and Kandahar, Afghanistan
- One initial base stand up per base and one site survey per base
- Each ferried aircraft arrives at the beginning of the month it is delivered
- All prices shall be identical to those stated in Section J, Attachment 34
- ICS is calculated as follows: CLIN xx09, OCONUS Aircraft ICS/month/aircraft FY unit cost TIMES the number of applicable FY aircraft months in a 12-month period
-The offeror-provided delivery schedule determines when the 12-month ICS period begins
- The offeror shall adjust the FY months formulas on the Customer 1 Aircraft ICS worksheet to align with offeror's proposed aircraft delivery schedule
- Interim Contractor Support (ICS) support for each aircraft begins at the beginning of the month that the aircraft is delivered
- GTD CLS is calculated similarly to Aircraft ICS:
-The offeror-provided delivery schedule determines when the 12 month CLS period begins
- The offeror shall adjust the FY months formulas on the Customer 1 GTD CLS worksheet to align with offeror's proposed GTD delivery schedule
- Alternate Mission Equipment (AME) and ICS Long Lead are ordered with the aircraft
- No Government Furnished Equipment (GFE) will be provided to the prime contractor or subcontractor. The Contractor is responsible for procuring all required goods & services.
- Contractor is responsible for all transportation costs for all goods and services
- AVPOL shall be provided by the US Government once aircraft are received on station; costs for AVPOL need not be included as part of proposed ICS/CLS Costs.
Overall Assumptions
30 April 2012
Order/ Delivery Schedules
O N D Jan F M A M J J A S O N D Jan F M A M J J A S O N D Jan
Customer 1 Order 20
Shindand Delivery
Kandahar Delivery
FMS 1 CBT 1
FMS 1 BATD 1
FMS 1 FTD 1
Order =
Ferry =
Delivery =
GTD Operational =
Assumes: (Offeror shall enter data used for each assumption)
# months production time for aircraft
# months ferry time for FMS aircraft
# months production time for GTD
# months GTD set-up time
FY13 FY14 FY15
Schedule Data
30 April 2012
Customer 1 Order
Shindand Delivery
Kandahar Delivery
FMS 1 CBT
FMS 1 BATD
FMS 1 FTD
Ferry =
Delivery =
GTD Operational =
Assumes:
F M A M J J A S
FY15
30 April 2012
Customer 1 Order
Shindand Delivery
Kandahar Delivery
FMS 1 CBT
FMS 1 BATD
FMS 1 FTD
Ferry =
Delivery =
GTD Operational =
Assumes:
O N D Jan F M A M J J A S O N D Jan F M A M J J A S
FY16 FY17
30 April 2012
Section 1
Customer 1 Evaluation Quantities (EQ)/Assumptions FY13 FY14 FY15 FY16 FY17
1 Buy 20 ea combat configured aircraft in Jan FY13 (1st order) 20
2 OCONUS ICS Long Lead (1 lot for both Shindand and Kandahar) 1
3 1 Base activation for Shindand AB
4 1 Site survey for Shindand AB
5 1 Base activation for Kandahar AB
6 1 Site survey for Kandahar AB
7 Air Advisor Pilot training = 6 classes per year for 1 yr
8 Air Advisor Maint training = 5 classes per year for 1 yr
9 ICS $/Month for 0 to 60 fly hrs/aircraft/month
10 Operational hours for GTD CLS support = 312 hrs/device/month
11 Mission Planning Station(s) ordered in Jan FY13 6
12 Mission Debrief Station(s) ordered in Jan FY13 6
13 Ferry Schedule
14 CBTs required = 1 ea at Shindand AB 1
15 BATDs required = 1 ea at Shindand AB 1
16 FTDs required = 1 ea at Shindand AB 1
17 AME- External Fuel Tank and Mated Pylon (with fairing) 4
18 AME-Travel Pod 20
19 AME- Weapon Pylon (with fairing as applicable) 40
20 AME- Flare/Chaff Magazine 16
21 AME- Flare/Chaff Cover 40
22 AME- Machine Gun Magazine 16
23 AME- Machine Gun Port Cover 40
24 AME- EO/IR Imaging Sensor Port Cover (if applicable) 20
25 AME- HUD Laser Range Finder Cover 20
26 AME- Pilot IFR Practice Shield/Cover 4
27 AME- Illumination Flare Dispenser 20
28 AME- 50 Cal Machine Gun 8
29 AME- 2.75" (70mm) Folding Fin Rocket Pod 40
30 LAS Flight Certification to USAF MTC Standards X
Execution Profile
Customer 1 Price
30 April 2012
Section 2
LAS Aircraft FY13 FY14 FY15 FY16 FY17 Total
Aircraft Unit Price
EQ 20
Aircraft Price 0 0
AME- External Fuel Tank and Mated Pylon (with fairing) FY13 FY14 FY15 FY16 FY17 Total
Price per external fuel tank
EQ 4
External Fuel Tank Price 0 0
AME-Travel Pod FY13 FY14 FY15 FY16 FY17 Total
Price per travel pod
EQ 20
Travel Pod Price 0 0
AME- External Fuel Tank and Mated Pylon (with fairing) FY13 FY14 FY15 FY16 FY17 Total
Price per pylon
EQ 40
Weapon Pylon Price 0 0
30 April 2012
AME- Flare/Chaff Magazine FY13 FY14 FY15 FY16 FY17 Total
Price per magazine
EQ 16
Flare/Chaff Magazine Price 0 0
AME- Flare/Chaff Cover FY13 FY14 FY15 FY16 FY17 Total
Price per cover
EQ 40
Flare/Chaff Cover Price 0 0
AME- Machine Gun Magazine FY13 FY14 FY15 FY16 FY17 Total
Price per magazine
EQ 16
Machine Gun Magazine Price 0 0
AME- Machine Gun Port Cover FY13 FY14 FY15 FY16 FY17 Total
Price per cover
EQ 40
Machine Gun Port Cover Price 0 0
AME- EO/IR Imaging Sensor Port Cover (if applicable) FY13 FY14 FY15 FY16 FY17 Total
Price per cover
EQ 20
EO/IR Imaging Sensor Port Cover Price 0 0
30 April 2012
AME- HUD Laser Range Finder Cover FY13 FY14 FY15 FY16 FY17 Total
Price per cover
EQ 20
HUD Laser Range Finder Cover Price 0 0
AME- Pilot IFR Practice Shield/Cover FY13 FY14 FY15 FY16 FY17 Total
Price per shield/cover
EQ 4
Pilot IFR Practice Shield/Cover Price 0 0
AME- Illumination Flare Dispenser FY13 FY14 FY15 FY16 FY17 Total
Price per dispenser
EQ 20
Illumination Flare Dispenser Price 0 0
AME- 50 Cal Machine Gun FY13 FY14 FY15 FY16 FY17 Total
Price per gun
EQ 8
50 Cal Machine Gun Price 0 0
AME- 2.75" (70mm) Folding Fin Rocket Pod FY13 FY14 FY15 FY16 FY17 Total
Price per pod
EQ 40
2.75" (70mm) Folding Fin Rocket Pod Price 0 0
30 April 2012
Mission Planning Stations FY13 FY14 FY15 FY16 FY17 Total
Mission Planning Stations Unit Price
EQ 6
Mission Planning Stations Price 0 0
Mission Debrief System FY13 FY14 FY15 FY16 FY17 Total
Mission Debrief System Unit Price
EQ 6
Mission Debrief System Price 0 0
Contractor Ferry Afghanistan FY13 FY14 FY15 FY16 FY17 Total
Contractor Ferry Afghanistan Unit Price
EQ 0 0 0 0 0
Contractor Ferry Afghanistan Price 0 0 0 0 0 0
30 April 2012
OCONUS ICS Long Lead FY13 FY14 FY15 FY16 FY17 Total
ICS Long Lead Price/Lot
EQ (# Lots) 1
ICS Long Lead Price 0 0
OCONUS ICS Base Activation FY13 FY14 FY15 FY16 FY17 Total Price per base activation
EQ
ICS Base Activation Price 0 0 0 0 0
OCONUS Aircraft ICS (Shindand) FY13 FY14 FY15 FY16 FY17 FY18 Total
OCONUS Aircraft ICS
Aircraft ICS Price 0 0 0 0 0
OCONUS Aircraft ICS (Kandahar) FY13 FY14 FY15 FY16 FY17 FY18 Total
OCONUS Aircraft ICS
Aircraft ICS Price 0 0 0 0 0
Air Advisor Pilot Training FY13 FY14 FY15 FY16 FY17 Total Price per class
EQ
Pilot Training Price 0 0 0
Air Advisor Maintainer Training FY13 FY14 FY15 FY16 FY17 Total Price per class
EQ
Maintainer Training Price 0 0 0
Computer Based Trainer (CBT), GTD FY13 FY14 FY15 FY16 FY17 Total
Price per unit
EQ 1
30 April 2012
CBT Price 0 0
Basic Aviation Training Device (BATD), GTD FY13 FY14 FY15 FY16 FY17 Total
Price per unit
EQ 1
BATD Price 0 0
Flight Training Device (FTD), GTD FY13 FY14 FY15 FY16 FY17 Total
Price per unit
EQ 1
FTD Price 0 0
30 April 2012
CBT GTD CLS FY13 FY14 FY15 FY16 FY17 Total
Price per month per CBT system
CBT GTD CLS Price 0 0 0 0 0
BATD GTD CLS FY13 FY14 FY15 FY16 FY17 Total
Price per month per CBT system
BATD GTD CLS 0 0 0 0 0
FTD GTD CLS FY13 FY14 FY15 FY16 FY17 Total
Price per month per CBT system
FTD GTD CLS 0 0 0 0 0
OCONUS Site Survey (SS) FY13 FY14 FY15 FY16 FY17 Total
Price per location
EQ
Site Survey Price 0 0 0 0 0
LAS Flight Certification to USAF MTC Standards FY13 FY14 FY15 FY16 FY17 Total
Price per certification
EQ 1
LAS Flight Certification Price 0 0
30 April 2012
Section 3
YOUR CUSTOMER 1 PRICE 0
30 April 2012
Shindahand Delivery FY13
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
Deliveries 0
Cum Deliveries 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ICS periods per a/c delivery
ICS Support Months by FY order Total aircraft months for first ICS order
Kandahar Delivery FY13
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
Deliveries 0
Cum Deliveries 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ICS periods per a/c delivery
ICS Support Months by FY order
Total aircraft months for first ICS order
ICS begins@ 1st A/C Delivery =
2nd 12 month ICS period =
3rd 12 month ICS period =
4th 12 month ICS period =
Offeror shall enter delivery schedule in blue-shaded areas
Offeror shall adjust color-coded 12-month CLS periods to align with Offeror's proposed delivery schedule
Customer 1 Aircraft ICS
30 April 2012
Shindahand Delivery
Deliveries
Cum Deliveries ICS periods per a/c delivery
ICS Support Months by FY order
Kandahar Delivery
Deliveries
Cum Deliveries ICS periods per a/c delivery
ICS Support Months by FY order
Mar
FY14 aircraft months
FY15 aircraft months
Total aircraft months for first ICS order
Mar
FY14 aircraft months
FY15 aircraft months
Total aircraft months for first ICS order
Offeror shall adjust color-coded 12-month CLS periods to align with Offeror's proposed delivery schedule
30 April 2012
Shindahand Delivery
Deliveries
Cum Deliveries ICS periods per a/c delivery
ICS Support Months by FY order
Kandahar Delivery
Deliveries
Cum Deliveries ICS periods per a/c delivery
ICS Support Months by FY order
FY14 FY15
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
FY14 aircraft months 0 FY15 aircraft months
FY15 aircraft months 0 FY16 aircraft months
Total aircraft months for first ICS order 0 Total aircraft months for 2nd ICS order
FY14 FY15
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
FY14 aircraft months 0 FY15 aircraft months
FY15 aircraft months 0 FY16 aircraft months
Total aircraft months for first ICS order 0 Total aircraft months for 2nd ICS order
Offeror shall adjust color-coded 12-month CLS periods to align with Offeror's proposed delivery schedule
30 April 2012
Shindahand Delivery
Deliveries
Cum Deliveries ICS periods per a/c delivery
ICS Support Months by FY order
Kandahar Delivery
Deliveries
Cum Deliveries ICS periods per a/c delivery
ICS Support Months by FY order
FY16
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
0 0 0 0 0 0 0 0 0 0 0 0 0
0 FY16 aircraft months
0 FY17 aircraft months
0 Total aircraft months for 3rd ICS order
FY16
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
0 0 0 0 0 0 0 0 0 0 0 0 0
0 FY16 aircraft months
0 FY17 aircraft months
0 Total aircraft months for 3rd ICS order
30 April 2012
Shindahand Delivery
Deliveries
Cum Deliveries ICS periods per a/c delivery
ICS Support Months by FY order
Kandahar Delivery
Deliveries
Cum Deliveries ICS periods per a/c delivery
ICS Support Months by FY order
FY17
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
0 0 0 0 0 0 0 0 0 0 0 0 0
0 FY17 aircraft months
0 FY18 aircraft months
0 Total aircraft months for 4th ICS order
FY17
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
0 0 0 0 0 0 0 0 0 0 0 0 0
0 FY17 aircraft months
0 FY18 aircraft months
0 Total aircraft months for 4th ICS order
30 April 2012
Shindahand Delivery
Deliveries
Cum Deliveries ICS periods per a/c delivery
ICS Support Months by FY order
Kandahar Delivery
Deliveries
Cum Deliveries ICS periods per a/c delivery
ICS Support Months by FY order
FY18
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
FY18
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
30 April 2012
Page 20 of 26Customer 1 - CBT FY13
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Total Oct Nov Dec Jan Feb
Deliveries 0
Cum Deliveries 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CLS periods per GTD delivery
FY14 GTD months
FY15 GTD months
CLS Support Months by FY order Total GTD months for first CLS order
Customer 1 - BATD FY13
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Total Oct Nov Dec Jan Feb
Deliveries 0
Cum Deliveries 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CLS periods per GTD delivery
FY14 GTD months
FY15 GTD months
CLS Support Months by FY order Total GTD months for first CLS order
Customer 1 - FTD FY13
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Total Oct Nov Dec Jan Feb
Deliveries 0
Cum Deliveries 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CLS periods per GTD delivery
FY14 GTD months
FY15 GTD months
CLS Support Months by FY order Total GTD months for first CLS order
CLS begins@ 1st system delivery =
2nd 12 month CLS period =
3rd 12 month CLS period =
4th 12 month CLS period =
Offeror shall enter delivery schedule in blue-shaded areas
Offeror shall adjust color-coded 12-month CLS periods to align with Offeror's proposed delivery schedule
Customer 1 GTD CLS
30 April 2012
Page 21 of 26Customer 1 - CBT
Deliveries
Cum Deliveries CLS periods per GTD delivery
CLS Support Months by FY order
Customer 1 - BATD
Deliveries
Cum Deliveries CLS periods per GTD delivery
CLS Support Months by FY order
Customer 1 - FTD
Deliveries
Cum Deliveries CLS periods per GTD delivery
CLS Support Months by FY order
Offeror shall enter delivery schedule in blue-shaded areas
Offeror shall adjust color-coded 12-month CLS periods to align with Offeror's proposed delivery schedule
FY14
Mar Apr
0 0
FY14 GTD months
FY15 GTD months
Total GTD months for first CLS order
FY14
Mar Apr
0 0
FY14 GTD months
FY15 GTD months
Total GTD months for first CLS order
FY14
Mar Apr
0 0
FY14 GTD months
FY15 GTD months
Total GTD months for first CLS order
Offeror shall adjust color-coded 12-month CLS periods to align with Offeror's proposed delivery schedule
30 April 2012
Page 22 of 26Customer 1 - CBT
Deliveries
Cum Deliveries CLS periods per GTD delivery
CLS Support Months by FY order
Customer 1 - BATD
Deliveries
Cum Deliveries CLS periods per GTD delivery
CLS Support Months by FY order
Customer 1 - FTD
Deliveries
Cum Deliveries CLS periods per GTD delivery
CLS Support Months by FY order
Offeror shall enter delivery schedule in blue-shaded areas
Offeror shall adjust color-coded 12-month CLS periods to align with Offeror's proposed delivery schedule
FY14 FY15
May Jun Jul Aug Sep Total Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 FY15 GTD months 0
0 FY16 GTD months 0
0 Total GTD months for 2nd CLS order 0
FY14 FY15
May Jun Jul Aug Sep Total Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 FY15 GTD months 0
0 FY16 GTD months 0
0 Total GTD months for 2nd CLS order 0
FY14 FY15
May Jun Jul Aug Sep Total Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 FY15 GTD months 0
0 FY16 GTD months 0
0 Total GTD months for 2nd CLS order 0
Offeror shall adjust color-coded 12-month CLS periods to align with Offeror's proposed delivery schedule
30 April 2012
Page 23 of 26Customer 1 - CBT
Deliveries
Cum Deliveries CLS periods per GTD delivery
CLS Support Months by FY order
Customer 1 - BATD
Deliveries
Cum Deliveries CLS periods per GTD delivery
CLS Support Months by FY order
Customer 1 - FTD
Deliveries
Cum Deliveries CLS periods per GTD delivery
CLS Support Months by FY order
Offeror shall enter delivery schedule in blue-shaded areas
Offeror shall adjust color-coded 12-month CLS periods to align with Offeror's proposed delivery schedule
FY16
Total Oct Nov Dec Jan Feb Mar Apr
0 0 0 0 0 0 0 0
FY16 GTD months
FY17 GTD months
Total GTD months for 3rd CLS order
FY16
Total Oct Nov Dec Jan Feb Mar Apr
0 0 0 0 0 0 0 0
FY16 GTD months
FY17 GTD months
Total GTD months for 3rd CLS order
FY16
Total Oct Nov Dec Jan Feb Mar Apr
0 0 0 0 0 0 0 0
FY16 GTD months
FY17 GTD months
Total GTD months for 3rd CLS order
30 April 2012
Page 24 of 26Customer 1 - CBT
Deliveries
Cum Deliveries CLS periods per GTD delivery
CLS Support Months by FY order
Customer 1 - BATD
Deliveries
Cum Deliveries CLS periods per GTD delivery
CLS Support Months by FY order
Customer 1 - FTD
Deliveries
Cum Deliveries CLS periods per GTD delivery
CLS Support Months by FY order
Offeror shall enter delivery schedule in blue-shaded areas
Offeror shall adjust color-coded 12-month CLS periods to align with Offeror's proposed delivery schedule
FY16 FY17
May Jun Jul Aug Sep Total Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 FY17 GTD months 0
0 FY18 GTD months 0
0 Total GTD months for 4th CLS order 0
FY16 FY17
May Jun Jul Aug Sep Total Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 FY17 GTD months 0
0 FY18 GTD months 0
0 Total GTD months for 4th CLS order 0
FY16 FY17
May Jun Jul Aug Sep Total Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 FY17 GTD months 0
0 FY18 GTD months 0
0 Total GTD months for 4th CLS order 0
30 April 2012
Page 25 of 26Customer 1 - CBT
Deliveries
Cum Deliveries CLS periods per GTD delivery
CLS Support Months by FY order
Customer 1 - BATD
Deliveries
Cum Deliveries CLS periods per GTD delivery
CLS Support Months by FY order
Customer 1 - FTD
Deliveries
Cum Deliveries CLS periods per GTD delivery
CLS Support Months by FY order
Offeror shall enter delivery schedule in blue-shaded areas
Offeror shall adjust color-coded 12-month CLS periods to align with Offeror's proposed delivery schedule
FY18
Total Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Total
0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
FY18
Total Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Total
0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
FY18
Total Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Total
0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
30 April 2012
Page 26 of 26Calculation of Evaluated Price
Your Customer 1 Price 0
Your Evaluated Price 0
Your Evaluation Price
Other files
Show 40 more
Latest 50 of 207 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .