F2AST_Capabilities_Matrix_Spec_29Jan08Rev1.xls
XLS spreadsheet 51 KB Posted
- Solicitation number
- FA8530-08-R-21758
About this file
RFP Attachments 4 and 5 Rev 1 (Capabilities Matrix Specification)
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Capabilities_Matrix
| Capabilities | Development | Modifications | Maintenance | Instructions | |
| Certifications | AS 9100 Rev B | A1 | A1 | A1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide face page of certification (including date and identity of certified entity), and signature page for each |
| ISO 9001:2000 | B1 | B1 | B1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide full copy of certification for each | |
| CMMI 3 -SEI | C1 | C1 | C1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide full copy of certification for each | |
| NDI Qualified | D1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide current number of Level II certified personnel, type of certification/capabilities/qualifications held, and effective date for each | |||
| Ground Engine Run Qualified | E1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide current number of qualified personnel, type of certification/capabilities/qualifications held, and effective date for each | |||
| Aircraft Alignment & Symmetry/Wing Joint Planarity Check Qualified | F1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide current number of qualified personnel, type of certification/capabilities/qualifications held, and effective date for each | |||
| Fastener Hole Cold-work Qualified | L1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide current number of qualified personnel, type of certification/capabilities/qualifications held, and effective date for each | |||
| Facilities | Hangar | G1 | G1 | G1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide spec for hangar including location and equipment list for each |
| Space Available for Gov't Personnel | G1.1 | G1.1 | G1.1 | Identify Prime and/or Subcontractor(s) that possess required space | |
| C-130 Peculiar Ground Handling Equipment | G1.2 | G1.2 | G1.2 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide completed C-130 Peculiar GHE spreadsheet (RFP Attach 6) for each | |
| Storage | G1.3 | G1.3 | G1.3 | ||
| Aircraft Parts & Data | G1.3.1 | G1.3.1 | G1.3.1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description, square footage, and location of storage space for each | |
| Shelf Space | G1.3.2 | G1.3.2 | G1.3.2 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description, square footage, and location of shelf space for each | |
| Wash Rack | G1.4 | G1.4 | G1.4 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide wash rack spec for each | |
| Backshops | G1.5 | G1.5 | G1.5 | ||
| Aircraft Weighing | G1.5.1 | G1.5.1 | G1.5.1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description of weighing facilities for each | |
| Battery | G1.5.2 | G1.5.2 | G1.5.2 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description of battery facility for each | |
| Brakes and Tire/Wheel | G1.5.3 | G1.5.3 | G1.5.3 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide list of equipment and tools for each | |
| Electrical | G1.5.4 | G1.5.4 | G1.5.4 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description of electrical shop for each | |
| Fuel | G1.5.5 | G1.5.5 | G1.5.5 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement, provide description of capabilities and facilities including square footage and location for each | |
| Fuel & Oil | G1.5.5.1 | G1.5.5.1 | G1.5.5.1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement, provide description of capabilities and facilities including capacity and location for each | |
| Hydraulic | G1.5.6 | G1.5.6 | G1.5.6 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement, provide description of hydraulic shop and location for each | |
| Oxygen | G1.5.7 | G1.5.7 | G1.5.7 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement, provide description including location for each | |
| Control Tower (Unicom Freq) | G1.6 | G1.6 | G1.6 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description for each | |
| Runway | G1.7 | G1.7 | G1.7 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide spec and location of runway for each | |
| Ramp Space | G1.8 | G1.8 | G1.8 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide spec and location of ramp space for each | |
| Lighting, Electricity, & Compressed Air | G1.8.1 | G1.8.1 | G1.8.1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description including location for each | |
| Paint/Depaint Facility | H1 | H1 | H1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide spec and location for each | |
| Space Available for Gov't Personnel | G1.1 | G1.1 | G1.1 | Identify Prime and/or Subcontractor(s) that possess required space for each | |
| C-130 Peculiar Ground Handling Equipment | G1.2 | G1.2 | G1.2 | Provide completed C-130 Peculiar GHE spreadsheet by Prime and/or Subcontractor(s) for each | |
| Wash Rack | G1.4 | G1.4 | G1.4 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide wash rack spec for each | |
| Backshops | G1.5 | G1.5 | G1.5 | ||
| Fuel | G1.5.5 | G1.5.5 | G1.5.5 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement, provide description of capabilities and facilities including square footage and location for each | |
| Fuel & Oil | G1.5.5.1 | G1.5.5.1 | G1.5.5.1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement, provide description of capabilities and facilities including capacity and location for each | |
| Oxygen | G1.5.7 | G1.5.7 | G1.5.7 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement, provide description including location for each | |
| Control Tower (Unicom Freq) | G1.6 | G1.6 | G1.6 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description for each | |
| Runway | G1.7 | G1.7 | G1.7 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide spec and location of runway for each | |
| Ramp Space | G1.8 | G1.8 | G1.8 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide spec and location of ramp space for each | |
| Lighting, Electricity, & Compressed Air | G1.8.1 | G1.8.1 | G1.8.1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description including location for each | |
| All Facilities | I1 | I1 | I1 | ||
| Fire Suppression | I1.1 | I1.1 | I1.1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide face page (including date and identification of entity) and signature page of Fire Suppression Plan for all facilities used to complete the Minimum Capability Matrix | |
| Processes | Workload Planning & Scheduling | K1 | K1 | K1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description of system for each |
| Parts Ordering/Handling | M1 | M1 | M1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description of system for each | |
| FOD and Tool Control Plan | N1 | N1 | N1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide face page (including date and identification of entity) and signature page of plan for all facilities used to complete the Minimum Capabilities Matrix | |
| Hazardous Material Management Plan | O1 | O1 | O1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide face page (including date and identification of entity) and signature page of plan for all facilities used to complete the Minimum Capabilities Matrix | |
| Severe Weather Plan | P1 | P1 | P1 | Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide face page (including date and identification of entity) and signature page of plan for all facilities used to complete the Minimum Capabilities Matrix | |
| Note: L1 was moved from processes to certifications & J1 was omitted intentionally. | |||||
| Contractor Name | Status | ||||
| 1 | Prime | ||||
| 2 | Subcontractor | ||||
| 3 | Subcontractor | ||||
| 4 | Subcontractor | ||||
| 5 | Subcontractor | ||||
| 6 | Subcontractor | ||||
| 7 | Subcontractor | ||||
| 8 | Subcontractor | ||||
| 9 | Subcontractor | ||||
| 10 | Subcontractor | ||||
| 11 | Subcontractor | ||||
| 12 | Subcontractor | ||||
| 13 | Subcontractor | ||||
| Instructions: | |||||
| 1 | Delete reference information in each cell (Example: A1) | ||||
| 2 | Complete each cell by inputting the assigned # (from above table) of the Prime and/or Subcontractor(s) that provide that capability. | ||||
| 3 | Each cell must have at least one input (Example: 1 or 1,3,5,etc.). | ||||
| 4 | This spreadsheet may not be modified in any fashion. (Only populate cells under each category.) |
&LMinimum Capabilities Matrix (Rev 1)&CRFP FA8530-08-R-21758&RRFP Attachment 4
Capabilities_Specification
| Specification | Capability | Type | Breakout | Requirement |
| A1 | Certification | AS 9100 Rev B | The Offeror shall possess a current AS 9100 Rev B registered certification. | |
| B1 | Certification | ISO 9001:2000 | The Offeror shall possess a current ISO 9001:2000 registered certification. | |
| C1 | Certification | CMMI 3 -SEI | The Offeror shall possess a current CMMI 3 - SEI certification. | |
| D1 | Certification | NDI Qualified | The Offeror shall possess nondestructive inspection (NDI) (X-ray, eddy current, ultrasonic, magnetic particle, and dye penetrate) capability in accordance with TO 1C-130A-36 and have at a minimum of one personnel with a current Level II certification per NAS 410 or equivalent as approved by the WR-ALC/ENFA Non-Destructive Inspection program manager, phone 478-327-4122. | |
| E1 | Certification | Ground Engine Run Qualified | The Offeror shall have a minimum of two qualified personnel to perform C-130 ground engine run operation IAW AFI 11-218 and applicable C-130 OMMS manuals. Personnel handling and operating aircraft shall be qualified IAW AFI 11-218, AFI 11-205, and AFI 10-220. | |
| F1 | Certification | Aircraft Alignment & Symmetry/Wing Joint Planarity Check Qualified | The Offeror shall possess the equipment and a minimum of one qualified personnel to perform complete aircraft alignment and symmetry checks and wing joint (rainbow and corner fittings) planarity checks IAW TO 1C-130A-3. | |
| L1 | Certification | Fastener Hole Cold-work Qualified | The Offeror shall have the capability to perform Bush-Lok, ForceMate, ForceTec, and cold-working (tooling and training) for general repair procedures listed in TO 1C-130A-3 for sizes 3/16" through 1/2" and the Fatigue Technologies Incorporated (FTI) manuals or equivalent provided by the government. | |
| G1 | Hangar | Enclosed Space | The Offeror shall possess enclosed hangar space for the accomplishment of all-major component disassembly and assembly, major structural repairs, alignment and symmetry, and wing joint planarity checks for one C-130 aircraft. All hangars shall be free of obstruction to ensure safety of the aircraft and have a minimum door height of 40 feet with a minimum door width of 140 feet. A minimum of 7 feet clearance is required between the aircraft and any obstruction. A nose dock hangar is considered an enclosed hangar for maintenance work forward of Fuselage Station 737 (FS 737), and it is not considered an enclosed hangar for maintenance work aft of FS 737. The Offeror shall possess hangar lighting, electricity, and compressed air IAW TO 00-25-172, TO 1-1-3, TO 1-1-300, NAS 3306, and NFPA 409 or equivalent. The Offeror shall posses an on-aircraft avionics cooling cart. | |
| G1.1 | Hangar | On-Site Govt Space | The Offeror shall possess on-site office space to house two U.S. Government personnel requiring an estimated 18 square meters. This facility shall also have heat and air conditioning, office furniture, local telephone service, and other utilities/services required for administrative purposes associated with this effort. | |
| G1.2 | Hangar | C-130 Peculiar Ground Handling Equipment | The Offeror shall possess or have access to C-130 peculiar ground handling equipment, NDI equipment and tools. See Tab C-130_Peculiar_GHE | |
| G1.3 | Hangar | Storage | ||
| G1.3.1 | Hangar | Storage | Aircraft Parts & Data | The Offeror shall have adequate covered storage space for the following: one C-130 Aircraft components (flight controls, doors, cargo ramp, cargo door, stabilizers, external fuel tanks, etc.); on-site space for technical and engineering data, aircraft records and forms; and inside secured storage space to segregate and control government property. |
| G1.3.2 | Hangar | Storage | Shelf Space | The Offeror shall have 50 square feet of industrial shelf space of which 10 square feet shall be for classified equipment. Each shelf shall support not less than 150 pounds over a six foot span and be at least two feet between each shelf. |
| G1.4 | Hangar | Wash Rack | The Offeror shall maintain a wash rack with the capacity to maintain wash and rinse water at a temperature of 130 degrees Fahrenheit (plus or minus 10 degrees), and maintain a temperature that would not allow water to freeze. | |
| G1.5 | Hangar | Backshops | ||
| G1.5.1 | Hangar | Backshop | Aircraft Weighing | The Offeror shall possess aircraft weighing facilities IAW TO 1-1B-50 or equivalent. |
| G1.5.2 | Hangar | Backshop | Battery | The Offeror shall possess or have access to a battery facility capable of storage, servicing, and handling lead acid and nickel-cadmium batteries IAW applicable C-130 OMMS manuals. |
| G1.5.3 | Hangar | Backshop | Brakes and Tire/Wheel | The Offeror shall possess or have access to equipment and tools for C-130 brakes (composite and boron) and tires/wheels. |
| G1.5.4 | Hangar | Backshop | Electrical | The Offeror shall possess an electrical shop for aircraft wiring harnesses repair/fabrication and testing. |
| G1.5.5 | Hangar | Backshop | Fuel | The Offeror shall possess refueling, defueling, fluid purging, fuel tank maintenance, and fuel cell foam handling/storage capabilities, equipment and facilities IAW TOs 1-1-3 and applicable C-130 OMMS manuals. A minimum of 1,500 square feet available for storage of foam awaiting replacement and /or installation is required. |
| G1.5.5.1 | Hangar | Backshop | Fuel and Oil | The Offeror shall possess or have access to fuel and oil storage capabilities IAW MIL-STD-1518D or equivalent. Minimum total fuel storage capacity is 15,000 gallons and minimum total oil storage capability is 20 gallons. |
| G1.5.6 | Hangar | Backshop | Hydraulic | The Offeror shall possess a hydraulic shop for aircraft tubes, fittings, hoses and valve housing repair/fabrication and testing. |
| G1.5.7 | Hangar | Backshop | Oxygen | The Offeror shall possess or have access to breathing oxygen storage and facilities for handling liquid oxygen IAW applicable C-130 OMMS manuals. |
| G1.6 | Hangar | Control Tower (Unicom Freq) | The Offeror shall possess or have access to a Unicom Freq radio and qualified airfield control personnel for C-130 aircraft landing and takeoff. | |
| G1.7 | Hangar | Runway | The Offeror shall possess or have access to a runway with a minimum length of 5,000 feet and minimum width of 150 feet with lighting parallel to the runway and taxi way IAW NAS 3306 and AFOSHSTD 91-100 or equivalent. | |
| G1.8 | Hangar | Ramp Space | The Offeror shall possess ramp space, with tie down grids, to handle one C-130 aircraft at a time with a minimum of 25 feet clearance between parked aircraft and any obstruction or other aircraft. Ramp space, where aircraft movement occurs other than towing operations, including shoulders, shall have a minimum clearance space of 125 feet from the edge of the paved surface outward to any obstruction.. | |
| G1.8.1 | Hangar | Ramp Space -- General Requirements | Lighting, Electricity, & Compressed Air | The Offeror shall possess ramp lighting, electricity, and compressed air IAW TO 00-25-172, TO 1-1-3, TO 1-1-300, NAS 3306, and NFPA 409 or equivalent. The paint facility shall have explosive proof electrical wiring and forced ventilation sufficient to provide 100 linear feet per minute air velocity IAW TO 1-1-8 or equivalent. |
| H1 | Paint/Depaint Hangar | Enclosed Space | The Offeror shall possess a paint facility capable of painting up to one C-130 per month. The paint facility shall be environmentally controlled IAW NAS 3306, NFPA 13, NFPA 70, NFPA 72, NFPA 409 and NFPA 410 or equivalent and TO 1-1-8. | |
| I1 | All Facilities | |||
| I1.1 | All Facilities | Fire Suppression Requirements | All facilities where U.S. government property will be stored, worked, maintained, repaired, modified or used shall have an automatic fire suppression system, which meets the requirements of NAS 3306, NFPA 13, NFPA 70, NFPA 72, NFPA 409 and NFPA 410 or equivalent. | |
| K1 | Process | Workload Planning and Scheduling | The Offeror shall possess the ability to plan and schedule all known workload, identifying critical path(s) and updating the scheduling of facilities and resources when additional requirements are identified. | |
| M1 | Process | Parts Ordering/Handling | The Offeror shall have a material management and accounting system for ordering/handling aircraft parts. | |
| N1 | Process | FOD and Tool Control Plan | The Offeror shall have an active tool control program and Foreign Object Damage (FOD) prevention plan. | |
| O1 | Process | Hazardous Material Management Plan | The Offeror shall have a Hazardous Material Management Plan (HMMP). The Offeror shall possess the capability of handling hazardous material and disposing of ALL hazardous waste associated with the performance of this contract including, but not limited to solvents, paint, paint residue, sealant residue, and fuel cell foam disposal in accordance with the country's existing laws and regulations. The contractor must provide a plan for review if proposed contract processes (paint, depaint, solvent usage, etc) violate the country's existing environmental laws and regulations. | |
| P1 | Process | Severe Weather Plan | The Offeror shall have a severe weather plan which shall define conditions which constitute severe weather and procedures/responsibilities. | |
| Note: L1 was moved from processes to certifications & J1 was omitted intentionally. |
&LMinimum Capabilities Specification (Rev 1)&CRFP FA8530-08-R-21758&RRFP Attachment 5
File details come from the government source that posted it. Updated .