F2AST_Capabilities_Matrix_Spec_29Jan08Rev1.xls

XLS spreadsheet 51 KB Posted

Attached to
Future Flexible Acquisition and Sustainment Tool (F2AST)
Solicitation number
FA8530-08-R-21758
Issued by

About this file

RFP Attachments 4 and 5 Rev 1 (Capabilities Matrix Specification)

View the file

Other files

File Type Posted
17Mar08.doc DOC document
3Mar08.doc DOC document
1_FA853008R21758______0008.doc DOC document
29Feb08.doc DOC document
1_FA853008R21758ConformedCopy.doc DOC document
27Feb08.doc DOC document
26Feb08.doc DOC document
25Feb08.doc DOC document
F2AST_LaborCategories_27Nov07RFPAttachment7Rev1.xls XLS spreadsheet
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev4.xls XLS spreadsheet
FA853008R21758______0007.doc DOC document
22Feb08.doc DOC document
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev4.xls XLS spreadsheet
21Feb08.doc DOC document
20Feb08.doc DOC document
19Feb08.doc DOC document
FA853008R21758______0006.doc DOC document
15Feb08final.doc DOC document
13Feb08.doc DOC document
FA853008R21758______0005.doc DOC document
11Feb08.doc DOC document
8Feb08.doc DOC document
FA853008R21758______0004.doc DOC document
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev3.xls XLS spreadsheet
Equip_List_29Jan08RFPAttachment6Rev2.xls XLS spreadsheet
7Feb08.doc DOC document
F2AST_EquipListRev1RFPAttach6.xls XLS spreadsheet
FA853008R21758______0003.doc DOC document
6Feb08.doc DOC document
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev2.xls XLS spreadsheet
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev3.xls XLS spreadsheet
PastPerfFACTSSheetRFPAttachment8Rev1.DOC DOC document
5Feb08.doc DOC document
FA853008R21758______0001.doc DOC document
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev2.xls XLS spreadsheet
FA853008R21758______0002.doc DOC document
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev1.xls XLS spreadsheet
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev1.xls XLS spreadsheet
4Feb08.doc DOC document
1Feb08.doc DOC document
31Jan08.doc DOC document
30Jan08.doc DOC document
29Jan08.doc DOC document
28Jan08.doc DOC document
25Jan08.doc DOC document
DD254RFPAttachment3.pdf PDF
CDRLsRFPAttachment2.pdf PDF
F2AST_PWS_Baseline_11Jan08Attachment2.pdf PDF
F2AST_LaborCategories_27Nov07RFPAttachment7.xls XLS spreadsheet
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10.xls XLS spreadsheet
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Capabilities_Matrix

CapabilitiesDevelopmentModificationsMaintenanceInstructions
CertificationsAS 9100 Rev BA1A1A1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide face page of certification (including date and identity of certified entity), and signature page for each
ISO 9001:2000B1B1B1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide full copy of certification for each
CMMI 3 -SEIC1C1C1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide full copy of certification for each
NDI QualifiedD1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide current number of Level II certified personnel, type of certification/capabilities/qualifications held, and effective date for each
Ground Engine Run QualifiedE1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide current number of qualified personnel, type of certification/capabilities/qualifications held, and effective date for each
Aircraft Alignment & Symmetry/Wing Joint Planarity Check QualifiedF1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide current number of qualified personnel, type of certification/capabilities/qualifications held, and effective date for each
Fastener Hole Cold-work QualifiedL1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide current number of qualified personnel, type of certification/capabilities/qualifications held, and effective date for each
FacilitiesHangarG1G1G1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide spec for hangar including location and equipment list for each
Space Available for Gov't PersonnelG1.1G1.1G1.1Identify Prime and/or Subcontractor(s) that possess required space
C-130 Peculiar Ground Handling EquipmentG1.2G1.2G1.2Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide completed C-130 Peculiar GHE spreadsheet (RFP Attach 6) for each
StorageG1.3G1.3G1.3
Aircraft Parts & DataG1.3.1G1.3.1G1.3.1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description, square footage, and location of storage space for each
Shelf SpaceG1.3.2G1.3.2G1.3.2Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description, square footage, and location of shelf space for each
Wash RackG1.4G1.4G1.4Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide wash rack spec for each
BackshopsG1.5G1.5G1.5
Aircraft WeighingG1.5.1G1.5.1G1.5.1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description of weighing facilities for each
BatteryG1.5.2G1.5.2G1.5.2Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description of battery facility for each
Brakes and Tire/WheelG1.5.3G1.5.3G1.5.3Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide list of equipment and tools for each
ElectricalG1.5.4G1.5.4G1.5.4Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description of electrical shop for each
FuelG1.5.5G1.5.5G1.5.5Identify Prime and/or Subcontractor(s) that meet(s) this requirement, provide description of capabilities and facilities including square footage and location for each
Fuel & OilG1.5.5.1G1.5.5.1G1.5.5.1Identify Prime and/or Subcontractor(s) that meet(s) this requirement, provide description of capabilities and facilities including capacity and location for each
HydraulicG1.5.6G1.5.6G1.5.6Identify Prime and/or Subcontractor(s) that meet(s) this requirement, provide description of hydraulic shop and location for each
OxygenG1.5.7G1.5.7G1.5.7Identify Prime and/or Subcontractor(s) that meet(s) this requirement, provide description including location for each
Control Tower (Unicom Freq)G1.6G1.6G1.6Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description for each
RunwayG1.7G1.7G1.7Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide spec and location of runway for each
Ramp SpaceG1.8G1.8G1.8Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide spec and location of ramp space for each
Lighting, Electricity, & Compressed AirG1.8.1G1.8.1G1.8.1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description including location for each
Paint/Depaint FacilityH1H1H1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide spec and location for each
Space Available for Gov't PersonnelG1.1G1.1G1.1Identify Prime and/or Subcontractor(s) that possess required space for each
C-130 Peculiar Ground Handling EquipmentG1.2G1.2G1.2Provide completed C-130 Peculiar GHE spreadsheet by Prime and/or Subcontractor(s) for each
Wash RackG1.4G1.4G1.4Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide wash rack spec for each
BackshopsG1.5G1.5G1.5
FuelG1.5.5G1.5.5G1.5.5Identify Prime and/or Subcontractor(s) that meet(s) this requirement, provide description of capabilities and facilities including square footage and location for each
Fuel & OilG1.5.5.1G1.5.5.1G1.5.5.1Identify Prime and/or Subcontractor(s) that meet(s) this requirement, provide description of capabilities and facilities including capacity and location for each
OxygenG1.5.7G1.5.7G1.5.7Identify Prime and/or Subcontractor(s) that meet(s) this requirement, provide description including location for each
Control Tower (Unicom Freq)G1.6G1.6G1.6Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description for each
RunwayG1.7G1.7G1.7Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide spec and location of runway for each
Ramp SpaceG1.8G1.8G1.8Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide spec and location of ramp space for each
Lighting, Electricity, & Compressed AirG1.8.1G1.8.1G1.8.1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description including location for each
All FacilitiesI1I1I1
Fire SuppressionI1.1I1.1I1.1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide face page (including date and identification of entity) and signature page of Fire Suppression Plan for all facilities used to complete the Minimum Capability Matrix
ProcessesWorkload Planning & SchedulingK1K1K1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description of system for each
Parts Ordering/HandlingM1M1M1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide description of system for each
FOD and Tool Control PlanN1N1N1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide face page (including date and identification of entity) and signature page of plan for all facilities used to complete the Minimum Capabilities Matrix
Hazardous Material Management PlanO1O1O1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide face page (including date and identification of entity) and signature page of plan for all facilities used to complete the Minimum Capabilities Matrix
Severe Weather PlanP1P1P1Identify Prime and/or Subcontractor(s) that meet(s) this requirement and provide face page (including date and identification of entity) and signature page of plan for all facilities used to complete the Minimum Capabilities Matrix
Note: L1 was moved from processes to certifications & J1 was omitted intentionally.
Contractor NameStatus
1Prime
2Subcontractor
3Subcontractor
4Subcontractor
5Subcontractor
6Subcontractor
7Subcontractor
8Subcontractor
9Subcontractor
10Subcontractor
11Subcontractor
12Subcontractor
13Subcontractor
Instructions:
1Delete reference information in each cell (Example: A1)
2Complete each cell by inputting the assigned # (from above table) of the Prime and/or Subcontractor(s) that provide that capability.
3Each cell must have at least one input (Example: 1 or 1,3,5,etc.).
4This spreadsheet may not be modified in any fashion. (Only populate cells under each category.)

&LMinimum Capabilities Matrix (Rev 1)&CRFP FA8530-08-R-21758&RRFP Attachment 4

Capabilities_Specification

SpecificationCapabilityTypeBreakoutRequirement
A1CertificationAS 9100 Rev BThe Offeror shall possess a current AS 9100 Rev B registered certification.
B1CertificationISO 9001:2000The Offeror shall possess a current ISO 9001:2000 registered certification.
C1CertificationCMMI 3 -SEIThe Offeror shall possess a current CMMI 3 - SEI certification.
D1CertificationNDI QualifiedThe Offeror shall possess nondestructive inspection (NDI) (X-ray, eddy current, ultrasonic, magnetic particle, and dye penetrate) capability in accordance with TO 1C-130A-36 and have at a minimum of one personnel with a current Level II certification per NAS 410 or equivalent as approved by the WR-ALC/ENFA Non-Destructive Inspection program manager, phone 478-327-4122.
E1CertificationGround Engine Run QualifiedThe Offeror shall have a minimum of two qualified personnel to perform C-130 ground engine run operation IAW AFI 11-218 and applicable C-130 OMMS manuals. Personnel handling and operating aircraft shall be qualified IAW AFI 11-218, AFI 11-205, and AFI 10-220.
F1CertificationAircraft Alignment & Symmetry/Wing Joint Planarity Check QualifiedThe Offeror shall possess the equipment and a minimum of one qualified personnel to perform complete aircraft alignment and symmetry checks and wing joint (rainbow and corner fittings) planarity checks IAW TO 1C-130A-3.
L1CertificationFastener Hole Cold-work QualifiedThe Offeror shall have the capability to perform Bush-Lok, ForceMate, ForceTec, and cold-working (tooling and training) for general repair procedures listed in TO 1C-130A-3 for sizes 3/16" through 1/2" and the Fatigue Technologies Incorporated (FTI) manuals or equivalent provided by the government.
G1HangarEnclosed SpaceThe Offeror shall possess enclosed hangar space for the accomplishment of all-major component disassembly and assembly, major structural repairs, alignment and symmetry, and wing joint planarity checks for one C-130 aircraft. All hangars shall be free of obstruction to ensure safety of the aircraft and have a minimum door height of 40 feet with a minimum door width of 140 feet. A minimum of 7 feet clearance is required between the aircraft and any obstruction. A nose dock hangar is considered an enclosed hangar for maintenance work forward of Fuselage Station 737 (FS 737), and it is not considered an enclosed hangar for maintenance work aft of FS 737. The Offeror shall possess hangar lighting, electricity, and compressed air IAW TO 00-25-172, TO 1-1-3, TO 1-1-300, NAS 3306, and NFPA 409 or equivalent. The Offeror shall posses an on-aircraft avionics cooling cart.
G1.1HangarOn-Site Govt SpaceThe Offeror shall possess on-site office space to house two U.S. Government personnel requiring an estimated 18 square meters. This facility shall also have heat and air conditioning, office furniture, local telephone service, and other utilities/services required for administrative purposes associated with this effort.
G1.2HangarC-130 Peculiar Ground Handling EquipmentThe Offeror shall possess or have access to C-130 peculiar ground handling equipment, NDI equipment and tools. See Tab C-130_Peculiar_GHE
G1.3HangarStorage
G1.3.1HangarStorageAircraft Parts & DataThe Offeror shall have adequate covered storage space for the following: one C-130 Aircraft components (flight controls, doors, cargo ramp, cargo door, stabilizers, external fuel tanks, etc.); on-site space for technical and engineering data, aircraft records and forms; and inside secured storage space to segregate and control government property.
G1.3.2HangarStorageShelf SpaceThe Offeror shall have 50 square feet of industrial shelf space of which 10 square feet shall be for classified equipment. Each shelf shall support not less than 150 pounds over a six foot span and be at least two feet between each shelf.
G1.4HangarWash RackThe Offeror shall maintain a wash rack with the capacity to maintain wash and rinse water at a temperature of 130 degrees Fahrenheit (plus or minus 10 degrees), and maintain a temperature that would not allow water to freeze.
G1.5HangarBackshops
G1.5.1HangarBackshopAircraft WeighingThe Offeror shall possess aircraft weighing facilities IAW TO 1-1B-50 or equivalent.
G1.5.2HangarBackshopBatteryThe Offeror shall possess or have access to a battery facility capable of storage, servicing, and handling lead acid and nickel-cadmium batteries IAW applicable C-130 OMMS manuals.
G1.5.3HangarBackshopBrakes and Tire/WheelThe Offeror shall possess or have access to equipment and tools for C-130 brakes (composite and boron) and tires/wheels.
G1.5.4HangarBackshopElectricalThe Offeror shall possess an electrical shop for aircraft wiring harnesses repair/fabrication and testing.
G1.5.5HangarBackshopFuelThe Offeror shall possess refueling, defueling, fluid purging, fuel tank maintenance, and fuel cell foam handling/storage capabilities, equipment and facilities IAW TOs 1-1-3 and applicable C-130 OMMS manuals. A minimum of 1,500 square feet available for storage of foam awaiting replacement and /or installation is required.
G1.5.5.1HangarBackshopFuel and OilThe Offeror shall possess or have access to fuel and oil storage capabilities IAW MIL-STD-1518D or equivalent. Minimum total fuel storage capacity is 15,000 gallons and minimum total oil storage capability is 20 gallons.
G1.5.6HangarBackshopHydraulicThe Offeror shall possess a hydraulic shop for aircraft tubes, fittings, hoses and valve housing repair/fabrication and testing.
G1.5.7HangarBackshopOxygenThe Offeror shall possess or have access to breathing oxygen storage and facilities for handling liquid oxygen IAW applicable C-130 OMMS manuals.
G1.6HangarControl Tower (Unicom Freq)The Offeror shall possess or have access to a Unicom Freq radio and qualified airfield control personnel for C-130 aircraft landing and takeoff.
G1.7HangarRunwayThe Offeror shall possess or have access to a runway with a minimum length of 5,000 feet and minimum width of 150 feet with lighting parallel to the runway and taxi way IAW NAS 3306 and AFOSHSTD 91-100 or equivalent.
G1.8HangarRamp SpaceThe Offeror shall possess ramp space, with tie down grids, to handle one C-130 aircraft at a time with a minimum of 25 feet clearance between parked aircraft and any obstruction or other aircraft. Ramp space, where aircraft movement occurs other than towing operations, including shoulders, shall have a minimum clearance space of 125 feet from the edge of the paved surface outward to any obstruction..
G1.8.1HangarRamp Space -- General RequirementsLighting, Electricity, & Compressed AirThe Offeror shall possess ramp lighting, electricity, and compressed air IAW TO 00-25-172, TO 1-1-3, TO 1-1-300, NAS 3306, and NFPA 409 or equivalent. The paint facility shall have explosive proof electrical wiring and forced ventilation sufficient to provide 100 linear feet per minute air velocity IAW TO 1-1-8 or equivalent.
H1Paint/Depaint HangarEnclosed SpaceThe Offeror shall possess a paint facility capable of painting up to one C-130 per month. The paint facility shall be environmentally controlled IAW NAS 3306, NFPA 13, NFPA 70, NFPA 72, NFPA 409 and NFPA 410 or equivalent and TO 1-1-8.
I1All Facilities
I1.1All FacilitiesFire Suppression RequirementsAll facilities where U.S. government property will be stored, worked, maintained, repaired, modified or used shall have an automatic fire suppression system, which meets the requirements of NAS 3306, NFPA 13, NFPA 70, NFPA 72, NFPA 409 and NFPA 410 or equivalent.
K1ProcessWorkload Planning and SchedulingThe Offeror shall possess the ability to plan and schedule all known workload, identifying critical path(s) and updating the scheduling of facilities and resources when additional requirements are identified.
M1ProcessParts Ordering/HandlingThe Offeror shall have a material management and accounting system for ordering/handling aircraft parts.
N1ProcessFOD and Tool Control PlanThe Offeror shall have an active tool control program and Foreign Object Damage (FOD) prevention plan.
O1ProcessHazardous Material Management PlanThe Offeror shall have a Hazardous Material Management Plan (HMMP). The Offeror shall possess the capability of handling hazardous material and disposing of ALL hazardous waste associated with the performance of this contract including, but not limited to solvents, paint, paint residue, sealant residue, and fuel cell foam disposal in accordance with the country's existing laws and regulations. The contractor must provide a plan for review if proposed contract processes (paint, depaint, solvent usage, etc) violate the country's existing environmental laws and regulations.
P1ProcessSevere Weather PlanThe Offeror shall have a severe weather plan which shall define conditions which constitute severe weather and procedures/responsibilities.
Note: L1 was moved from processes to certifications & J1 was omitted intentionally.

&LMinimum Capabilities Specification (Rev 1)&CRFP FA8530-08-R-21758&RRFP Attachment 5

File details come from the government source that posted it. Updated .