Questions and Answers 3 Mar 08

View the file

Other files

File Type Posted
17Mar08.doc DOC document
1_FA853008R21758______0008.doc DOC document
29Feb08.doc DOC document
1_FA853008R21758ConformedCopy.doc DOC document
27Feb08.doc DOC document
26Feb08.doc DOC document
25Feb08.doc DOC document
F2AST_LaborCategories_27Nov07RFPAttachment7Rev1.xls XLS spreadsheet
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev4.xls XLS spreadsheet
FA853008R21758______0007.doc DOC document
22Feb08.doc DOC document
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev4.xls XLS spreadsheet
21Feb08.doc DOC document
20Feb08.doc DOC document
19Feb08.doc DOC document
FA853008R21758______0006.doc DOC document
15Feb08final.doc DOC document
13Feb08.doc DOC document
FA853008R21758______0005.doc DOC document
11Feb08.doc DOC document
8Feb08.doc DOC document
FA853008R21758______0004.doc DOC document
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev3.xls XLS spreadsheet
Equip_List_29Jan08RFPAttachment6Rev2.xls XLS spreadsheet
7Feb08.doc DOC document
F2AST_EquipListRev1RFPAttach6.xls XLS spreadsheet
FA853008R21758______0003.doc DOC document
6Feb08.doc DOC document
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev2.xls XLS spreadsheet
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev3.xls XLS spreadsheet
PastPerfFACTSSheetRFPAttachment8Rev1.DOC DOC document
5Feb08.doc DOC document
FA853008R21758______0001.doc DOC document
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev2.xls XLS spreadsheet
FA853008R21758______0002.doc DOC document
F2AST_Capabilities_Matrix_Spec_29Jan08Rev1.xls XLS spreadsheet
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev1.xls XLS spreadsheet
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev1.xls XLS spreadsheet
4Feb08.doc DOC document
1Feb08.doc DOC document
31Jan08.doc DOC document
30Jan08.doc DOC document
29Jan08.doc DOC document
28Jan08.doc DOC document
25Jan08.doc DOC document
DD254RFPAttachment3.pdf PDF
CDRLsRFPAttachment2.pdf PDF
F2AST_PWS_Baseline_11Jan08Attachment2.pdf PDF
F2AST_LaborCategories_27Nov07RFPAttachment7.xls XLS spreadsheet
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10.xls XLS spreadsheet
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

RFP FA8530-08-R-21758

3 Mar 08

Question: The recent conformed copy of the RFP did not reflect the changes made to H-910 in Amendment 007 and Note 4 in Amendment 008. Does the Government intend to issue another conformed RFP which reflects these changes?

Answer: The change made in Note 4 is reflected in the Amendment 0008 currently on FedBizOps. No further conformed copies will be released prior to proposal due dates.

Question Regarding location of Disclosure statements in Vol IV, would the SubK disclosure statement for ‘composite’ rates go behind the individual SubK’sAdd-on narrative, which is behind the rates sheets, `in this Volume? If a Prime is using a Non-critical Subcontractor for Flight Crews, does the Non critical SubK have to submit a narrative for add-on factors? During the 90 day add-on period for new SubK’s, do the new non-critical SubK’s have to submit a narrative for add-on factors?

Answer: Yes to all.

Question Reference Q&A dated 30 January 2008: Is any narrative information required or desired in Volume IV (Cost/Price Volume) in addition to the prime contractor and subcontractor pricing files provided as RFP attachments 9 and 10?

Answer: Yes.

Question: As stated in RFP Clause M-900, the Government anticipates that the proposed FP/LH, T&M, and CR rates will be the same for all labor categories through the cost line. In the extraordinary event that the proposed CR rates differ from the FP/LH and T&M rates at the cost line, the offeror must provide in his proposal a complete breakdown of the specific cost elements included in the CR rates with appropriate rationale and explanations. Offerors may provide any other cost/pricing-related narrative information they desire to include in this volume. In addition, the add-on factor spreadsheets contained in both RFP Attachments 9 and 10 will be revised via RFP Amendment to include additional information regarding the add-on factors. This additional information is as follows: Material, Crisis Pay, and Overtime Factors: These factors shall apply against material, crisis pay, and/or overtime. These factors should incorporate all normal charges (including, but not limited to, G&A and Cost of Money, etc.) allowed for these specific costs. A narrative description of the composition of these factors is to be submitted in Volume IV, Cost/Pricing Volume, for each of these add-on factors. Fee/profit will be proposed at the D/TO level for FP, CR, and LH orders; therefore, FP, CR, and LH factors should not include any fee/profit. Subcontract Add-on Factor: This factor shall apply against subcontracted costs. This factor should incorporate all normal charges (including, but not limited to, G&A and Cost of Money, etc.) allowed for these specific charges. A narrative description of the composition of these factors is to be submitted in Volume IV, Cost/Pricing Volume, for each of these add-on factors. Fee/profit will be proposed at the D/TO level for FP, CR, and LH orders; therefore, FP, CR, and LH factors should not include any fee/profit.

OCONUS Labor Adjustment Factors: These factors shall apply against OCONUS labor. These factors should incorporate any unique charges allowable for these specific costs. A narrative description of the composition of these factors is to be submitted in Volume IV, Cost/Pricing Volume, for each of these add-on factors. Fee/profit will be proposed at the D/TO level for FP, CR, and LH orders; therefore, FP, CR, and LH factors should not include any fee/profit. Therefore, is it correct to assume that profit/fee can/should be included on T&M Sub handling factors?

Answer: It is up to individual offerors to decide what to include in their add-on factors and to provide narrative in support of the factor.

Question Reference RFP Section L-900, para 2.b.iv, 1” Margin requirement, the excel files provided have instructions detailing not to touch settings on sheets and the margins on Attachments 9 and 10 are set at .5” and we are finding that the holes are punching in printed material. How are we to fulfill the 1” requirement and not change sheet settings? Can we change margins to 1” in excel files? Does the Gov’t consider the .5” footer and .5” bottom combined to meet the 1” requirement

Answer: The margins may be adjusted to 1” to prevent the hole punches from interfering with the text.

Question Reference Attachment 9, Rev 4, Prime pricing sheet. The Margins on tab “Labor Workload & Mat'l Dist FP%’ are set to left, 0.20; right, 0.0, Top, 0.58 and bottom, 0.45. Attachment 4 has settings of left, 0.20; right, 0.20, Top, 0.56 and bottom, 0.00. These settings do not allow for the inclusion of the required FAR Statement, numbering per section and printed material is lost with 3-hole punching and the Source Selection statement prints in the rate sheet numbers. Is the contractor allowed to adjust these settings?

Answer: See answer above.

Question: All Government provided excel attachments have various settings set to less then 1” margin for top, bottom and left/right. Are these setting from the Gov't exempt from the L-900 1” margin rule?

Answer: The margin rule of 1” does not apply margins set by the Government and unchanged by the contractor.

Question:Reference revised Section L below: ORGANIZATION: The following instructions cover the preparation and submittal of the offeror’s proposal for this solicitation. Proposals shall be submitted to the Government in four (4) separate volumes as set forth below:

VOLUME

PAGE LIMITS

NUMBER OF COPIES

DESCRIPTION

I N/A Completed RFP

II

Written Technical Proposal – Factor 1

See RFP Attachment 4, Minimum Capabilities Matrix, for

Instructions

III

Present/Past Performance

IV

N/A Cost/Price Volume**

*See “FACTS Sheet” (RFP Attachment 8) Instructions.

**The Cost/Price Volume shall be submitted as follows:

One (1) hard copy and one (1) copy on CD-R by either mail or hand-delivery to:

Mailing and Physical Address:

OO-ALC/PKCF

Pricing and Policy Division PKC

Attn: Mike Vernon

Bldg 1289 2nd Floor

6038 Aspen Avenue

Hill AFB UT 84056-5805

One (1) hard copy and one (1) copy on CD-R by either mail or hand-delivery to:

Mailing Address:

WR-ALC/PKPF

Dee Young

215 Page Street, Ste 231

Robins AFB GA 31098-1662

Physical Address:

WR-ALC/PKPF

Dee Young

Bldg 300, West Wing, Bay C, Door C312

Robins AFB GA 31098

One (1) hard copy submitted with the completed RFP, Written Technical Proposal, and

Present/Past Performance Volume, by either mail or hand-delivery to:

Mailing address:

WR-ALC/PKE

Charlotte Hobson

215 Page Street, Ste 231

Robins AFB GA 31098-1662

Physical address:

WR-ALC/PKE

Charlotte Hobson

Bldg 300, West Wing, Bay C, Door C315

Robins AFB GA 31098

NOTE: In addition to the paper copies listed above, the contractor will submit one (1) CD-R with Volumes I through

III saved to the CD, and one (1) CD-R with only Volume IV saved to the CD. This does not include the CD-R copies that may be asked for elsewhere in Sections L and M.

Each volume shall be marked with the solicitation number, the Offeror’s name and address, and the buyer information contained in Block 7 of Standard Form 1447 (RFP cover page) and shall contain a glossary of all abbreviations and acronyms used, with an explanation for each. Glossaries do not count against the page limitations for their respective volumes. In addition to the page limitations set forth above that includes any executive summary but excludes table of contents and cross-reference matrix, proposals shall comply with the following format:

The distribution on the Cost Volume accounts for two of the three copies and then starts distribution of the

1 hard copy of the consolidated copy to WR-ALC/PKE. Does the third copy get sent as paper and CD to the block 7 address since it is not discussed?

Answer: Yes.

Question: The NOTE says to submit 1 CD with Volumes I through III and 1 CD with Volume IV but does not say where.

Answer: Submit to PKE in the address provided.

Question: The NOTE then states it does not include CD-R copies that may be asked for elsewhere in Sections L&M.

Would you identify those additional CD's if required?

Answer: The CDs as required are set forth in Sections L&M.

Question:One of the answers given in the 29 Feb 2008 Q & A’s was fragmented. Question 4 contained an incomplete answer. Could the Government please reword the reply given?

Answer: A corrected copy of the 29 Feb 2008 Q&As has been posted to FedBizOpps.

Question Given the release of a complete conformed RFP on a Friday afternoon, and given that most bidders will have to go to press this weekend or first thing Monday morning at the latest to make a Wednesday at separate locations 2000 miles apart, this allows offerors no opportunity to react to any potential printing errors or last minute changes (we have had no time yet to review the document to see if there are any). We therefore request a simple two day extension to Friday, 7 March 2008.

Answer: No extension can be granted. Proposals are due as set forth in the Conformed Copy of the RFP, i.e. 1600 5 Mar 08.