Questions and Answers 7 Feb 08

View the file

Other files

File Type Posted
17Mar08.doc DOC document
3Mar08.doc DOC document
1_FA853008R21758______0008.doc DOC document
29Feb08.doc DOC document
1_FA853008R21758ConformedCopy.doc DOC document
27Feb08.doc DOC document
26Feb08.doc DOC document
25Feb08.doc DOC document
F2AST_LaborCategories_27Nov07RFPAttachment7Rev1.xls XLS spreadsheet
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev4.xls XLS spreadsheet
FA853008R21758______0007.doc DOC document
22Feb08.doc DOC document
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev4.xls XLS spreadsheet
21Feb08.doc DOC document
20Feb08.doc DOC document
19Feb08.doc DOC document
FA853008R21758______0006.doc DOC document
15Feb08final.doc DOC document
13Feb08.doc DOC document
FA853008R21758______0005.doc DOC document
11Feb08.doc DOC document
8Feb08.doc DOC document
FA853008R21758______0004.doc DOC document
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev3.xls XLS spreadsheet
Equip_List_29Jan08RFPAttachment6Rev2.xls XLS spreadsheet
F2AST_EquipListRev1RFPAttach6.xls XLS spreadsheet
FA853008R21758______0003.doc DOC document
6Feb08.doc DOC document
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev2.xls XLS spreadsheet
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev3.xls XLS spreadsheet
PastPerfFACTSSheetRFPAttachment8Rev1.DOC DOC document
5Feb08.doc DOC document
FA853008R21758______0001.doc DOC document
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev2.xls XLS spreadsheet
FA853008R21758______0002.doc DOC document
F2AST_Capabilities_Matrix_Spec_29Jan08Rev1.xls XLS spreadsheet
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev1.xls XLS spreadsheet
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev1.xls XLS spreadsheet
4Feb08.doc DOC document
1Feb08.doc DOC document
31Jan08.doc DOC document
30Jan08.doc DOC document
29Jan08.doc DOC document
28Jan08.doc DOC document
25Jan08.doc DOC document
DD254RFPAttachment3.pdf PDF
CDRLsRFPAttachment2.pdf PDF
F2AST_PWS_Baseline_11Jan08Attachment2.pdf PDF
F2AST_LaborCategories_27Nov07RFPAttachment7.xls XLS spreadsheet
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10.xls XLS spreadsheet
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

RFP FA8530-08-R-21758

7 Feb 08

Question: Reference Attachment 6. Where there are duplicated items or items with the same NSN but different part numbers, is the Government looking for double quantities? Has this list been validated by a C-130 equipment specialist since there have been many similar questions concerning this attachment? See below for this new example:

4920003475642 402636

4920003475642 402637

4920005330933 6796458

4920005451063 6796458

Answer: For P/N 402636, NSN and Noun are incorrect. The correct NSN is 4920003475640 and the correct Noun is Template, Rudder Rigging. NSN 4920003475642, P/N 402637, Template, Aileron Rigging, is correct.

NSN 4920005330933, Vulcanizing Tool, is correct, but the P/N is incorrect. The correct P/N is 3401500-105. NSN 492000545106, P/N 6796458, Fixture Neg. Torque Sys, is correct.

Question: Regarding RFP Attachment 6, the following items are "P" and "L" numbers which are normally assigned by the using organization Base Supply. Accordingly, there is insufficient information to properly identify the make and manufacturer for the below listed items. Can you provide additional information, such as T.O, Figure and Index?

3920PX65F47322

X65F47322

Dolly, MLG Doors

3920PX67E47654

X67E47654

Dolly, Cargo Floor Panels

4920L0007917510

64WRF301-1-2

Wing Device

4920P402508-1

TO 1C-130H

Template

5120L0033387510 7842909-10

Rewinding Tool

Answer: These five items will be deleted from the equipment list.

Question: There are two items listed in the RFP Attachment 6, C-130 Peculiar Ground Handling Equipment List, that cannot be identified for use or applicability in the C-130 series technical manuals. Can the specific Technical data requirement or specific task requirement be identified for the two pieces of equipment listed below. Neither the NSN or part number is active in the Government Fedlog system.

4920L007917510

64WRF301-1-2

Wing Device

4920P402508-1

TO 1C-130H

Template

Answer: See answer provided above.

Question: Attachment 5 (MCM specification) G1.8.1, Hangar, Ramp Space, Lighting, Electrical, and Compressed Air includes the requirement, "The paint facility shall have explosive proof electrical wiring and forced ventilation sufficient to provide 100 linear feet per minute air velocity IAW TO 1-1-8 or equivalent." We interpret that this requirement was intended to be located in the next row below (H1, Paint/Depaint Hangar). Is this correct?

Answer: The first sentence in G1.8.1 of the Minimum Capabilities Specification applies to both the Hangar and Paint/Depaint Facility Requirements. The second sentence in G1.8.1 of the Minimum Capabilities Specification only applies to the Paint/Depaint Facility requirements.

Question: Regarding FACTS Sheets page limitations, Amendment 0001 and the 30 Jan Q&As state that the following:

Amendment 1, Section L (f) - “the Offeror may expand the answering space on the FACTS Sheet so that the filled-in FACTS Sheet for each relevant contract covers no more than both sides of two 8 ½ x 11 pages.”

Amendment #1 Revised FACTS Sheet, Section O (i.e. Subcontractor Relevancy) - “This information is limited to two pages beyond the page limitation of the FACTS Sheet information.”

30 Jan 08 Q&A - “In total, the most single pages to be submitted for one relevant contract is 8 (3 pages FACTS Sheet, four pages – two double-sided sheets – for relevancy, and one page if needed for unfavorable assessment).”

Following the instructions listed above, is it correct to assume that the Section O instructions (i.e. “two pages beyond the page limitation of the FACTS Sheet information”) can be considered as two double-sided pages or 4 single-sided pages?

In addition, following the 30 Jan 08 Q&A that the most single pages submitted for one contact is 8 pages this would mean that:

FACTS Sheets Sections A – N have a three page single-sided page limit, with 1 extra single-sided page allowed for Section M. Unfavorable Assessment explanation.

FACTS Sheet Section O would have a 4 single-sided page limit.

Is this a correct interpretation?

Answer: A double-sided page counts as two pages, and a single-sided page counts as one page. Each FACTS Sheet submission is limited to no more than 8 pages. Those eight pages can be any combination of double-sided or single-sided pages, so long as the maximum 8 page limitation is not exceeded.

Question: Reference Attachment 6. Where there are duplicated items or items with the same NSN but different part numbers, is the Government looking for double quantities? Has this list been validated by a C-130 equipment specialist since there have been many similar questions concerning this attachment? See below for this new example:

1730001533242 7134770

1730001533242 7134771

1730006701556 404055-1

1730006701556 404055-1

1730008163459 3400961-1

1730008163459 3400961-1

4920003475642 402636

4920003475642 402637

4920005330933 6796458

4920005451063 6796458

Do they want double quantities in the case of duplicates and what about the items with different NSNs and same PNs or same NSNs and different PNs?

Answer: Please take note of the Noun column in the equipment list, as is provides discriminating descriptive information for most items.

NSN 1730001533242, P/N 7134770, is Shoring C-130 Fuselage. NSN 1730001533242, P/N 7134771, is Shoring C-130 Fueslage, FS 737. Both are required.

NSN 1730006701556, P/N 404055-1, is Sling Assy, Engine/QEC. The same NSN and P/N listed directly below in the equipment list is Sling, Engine Removal. Both are required.

NSN 1730008163459, P/N 3400961-1, is Sling Assy, Vertical Stabilizer. The same NSN and P/N listed directly below in the equipment list is Sling Assy Gen Purpose. Both are required.

NSN 4920003475642, P/N 402636, Template Aileron Rigging, and NSN 4920003475642, P/N 402637, will be researched by the Government and an answer will be provided as soon as possible.

NSN 4920005330933, P/N 6796458, Vulcanizing Tool, and NSN 492000545106, P/N 6796458, Fixture Neg. Torque Sys, will be researched by the Government and an answer will be provided as soon as possible.

Question: Reference RFP Amendment 0001, page 16. Amendment 0001 adds a requirement for the prime and each critical subcontractor to provide a narrative description of the composition of the proposed Material Handling Add-On Factors, Crisis Pay Factors, Overtime Factors, Subcontract Add-On Factors and OCONUS Labor Adjustment Factors. This information is typically considered company proprietary and is typically submitted by subcontractors in sealed packages. Does the Government have any preferences for packaging and labeling the subcontractors' separate, sealed hard copies and CD-Rs submitted with the prime contractors' proposals? Does the Government have any preferences for how prime contractors should reference this material within their proposals?

Answer: The prime contractor is to submit the required information for the prime and all of its critical subcontractors, in the Cost/Price volume. In the event that a critical subcontractor considers the required information to be company proprietary, they may submit their information to their prime contractor in a sealed envelope labeled with their company name and marked “proprietary information.” The prime contractor is to provide the sealed envelope to the Government as part of the Cost/Price Volume. The required narratives are to be brief and limited to no more than two pages per subcontractor and per prime contractor.

Question: Attachments 9 and 10 are not consistent with one another regarding OCONUS factors 1 and 2. Attachment 9 reads Germany and Western Europe, Excluding Germany respectively. Attachment 10 reads Germany – Payroll Taxes and Western Europe respectively. Please update Attachment 10 to be consistent with Attachment 9.

Answer: Attachment 10 will be revised.