22Feb08.doc

DOC document 45 KB Posted

Attached to
Future Flexible Acquisition and Sustainment Tool (F2AST)
Solicitation number
FA8530-08-R-21758
Issued by

About this file

Questions and Answers 22 Feb 08

View the file

Other files

File Type Posted
17Mar08.doc DOC document
3Mar08.doc DOC document
1_FA853008R21758______0008.doc DOC document
29Feb08.doc DOC document
1_FA853008R21758ConformedCopy.doc DOC document
27Feb08.doc DOC document
26Feb08.doc DOC document
25Feb08.doc DOC document
F2AST_LaborCategories_27Nov07RFPAttachment7Rev1.xls XLS spreadsheet
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev4.xls XLS spreadsheet
FA853008R21758______0007.doc DOC document
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev4.xls XLS spreadsheet
21Feb08.doc DOC document
20Feb08.doc DOC document
19Feb08.doc DOC document
FA853008R21758______0006.doc DOC document
15Feb08final.doc DOC document
13Feb08.doc DOC document
FA853008R21758______0005.doc DOC document
11Feb08.doc DOC document
8Feb08.doc DOC document
FA853008R21758______0004.doc DOC document
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev3.xls XLS spreadsheet
Equip_List_29Jan08RFPAttachment6Rev2.xls XLS spreadsheet
7Feb08.doc DOC document
F2AST_EquipListRev1RFPAttach6.xls XLS spreadsheet
FA853008R21758______0003.doc DOC document
6Feb08.doc DOC document
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev2.xls XLS spreadsheet
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev3.xls XLS spreadsheet
PastPerfFACTSSheetRFPAttachment8Rev1.DOC DOC document
5Feb08.doc DOC document
FA853008R21758______0001.doc DOC document
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev2.xls XLS spreadsheet
FA853008R21758______0002.doc DOC document
F2AST_Capabilities_Matrix_Spec_29Jan08Rev1.xls XLS spreadsheet
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10Rev1.xls XLS spreadsheet
Prime_Contractor_PricingSubmission_28Nov07RFPAttachment9Rev1.xls XLS spreadsheet
4Feb08.doc DOC document
1Feb08.doc DOC document
31Jan08.doc DOC document
30Jan08.doc DOC document
29Jan08.doc DOC document
28Jan08.doc DOC document
25Jan08.doc DOC document
DD254RFPAttachment3.pdf PDF
CDRLsRFPAttachment2.pdf PDF
F2AST_PWS_Baseline_11Jan08Attachment2.pdf PDF
F2AST_LaborCategories_27Nov07RFPAttachment7.xls XLS spreadsheet
Subcontractor_X_PricingSubmission_28Nov07RFPAttachment10.xls XLS spreadsheet
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

RFP FA8530-08-R-21758

22 Feb 08 RFP AMENDMENT 0007 HAS BEEN POSTED TO FEDBIZOPPS WEBSITE TODAY (22 FEB 08). THIS AMENDMENT EXTENDS THE CLOSING DATE OF THE RFP TO 5 MAR 08.

NOTICE: IT HAS COME TO OUR ATTENTION THAT SOME POTENTIAL OFFERORS AND/OR THEIR POTENTIAL SUBCONTRACTORS HAVE BEEN CONTACTED BY DCMA AND ASKED TO FURNISH INFORMATION IN REGARD TO THE SUBJECT CONTRACTOR’S ABILITY TO MEET CERTAIN ASPECTS OF THE MINIMUM CAPABILITIES MATRIX. THIS CONTACT HAS INCLUDED TELEPHONE CALLS, EMAILS AND SITE VISITS. IF SO CONTACTED, PLEASE DO NOT FURNISH ANY INFORMATION AT THIS TIME AND PLEASE DISREGARD ANY DCMA IMPOSED DEADLINE FOR FURNISHING THIS INFORMATION. WE APOLOGIZE FOR ANY CONFUSION AND INCONVENIENCE THIS MAY HAVE CAUSED.

Question: Per F2AST RFP Attachment 05, Specification G1.5.3 Brakes and Tire/Wheel “provide a list of equipment and tools for each.” Most of our Critical Subcontractors do not conduct repair or refurbishment actions on C-130 Brakes, Tires and Wheels. Their normal C-130 maintenance actions consist of removal, inspection and replacement of brakes, tires and wheels, with replacement being accomplished by the purchase of parts from qualified C-130 parts vendors. One subcontractor uses a reimbursable JON arrangement with a USAF organization for brake/tire/wheel maintenance. If the subcontractor possesses only the tools and equipment to remove and replace brakes, tires and wheels, is this the equipment that should be listed per the MCM Specification requirements?

Answer: No. The requirement of the Minimum Capabilities Matrix is for equipment and tools for use in repair, removal, inspection, and replacement of brakes, tires, and wheels. The prime and/or critical subcontractor(s) must have this capability in order to meet the requirements of the Minimum Capabilities Matrix.

Question: One of our critical subcontractors has stated that “It is XXXX’s policy to send government packages directly to the government. Could you please provide the name and address of where the package needs to be sent?” Should we instruct them to send their sealed rate packages directly to the addresses indicated in the F2AST solicitation?

Answer: No. Sealed rate packages submitted by subs to the prime contractor should be a part of the prime contractor’s proposal submittal and should not be sent under separate cover.