FA823220R0001.pdf

PDF 287 KB Posted

Attached to
PACAF F16 Depot Federal contract opportunity
Solicitation number
FA823220R0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document provides information regarding a planned solicitation for depot support services on United States Air Forces in the Pacific (PACAF) F-16 aircraft. Key details include:

  • The scope of work includes core defined depot-level maintenance activities such as aircraft coating removal and painting, non-destructive inspections, and radar absorbing material intake surface repair. Additional programmed work includes major depot-level modifications and repairs including longeron repair or replacement, major bulkhead repair or replacement, wing repair or replacement, and avionic modifications/upgrades.

  • The contract will be for depot-level maintenance and repair at a contractor-operated facility located within the competition circle provided in an attachment. Support may also include sending contractor field teams to perform depot-level repairs on any F-16 aircraft in any location excluding combat zones.

  • The contract type will be an indefinite delivery/indefinite quantity ordering contract with a ceiling amount of $252 million over five years and an option to extend an additional five years. The period of performance is from April 2020 through March 2025 with an option to extend through March 2030.

View the file

Other files for this federal contract opportunity

Other files attached to PACAF F16 Depot, newest first.
File Type Posted
Amendment 5 Question set 9.pdf PDF
Amendment_5_Question_and_Answer_Set_8_PACAF.pdf PDF
Amendment 5 Attachment_1_PACAF_Pricing_Table_2_Apr_20.xlsx XLSX spreadsheet
Amendment_4_Attachment_1_PACAF_Pricing_Table_31_Mar_20.xlsx XLSX spreadsheet
Amendment_4_Attachment_5_PACAF_Section_M_31_Mar_20.pdf PDF
Amendment_4_Attachment_4_PACAF_Section_L_31_Mar_20.pdf PDF
Amendment_4_Attachment_1_PACAF_Pricing_Table_31_Mar_20.pdf PDF
Amendment_4_Attachment_16_-_PWS_Attachment_6_-_Unclassified_OCONUS_Engine_Runs_31_Mar_20.pdf PDF
Amendment_4_Attachment_2_-_PWS_PACAF_F-16_Depot_31_Mar_20.pdf PDF
Amendment_4_Question and Answer Set 6 Amendment 5.pdf PDF
Amendment_4_FA823220R0001_______0005.pdf PDF
FA823220R0001_______0003.pdf PDF
Amendment_3_Attachment_1_PACAF_Pricing_Table_17_Mar_20.pdf PDF
Amendment_3_Attachment_4_PACAF_Section_L_17_Mar_20.pdf PDF
Amendment_3_CLIN_0074_0075_stock_number_prices_19_March_20.xlsx XLSX spreadsheet
Amendment_3_Question_Set_5_Tool List.xlsx XLSX spreadsheet
Amendment_2_Question_set_4_PACAF_9_March_20.pdf PDF
Attachment_2_-_PWS_PACAF_F-16_Depot_6_Mar_20.pdf PDF
Attachment_1_PACAF_Pricing_Table_6_Mar_20.xlsx XLSX spreadsheet
FA823220R0001_______0002.pdf PDF
Attachment_11_-_PWS_Attachment_1_-_PACAF_USG_Provided_Materials_6_Mar_20.xlsx XLSX spreadsheet
Attachment_11_-_PWS_Attachment_1_-_PACAF_USG_Provided_Materials_6_Mar_20.pdf PDF
Amendment_1_Question_set_3_PACAF_6_Mar_20.docx DOCX document
Amendment_1_Question Set 2 - 27_Feb_20 PACAF.pdf PDF
Amendment_1_Question Set 1 - PACAF.pdf PDF
Amendment_1_FA823220R0001_______0001_20_Feb_20.pdf PDF
Depot_Requirements_Matrix.xlsx XLSX spreadsheet
Amendment_1_Attachment_1_-_PACAF_Pricing_Table_19_Feb_20.pdf PDF
Amendment_1_Attachment_1_-_PACAF_Pricing_Table_19_Feb_20.xlsx XLSX spreadsheet
Amendment_1_Attachment_2_-_PWS_PACAF_F-16_Depot_19_Feb_20.pdf PDF
Attachment_1_-_PACAF_Pricing_Table.xlsx XLSX spreadsheet
Attachment_17_-_GFP.pdf PDF
Attachment_6_-_Attachment_L-1_-_Past_Performance_Information_Sheet.pdf PDF
Attachment_14_-_PWS_Attachment_4_-_Required_Wing_Tooling.xlsx XLSX spreadsheet
Attachment_11_-_PWS_Attachment_1_-_PACAF_USG_Provided_Materials.xlsx XLSX spreadsheet
Attachment_8_-_Attachment_L-3_-_Sample_Consent_Letter.pdf PDF
Attachment_13_-_PWS_Attachment_3_-_SLEP_Tool_Replacement_List.xlsx XLSX spreadsheet
Attachment_15_-_PWS_Attachment_5_-_Contractor_Provided_Tooling.xlsx XLSX spreadsheet
Attachment_2_-_PWS_PACAF_F-16_Depot.pdf PDF
Attachment_9_-_Attachment_L-4_-_Client_Authorization_Letter_sample.pdf PDF
Attachment_7_-_Attachment_L-2_-_Cover_Letter_Template.pdf PDF
Attachment_10_-_Attachment_L-5_-_Past_Performance_Questionnaire.pdf PDF
Attachment_4_PACAF_Section_L_24_Jan_20.pdf PDF
Attachment_5_PACAF_Section_M_24_Jan_20.pdf PDF
Attachment_3a_PACAF_CDRLs.pdf PDF
Attachment_12_-_PWS_Attachment_2_-_Additional_SLEP_Modification_Tooling.pdf PDF
Attachment_16_-_PWS_Attachment_6_-_Unclassified_OCONUS_Engine_Runs.pdf PDF
Attachment_3b_PACAF_CDRLs_Option_CLINs.pdf PDF
PACAF_F-16_Depot_Synopsis.docx DOCX document
Attachment_1.docx DOCX document
Show all 50

PACAF F16 Depot has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV. 9-97)

PREVIOUS EDITION NOT USABLE Prescribed by GSA – FAR (48 CFR) 53/214(c)

SOLICITATION, OFFER AND AWARD JS

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15CFR 7900)

RATING

DO: A1

Page of Page

2. CONTRACT NO. 3. SOLICITATION NO.

FA8232-20-R-0001

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

7. ISSUED BY

DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING

AFLCMC WWMK

6072 FIR AVENUE BLDG 1233

HILL AIR FORCE BASE UT 84056-5820

BUYER: Timothy Howard/AFLCMC timothy.howard.27@us.af.mil Phone: (801) 777- 8118

FA8232 8. ADDRESS OFFER TO (If other than Item 7)

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTON PAGE(S) (X) Sec. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

X A SOLICITATION/CONTRACT FORM

X B SUPPLIES OR SERVICES AND

C DESCRIPTION/SPECS/WORK STATEMENT

D PACKAGING AND MARKING

X E INPECTION AND ACCEPTANCE

F DELIVERIES OR PERFORMANCE

X G CONTRACT ADMINISTRATION DATA

H SPECIAL CONTRACT REQUIREMENTS

X I CONTRACT CLAUSES

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER

X J LIST OF ATTACHMENTS

X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

X L INSTRS., CONDS., AND NOTICES TO OFFERORS

X M EVALUATION AND FACTORS FOR AWARD

OFFER (Must be fully completed by offeror)

24. ADMINISTERED BY (If other than Item 7) SCD:B 25. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

X

5. DATE ISSUED 6.REQUISITION/PURCHASE NO

F2DCCM9354A003

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the depository located in until 2:00 (Hour) local time 24-MAR-2020 (Date).

CAUTION- LATE Submissions, Modifications, and Withdrawals: Section L, Provision No 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this section.

10. FOR INFORMATION

CALL:

A. NAME

Timothy Howard

B. TELEPHONE (NO COLLECT CALLS)

(801 ) 777 -8118

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within 180 calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT(See Section I, Clause No 52.232-8)

10 CALENDAR DAYS 20 CALENDAR DAYS 30 CALENDAR DAYS CALENDAR DAYS

14. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated:

AMENDMENT NO. DATE AMENDMENT NO. DATE

15A. NAME AND

ADDRESS OF

OFFEROR

CODE FACILITY

16. NAME AND TITLE OF PERSON

AUTHORIZED TO SIGN OFFER (Type or print)

15B. TELEPHONE NO.

(Include Area Code)

15C.CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE-ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS 20. AMOUNT

$ 252,000,000.00

21. ACCOUNTING AND APPROPRIATION

SEE SCHEDULE

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN

COMPETITION

10 U.S.C. 2304 (c) ( ) 41 U.S.C. 253 (c)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

SOLICITATION

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

C. E-MAIL ADDRESS

timothy.howard.27@us.af.mil

FA8232-20-R-0001

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

All orders placed against the contract may use Republic of Korea (ROK) funding when available. Funding is available for labor dollars in accordance with a pricing attachment that will be added after award by modification. Upon the utilization of ROK funding, the U.S. will de-obligate the unused funding after invoice payment.

Pricing is applicable to the ordering period in the most current PACAF pricing attachment.

The estimated contract ceiling amount is $252M.

The Government guarantees a single minimum order value of at least $50,000.

The ordering period of this contract will be 60 months from date of award with a period of performance (PoP) that may extend up to 12 months from the last order for a potential PoP of 72 months. The option, if exercised, will add an additional 60 months with a PoP that may extend up to 12 months from the last order for a potential PoP of 132 months.

F-16 PRE-MAINTENANCE AND MODIFICATION INSTRUCTIONS

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

RECEIVING

Per PWS 1.13.1.4.1 Pre-induction services with inspection and work request.

An incoming inspection shall be performed on all aircraft received for depot maintenance. This inspection shall include the applicable portions of the basic post-flight inspection in accordance with TO 1F-16(*)-6.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

Buy American Act N/A for Construction Material IUID Required: No

POST MAINTENANCE

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

POST MAINTENANCE

Per PWS 1.15 Post induction services, To include replacement of all aircraft nitrogen, fuel, liquid oxygen and hydrazine, inspection, cleaning, securing access plates/panels, weight and balance, ops checks, engine runs, reinstalling extraneous equipment and functional check flights.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IAW PWS Sec 1.10.1

OVER AND ABOVE WORK PROCEDURES

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

OVER AND ABOVE

Per PWS 1.17 Over and Above, (O&A) including Surge, as Directed by the PCOFixed Composite or Loaded Rates as established. Tasks, labor hours and material to be established on orders issued hereunder.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

CONTRACT DATA REQUIREMENTS LIST (CDRLs) Item No.

Not Separately Priced Quantity U/I Unit Price

LO NSP

J015 CONTRACT DATA REQUIREMENT LIST (CDRLs) Per PWS 1.18 Contract Data Requirement List (CDRLs), Contract Data Requirements List (CDRL), Administrative Reporting IAW Contract attachment, Exhibit A, DD Forms 1423, and all other contract CDRL requirements Priority: R ROUTINE.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

DROP-IN WORKLOAD

Per PWS 1.14.3 Drop-in maintenance on F-16 C/D aircraft. Workload shall be negotiated as FFP for each event (aircraft), or determined as appropriate by the PCO and PM. Hours and Material to be specified on individual orders issued hereunder. Fully loaded rates in fixed rate agreement apply to labor hours. See contract Attachment 2.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Contractor Field Team - Travel Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

EA

J015

CONTRACT FIELD TEAM (CFT)

Per PWS 1.14.10 Travel Contractor Field Team Travel, maintenance certification, training, and other meetings as required.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

CONTRACT FIELD TEAM (CFT)

Per PWS 1.14.10 CFT support for F-16 C/D aircraft. If the schedule allows, to be negotiated (TBN) as FFP for each event (aircraft), as determined by the PCO. Fully loaded rates in fixed rate agreement apply. Labor hours may be negotiated as determined by the PCO. See contract Attachment 2.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price

DEPOT MAINTENANCE AND MODIFICATION

Quantity U/I Unit Price Amount

EA

J015

PHASE INSPECTIONS

Per PWS 1.14.11 Phase Inspection, FFP includes providing the repair proposal Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

PHASE INSPECTIONS

Per PWS 1.14.11 Phase Inspection Repair Based on Proposal Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

LO

J015

PHASE INSPECTIONS

DEPOT MAINTENANCE AND MODIFICATION

Per PWS 1.14.11 Phase Inspection Over and Above, (O&A) Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

PRE-MAINTENANCE AND MODIFICATIONS

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

EXTERNAL FUEL TANK HANDLING

Per PWS 1.13.1.6.2 and 1.15.4 Two 370-gal External Fuel Tanks removal/installation (Defuel/Storage/Reinstall) The Contractor shall remove, store, and reinstall two 370-gal external fuel tanks equipment after installation operational checks.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

PRE-MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

EXTERNAL FUEL TANK HANDLING

Per PWS 1.13.1.6.2 and 1.15.4 300-gal External Fuel Tank removal/installation (Defuel/Storage/Reinstall) The Contractor shall remove, store, and reinstall 300-gal external fuel tank equipment after installation operational checks.

PRE-MAINTENANCE AND MODIFICATION

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

PMB STRIP OF UHG

Per PWS 1.14.7 Strip where UHG (FMS 3600) will apply, F-16 C/D Full strip of UHG (FMS 3600) coatings using plastic media blast (PMB) for C/D model F-16 aircraft Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

PMB STRIP OF POLY PAINT

Per PWS 1.14.7 Strip where Poly coat will apply, F-16 C/D Full strip of Poly coatings using plastic media blast (PMB) for C/D model F-16 aircraft

Limitations of Liability: High Value Item

DEPOT MAINTENANCE AND MODIFICATION

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

STANDARD POLY APPLICATION

Per PWS 1.14.7 Full paint, apply poly coat paint, F-16 C/D Standard Paint application of Poly paint on F-16 C/D model aircraft Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SCUFF SAND AND PAINT

Per PWS 1.14.3 Scuff, sand, and apply UHG (FMS 3600) paint, F-16C/D Scuff sand & paint of aircraft for C/D model F-16 aircraft using UGH (FMS 3600) paint Priority: R ROUTINE.

DEPOT MAINTENANCE AND MODIFICATION

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SCUFF SAND AND PAINT

Per PWS 1.14.3 Scuff, sand, and apply poly paint, F-16 C/D Scuff sand & paint of aircraft for C/D model F-16 aircraft using Poly paint Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

STRIP AND REPAINT

Per PWS 1.14.7 Two 370-gal Ex Fuel Tanks Surface Treat, PMB and Paint, Apply Poly Strip using Plastic Media Blast (PMB) and repaint two 370-gal fuel tanks utilizing Poly paint. Unit price per two tanks.

DEPOT MAINTENANCE AND MODIFICATION

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

STRIP AND REPAINT

Per PWS 1.14.7 300-gal External Fuel Tank PMB and Paint (Poly Coat) Strip using Plastic Media Blast (PMB) and repaint 300 gal fuel tanks utilizing Poly Paint. Unit price is per tank.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

STRIP AND REPAINT

Per PWS 1.14.7 Two 370-gal External Fuel Tanks Scuff/Sand and Paint (Poly Coat) Strip using Plastic Media Blast (PMB) and repaint two 370-gal fuel tanks utilizing poly paint. Unit price per two tanks.

DEPOT MAINTENANCE AND MODIFICATION

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SCUFF SAND AND REPAINT

Per PWS 1.14.7 300-gal External Fuel Tank Scuff/Sand and Paint (Poly Coat) Scuff/sand and repaint of 300 gal fuel tanks using Poly Paint as required. Unit price is per tank.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

PMB AND REPAINT FUEL TANKS

Per PWS 1.14.7 Two 370-gal External Fuel Tanks Surface Treat, PMB and Paint, Apply UHG (FMS 3600) Strip using Plastic Media Blast (PMB) and repaint two 370-gal fuel tanks utilizing UHG (FMS 3600) paint. Unit price per two tanks.

DEPOT MAINTENANCE AND MODIFICATION

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

PMB AND REPAINT FUEL TANKS

Per PWS 1.14.7 300-gal External Fuel Tank Surface Treat, PMB and Paint, Apply UHG (FMS 3600) Strip using Plastic Media Blast (PMB) and repaint 300 gal fuel tanks utilizing UHG (FMS 3600) paint. Unit price is per tank.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SCUFF SAND AND PAINT FUEL TANKS

Per PWS1.14.3 Two 370-gal External Fuel Tanks Scuff/Sand and UHG (FMS 3600) Paint Scuff/sand two 370-gal external fuel tanks then paint using UHG (FMS 3600)

DEPOT MAINTENANCE AND MODIFICATION

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

CORROSION TREATMENT AND PAINTING

Per PWS 1.14.3 300-gal external fuel tank scuff / sand and paint UHG (FMS 3600) Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

PMB AME AND POLY PAINT TO STATIONS 1-9

Per PWS 1.14.7 - AME with poly paint PMB strip AME and apply Polyurethane paint to Stations 1 and 9 Missle Rails and centerline (Station 5) pylon Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required

DEPOT MAINTENANCE AND MODIFICATION

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

PMB AME AND UHG PAINT TO STATIONS 1-9

Per PWS 1.14.7 AME with UHG (FMS 3600) paint PMB strip AME and UHG (FMS 3600) paint to Stations 1 and 9 Missle Rails and centerline (Station 5) pylon Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SCUFF/SAND FOR AME AND APPLY UHG

Per PWS 1.14.3 - Scuff / sand for AME and apply poly paint Scuff/sand for AME then apply Polyurethane paint to Stations 1 and 9 Missle Rails and centerline (Station 5) pylon Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SCUFF/SAND FOR AME TO APPLY UHG

Per PWS 1.14.3 - Scuff / sand for AME and apply UHG (FMS 3600) paint Scuff/sand for AME then apply UHG (FMS 3600) paint to Stations 1 and 9 Missle Rails and centerline (Station 5) pylon Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

INLET RAM STRIP AND PAINT

Per PWS 1.13.1, 1.14.1, 1.14.3, 1.14.4, 1.14.7, 1.14.18.6, 1.14.26, and 1.15.9 - Induction, PMB / paint, RAM repair and outgoing services, Inlet RAM strip and paint Inlet Radar Absorbing Material (RAM) Strip and Paint Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

UPPER FLANGE INSPECTION AND REPAIR

Per PWS 1.14.19.3 - Upper Flange Inspection and Replace, Block 40 (TCTO 2741C) Upper Flange Inspection and Repair: The Contractor shall have the capability to perform a post-block F-16 bulkhead upper flange inspection in accordance with TCTO 1F-16-2741C and blend and repair the bulkhead upper flange in accordance with 16RB527. The Contractor shall also have the capability to replace upper bulkhead segments (i.e., upper FS341 bulkhead segment replacement per 16RB481).

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

UPPER FLANGE INSPECTION AND REPAIR

Per PWS 1.14.19.3 - Upper Flange Inspection and Replace, Block 50 (TCTO 2741C) Upper Flange Inspection and Repair: The Contractor shall have the capability to perform a post-block F-16 bulkhead upper flange inspection in accordance with TCTO 1F-16-2741C and blend and repair the bulkhead upper flange in accordance with 16RB527. The Contractor shall also have the capability to replace upper bulkhead segments (i.e., upper FS341 bulkhead segment replacement per 16RB481).

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required

DEPOT MAINTENANCE AND MODIFICATION

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

WING INSPECTION / REPAIR

Per PWS 1.14.12 - F-16 internal wing box inspection (TCTO2741D) F-16 internal Wing Box Inspection, including Upper/Lower Skin and Interior Wing Box -36 Inspection, Wing Box Cleaning, Fuel Cells Re-seal, and Faulty Component Replacement. Unit price is per wing.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

WING INSPECTION / REPAIR

Per PWS 1.14.12 - Upper wing skin replacement (TCTO2741D) Upper skin replacement. Unit price is per wing Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

WING INSPECTION / REPAIR

Per PWS1.14.12 - Wing removal and reinstallation, right side Perform wing removal and reinstallation on right side. Unit price is per wing.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

WING INSPECTION / REPAIR

Per PWS 1.14.12 - Wing replacement, right side Perform wing replacement on right side. Unit price is per wing.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

WING INSPECTION / REPAIR

Per PWS 1.14.12 - Wing removal and reinstallation, left side Perform wing removal and reinstallation on left side. Unit price is per wing.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

WING INSPECTION / REPAIR

Per PWS 1.14.12 - Wing replacement, left side Perform wing replacement on left side. Unit price is per wing.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

CANOPY SILL LONGERON REPAIR

Per PWS 1.14.15 - Canopy sill longeron replace, F-16C, both sides (left and right) Both sides (Left and Right) Canopy Sill Longeron replacement on F-16C model aircraft Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

CANOPY SILL LONGERON REPAIR

Per PWS 1.14.15 - Canopy sill longeron repair, F-16C, left or right, 16RB098 temp strap Left or Right side Canopy Sill Longeron temporary strap repair on F-16C model aircraft.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICAITON

Item No.

DEPOT MAINTENANCE AND MODIFICAITON

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

CANOPY SILL LONGERON REPAIR

Per PWS 1.14.15 - Canopy sill longeron replace, F-16D both sides (2 sides, four longerons) Both sides (Left and Right), three-piece Longeron replacement on F-16D model aircraft.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

CANOPY SILL LONGERON REPAIR

Per PWS1.14.15 - Canopy sill longeron repair, F-16D, left side FS 161 strap repair (TCTO2749) Left side FS 161 Canopy Sill Longeron strap repair on F-16D Model aircraft.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Quantity U/I Unit Price Amount

DEPOT MAINTENANCE AND MODIFICATION

EA

J015

CANOPY SILL LONGERON REPAIR

Per PWS 1.14.15 - Canopy sill longeron repair, F-16D, right side FS 161 strap repair (TCTO2749) Right side FS 161 Canopy Sill Longeron strap repair on F-16D Model aircraft.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

CANOPY SILL LONGERON REPAIR

Per PWS 1.14.15 - Canopy Sill Longeron Rep, F-16D, L/R, FS 189 Strap Repair, TCTO 2750 Both sides (Left and Right), FS 189 Canopy Sill Longeron strap repair, F-16D Model aircraft.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

DEPOT MAINTENANCE AND MODIFICATION

CANOPY SILL LONGERON REPAIR

Per PWS 1.14.15 - Canopy sill longeron repair, F-16D, left and right sides, FS 218 strap repair (16RB2004) Both sides (Left and Right) F-16D, FS 218 Canopy Sill Longeron Strap Repair (16RB2004) Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

INSTALL CENTER DISPLAY UNIT (CDU) MODIFICATION

Per PWS 1.14.20 - Install CDU Mod Install CDU modification on aircraft (TCTO 2801D and 2829). Once complete, document accomplishment of applicable TCTOs in AFTO 781 series forms.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

INSTALL HIGH SPEED DATA NETWORK (HSDN) MODIFICATION

Per PWS 1.14.21 - Install HSDN

DEPOT MAINTENANCE AND MODIFICATION

The contractor shall have capability to perform Block 40-42 and Block 50-52 HSDN avionic modification, in accordance with TCTO’s 1F-16-2800C and 1F-16-2830.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

INSTALL AN/ASQ-236 MODIFICATION

Per PWS 1.14.22 - Install AN/ASQ-236 Group A mod, The Contractor shall perform AN/ASQ-236 avionic modification, (TCTO 2795, 2833, 2844) Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

ALQ-213 MODIFICATION

Per PWS 1.14.23 - ALQ-213 Mod The Contractor shall have capability to perform post-block ALQ-213 avionic modification and operational checks, (TCTO 2663E (Blk 42C), 2664C (Blk 42D), 2825 (Blk 40C), 2826 (Blk 40D), 2827 (Blk 50/52C) & 2828 (Blk 50/52D))

DEPOT MAINTENANCE AND MODIFICATION

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

POST-BLOCK REPAIR (PBR)

Per PWS 1.14.19 - Post-block repair (PBR) The contractor shall accomplish Post-Block Repair (PBR) Left & right cockpit skins corrosion inspection TCTO 2831, Engine intake corrosion inspection TCTO 2832, Replacement of inner/outer box beams TCTO 2732, Upper bulkhead flange (UBF) 100% fitting install TCTO 2741, and Keel beam mod TCTO 2730 to complete the PBR tasks and increase long-term maintainability.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

COCKPIT INSPECTION

Per PWS 1.14.19.1 - Cockpit skins corrosion inspection, left and right (TCTO 2831)

DEPOT MAINTENANCE AND MODIFICATION

Inspect Left and Right Lower 16B1307 Cockpit Skins: The Contractor shall have the capability to perform pre-block corrosion inspection on all USAF F-16 A/B/C/D BLOCK 5 thru 52 aircraft in accordance with TCTO 1F-16-2831.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

INTAKE CORROSION INSPECTION

Per PWS 1.14.18.2 - Engine intake corrosion inspection (TCTO 2832) Inspect Engine Air Inlet: The Contractor shall perform pre-block corrosion inspection on all USAF F-16 A/B/C/D BLOCK 5 thru 52 aircraft in accordance with TCTO 1F-16-2832.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATIONS

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SERVICE LIFE EXTENSION PROGRAM (SLEP):

Per PWS 1.3.5 and 1.14.24 - Service Life Extension Program (TCTO 2776) Inspection of Completed TCTOs for F-16 Service Life Extension Requirements

DEPOT MAINTENANCE AND MODIFICATIONS

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATIONS

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

CANOPY SILL LONGERON REPLACEMENT F-16 C-MODEL

Per PWS 1.3.5 and 1.14.15.1 - CSL 16B1107 Model C, Blk 40/42/50/52, (TCTO 2775) Replacement of PN 16B1103 Canopy Sill Longerons (C Model) Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICAION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

CANOPY SILL LONGERON REPLACEMENT F-16 D-MODEL

Per PWS 1.3.5 and 1.14.14.2 - CSL 16B2101/03 Model D, Blk 40/42s, (TCTO 2770) Replacement of PN 16B2101 and 16B2103 Canopy Sill Longerons (D Model)

DEPOT MAINTENANCE AND MODIFICAION

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICAITON

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

CANPOY SILL LONGERON REPLAMENT F-16 D-MODEL

Per PWS 1.3.5 and 1.14.15.2 - CSL 16B2101/03 Model D, Blk 50/52s, (TCTO 2770) Replacement of PN 16B2101 and 16B2103 Canopy Sill Longerons (D Model) Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

STRAKE CLOSURE

Per PWS 1.3.5 and 1.3.8 - Strake closure rib 16B5135, (TCTO 2733), Replacement of Butt Line 54 Closure Rib Assembly, PN 16B5135 and Replacement of the 16B5278 and 16B5279 Flanges

DEPOT MAINTENANCE AND MODIFICATION

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

REMOVE/REPLACE WING BOX

Per PWS 1.3.5 and 1.3.8 Remove and replace SLEP wing (TCTO 2726) Removal and Replacement of Wing Box TCTO 2726 Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATIONS

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

MODIFICATION OF WING BOX

Per PWS 1.3.5 and 1.3.8 Modification of Wing box Modification of Wing Box, PN 16W1030 (16W9-13-501). Replacement of Upper Wing Skin PN 16W1101 and Modification of Lower Wing Skin PN 16W1102

DEPOT MAINTENANCE AND MODIFICATIONS

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATIONS

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

MODIFICATION OF CENTER FUSELAGE

Per PWS 1.3.5 and 1.3.8 - Upper fuselage skin, 16B5301 Blk 40/42s, 5303 (TCTO 2734) Modification of Center Fuselage Upper Skin Assemblies, PN 16B5301, 16B5303 and 16B5304 Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATIONS

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

MODIFICATION OF CENTER FUSELAGE

Per PWS 1.3.5 AND 1.3.8 Upper fuselage skin 16B5301 Blk 50/52s, 5303 (TCTO 2734) Modification of Center Fuselage Upper Skin Assemblies, PN 16B5301, 16B5303 and 16B5304

DEPOT MAINTENANCE AND MODIFICATIONS

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATIONS

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

MODIFICATION OF BUTT LINE

Per PWS1.3.5 and 1.3.8 - Refuel web (TCTO 2780) Modification of Butt line 8 Upper Web Assembly, PN 16B5113 Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

REMOVE/REPLACE AND MILL/DRILL FS479 BULKHEAD

Per PWS 1.3.5 and 1.3.8 - Upper bulkhead 16B6224 FS479/ Splice plate 16B6166 (TCTO 2727) The Contractor shall remove, replace and perform mill and drill operations on the FS479 bulkhead per TCTO 1F-16-2727, PN 16B6224 and Replacement of 16B6166 Splice Plate

DEPOT MAINTENANCE AND MODIFICATION

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

INSTALLATION OF REINFORCEMENT FITTINGS ON CLOSURE BEAM

Per PWS 1.3.5 and 1.3.8 - Closure beam 16B5132 (TCTO 2729) Installation of Reinforcement Fittings on Closure Beam, PN 16B5132 Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATIONS

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SLEP MODIFICATIONS

Per PWS 1.14.24.4 - Lower Bulkhead FS357 (TCTO2779) The Contractor shall perform cold work operations for SLEP modification. Modification of Bracket Installation, PN 16D4037 to Improve Service Life on Lower Flange of FS357 Lower Bulkhead 16B6268

DEPOT MAINTENANCE AND MODIFICATIONS

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATIONS

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SLEP MODIFICATIONS

Per PWS 1.14.24.4 - Lower Bulkhead FS341 16B5253; Fuel Shelf Web 16B5141/16B5142, Model C, Blk 40/42s, (TCTO 2728)

The Contractor shall perform cold work operations for SLEP modification. The Contractor shall remove and replace a FS341 lower bulkhead per TCTO 1F-16-2728. Replacement of Fuselage Station 341.80 Lower Bulkhead PN 16B5250 and Modification of Fuel Shelf Web, PN 16B5141/42 Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATIONS

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SLEP MODIFICATIONS

Per PWS 1.14.24.4 - Lower Bulkhead FS341 16B5253; Fuel Shelf Web 16B5141/16B5142, Model C, Blk 50/52s, (TCTO 2728)

The Contractor shall perform cold work operations for SLEP modification. The Contractor shall remove and replace a FS341 lower bulkhead per TCTO 1F-16-2728. Replacement of Fuselage Station 341.80 Lower Bulkhead PN 16B5250 and Modification of Fuel Shelf Web, PN 16B5141/42

DEPOT MAINTENANCE AND MODIFICATIONS

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATIONS

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SLEP MODIFICATIONS

Per PWS1.14.24 - Lower Bulkhead FS341 16B5253; Fuel Shelf Web 16B5141/16B5142, Model D, Blk 40/42s, (TCTO 2728) The Contractor shall perform cold work operations for SLEP modification. The Contractor remove and replace a FS341 lower bulkhead per TCTO 1F-16-2728. Replacement of Fuselage Station 341.80 Lower Bulkhead PN 16B5250 and Modification of Fuel Shelf Web, PN 16B5141/42 Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DEPOT MAINTENANCE AND MODIFICATIONS

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SLEP MODIFICATIONS

Per PWS 1.14.24.4 -Lower Bulkhead FS341 16B5253; Fuel Shelf Web 16B5141/16B5142, Model D, Blk 50/52s, (TCTO 2728)

DEPOT MAINTENANCE AND MODIFICATIONS

The Contractor shall have the capability to perform cold work operations for SLEP modification. The Contractor shall have the capability to remove and replace a FS341 lower bulkhead per TCTO 1F-16-2728. Replacement of Fuselage Station 341.80 Lower Bulkhead PN 16B5250 and Modification of Fuel Shelf Web, PN 16B5141/42 Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspect…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .