Amendment_4_FA823220R0001_______0005.pdf

PDF 231 KB Posted

Attached to
PACAF F16 Depot Federal contract opportunity
Solicitation number
FA823220R0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document provides an advance notice of a forthcoming solicitation for depot-level maintenance and repair services for F-16 aircraft allocated to the United States Air Forces in the Pacific Command. The scope of work includes core depot maintenance activities, predefined programmatic work, and unplanned drop-in maintenance. Core work includes aircraft coating removal and painting, inspections, and radar absorbing material repairs. Programmed work covers major modifications, repairs, and upgrades such as longeron and bulkhead replacements, wing repairs, and avionic upgrades. Additional unplanned workload will be supported as needed. The contract will have a ceiling of $252 million over five years of ordering from April 2020 through March 2025, with an optional five-year extension. Foreign participation is allowed. Questions may be directed to the points of contact listed.

View the file

Other files for this federal contract opportunity

Other files attached to PACAF F16 Depot, newest first.
File Type Posted
Amendment_5_Question_and_Answer_Set_8_PACAF.pdf PDF
Amendment 5 Question and Answer Set 7.docx DOCX document
Amendment_4_Attachment_1_PACAF_Pricing_Table_31_Mar_20.xlsx XLSX spreadsheet
Amendment_4_Attachment_5_PACAF_Section_M_31_Mar_20.pdf PDF
Amendment_4_Attachment_4_PACAF_Section_L_31_Mar_20.pdf PDF
Amendment_4_Attachment_1_PACAF_Pricing_Table_31_Mar_20.pdf PDF
Amendment_4_Attachment_16_-_PWS_Attachment_6_-_Unclassified_OCONUS_Engine_Runs_31_Mar_20.pdf PDF
Amendment_3_Attachment_1_PACAF_Pricing_Table_17_Mar_20.pdf PDF
Amendment_3_Attachment_4_PACAF_Section_L_17_Mar_20.pdf PDF
Amendment_3_Attachment_6_Attachment_L-1_past_performance_information.docx DOCX document
Amendment_3_Attachment_2_-_PWS_PACAF_F-16_Depot_18_Mar_20.pdf PDF
Amendment_3_Attachment_1_PACAF_Pricing_Table_17_Mar_20.xlsx XLSX spreadsheet
Amendment_3_Question_set_5_PACAF_17_March_20.docx DOCX document
Amendment_3_Attachment_6_Attachment_L-1_past_performance_information.pdf PDF
Amendment_2_Question_set_4_PACAF_9_March_20.pdf PDF
Attachment_2_-_PWS_PACAF_F-16_Depot_6_Mar_20.pdf PDF
Attachment_1_PACAF_Pricing_Table_6_Mar_20.xlsx XLSX spreadsheet
FA823220R0001_______0002.pdf PDF
Attachment_11_-_PWS_Attachment_1_-_PACAF_USG_Provided_Materials_6_Mar_20.pdf PDF
Attachment_17_-_GFP_6_Mar_20.pdf PDF
Attachment_1_PACAF_Pricing_Table_6_Mar_20.pdf PDF
Amendment_1_Question_set_3_PACAF_6_Mar_20.docx DOCX document
Amendment_1_Question Set 2 - 27_Feb_20 PACAF.pdf PDF
Amendment_1_Question Set 1 - PACAF.pdf PDF
Amendment_1_FA823220R0001_______0001_20_Feb_20.pdf PDF
Amendment_1_Attachment_1_-_PACAF_Pricing_Table_19_Feb_20.pdf PDF
Amendment_1_Attachment_1_-_PACAF_Pricing_Table_19_Feb_20.xlsx XLSX spreadsheet
Amendment_1_Attachment_2_-_PWS_PACAF_F-16_Depot_19_Feb_20.pdf PDF
Depot_Requirements_Matrix.xlsx XLSX spreadsheet
Attachment_1_-_PACAF_Pricing_Table.xlsx XLSX spreadsheet
Attachment_17_-_GFP.pdf PDF
Attachment_6_-_Attachment_L-1_-_Past_Performance_Information_Sheet.pdf PDF
Attachment_14_-_PWS_Attachment_4_-_Required_Wing_Tooling.xlsx XLSX spreadsheet
Attachment_11_-_PWS_Attachment_1_-_PACAF_USG_Provided_Materials.xlsx XLSX spreadsheet
Attachment_8_-_Attachment_L-3_-_Sample_Consent_Letter.pdf PDF
Attachment_13_-_PWS_Attachment_3_-_SLEP_Tool_Replacement_List.xlsx XLSX spreadsheet
Attachment_15_-_PWS_Attachment_5_-_Contractor_Provided_Tooling.xlsx XLSX spreadsheet
Attachment_2_-_PWS_PACAF_F-16_Depot.pdf PDF
Attachment_9_-_Attachment_L-4_-_Client_Authorization_Letter_sample.pdf PDF
Attachment_3a_PACAF_CDRLs.pdf PDF
Attachment_12_-_PWS_Attachment_2_-_Additional_SLEP_Modification_Tooling.pdf PDF
Attachment_16_-_PWS_Attachment_6_-_Unclassified_OCONUS_Engine_Runs.pdf PDF
Attachment_3b_PACAF_CDRLs_Option_CLINs.pdf PDF
FA823220R0001.pdf PDF
Attachment_7_-_Attachment_L-2_-_Cover_Letter_Template.pdf PDF
Attachment_10_-_Attachment_L-5_-_Past_Performance_Questionnaire.pdf PDF
Attachment_4_PACAF_Section_L_24_Jan_20.pdf PDF
Attachment_5_PACAF_Section_M_24_Jan_20.pdf PDF
PACAF_F-16_Depot_Synopsis.docx DOCX document
Attachment_1.docx DOCX document
Show all 50

PACAF F16 Depot has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

JS

2. AMENDMENT/MODIFICATION NO.

FA8232-20-R-0001-0005

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ. NO.

NON PR GENERATED

5. PROJECT NO (If applicable)

6. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING

AFLCMC WWMK

6072 FIR AVENUE BLDG 1233

HILL AIR FORCE BASE UT 84056-5820

BUYER: Johnny Billett/AFLCMC johnny.billett@us.af.mil Phone: (801) 777- 1602

7. ADMINISTERED BY (If other than item 6) CODEFA8232

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA823220R0002

9B. DATED (SEE ITEM 11)

4-FEB-2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 14-APR-2020 2:00 PM

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ROUTINE.

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

FA8232-20-R-0001 - PACAF

NOTE: Due to a clerical error, this amendment is not numbered sequentially compared to the last three. We will not be using FA8232-20-R-0002-0004; instead we are using

FA8232-20-R-0002-0005.

The purpose of this amendment is to make the following changes/updates:

1. CLIN 0001 PWS reference changed from 1.13.1.4.1 to 1.13.1, 1.13.2, and 1.13.3

2. CLIN 0002 PWS reference changed from 1.14 to 1.13.2 and 1.15

3. CLIN 0008 PWS reference changed from 1.14.11 to 1.14.11.3

4. CLIN 0015 PWS reference changed from 1.14.7 to 1.14.7 and 1.15.9

5. CLIN 0016 PWS reference changed from 1.14.3 to 1.14.3, 1.14.7, and 1.15.9

6. CLIN 0017 PWS reference changed from 1.14.3 to 1.14.3, 1.14.7, and 1.15.9

7. CLIN 0024 PWS reference changed from 1.14.3 to 1.14.7

8. CLIN 0025 PWS reference changed from 1.14.3 to 1.14.7

9. CLIN 0026 description updated to PMB strip AME and apply Polyurethane paint to Stations 1 and 9 Missile Rails (launcher) and centerline (Station 5) fuel pylon

10. CLIN 0027 description updated to PMB strip AME and apply UHG (FMS 3600) paint to Stations 1 and 9 Missile Rails (launcher) and centerline (Station 5) fuel pylon

11. CLIN 0028 PWS reference changed from 1.14.3 to 1.14.7 description updated to Scuff/sand AME then apply Polyurethane paint to Stations 1 and 9 Missile Rails (Launcher) and centerline (Station 5) fuel pylon

12. CLIN 0029 PWS reference changed from 1.14.3 to 1.14.7 description updated to Scuff/sand AME then apply UHG (FMS 3600) paint to Stations 1 and 9 Missile Rails (Launcher) and centerline (Station 5) fuel pylon

13. CLIN 0030 Title changed from INLET RAM STRIP AND PAINT to INLET RADAR ABSORBING

MATERIAL (RAM) REMOVAL AND REPLACEMENT

description updated to Removal and replacement of inlet RAM on USAF F-16C/D Block 40/42/50/52 Aircraft IAW TCTO 1F-16-2699

14. CLIN 0031 PWS reference changed from 1.14.19.3 to 1.14.17 description updated to Upper Flange Inspection and Repair: Perform a post-block F-16 bulkhead upper flange inspection in accordance with TCTO 1F-16-2741D and blend and repair the bulkhead upper flange in accordance with 16RB527. The Contractor shall also have the capability to replace upper bulkhead segments (i.e., upper FS341 bulkhead segment replacement per 16RB481).

Amendment/Modification FA8232-20-R-0001-0005

15. CLIN 0032 PWS reference changed from 1.14.19.3 to 1.14.17 description updated to Upper Flange Inspection and Repair: Perform a post-block F-16 bulkhead upper flange inspection in accordance with TCTO 1F-16-2741D and blend and repair the bulkhead upper flange in accordance with 16RB527. The Contractor shall also have the capability to replace upper bulkhead segments (i.e., upper FS341 bulkhead segment replacement per 16RB481).

16. CLIN 0033 PWS reference changed from 1.14.12 to 1.14.12.3.1, 1.14.12.3.2 and 1.14.12.3.3 description updated to Inspection of upper and lower wing skins and inner wing box, to include cleaning and sealing using TO 16W9-13-3 and 1F-16C-36, any faulty component replacement would be considered Over and Above tasks. Unit price is per wing.

17. CLIN 0036 PWS reference changed from 1.14.12 to 1.14.12 and 1.14.13

18. CLIN 0037 PWS reference changed from 1.14.12 to 1.14.12 and 1.14.13

19. CLIN 0039 PWS reference changed from 1.14.15 to 1.14.15.1

20. CLIN 0040 PWS reference changed from 1.14.15 to 1.14.16

21. CLIN 0041 PWS reference changed from 1.14.15 to 1.14.15.2

22. CLIN 0042 PWS reference changed from 1.14.15 to 1.14.15.2.3, 1.14.16, and 1.14.19.7

23. CLIN 0043 PWS reference changed from 1.14.15 to 1.14.15.2.3, 1.14.16, and 1.14.19.7

24. CLIN 0044 PWS reference changed from 1.14.15 to 1.14.15.2.2, 1.14.16, and 1.14.19.6

25. CLIN 0045 PWS reference changed from 1.14.15 to 1.14.16 and 1.14.19.8

26. CLIN 0047 description updated to Perform Block 40-42 and Block 50-52 HSDN avionic modification, in accordance with TCTO’s 1F-16-2800C and 1F-16-2830.

27. CLIN 0048 description updated to Perform both pre-block & post-block AN/ASQ-236 avionic modification, (TCTO 2795, 2833, 2844)

28. CLIN 0049 description updated to Perform post-block ALQ-213 avionic modification and operational checks, (TCTO 2663E (Blk 42C), 2664C (Blk 42D), 2825 (Blk 40C), 2826 (Blk 40D), 2827 (Blk 50/52C) & 2828 (Blk 50/52D))

29. CLIN 0050 description updated to Accomplish Post-Block Repair (PBR) Left & right cockpit skins corrosion inspection TCTO 2831C, Engine intake corrosion inspection TCTO 2832C, Replacement of inner/outer box beams TCTO 2732, Upper bulkhead flange (UBF) 100% fitting install TCTO 2741D, and Keel beam mod TCTO 2730 to complete the PBR tasks and increase long-term maintainability.

30. CLIN 0051 Title changed from COCKPIT INSPECTION to COCKPIT SKINS CORROSION

INSPECTION, RIGHT AND LEFT, (TCTO 2831C)

description updated to Inspect Left and Right Lower 16B1307 Cockpit Skins: Perform pre-block corrosion inspection on all USAF F-16 A/B/C/D BLOCK 5 thru 52 aircraft in accordance with TCTO 1F-16-2831C.

31. CLIN 0052 Title changed from INTAKE CORROSION INSPECTION to ENGINE INTAKE

CORROSION INSPECTION (TCTO 2832C)

description updated to Inspect Engine Air Inlet for Corrosion on ALL USAF/EPAF F-16 A/B/C/D BLOCK 5 thru 52 aircraft in accordance with TCTO 1F-16-2832C.

32. CLIN 0054 PWS reference changed from 1.3.5 and 1.14.15.1 to 1.3.5, 1.3.8 and 1.14.24

33. CLIN 0055 PWS reference changed from 1.3.5 and 1.14.14.2 to 1.3.5, 1.3.8, and 1.14.24

34. CLIN 0056 PWS reference changed from 1.3.5 and 1.14.15.2 to 1.3.5, 1.3.8 and 1.14.24

35. CLIN 0057 PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8 and 1.14.24

36. CLIN 0058 PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8 and 1.14.24 description updated to Removal and Replacement of Upper Wing Skin PN 16W1101 and Modification of Lower Wing Skin PN 16W1102, TCTO 2726 (Both Left and Right Wing will be removed)

37. CLIN 0059 PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8 and 1.14.24 description updated to Modification of Wing Box, PN 16W1030 (16W9-13-501). Replacement of Upper Wing Skin PN 16W1101 and Modification of Lower Wing Skin PN 16W1102 (Set of One Left and One Right)

38. CLIN 0060 PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8 and 1.14.24

39. CLIN 0061 PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8 and 1.14.24

40. CLIN 0062 PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8 and 1.14.24

41. CLIN 0063 Title changed from REMOVE/REPLACE AND MILL/DRILL FS479 BULKHEAD to

UPPER BULKHEAD 16B6224 FS479 / SPLICE PLATE 16B6166, (TCTO 2727C).

PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8, and 1.14.24.

Description updated to Remove, replace and perform mill and drill operations on the FS479 bulkhead per TCTO 1F-16-2727C, PN 16B6224 and Replacement of 16B6166 Splice Plate

42. CLIN 0064 PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8 and 1.14.24

43. CLIN 0065 PWS reference changed from 1.14.24.4 to 1.3.5, 1.3.8 and 1.14.24

44. CLIN 0066 PWS reference changed from 1.14.24.4 to 1.3.5, 1.3.8 and 1.14.24 description updated to Perform cold work operations for SLEP modification. Remove and replace a FS341 lower bulkhead per TCTO 1F-16-2728. Replacement of Fuselage Station 341.80 Lower Bulkhead PN 16B5250 and Modification of Fuel Shelf Web, PN 16B5141/42

45. CLIN 0067 PWS reference changed from 1.14.24.4 to 1.3.5, 1.3.8 and 1.14.24 description updated to Perform cold work operations for SLEP modification. Remove and replace a FS341 lower bulkhead per TCTO 1F-16-2728. Replacement of Fuselage Station 341.80 Lower Bulkhead PN 16B5250 and Modification of Fuel Shelf Web, PN 16B5141/42

46. CLIN 0068 PWS reference changed from 1.14.24.4 to 1.3.5, 1.3.8 and 1.14.24 description updated to Perform cold work operations for SLEP modification. Remove and replace a FS341 lower bulkhead per TCTO 1F-16-2728. Replacement of Fuselage Station 341.80 Lower Bulkhead PN 16B5250 and Modification of Fuel Shelf Web, PN 16B5141/42

47. CLIN 0069 PWS reference changed from 1.14.24.4 to 1.3.5, 1.3.8 and 1.14.24 description updated to Perform cold work operations for SLEP modification. Remove and replace a FS341 lower bulkhead per TCTO 1F-16-2728. Replacement of Fuselage Station 341.80 Lower Bulkhead PN 16B5250 and Modification of Fuel Shelf Web, PN 16B5141/42

48. CLIN 0070 PWS reference changed from 1.14.24.4 to 1.3.5, 1.3.8 and 1.14.24 description updated to Perform cold work operations for SLEP modification. Modification of Fuselage Station 309.80 and 325.80 Lower Bulkheads 16B5235 and 16B5245

49. CLIN 0071 PWS reference changed from 1.14.19 and 1.19.19.4 to 1.3.5, 1.3.8 and 1.14.24

50. CLIN 0072 PWS reference changed from 1.3.5, 1.3.8 and 1.14.19.5 to 1.3.5, 1.3.8 and 1.14.24

51. CLIN 0073 PWS reference changed from 1.3.6, 1.3.8, and 1.14.24.5 to 1.3.6, 1.3.8, 1.14.24.5

52. CLIN 0075 PWS reference changed from 1.3.5, 1.3.6, 1.3.8, 1.14.18.3 and 1.14.18.4 to 1.3.6 and 1.14.18.3

53. CLIN 0076 Title changed from INSPECT UPPER OUTBOARD BULKHEAD FLANGE FITTINGS to (TCTO 2823C) PSSR INSTALL OF UPPER OUTBOARD BULKHEAD FLANGE FITTINGS AT F.S. 309.8, 325.8, 341.8 AND 357.8 ON USAF/EPAF F-16A/B/C/D BLOCK 1/5/10/15/25/30/32 AIRCRAFT.

PWS reference changed from 1.3.5, 1.3.6, 1.3.8, 1.14.18.3 and 1.14.18.4 to 1.3.6 and 1.14.18.4.

Description updated to Perform pre-block installation at F.S. 309.8, 325.8, 341.8 and 357.8 on USAF F-16C/D BLOCK 25/30/32 aircraft in accordance with (TCTO 2823C)

54. CLIN 0077 Title changed from INSPECTION AND REPAIR OF UPPER FUSELAGE STATION 309 BULKHEAD to (TCTO 2831C) PSSR OMNI-SCAN FWD FUSELAGE/AFT COCKPIT SKINS CORROSION

INSPECTION.

PWS reference changed from 1.14.18.1 to 1.3.6 and 1.14.18.1.

Description updated to Perform inspection of left and right lower 16B1307Cockpit Skins for corrosion on all USAF/EPAF F-16 A/B/C/D Block 10/15/25/30/32/40/42/50 and 52 aircraft

55. CLIN 0078 Title changed from INSPECT BULKHEAD RADII AND UPPER OUTBOARD BULKHEAD FLANGE FITTING to (TCTO 2832C) PSSR OMNI-SCAN ENGINE AIR INLET CORROSION INSPECTION.

PWS reference changed from 1.14.18.2 to 1.3.6 and 1.14.18.1.

Description updated to Perform inspection of left and right lower 16B1307Cockpit Skins for corrosion on all USAF/EPAF F-16 A/B/C/D Block 10/15/25/30/32/40/42/50 and 52 aircraft

56. CLIN 0079 description updated to Perform inspection and repair of upper fuselage station 309 bulkhead, 16B5231-97, -99, -102, and -104 on USAF F-16C/D Block 30/32 Aircraft

57. CLIN 0080 Title changed from PRE‐BLOCK RAM to (TCTO 2810) PSSR, INLET RAM REMOVAL

AND REPLACEMENT.

PWS reference changed from 1.3.6, 1.14.7.2 and 1.14.18.6 to 1.3.6, 1.14.7.2 and 1.14.18.6.

Description updated to Remove inlet FMS-3029 Sheet RAM and replace with FMS-3049 Spray RAM on USAF F-16C/D Block 25/30/32 Aircraft IAW TCTO 1F-16-2810

58. CLIN 1001 PWS reference changed from 1.13.1.4.1 to 1.13.1, 1.13.2, and 1.13.3

59. CLIN 1002 PWS reference changed from 1.14 to 1.13.2 and 1.15

60. CLIN 1008 PWS reference changed from 1.14.11 to 1.14.11.3

61. CLIN 1015 PWS reference changed from 1.14.7 to 1.14.7 and 1.15.9

62. CLIN 1016 PWS reference changed from 1.14.3 to 1.14.3, 1.14.7, and 1.15.9

63. CLIN 1017 PWS reference changed from 1.14.3 to 1.14.3, 1.14.7, and 1.15.9

64. CLIN 1024 PWS reference changed from 1.14.3 to 1.14.7

65. CLIN 1025 PWS reference changed from 1.14.3 to 1.14.7

66. CLIN 1026 description updated to PMB strip AME and apply Polyurethane paint to Stations 1 and 9 Missile Rails (launcher) and centerline (Station 5) fuel pylon

67. CLIN 1027 description updated to PMB strip AME and apply UHG (FMS 3600) paint to Stations 1 and 9 Missile Rails (launcher) and centerline (Station 5) fuel pylon

68. CLIN 1028 PWS reference changed from 1.14.3 to 1.14.7 description updated to Scuff/sand AME then apply Polyurethane paint to Stations 1 and 9 Missile Rails (Launcher) and centerline (Station 5) fuel pylon

69. CLIN 1029 PWS reference changed from 1.14.3 to 1.14.7 description updated to Scuff/sand AME then apply UHG (FMS 3600) paint to Stations 1 and 9 Missile Rails (Launcher) and centerline (Station 5) fuel pylon

70. CLIN 1030 Title changed from INLET RAM STRIP AND PAINT to INLET RADAR ABSORBING

MATERIAL (RAM) REMOVAL AND REPLACEMENT

description updated to Removal and replacement of inlet RAM on USAF F-16C/D Block 40/42/50/52 Aircraft IAW TCTO 1F-16-2699

71. CLIN 1031 PWS reference changed from 1.14.19.3 to 1.14.17 description updated to Upper Flange Inspection and Repair: Perform a post-block F-16 bulkhead upper flange inspection in accordance with TCTO 1F-16-2741D and blend and repair the bulkhead upper flange in accordance with 16RB527. The Contractor shall also have the capability to replace upper bulkhead segments (i.e., upper FS341 bulkhead segment replacement per 16RB481).

72. CLIN 1032 PWS reference changed from 1.14.19.3 to 1.14.17 description updated to Upper Flange Inspection and Repair: Perform a post-block F-16 bulkhead upper flange inspection in accordance with TCTO 1F-16-2741D and blend and repair the bulkhead upper flange in accordance with 16RB527. The Contractor shall also have the capability to replace upper bulkhead segments (i.e., upper FS341 bulkhead segment replacement per 16RB481).

73. CLIN 1033 PWS reference changed from 1.14.12 to 1.14.12.3.1, 1.14.12.3.2 and 1.14.12.3.3 description updated to Inspection of upper and lower wing skins and inner wing box, to include cleaning and sealing using TO 16W9-13-3 and 1F-16C-36, any faulty component replacement would be considered Over and Above tasks. Unit price is per wing.

74. CLIN 1036 PWS reference changed from 1.14.12 to 1.14.12 and 1.14.13

75. CLIN 1037 PWS reference changed from 1.14.12 to 1.14.12 and 1.14.13

76. CLIN 1039 PWS reference changed from 1.14.15 to 1.14.15.1

77. CLIN 1040 PWS reference changed from 1.14.15 to 1.14.16

78. CLIN 1041 PWS reference changed from 1.14.15 to 1.14.15.2

79. CLIN 1042 PWS reference changed from 1.14.15 to 1.14.15.2.3, 1.14.16, and 1.14.19.7

80. CLIN 1043 PWS reference changed from 1.14.15 to 1.14.15.2.3, 1.14.16, and 1.14.19.7

81. CLIN 1044 PWS reference changed from 1.14.15 to 1.14.15.2.2, 1.14.16, and 1.14.19.6

82. CLIN 1045 PWS reference changed from 1.14.15 to 1.14.16 and 1.14.19.8

83. CLIN 1047 description updated to Perform Block 40-42 and Block 50-52 HSDN avionic modification, in accordance with TCTO’s 1F-16-2800C and 1F-16-2830.

84. CLIN 1048 description updated to Perform both pre-block & post-block AN/ASQ-236 avionic modification, (TCTO 2795, 2833, 2844)

85. CLIN 1049 description updated to Perform post-block ALQ-213 avionic modification and operational checks, (TCTO 2663E (Blk 42C), 2664C (Blk 42D), 2825 (Blk 40C), 2826 (Blk 40D), 2827 (Blk 50/52C) & 2828 (Blk 50/52D))

86. CLIN 1050 description updated to Accomplish Post-Block Repair (PBR) Left & right cockpit skins corrosion inspection TCTO 2831C, Engine intake corrosion inspection TCTO 2832C, Replacement of inner/outer box beams TCTO 2732, Upper bulkhead flange (UBF) 100% fitting install TCTO 2741D, and Keel beam mod TCTO 2730 to complete the PBR tasks and increase long-term maintainability.

87. CLIN 1051 Title changed from COCKPIT INSPECTION to COCKPIT SKINS CORROSION

INSPECTION, RIGHT AND LEFT, (TCTO 2831C)

description updated to Inspect Left and Right Lower 16B1307 Cockpit Skins: Perform pre-block corrosion inspection on all USAF F-16 A/B/C/D BLOCK 5 thru 52 aircraft in accordance with TCTO 1F-16-2831C.

88. CLIN 1052 Title changed from INTAKE CORROSION INSPECTION to ENGINE INTAKE

CORROSION INSPECTION (TCTO 2832C)

description updated to Inspect Engine Air Inlet for Corrosion on ALL USAF/EPAF F-16 A/B/C/D BLOCK 5 thru 52 aircraft in accordance with TCTO 1F-16-2832C.

89. CLIN 1054 PWS reference changed from 1.3.5 and 1.14.15.1 to 1.3.5, 1.3.8 and 1.14.24

90. CLIN 1055 PWS reference changed from 1.3.5 and 1.14.14.2 to 1.3.5, 1.3.8, and 1.14.24

91. CLIN 1056 PWS reference changed from 1.3.5 and 1.14.15.2 to 1.3.5, 1.3.8 and 1.14.24

92. CLIN 1057 PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8 and 1.14.24

93. CLIN 1058 PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8 and 1.14.24 description updated to Removal and Replacement of Upper Wing Skin PN 16W1101 and Modification of Lower Wing Skin PN 16W1102, TCTO 2726 (Both Left and Right Wing will be removed)

94. CLIN 1059 PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8 and 1.14.24 description updated to Modification of Wing Box, PN 16W1030 (16W9-13-501). Replacement of Upper Wing Skin PN 16W1101 and Modification of Lower Wing Skin PN 16W1102 (Set of One Left and One Right)

95. CLIN 1060 PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8 and 1.14.24

96. CLIN 1061 PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8 and 1.14.24

97. CLIN 1062 PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8 and 1.14.24

98. CLIN 1063 Title changed from REMOVE/REPLACE AND MILL/DRILL FS479 BULKHEAD to

UPPER BULKHEAD 16B6224 FS479 / SPLICE PLATE 16B6166, (TCTO 2727C).

PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8, and 1.14.24.

Description updated to Remove, replace and perform mill and drill operations on the FS479 bulkhead per TCTO 1F-16-2727C, PN 16B6224 and Replacement of 16B6166 Splice Plate

99. CLIN 1064 PWS reference changed from 1.3.5 and 1.3.8 to 1.3.5, 1.3.8 and 1.14.24

100. CLIN 1065 PWS reference changed from 1.14.24.4 to 1.3.5, 1.3.8 and 1.14.24

101. CLIN 1066 PWS reference changed from 1.14.24.4 to 1.3.5, 1.3.8 and 1.14.24 description updated to Perform cold work operations for SLEP modification. Remove and replace a FS341 lower bulkhead per TCTO 1F-16-2728. Replacement of Fuselage Station 341.80 Lower Bulkhead PN 16B5250 and Modification of Fuel Shelf Web, PN 16B5141/42

102. CLIN 1067 PWS reference changed from 1.14.24.4 to 1.3.5, 1.3.8 and 1.14.24 description updated to Perform cold work operations for SLEP modification. Remove and replace a FS341 lower bulkhead per TCTO 1F-16-2728. Replacement of Fuselage Station 341.80 Lower Bulkhead PN 16B5250 and Modification of Fuel Shelf Web, PN 16B5141/42

103. CLIN 1068 PWS reference changed from 1.14.24.4 to 1.3.5, 1.3.8 and 1.14.24 description updated to Perform cold work operations for SLEP modification. Remove and replace a FS341 lower bulkhead per TCTO 1F-16-2728. Replacement of Fuselage Station 341.80 Lower Bulkhead PN 16B5250 and Modification of Fuel Shelf Web, PN 16B5141/42

104. CLIN 1069 PWS reference changed from 1.14.24.4 to 1.3.5, 1.3.8 and 1.14.24 description updated to Perform cold work operations for SLEP modification. Remove and replace a FS341 lower bulkhead per TCTO 1F-16-2728. Replacement of Fuselage Station 341.80 Lower Bulkhead PN 16B5250 and Modification of Fuel Shelf Web, PN 16B5141/42

105. CLIN 1070 PWS reference changed from 1.14.24.4 to 1.3.5, 1.3.8 and 1.14.24 description updated to Perform cold work operations for SLEP modification. Modification of Fuselage Station 309.80 and 325.80 Lower Bulkheads 16B5235 and 16B5245

106. CLIN 1071 PWS reference changed from 1.14.19 and 1.19.19.4 to 1.3.5, 1.3.8 and 1.14.24

107. CLIN 1072 PWS reference changed from 1.3.5, 1.3.8 and 1.14.19.5 to 1.3.5, 1.3.8 and 1.14.24

108. CLIN 1073 PWS reference changed from 1.3.6, 1.3.8, and 1.14.24.5 to 1.3.6, 1.3.8, 1.14.24.5

109. CLIN 1075 PWS reference changed from 1.3.5, 1.3.6, 1.3.8, 1.14.18.3 and 1.14.18.4 to 1.3.6 and 1.14.18.3

110. CLIN 1076 Title changed from INSPECT UPPER OUTBOARD BULKHEAD FLANGE FITTINGS to (TCTO 2823C) PSSR INSTALL OF UPPER OUTBOARD BULKHEAD FLANGE FITTINGS AT F.S. 309.8, 325.8, 341.8 AND 357.8 ON USAF/EPAF F-16A/B/C/D BLOCK 1/5/10/15/25/30/32 AIRCRAFT.

PWS reference changed from 1.3.5, 1.3.6, 1.3.8, 1.14.18.3 and 1.14.18.4 to 1.3.6 and 1.14.18.4.

Description updated to Perform pre-block installation at F.S. 309.8, 325.8, 341.8 and 357.8 on USAF F-16C/D BLOCK 25/30/32 aircraft in accordance with (TCTO 2823C)

111. CLIN 1077 Title changed from INSPECTION AND REPAIR OF UPPER FUSELAGE STATION 309 BULKHEAD to (TCTO 2831C) PSSR OMNI-SCAN FWD FUSELAGE/AFT COCKPIT SKINS CORROSION

INSPECTION.

PWS reference changed from 1.14.18.1 to 1.3.6 and 1.14.18.1.

Description updated to Perform inspection of left and right lower 16B1307Cockpit Skins for corrosion on all USAF/EPAF F-16 A/B/C/D Block 10/15/25/30/32/40/42/50 and 52 aircraft

112. CLIN 1078 Title changed from INSPECT BULKHEAD RADII AND UPPER OUTBOARD BULKHEAD FLANGE FITTING to (TCTO 2832C) PSSR OMNI-SCAN ENGINE AIR INLET CORROSION

INSPECTION.

PWS reference changed from 1.14.18.2 to 1.3.6 and 1.14.18.1.

Description updated to Perform inspection of left and right lower 16B1307Cockpit Skins for corrosion on all USAF/EPAF F-16 A/B/C/D Block 10/15/25/30/32/40/42/50 and 52 aircraft

113. CLIN 1079 description updated to Perform inspection and repair of upper fuselage station 309 bulkhead, 16B5231-97, -99, -102, and -104 on USAF F-16C/D Block 30/32 Aircraft

114. CLIN 1080 Title changed from PRE‐BLOCK RAM to (TCTO 2810) PSSR, INLET RAM REMOVAL

AND REPLACEMENT.

PWS reference changed from 1.3.6, 1.14.7.2 and 1.14.18.6 to 1.3.6, 1.14.7.2 and 1.14.18.6.

Description updated to Remove inlet FMS-3029 Sheet RAM and replace with FMS-3049 Spray RAM on USAF F-16C/D Block 25/30/32 Aircraft IAW TCTO 1F-16-2810

115. Add CLIN 0081

116. Add CLIN 0082

117. Add CLIN 1081

118. Add CLIN 1082

119. Attachment 2 – PWS has updated paragraph 1.9.4.1

120. Attachment 1 – Pricing Table has been updated to include the new CLINs (0081/1081 and 0082/1082). A note was also added stating “The Option CLINs (numbered 10XX) will be used with the pricing in this table after the option is exercised.”

121. Attachment 4 Section L

2.1 The buyer is updated to Lonnie Lujan

9.4.1.1 updated to reflect the two new CLINs

4.10.1 updated to reflect that a paper copy is not required, email is sufficient

4.13.1 updated to reflect that a paper copy is not required, email is sufficient

122. Attachment 5 Section M 4.4.1.1 updated to reflect the two new CLINs

123. Attachment 16 Engine Motor/Run Process 2. D. updated

As a result of this amendment the solicitation closing date is being extended by seven (7) days to 2:00 PM (Mountain Standard Time) on April 14th, 2020.

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Pricing is applicable to the ordering period in the most current USAFE pricing attachment.

The estimated contract ceiling amount is $365M.

The Government guarantees a single minimum order value of at least $50,000.

The ordering period of this contract will be 60 months from date of award with a period of performance (PoP) that may extend up to 12 months from the last order for a potential PoP of 72 months. The option, if exercised, will add an additional 60 months with a PoP that may extend up to 12 months from the last order for a potential PoP of 132 months.

F-16 PRE-MAINTENANCE AND MODIFICATION INSTRUCTIONS

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

RECEIVING

Per PWS 1.13.1, 1.13.2 and 1.13.3 Pre-induction services with inspection and work request.

An incoming inspection shall be performed on all aircraft received for depot maintenance. This inspection shall includethe applicable portions of the basic post-flight inspection in accordance with TO 1F-16(*)-6.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

Buy American Act N/A for Construction Material IUID Required: No

POST MAINTENANCE

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

POST MAINTENANCE

Per PWS 1.13.2 and 1.15 Post induction services, To include replacement of all aircraft nitrogen, fuel, liquid oxygen and hydrazine, inspection, cleaning, securing access plates/panels, weight and balance, ops checks, engine runs, reinstalling extraneous equipment and functional check flights.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec 1.10.1

IUID Required: No

OVER AND ABOVE WORK PROCEDURES

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

OVER AND ABOVE

Per PWS 1.17 Over and Above, (O&A) including Surge, as Directed by the PCOFixed Composite or Loaded Rates as established.

Tasks, labor hours and material to be established on orders issued hereunder.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

CONTRACT DATA REQUIREMENTS LIST (CDRLs) Item No.

CONTRACT DATA REQUIREMENTS LIST (CDRLs) Not Separately Priced Quantity U/I Unit Price

LO NSP

J015 CONTRACT DATA REQUIREMENT LIST (CDRLs) Per PWS 1.18 Contract Data Requirement List (CDRLs), Contract Data Requirements List (CDRL), Administrative Reporting IAW Contract attachment, Exhibit A, DD Forms 1423, and all other contract CDRL requirements Priority: R ROUTINE.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

DROP-IN WORKLOAD

Per PWS 1.14.3 Drop-in maintenance on F-16 C/D aircraft. Workload shall be negotiated as FFP for each event (aircraft), or determined as appropriate by the PCO and PM. Hours and Material to be specified on individual orders issued hereunder. Fully loaded rates in fixed rate agreement apply to labor hours. See contract Attachment 2.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

Contractor Field Team - Travel Item No.

Cost Reimbursement - No Fee

Contractor Field Team - Travel Quantity U/I Est Unit Cost Total Estimated Cost

EA

J015

CONTRACT FIELD TEAM (CFT)

Per PWS 1.14.10 Travel Contractor Field Team Travel, maintenance certification, training, and other meetings as required.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

CONTRACT FIELD TEAM (CFT)

Per PWS 1.14.10 CFT support for F-16 C/D aircraft. If the schedule allows, to be negotiated (TBN) as FFP for each event (aircraft), as determined by the PCO. Fully loaded rates in fixed rate agreement apply. Labor hours may be negotiated as determined by the PCO. See contract Attachment 2.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

DEPOT MAINTENANCE AND MODIFICATION

J015

PHASE INSPECTIONS

Per PWS 1.14.11.3 Perform Phase Inspections if required in the delivery order Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

PHASE INSPECTIONS

Per PWS 1.14.11 Perform Phase Inspections if required in the delivery order Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

LO

J015

PHASE INSPECTIONS

Per PWS 1.14.11 Phase Inspection O&A - Perform Phase Inspections if required in the delivery order Priority: R ROUTINE.

DEPOT MAINTENANCE AND MODIFICATION

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

PRE-MAINTENANCE AND MODIFICATIONS

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

EXTERNAL FUEL TANK HANDLING

Per PWS 1.13.1.6.2 and 1.15.4 Two 370-gal External Fuel Tanks removal/installation (Defuel/Storage/Reinstall) The Contractor shall remove, store, and reinstall two 370-gal external fuel tanks equipment after installation operational checks.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

PRE-MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

EXTERNAL FUEL TANK HANDLING

Per PWS 1.13.1.6.2 and 1.15.4 300-gal External Fuel Tank removal/installation (Defuel/Storage/Reinstall) The Contractor shall remove, store, and reinstall 300-gal external fuel tank equipment after installation operational checks.

Limitations of Liability: High Value Item

PRE-MAINTENANCE AND MODIFICATION

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

PMB STRIP OF UHG

Per PWS 1.14.7 Strip/PBM where UHG (FMS 3600) will apply, F-16 C/D Full strip of UHG (FMS 3600) coatings using plastic media blast (PMB) for C/D model F-16 aircraft Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

PMB STRIP OF POLY PAINT

Per PWS 1.14.7 Strip/PBM where Poly coat will apply, F-16 C/D Full strip of Poly coatings using plastic media blast (PMB) for C/D model F-16 aircraft

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required

DEPOT MAINTENANCE AND MODIFICATION

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

STANDARD POLY APPLICATION

Per PWS 1.14.7 and 1.15.9 Full paint, apply poly coat paint, F-16 C/D Standard Paint application of Poly paint on F-16 C/D model aircraft Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SCUFF SAND AND PAINT

Per PWS 1.14.3, 1.14.7, and 1.15.9 Scuff, sand, and apply UHG (FMS 3600) paint, F-16C/D Scuff sand & paint of aircraft for C/D model F-16 aircraft using UGH (FMS 3600) paint Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

DEPOT MAINTENANCE AND MODIFICATION

IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SCUFF SAND AND PAINT

Per PWS 1.14.3, 1.14.7 and 1.15.9 Scuff, sand, and apply poly paint, F-16 C/D Scuff sand & paint of aircraft for C/D model F-16 aircraft using Poly paint Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

STRIP AND REPAINT

Per PWS 1.14.7 Two 370-gal Ex Fuel Tanks Surface Treat, PMB and Paint, Apply Poly Strip using Plastic Media Blast (PMB) and repaint two 370-gal fuel tanks utilizing Poly paint. Unit price per two tanks.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

STRIP AND REPAINT

Per PWS 1.14.7 300-gal External Fuel Tank PMB and Paint (Poly Coat) Strip using Plastic Media Blast (PMB) and repaint 300 gal fuel tanks utilizing Poly Paint. Unit price is per tank.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

STRIP AND REPAINT

Per PWS 1.14.7 Two 370-gal External Fuel Tanks Scuff/Sand and Paint (Poly Coat) Strip using Plastic Media Blast (PMB) and repaint two 370-gal fuel tanks utilizing poly paint. Unit price per two tanks.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price

DEPOT MAINTENANCE AND MODIFICATION

Quantity U/I Unit Price Amount

EA

J015

SCUFF SAND AND REPAINT

Per PWS 1.14.7 300-gal External Fuel Tank Scuff/Sand and Paint (Poly Coat) Scuff/sand and repaint of 300 gal fuel tanks using Poly Paint as required. Unit price is per tank.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

PMB AND REPAINT FUEL TANKS

Per PWS 1.14.7 Two 370-gal External Fuel Tanks Surface Treat, PMB and Paint, Apply UHG (FMS 3600) Strip using Plastic Media Blast (PMB) and repaint two 370-gal fuel tanks utilizing UHG (FMS 3600) paint. Unit price per two tanks.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

DEPOT MAINTENANCE AND MODIFICATION

J015

PMB AND REPAINT FUEL TANKS

Per PWS 1.14.7 300-gal External Fuel Tank Surface Treat, PMB and Paint, Apply UHG (FMS 3600) Strip using Plastic Media Blast (PMB) and repaint 300 gal fuel tanks utilizing UHG (FMS 3600) paint. Unit price is per tank.

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SCUFF SAND AND PAINT FUEL TANKS

Per PWS1.14.7 Two 370-gal External Fuel Tanks Scuff/Sand and UHG (FMS 3600) Paint Scuff/sand two 370-gal external fuel tanks then paint using UHG (FMS 3600) Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

CORROSION TREATMENT AND PAINTING

Per PWS 1.14.7 300-gal external fuel tank scuff / sand and paint UHG (FMS 3600)

DEPOT MAINTENANCE AND MODIFICATION

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

PMB AME AND POLY PAINT TO STATIONS 1-9

Per PWS 1.14.7 - AME with poly paint PMB strip AME and apply Polyurethane paint to Stations 1 and 9 Missile Rails (launcher) and centerline (Station 5) fuel pylon Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

PMB AME AND UHG PAINT TO STATIONS 1-9

Per PWS 1.14.7 AME with UHG (FMS 3600) paint PMB strip AME and apply UHG (FMS 3600) paint to Stations 1 and 9 Missile Rails (launcher) and centerline (Station 5) fuel pylon

DEPOT MAINTENANCE AND MODIFICATION

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SCUFF/SAND FOR AME AND APPLY UHG

Per PWS 1.14.7 - Scuff / sand for AME and apply poly paint Scuff/sand AME then apply Polyurethane paint to Stations 1 and 9 Missile Rails (Launcher) and centerline (Station 5) fuel pylon Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

SCUFF/SAND FOR AME TO APPLY UHG

Per PWS 1.14.7 - Scuff / sand for AME and apply UHG (FMS 3600) paint Scuff/sand AME then apply UHG (FMS 3600) paint to Stations 1 and 9 Missile Rails (Launcher) and centerline (Station 5) fuel pylon

DEPOT MAINTENANCE AND MODIFICATION

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

INLET RADAR ABSORBING MATERIAL (RAM) REMOVAL AND REPLACEMENT

Per PWS 1.3.6 and 1.14.7.2 - Inlet RAM strip and paint (TCTO2699)Inlet Radar Absorbing Material (RAM) Strip and Paint Removal and replacement of inlet RAM on USAF F-16C/D Block 40/42/50/52 Aircraft IAW TCTO 1F-16-2699 Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

UPPER FLANGE INSPECTION AND REPAIR

Per PWS 1.14.17 - Upper Flange Inspection and Repair, Block 40 (TCTO 2741D) Upper Flange Inspection and Repair: Perform a post-block F-16 bulkhead upper flange inspection in accordance with TCTO 1F-16-2741D and blend and repair the bulkhead upper flange in accordance with 16RB527. The Contractor shall also have the capability to replace upper bulkhead segments (i.e., upper FS341 bulkhead segment replacement per 16RB481).

DEPOT MAINTENANCE AND MODIFICATION

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

UPPER FLANGE INSPECTION AND REPAIR

Per PWS 1.14.17 - Upper Flange Inspection and Repair, Block 50 (TCTO 2741D) Upper Flange Inspection and Repair: Perform a post-block F-16 bulkhead upper flange inspection in accordance with TCTO 1F-16-2741D and blend and repair the bulkhead upper flange in accordance with 16RB527. The Contractor shall also have the capability to replace upper bulkhead segments (i.e., upper FS341 bulkhead segment replacement per 16RB481).

Priority: R ROUTINE.

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring IAW PWS Sec. 1.10.1

IUID Required: No

DEPOT MAINTENANCE AND MODIFICATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

J015

WING INSPECTION / REPAIR

Per PWS 1.14.12.3.1, 1.14.12.3.2 and 1.14.12.3.3 - F-16 internal wing box inspection (16W9-13-3) Inspection of upper and lower wing skins and inner wing box, to include cleaning and sealing using TO 16W9-13-3 and 1F-16C-36, any faulty component replacement would be considered Over and Above tasks. Unit price is per wing.

DEPOT MAINTENANCE AND MODIFICATION

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .