Attachment_16_-_PWS_Attachment_6_-_Unclassified_OCONUS_Engine_Runs.pdf

PDF 227 KB Posted

Attached to
PACAF F16 Depot Federal contract opportunity
Solicitation number
FA823220R0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document outlines requirements for depot-level maintenance services for F-16 aircraft allocated to the United States Air Forces in the Pacific Command. Services include core depot maintenance activities such as aircraft painting, non-destructive inspections, and radar absorbing material repair. Programmed work includes major modifications and repairs to structures like longerons, bulkheads, wings, and avionic upgrades. Additional unplanned maintenance is also in scope. The contractor will perform this work at a facility within the competition circle provided in Attachment 1 to the solicitation. Contractor field teams may also deploy for repairs worldwide excluding combat zones. The Air Force Materiel Command Lifecycle Management Center seeks these services through a five-year IDIQ contract with a ceiling of $252 million and potential five-year option. The period of performance is from April 2020 through March 2025 with an optional extension to March 2030. The anticipated solicitation and award are forthcoming.

View the file

Other files for this federal contract opportunity

Other files attached to PACAF F16 Depot, newest first.
File Type Posted
Amendment 5 Question set 9.pdf PDF
Amendment_5_Question_and_Answer_Set_8_PACAF.pdf PDF
Amendment 5 Attachment_1_PACAF_Pricing_Table_2_Apr_20.xlsx XLSX spreadsheet
Amendment_4_Attachment_2_-_PWS_PACAF_F-16_Depot_31_Mar_20.pdf PDF
Amendment_4_Question and Answer Set 6 Amendment 5.pdf PDF
Amendment_4_FA823220R0001_______0005.pdf PDF
Amendment_4_Attachment_1_PACAF_Pricing_Table_31_Mar_20.xlsx XLSX spreadsheet
Amendment_4_Attachment_5_PACAF_Section_M_31_Mar_20.pdf PDF
Amendment_4_Attachment_4_PACAF_Section_L_31_Mar_20.pdf PDF
Amendment_4_Attachment_1_PACAF_Pricing_Table_31_Mar_20.pdf PDF
Amendment_4_Attachment_16_-_PWS_Attachment_6_-_Unclassified_OCONUS_Engine_Runs_31_Mar_20.pdf PDF
FA823220R0001_______0003.pdf PDF
Amendment_3_CLIN_0074_0075_stock_number_prices_19_March_20.xlsx XLSX spreadsheet
Amendment_3_Question_Set_5_Tool List.xlsx XLSX spreadsheet
Amendment_3_Attachment_1_PACAF_Pricing_Table_17_Mar_20.pdf PDF
Amendment_3_Attachment_4_PACAF_Section_L_17_Mar_20.pdf PDF
Amendment_3_Attachment_6_Attachment_L-1_past_performance_information.docx DOCX document
Amendment_2_Question_set_4_PACAF_9_March_20.pdf PDF
Attachment_11_-_PWS_Attachment_1_-_PACAF_USG_Provided_Materials_6_Mar_20.xlsx XLSX spreadsheet
Attachment_2_-_PWS_PACAF_F-16_Depot_6_Mar_20.pdf PDF
Attachment_1_PACAF_Pricing_Table_6_Mar_20.xlsx XLSX spreadsheet
FA823220R0001_______0002.pdf PDF
Attachment_11_-_PWS_Attachment_1_-_PACAF_USG_Provided_Materials_6_Mar_20.pdf PDF
Amendment_1_Question_set_3_PACAF_6_Mar_20.docx DOCX document
Amendment_1_Question Set 2 - 27_Feb_20 PACAF.pdf PDF
Depot_Requirements_Matrix.xlsx XLSX spreadsheet
Amendment_1_Question Set 1 - PACAF.pdf PDF
Amendment_1_FA823220R0001_______0001_20_Feb_20.pdf PDF
Amendment_1_Attachment_1_-_PACAF_Pricing_Table_19_Feb_20.pdf PDF
Amendment_1_Attachment_1_-_PACAF_Pricing_Table_19_Feb_20.xlsx XLSX spreadsheet
Amendment_1_Attachment_2_-_PWS_PACAF_F-16_Depot_19_Feb_20.pdf PDF
Attachment_7_-_Attachment_L-2_-_Cover_Letter_Template.pdf PDF
Attachment_10_-_Attachment_L-5_-_Past_Performance_Questionnaire.pdf PDF
Attachment_4_PACAF_Section_L_24_Jan_20.pdf PDF
Attachment_5_PACAF_Section_M_24_Jan_20.pdf PDF
Attachment_1_-_PACAF_Pricing_Table.xlsx XLSX spreadsheet
Attachment_17_-_GFP.pdf PDF
Attachment_6_-_Attachment_L-1_-_Past_Performance_Information_Sheet.pdf PDF
Attachment_14_-_PWS_Attachment_4_-_Required_Wing_Tooling.xlsx XLSX spreadsheet
Attachment_11_-_PWS_Attachment_1_-_PACAF_USG_Provided_Materials.xlsx XLSX spreadsheet
Attachment_8_-_Attachment_L-3_-_Sample_Consent_Letter.pdf PDF
Attachment_13_-_PWS_Attachment_3_-_SLEP_Tool_Replacement_List.xlsx XLSX spreadsheet
Attachment_15_-_PWS_Attachment_5_-_Contractor_Provided_Tooling.xlsx XLSX spreadsheet
Attachment_2_-_PWS_PACAF_F-16_Depot.pdf PDF
Attachment_9_-_Attachment_L-4_-_Client_Authorization_Letter_sample.pdf PDF
Attachment_3a_PACAF_CDRLs.pdf PDF
Attachment_12_-_PWS_Attachment_2_-_Additional_SLEP_Modification_Tooling.pdf PDF
Attachment_3b_PACAF_CDRLs_Option_CLINs.pdf PDF
Attachment_1.docx DOCX document
PACAF_F-16_Depot_Synopsis.docx DOCX document
Show all 50

PACAF F16 Depot has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS Attachment 6 – Unclassified OCONUS Engine Runs

Purpose: In order to maintain paint, repair and modification schedule for USAF Bk 40/50 aircraft undergoing maintenance at OCONUS depots, and to reduce the cost and maintenance burden for USAF personnel to travel to perform preliminary F-110-GE-100/-129 engine runs, the Contractor shall perform unclassified engine motoring and runs in accordance with the following aircraft configuration and process. This process meets the intent of the F-16 System Safety evaluation titled ‘Hazard Risk Assessment of Engine Run With Equipment Removed”, dated 24 April 2012.

Aircraft Configuration:

1. The following items will be removed and properly stored by USAF personnel prior to aircraft induction into an OCONUS depot. All listed items will be removed for motoring or engine runs performed by the contractor and shall be installed and operationally checked by USAF personnel prior to Functional Check Flight or first flight.

2. The equipment list below is removed at owning unit before an aircraft is inducted into the OCONUS depot. Engine run and FCF will be performed without listed equipment. After delivery to the owning unit, all listed classified items installation and follow-on operational checkouts will be performed by unit personnel at owning unit facility.

KY-58 (Secure Voice Processor) CCU (Cockpit Control Unit)

ALE-47 CHAFF/FLARE PROGRAMMER

ECM Panel (Electronic Counter Measures Panel, 9921CT1)

SUPERHETERODYNE RECEIVER (SHR)

SUPERHETERODYNE CONTROLLER (SHC)

AP: ANALYSIS PROCESSOR (9911A6)

ALR-56M/ALR-69: C/D BAND RECEIVER POWER SUPPLY

AFT DF RECEIVER (R/H 9911A8, L/H 9911A7)

RIGHT STRAKE DF RECEIVER(9911A1)

LEFT STRAKE DF RECEIVER(9911A2)

KIV-6 MODE 4 COMPUTER

AN/ALQ-131,184,188 POD

AN/ALE-50

AN/ALE-50 TOWED DECOY

KIT-1C

MIDS LVT (The Multifunction Information Distribution System Low Volume Terminal)

MMC (MODULAR MISSION COMPUTER)

APSP (Advanced Programmable Signal Processor)/PSP ARC-210 (UHF/VHF Radio, 2325A1) EGI (Embedded GPS/INS) PDG/CPDG (Color) Programmable Display Generator

CIT/KIV-77/78

PWS Attachment 6 – Unclassified OCONUS Engine Runs

Engine Motor/Run Process:

1. Aircraft preparation prior to engine run and/or tow:

a. The following process will be implemented as safety/securing for all removed items.

i. Each connector, harness and air duct shall be protected by covering with a plastic bag or plastic shipping cap.

ii. All connectors/harnesses will be attached to the nearest primary support or to the main wire harness bundle using lacing.

iii. All corresponding doors shall be closed.

b. Aircraft Center of Gravity limits shall be verified per 1F-16()-5-2 for weight and balance and aircraft shall not be towed with less than 1000 pounds of weight on the nose landing gear.

c. Glare Shield Warning Lights (e.g., HYD/OIL PRESS, ENGINE, ENG FIRE) and Caution Lights (e.g., SEC, FUEL/OIL HOT, FWD and AFT FUEL LOW) shall be checked for proper operation per JG33-00-05 (CAUTION, WARNING, AND

ADVISORY LIGHTS, OPERATIONAL CHECKOUT)

d. Main Fuel Shutoff Valve shall be checked prior to engine run for proper operation to ensure control from the cockpit is available.

e. The intercom and the COMM 1 control installed in the cockpit will be checked for proper operation per JG23-20-01 (UHF RADIO operational checkout) and JG23-40- 01 (Interphone system operational checkout).

2. Engine motor/run procedure:

a. All procedures listed in TO 1F-16CG-2-70JG-00-11 and TO 1F-16CJ-2-70JG-00-1 shall be complied with fully.

b. Fuel Flow, RPM, FTIT, Oil Pressure, Nozzle Position, and Hydraulic Pressure indicators shall be checked for proper function and availability during engine operation.

c. Engine operation shall only be conducted by properly trained and certified Contractor technicians or USAF personnel.

d. Equipment and facilities used for engine operation shall be approved and certified for use, as necessary, by DCMA prior to use.

e. Emergency services will be available, as necessary.

Follow-on Maintenance

1. All non-classified follow-on maintenance checks will be performed by the Contractor.

2. All classified equipment installations and follow-on maintenance checks will be performed by

USAF personnel with the exception of the following operations (these non-Safety of Flight items will be carried forward in the aircraft maintenance records):

• FUNCTIONAL CHECKOUT OF AIM-9 (OR LAU-129) MISSILE LAUNCHER

• CRASH SURVIVABLE FLIGHT DATA RECORDER BUILT IN TEST (BIT)

• CRASH SURVIVABLE FLIGHT DATA RECORDER OPERATIONAL FLIGHT

PROGRAM IDENTIFICATION CHECK

• RADAR THREAT WARNING SYSTEM OPERATIONAL CHECKOUT

3. A follow-on classified configuration engine run may be required by USAF personnel based on maintenance performed.

File details come from the government source that posted it. Updated .