FA8201-16-R-0007-0002_pdf_FINAL.pdf
PDF 46 KB Posted
- Attached to
- SIMPLIFIED BASE ENGINEERING REQUIREMENT (SABER) Federal contract opportunity
- Solicitation number
- FA8201-16-R-0007
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to: 1) Correct clause 52.216-27; 2)Replace the following documents with revised versions: Basic SOW, Seed Project SOW, Section L, Section M, Construction Cost Estimate Breakdown and Rate Worksheet; and, 3) Add new document: Bldg 2405 and 2408 Mastic Asbestos Containing Material Samples (Attachment 26).
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Mar-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8201-16-R-0007
X 9B. DATED (SEE ITEM 11)
03-Feb-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Mar-2016
CODE
OL:H/PZIE
MARNIE WHITEAKER 6038 ASPEN AVE BLDG 1289
HILL AFB UT 84056-5805
FA8224 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA8201-16-R-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
Offeror shall perform multiple disciplines in construction to include maintenance, repair, and alteration of real property and facilities as specified on the attached SABER Statement of Work (SOW). Individual projects will be further defined in each individual Task Order. Labor rates for ordering periods below are Not to Exceed (NTE) Labor Rates. The rates proposed will be contractually binding and shall be NTE amounts for any future Task Order proposals under this contract.
Ordering Period 1: 12 months* Labor Categories:
Contract Manager hourly rate: _________ Project Manager/Superintendent hourly rate: ___________ Quality Control Officer hourly rate: __________ Environmental Officer hourly rate: _________ Site Safety and Health Officer hourly rate: _________
Ordering Period 2: 12 months* Labor Categories:
Contract Manager hourly rate: _________ Project Manager/Superintendent hourly rate: ___________ Quality Control Officer hourly rate: __________ Environmental Officer hourly rate: _________ Site Safety and Health Officer hourly rate: _________
Ordering Period 3: 12 months* Labor Categories:
Contract Manager hourly rate: _________ Project Manager/Superintendent hourly rate: ___________ Quality Control Officer hourly rate: __________ Environmental Officer hourly rate: _________ Site Safety and Health Officer hourly rate: _________
Ordering Period 4: 12 months* Labor Categories:
Contract Manager hourly rate: _________ Project Manager/Superintendent hourly rate: ___________ Quality Control Officer hourly rate: __________ Environmental Officer hourly rate: _________ Site Safety and Health Officer hourly rate: _________
Ordering Period 5: 12 months* Labor Categories:
Contract Manager hourly rate: _________ Project Manager/Superintendent hourly rate: ___________ Quality Control Officer hourly rate: __________ Environmental Officer hourly rate: _________ Site Safety and Health Officer hourly rate: _________
*Rates for ordering period 1 are valid from date of basic contract award thru 12 months. Each subsequent ordering period is valid 12 months thereafter except the option period, which is valid 6 months thereafter (if exercised). Exact dates will be determined upon basic contract award.
Minimum/Maximum Contract Amounts:The minimum guaranteed amount over the life of the contract is $500.00. The total aggregated maximum amount expendable under all SABER Contracts awarded is an estimated $150 Million.
CLIN 1001
Offeror shall perform multiple disciplines in construction to include maintenance, repair, and alteration of real property and facilities as specified on the attached SABER Statement of Work (SOW). Individual projects will be further defined in each individual Task Order. Labor rates for ordering periods below are Not to Exceed (NTE) Labor Rates. The rates proposed will be contractually binding and shall be NTE amounts for any future Task Order proposals under this contract.
Option Period: 6 months* Labor Categories:
Contract Manager hourly rate: _________ Project Manager/Superintendent hourly rate: ___________ Quality Control Officer hourly rate: __________ Environmental Officer hourly rate: _________ Site Safety and Health Officer hourly rate: _________
*Rates for ordering period 1 are valid from date of basic contract award thru 12 months. Each subsequent ordering period is valid 12 months thereafter except the option period, which is valid 6 months thereafter (if exercised). Exact dates will be determined upon basic contract award.
Minimum/Maximum Contract Amounts: The minimum guaranteed amount over the life of the contract is $500.00. The total aggregated maximum amount expendable under all SABER Contracts awarded is an estimated $150 Million.
SECTION I - CONTRACT CLAUSES
The following have been modified:
52.216-27 SINGLE OR MULTIPLE AWARDS. (OCT 1995)
The Government may elect to award a single delivery order contract or task order contract or to award multiple delivery order contracts or task order contracts for the same or similar supplies or services to two or more sources under this solicitation. The estimated number of awards is approximately 3 basic IDIQ contracts. The Government reserves the right to award more or less than this amount.
(End of provision)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following attachments have either been revised or added as new:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 SABER Basic Statement of Work
07-MAR-2016
Attachment 12 Section L 07-MAR-2016 Attachment 13 Section M 07-MAR-2016 Attachment 14 Construction Cost
Estimate Breakdown
07-MAR-2016
Attachment 15 Rate Worksheet 07-MAR-2016 Attachment 16 Bona Fide Office
Requirements Attachment 17 SABER Seed Project
Statement of Work
(SOW)
07-MAR-2016
Attachment 26 Attachment 26 - Bldg2405and2408 Mastic Asbestos Containing M
(End of Summary of Changes)
File details come from the government source that posted it. Updated .