Attachment_07_-_Wage_Determination_UT110.pdf

PDF 35 KB Posted

Attached to
SIMPLIFIED BASE ENGINEERING REQUIREMENT (SABER) Federal contract opportunity
Solicitation number
FA8201-16-R-0007
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attachment 07 - Wage Determination

View the file

Other files for this federal contract opportunity

Other files attached to SIMPLIFIED BASE ENGINEERING REQUIREMENT (SABER), newest first.
File Type Posted
Questions_and_Responses_15_March_2016.pdf PDF
Questions_and_Responses_15_March_2016.pdf PDF
SABER_Seed_Project_SOW_7Mar2016_Rev1_TrackChanges.pdf PDF
SABER_BASIC_SOW_7Mar2016_Rev1_TrackChanges.pdf PDF
SABER_Section_L_7March2016_Rev1_TrackChanges.pdf PDF
SABER_Section_M_7March2016_Rev1_TrackChanges.pdf PDF
Attachment_01_-_SABER_BASIC_SOW_7Mar2016_Rev1_ApprovedChanges.pdf PDF
Attachment_15_-_Rate_Worksheet_Rev_1.xlsx XLSX spreadsheet
Attachment_13_-_SABER_Section_M_7March2016_Rev1_ApprovedChanges.pdf PDF
FA8201-16-R-0007-0002_pdf_FINAL.pdf PDF
Attachment_17_-_SABER_Seed_Project_SOW_7Mar2016_Rev1_ApprovedChanges.pdf PDF
Attachment_26_-_Bldg_2405_and_2408_Mastic_Asbestos_Containing_Material_Samples.pdf PDF
Attachment_12_-_SABER_Section_L_7March2016_Rev1_ApprovedChanges.pdf PDF
Question_and_Responses_7_March_2016.pdf PDF
Site_Visit_Attendee_List.pdf PDF
FA8201-16-R-0007-0001.pdf PDF
Responses_to_Questions_-_5Feb2016.pdf PDF
Attachment_13_-_SABER_Section_M_FINAL_3Feb2016.pdf PDF
Attachment_25_-_Seed_Project_Pictures_3Feb2016.pdf PDF
Attachment_04_-_Wage_Determination_UT100.pdf PDF
Attachment_05_-_Wage_Determination_UT102.pdf PDF
Attachment_17_-_SABER_Seed_Project_SOW_FINAL_28Dec2015.pdf PDF
Attachment_23_-_Site_Visit_Information.pdf PDF
Attachment_16_-_Bona_Fide_Office_Requirements.pdf PDF
Attachment_19_-_Bldg_950 _970 _980_Asbestos_Report.pdf PDF
Attachment_18_-_Seed_Project_Burglar_Bar_Drawing.pdf PDF
Attachment_15_-_Rate_Worksheet_FINAL.xlsx XLSX spreadsheet
Attachment_06_-_Wage_Determination_UT104.pdf PDF
Attachment_24_-_Site_Visit_Attendees.xlsx XLSX spreadsheet
Attachment_02_-_BASE_FACILITY_DESIGN_STANDARD_-_3_SEP_15.pdf PDF
Attachment_09_-_Hill_AFB_Construction_and_Demolition_Waste_Diversion_Report.pdf PDF
Attachment_20_-_Bldg_2405 _2408_Asbestos_Report.pdf PDF
Attachment_22_-_Bldg_2405 _2408_LBP_Report.pdf PDF
ppi_tool.accdb —
Attachment_11_-_Government_Furnished_Property_(Requisitioned)_RGFP_V4.pdf PDF
Attachment_08_-_Wage_Determination_WY15.pdf PDF
Attachment_12_-_SABER_Section_L_FINAL_3Feb2016.pdf PDF
Attachment_10_-_Government_Furnished_Property_(Scheduled)-_SGFP_V5.pdf PDF
Attachment_03_-_APPENDIX_C_MASTER_ON_or_OFF_BASE_UPDATED_Dec_2014.pdf PDF
Attachment_01_-_SABER_BASIC_SOW_FINAL_28Dec2015.pdf PDF
Attachment_21_-_Bldg_950 _970 _980_LBP_Report.pdf PDF
FA8201-16-R-0007.pdf PDF
Attachment_14_-_Construction_cost_estimate_breakdown_FINAL.xls XLS spreadsheet
DRAFT_-_SABER_BASIC_SOW_8_Dec_2015.pdf PDF
DRAFT_-_SABER_Seed_Project_SOW_8_Dec_2015.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: UT160110 01/29/2016 UT110

Superseded General Decision Number: UT20150110

State: Utah

Construction Type: Building

Counties: Morgan and Weber Counties in Utah.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/29/2016

CARP1507-001 01/01/2014

Rates Fringes

CARPENTER (Drywall Hanging and Metal Stud Installation Only)............................$ 21.00 8.66

* ELEC0354-001 01/01/2016

Rates Fringes

ELECTRICIAN (Low Voltage Wiring Only).....................$ 23.51 9.97

ELECTRICIAN......................$ 30.39 11.35

PAIN0077-003 01/01/2013

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 19.50 6.28

PLUM0140-001 08/01/2013

Rates Fringes

PLUMBER/PIPEFITTER...............$ 30.05 12.93

SFUT0669-003 07/01/2013

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 29.93 16.87

SHEE0312-002 07/01/2014

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 32.11 11.40

SUUT2012-021 07/29/2014

Rates Fringes

BRICKLAYER.......................$ 22.13 1.67

CARPENTER (Acoustical Ceiling Installation Only)...............$ 21.00 3.20

CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, and Metal Stud Installation.....................$ 20.68 5.49

CEMENT MASON/CONCRETE FINISHER...$ 16.00 0.00

INSULATOR - MECHANICAL

(Duct, Pipe & Mechanical System Insulation)...............$ 17.76 1.83

IRONWORKER, STRUCTURAL...........$ 20.21 3.22

LABORER: Common or General......$ 12.78 0.00

LABORER: Irrigation.............$ 9.50 0.00

LABORER: Mason Tender - Brick...$ 16.38 1.00

LABORER: Mason Tender - Cement/Concrete..................$ 13.87 0.14

LABORER: Pipelayer..............$ 13.57 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 16.92 0.00

OPERATOR: Loader................$ 19.34 0.00

PAINTER (Brush, Roller and Spray, Excluding

Drywalling/Taping)...............$ 15.33 0.00

ROOFER...........................$ 15.62 0.00

TILE FINISHER....................$ 13.54 0.00

TILE SETTER......................$ 23.00 0.00

TRUCK DRIVER: Dump Truck........$ 17.74 2.66

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.