Attachment_26_-_Bldg_2405_and_2408_Mastic_Asbestos_Containing_Material_Samples.pdf

PDF 227 KB Posted

Attached to
SIMPLIFIED BASE ENGINEERING REQUIREMENT (SABER) Federal contract opportunity
Solicitation number
FA8201-16-R-0007
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attachment 26 - Bldg 2405 and 2408 Mastic Asbestos Containing Material Samples

View the file

Other files for this federal contract opportunity

Other files attached to SIMPLIFIED BASE ENGINEERING REQUIREMENT (SABER), newest first.
File Type Posted
Questions_and_Responses_15_March_2016.pdf PDF
Questions_and_Responses_15_March_2016.pdf PDF
SABER_Section_L_7March2016_Rev1_TrackChanges.pdf PDF
SABER_Section_M_7March2016_Rev1_TrackChanges.pdf PDF
SABER_Seed_Project_SOW_7Mar2016_Rev1_TrackChanges.pdf PDF
SABER_BASIC_SOW_7Mar2016_Rev1_TrackChanges.pdf PDF
Attachment_12_-_SABER_Section_L_7March2016_Rev1_ApprovedChanges.pdf PDF
Attachment_01_-_SABER_BASIC_SOW_7Mar2016_Rev1_ApprovedChanges.pdf PDF
Attachment_15_-_Rate_Worksheet_Rev_1.xlsx XLSX spreadsheet
Attachment_13_-_SABER_Section_M_7March2016_Rev1_ApprovedChanges.pdf PDF
FA8201-16-R-0007-0002_pdf_FINAL.pdf PDF
Attachment_17_-_SABER_Seed_Project_SOW_7Mar2016_Rev1_ApprovedChanges.pdf PDF
Question_and_Responses_7_March_2016.pdf PDF
Site_Visit_Attendee_List.pdf PDF
Responses_to_Questions_-_5Feb2016.pdf PDF
FA8201-16-R-0007-0001.pdf PDF
Attachment_08_-_Wage_Determination_WY15.pdf PDF
Attachment_12_-_SABER_Section_L_FINAL_3Feb2016.pdf PDF
Attachment_10_-_Government_Furnished_Property_(Scheduled)-_SGFP_V5.pdf PDF
Attachment_03_-_APPENDIX_C_MASTER_ON_or_OFF_BASE_UPDATED_Dec_2014.pdf PDF
Attachment_01_-_SABER_BASIC_SOW_FINAL_28Dec2015.pdf PDF
Attachment_21_-_Bldg_950 _970 _980_LBP_Report.pdf PDF
FA8201-16-R-0007.pdf PDF
Attachment_14_-_Construction_cost_estimate_breakdown_FINAL.xls XLS spreadsheet
Attachment_13_-_SABER_Section_M_FINAL_3Feb2016.pdf PDF
Attachment_25_-_Seed_Project_Pictures_3Feb2016.pdf PDF
Attachment_04_-_Wage_Determination_UT100.pdf PDF
Attachment_05_-_Wage_Determination_UT102.pdf PDF
Attachment_17_-_SABER_Seed_Project_SOW_FINAL_28Dec2015.pdf PDF
Attachment_23_-_Site_Visit_Information.pdf PDF
Attachment_16_-_Bona_Fide_Office_Requirements.pdf PDF
Attachment_19_-_Bldg_950 _970 _980_Asbestos_Report.pdf PDF
Attachment_18_-_Seed_Project_Burglar_Bar_Drawing.pdf PDF
Attachment_15_-_Rate_Worksheet_FINAL.xlsx XLSX spreadsheet
Attachment_06_-_Wage_Determination_UT104.pdf PDF
Attachment_24_-_Site_Visit_Attendees.xlsx XLSX spreadsheet
Attachment_02_-_BASE_FACILITY_DESIGN_STANDARD_-_3_SEP_15.pdf PDF
Attachment_07_-_Wage_Determination_UT110.pdf PDF
Attachment_09_-_Hill_AFB_Construction_and_Demolition_Waste_Diversion_Report.pdf PDF
Attachment_20_-_Bldg_2405 _2408_Asbestos_Report.pdf PDF
Attachment_22_-_Bldg_2405 _2408_LBP_Report.pdf PDF
ppi_tool.accdb —
Attachment_11_-_Government_Furnished_Property_(Requisitioned)_RGFP_V4.pdf PDF
DRAFT_-_SABER_BASIC_SOW_8_Dec_2015.pdf PDF
DRAFT_-_SABER_Seed_Project_SOW_8_Dec_2015.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS

Assumed

This inspection was performed in accordance with the Utah Division of Air Quality (DAQ) requirements as found in the Utah Air Quality Rule R307-801-10. This inspection report is required to be on site during all abatement, renovation, and demolition activities. Samples referenced in this report were analyzed by polarized light microscopy (PLM) utilizing method 600R-93-116 by The Science and Engineering laboratory at

Hill Air Force Base, Utah.

Exterior of facilities and mechanical rooms

Refurbish the HVAC systems.

Replace air conditioning equipment

Affected Area:

September 2015

Scott Combe

309 MMXG

Date Requested:

Requester:

Organization:

Location & Building:

Inspector:

58595

Statement of Work:

DEPARTMENT OF THE AIR FORCE

75 CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

REFURBISH HVAC SYSTEM

HILL AFB BUILDINGS, 2405 AND 2408

Inspection Date:

Work Order:

LIMITED ASBESTOS INSPECTION REPORT, HILL AFB BUILDINGS, 2405 AND 2408

Civil Engineering personnel also reviewed previous asbestos inspection reports of suspect asbestos containing building materials (ACM) that could potentially be encountered in this area. The information gathered from all current and previous inspections is shown below by homogenous area.

MATERIAL TYPE *LOCATIONS FOUNDQUANTITY

100 Linear

Feet

Category I, Potential RACM Non-Friable

14 October 2015

Chase Johnson (Utah Certified Asbestos

Inspector ASB#-5645)

*RACM

*Category I

*Category II

FRIABILITY

(During

Removal)*

Roof Flashing Duct Roof Penetrations and all

Other Flashing Areas.

SUMMARY OF ASBESTOS FOUND

A total of 6 1

GM153806

South Exterior Duct, Building 2405 None Detected

GM153807

South Exterior Duct, Building 2405 None Detected

Duct Insulation, Metal/Black/Yellow

GM153808

North Exterior Duct, Building 2408 None Detected

GM153809

North Exterior Duct, Building 2408 None Detected

GM153810

North Exterior Duct, Building 2408 None Detected

The following table summarizes the sampling data.

Homogenous Building Material, Description, Location, Quantity.

RACM: Regulated Asbestos-Containing Material (RACM)" means friable ACM, Category I non-friable ACM that has become friable, Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation project operations.

Locations found: Locations of building materials as described in this report indicate where they were found, but do not necessarily mean that these are the only locations where these materials may be encountered during the project.

Category II Non-Friable ACM: Any material, excluding Category I non- friable ACM, containing more than

1% asbestos as determined by using the methods specified in 40 CFR Part 763, Subpart E, Appendix E, Section

1, Polarized Light Microscopy (PLM) that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.

suspect materials assesses as part of the inspection.

Sample #

Duct Insulation, Metal/Black/Yellow

GM153805

South Exterior Duct, Building 2405 None Detected

*Per UDAQ definition.

Sample Location

Category I Non-Friable ACM: Asbestos-containing packings, gaskets, resilient floor coverings, or asphalt roofing products containing more than 1% asbestos as determined by using the method specified in 40 CFR

Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM).

Results

The following is a list of the "Suspect Materials" that were sampled as part of this inspection:

samples reference the

Building: 2405 and 2408

Refurbish HVAC System

WO#: 58595

6 November 2015

1330 Hours

Asbestos/LBP Shop (801)777-8006

This inspection report only encompasses the areas/materials designated within this report. Should the scope of the project be altered in any way or any materials found that are not identified in this report shall require additional assessment. This report cannot be used for any other projects within the building.

POTENTIAL FOR ADDITIONAL MATERIALS:

Any questions or concerns regarding this inspection report or if any new suspect asbestos containing material (ACM) is encountered, stop work and contact the personnel listed below for further assistance.

Cell: (801)430-4785

Supervisor: Nickolas King: DSN: (801)586-7094

Asbetsos/LBP Shop 75 CES(CEOHA)

CONTACT INFORMATION

This report was inspected by:

Chase Johnson (Utah Certified Asbestos Inspector ASB#-5645) of the 75 CES/CEOHA Asbestos/LBP Shop.

Building: 2405 and 2408

Refurbish HVAC System

WO#: 58595

6 November 2015

1330 Hours

File details come from the government source that posted it. Updated .