Attachment 09 - Hill AFB Construction and Demolition Waste Diversion Report
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hill AFB Construction and Demolition Waste Diversion Report
Project Title:
Contract No.:
Project No.:
Project Manager:
Contractor:
MATERIAL
Reused Recycled Disposed
Recycling Service Provider Used (tons) (tons) (tons)
Asphalt 0.0 0.0 0.0 Cardboard 0.0 0.0 0.0 Concrete 0.0 0.0 0.0 Dry Wall 0.0 0.0 0.0 Green Waste 0.0 0.0 0.0 Lumber/Wood 0.0 0.0 0.0 Metal(s) 0.0 0.0 0.0 Rock/Stone 0.0 0.0 0.0 Other: 0.0 0.0 0.0 Other: 0.0 0.0 0.0
TOTALS 0.0 0.0 0.0
Attach copy of weigh tickets or estimate;
Provide justification for not diverting recyclable materials
Total recycled and reused 0.0 tons Total material disposed 0.0 tons Total solid Waste 0.0 tons Percent recycled or reused [(A/C )x100]:
Contractor Superintendent Signature Date
Construction and Demolition (C&D) debris typically includes concrete, copper piping, copper wire, steel and other metals, wood, ceramic tile, porcelain bathroom fixtures, asphalt, intact building components (doors, windows, cabinets, ceiling fans, etc.), gypsum wallboard, and roofing material. C&D debris DOES NOT include dirt/soil removed from construction sites.