Attachment_19_-_Bldg_950 _970 _980_Asbestos_Report.pdf
PDF 97 KB Posted
- Attached to
- SIMPLIFIED BASE ENGINEERING REQUIREMENT (SABER) Federal contract opportunity
- Solicitation number
- FA8201-16-R-0007
About this file
Attachment 19 - Seed Project - Asbestos Report Bldg 950 970 980
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS
Assumed
02 November 2015 Nickolas King (Utah Certified Asbestos Inspector ASB#-2257)
*RACM
*Category I *Category II
FRIABILITY
(During
Removal)* HardThermal System Pipe
Insulation
Mechanical Rooms, Attics, Pipe Chases, Tunnels, etc.
SUMMARY OF ASBESTOS FOUND
200 Linear Feet
RACMFriable
DEPARTMENT OF THE AIR FORCE
75 CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
REFURBISH HVAC SYSTEMS
HILL AFB BUILDINGS,980, 950, & 970
Inspection Date:
Work Order:
LIMITED ASBESTOS INSPECTION REPORT, HILL AFB BUILDINGS,980, 950, & 970
Mechanical systems in Buildings: 980,950, and 970 Refurbish HVAC systems in these facilities.
Affected Area:
October 2015 Cary Haws
309 MXSS
Date Requested:
Requester:
Organization:
Location & Building:
Inspector:
58698
Statement of Work:
RACM: Regulated Asbestos-Containing Material (RACM)" means friable ACM, Category I non-friable ACM that has become friable, Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation project operations.
This inspection was performed in accordance with the Utah Division of Air Quality (DAQ) requirements as found in the Utah Air Quality Rule R307-801-10. This inspection report is required to be on site during all abatement, renovation, and demolition activities. Samples referenced in this report were analyzed by polarized light microscopy (PLM) utilizing method 600R-93-116 by The Science and Engineering laboratory at Hill Air Force Base, Utah.
Civil Engineering personnel also reviewed previous asbestos inspection reports of suspect asbestos containing building materials (ACM) that could potentially be encountered in this area. The information gathered from all current and previous inspections is shown below by homogenous area.
MATERIAL TYPE *LOCATIONS FOUND
*Per UDAQ definition.
QUANTITY
Buildings: 980, 950, 970 Refurbish HVAC system
WO#: 58698
16 November 2015 1345 hours
A total of 5 3
Sample Location
Category I Non-Friable ACM: Asbestos-containing packings, gaskets, resilient floor coverings, or asphalt roofing products containing more than 1% asbestos as determined by using the method specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM).
Results
The following is a list of the "Suspect Materials" that were sampled as part of this inspection:
samples reference the
Cell: (801)430-4785 Supervisor: Nickolas King: DSN: (801)586-7094
Asbetsos/LBP Shop 75 CES(CEOHA)
CONTACT INFORMATION
This report was inspected by:
Nickolas King (Utah Certified Asbestos Inspector ASB#-2257) of the 75 CES/CEOHA Asbestos/LBP Shop.
The following table summarizes the sampling data.
Homogenous Building Material, Description, Location, Quantity.
Asbestos/LBP Shop (801)777-8006
This inspection report only encompasses the areas/materials designated within this report. Should the scope of the project be altered in any way or any materials found that are not identified in this report shall require additional assessment. This report cannot be used for any other projects within the building.
POTENTIAL FOR ADDITIONAL MATERIALS:
Any questions or concerns regarding this inspection report or if any new suspect asbestos containing material (ACM) is encountered, stop work and contact the personnel listed below for further assistance.
Locations found: Locations of building materials as described in this report indicate where they were found, but do not necessarily mean that these are the only locations where these materials may be encountered during the project.
Category II Non-Friable ACM: Any material, excluding Category I non- friable ACM, containing more than 1% asbestos as determined by using the methods specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM) that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
suspect materials assesses as part of the inspection.
Sample #
Vibration Collar Duct Insulation, Grey/Brown Duct Insulation, Foil/Brown
Vibration Collar, 100 Linear Feet
Duct Insulation, Grey over Brown, 400 Square Feet
GM122401
North Center, Mechanical
Room, B. 980 None-Detected
Duct Insulation, Foil over Brown, 100 Square Feet
GM132007 South, Exterior Facility None-Detected
GM122387
North Center, Mechanical
Room, B. 950 None-Detected
GM122391
North Center, Mechanical
Room, B. 980 None-Detected
GM122400
North Center, Mechanical
Room, B/ 970 None-Detected