Text version
Question/Answers #1
29 JAN 2013
The questions and answers below comprise all questions submitted by contractors from 18 JAN 13 through 25 Jan 13. If there is a question that isn’t included in this document and was submitted, please contact Sharla Brandon at sharla.flowers-brandon@tinker.af.mil and lori.fixico@tinker.af.mil
RFI #
Subject Question/Answer
| 1 |
| Contracting |
| I was checking on the specs of this solicitation and apparently the 8(a) is not restricted to any region. Does that mean that any 8(a) in the US can submit a proposal? |
This is a restricted 8a, to Oklahoma. Offers must have a bona fide place of business (determined by SBA) at the time the offeror submits the proposal.
| 2 |
| Contracting |
| With regards to section L of the solicitation and its requirements, I have a question regarding Table 2.3- Proposal Organization -Under Volume 1-Technical, it clearly states that the page limitation for the technical is 10 pages. Starting under paragraph 3.2.2- Volume -1 Organization, and continuing through paragraph 3.2.4, the requirements are clearly stated as |
to the contents of the Technical Volume, including Subfactor One (para 3.2.3) and Subfactor Two (para 3.2.4). These requirements would undoubtedly extend past 10 pages.
-However, in table 2.3, under the requirement for the Title Page there is a reference to this page not being included in the 65 page limit.
My question is, in addressing these pieces of conflicting information, can my subfactors one and two exceed 10 pages as long as the entire technical volume stays within the "65 page limitation"? Of course I am keeping in mind the other page limitations for the other features of Volume 1.
An amendment will be posted to change the technical page limitation to 25. This should give Vendors adequate pages to submit any plans they may want to offer.
| 3 |
| Site Visit |
| We will be proposing on the Tinker Painting IDIQ and would like to attend the site visit. I noticed there is a temporary date set for the site visit on Feb. 1st. If this date still stands what information will you need from contractors to get on base and attend the site visit? |
The site visit for the IDIQ paint contract is set for 01 Feb 2013. The solicitation will be amended to add full information on time/location/procedures. Site visit will be at 0900 1 feb 13. Details are as follows:
A bus will be outside of Gott Gate/Truck Gate on the Navy side of the base at Air Depot and 59th Street. (I-240, exit Air Depot). There is very limited parking at the gate. Outside of the fence, on the north end of building 801, there is additional parking. Do not park on the grass or gravel at Gott Gate, your vehicle will be towed. All attending will need to have a Driver’s lisence and insurance verification and be able to pass a background check.
The bus will pick all attendees up outside of the gate at 0900, the bus will be there 15 minutes early. The bus will drive to the Seed project location, as well as through the base for a “window tour” of typical areas of work for this contract.
The bus will “drop off” all attendees back at Gott Gate/Truck Gate for lunch – around 1130. The bus will return to pick all attendees up for a question and answer session at 1330 and drop off at Building 3 (PZIOC-Contracting).
The bus will return for pick up at 1445 and return all to Gott Gate/Truck Gate.
Please limit attendees to 5 per Prime Contractor.
| 4 |
| Contracting |
| There appears to be a conflict between the |
solicitation and the synopsis regarding the office location of the firm. Per the synopsis the offeror has to be from Oklahoma however I cant find anywhere in the solicitation this limitation.
See RFI #1
| 5 |
| Technical |
| I could not tell what type of coatings you were looking for in your bid request. |
Please see Sections 03000 (Pg 37), Section 03200 (Pg 50, Section 09720, (Pg 64) and Section 09000, (Pg 68) of the Statement of Work (SOW) for the type of coatings needed for the vendors to complete the bid schedule.
| 6 |
| Contracting |
| There appears to be a conflict between the solicitation and the synopsis regarding the office location of the firm. Per the synopsis the offeror has to be from Oklahoma however I cant find anywhere in the solicitation this limitation. |
See RFI #1
| 7 |
| Technical |
| The next course for the c-3 for lead training is on 03/18/13-03/21/13 in Vallejo, CA. I have called environmental companies and they have never heard of this training. This is not an state mandated requirement. |
An amendment to the SOW will be posted to change this requirement to the following: Section 02800, Paragraph 1.6.1.2 to the lead competent- person having completed approved training and certification by EPA and Oklahoma DEQ.
| 8 |
| Contracting |
| Both firms are based out of another state but performed similar contracts throughout the nation. Typically we set up construction trailers for quick response on-site service. Will this fulfill the "reserved for Oklahoma only" |
requirement?
This requirement is set aside for a local 8(a) firm. The office must be in place prior to contract award and remain throughout the lifetime of the contract. There must be a physical address of the office. Please see RFI #1
| 9 |
| Technical |
| I could not tell what type of coatings you were looking for in your bid request. |
Please refer to RFI #5
| 10 |
| Technical |
| Do we have to have our certification for SSPC QP 1 before the award of the IDIQ. This certification takes up to eight weeks and is $5,400.00/year. It also states that all subcontractors must have this certification. We have never had to obtain this certification for any other projects. If we are unsuccessful in the IDIQ, we would not need it. Can this be a certification obtained after an award has been made? This certification is for complex steel metal structures. |
Will change the SOW, Section 09900, Paragraph 1.3.1 to require a minimum a one employee certified during the life of the contract.
| 11 |
| Technical |
| Do we need to submit the Certified industrial Hygienist for the solicitation or after the award for a delivery order? |
The requirement to submit the documentation for a Certified Industrial Hygienist is after the award of the individual delivery order that has LBP associated with it.
| 12 |
| Technical |
| Do we need to submit the testing laboratory and third party consultant performing wipe sampling for lead in dust for the solicitation or after the award for a delivery order? |
The requirement to submit documentation for the testing laboratory and third party consultant performing wipe sampling for lead in dust is after award of the individual delivery order that has LBP associated with it.
| 13 |
| Technical |
| Which types of certifications are needed for handling of chemicals? |
The only type of certifications needed for handling of chemicals would be standard certifications required by Federal, State and Local Regulations.
| 14 |
| Technical |
| Is sub factor 1 & 2 in the technical section part of the 10 page limit under the technical section Table 2.3? |
Yes, please refer to RFI #2
| 15 |
| Technical |
| Paragraph 1.6.1.2 state that we must submit a person who has completed the Lead Paint Removal (C-3) course by SSPC. This is a 4 day, $1,195 course. There are no courses offered in Oklahoma. This person is required to be on the project at all times. Our owners have taken an EPA course in Lead Renovator Initial, which allows them to train our employees in-house. Can the requirements be altered? |
Please refer to RFI #7