STATEMENT OF WORK
Paint Exterior of B-1086 (W.O. #53790)
26 Feb 2013
1. SCOPE OF WORK:
1.1 The work to be performed under the terms and conditions of this order consists of furnishing all plant, labor, equipment, instruments, materials, transportation, and incidentals necessary to paint the exterior of Bldg 1086, Tinker Air Force Base.
1.2 The “work” shall mean to prepare and paint the exterior of Bldg 1086 (to include all metal, concrete/masonry, 3 exterior doors, and the metal portion of the roof only) to be complete, finished and ready for use by the Government. The Contractor shall be responsible for field verification of measurements as well as identify any unfavorable conditions or work elements that would impede or prevent the required work to be accomplished as described herein.
2. LOCATION OF WORK: Bldg 1086, Tinker Air Force Base
3. DESCRIPTION OF WORK: All work shall be In Accordance With (IAW)
Specifications for Protective Coating Maintenance dated 26 Feb 13.
4. Contractor shall paint the exterior of Bldg 1086 by:
(a) Prepping and cleaning the exterior surface of B1086 by hand tool clean, power tool clean, and/or water blast (Contractor shall determine most suitable method to prep the exterior surfaces).
(b) Block-fill concrete/masonry where needed (approximately 5%).
(c) Prime/Seal concrete/masonry 100% (one coat).
(d) Painting exterior concrete/masonry 100% (one coat).
(e) . Priming exterior metal 100% (one coat)
(f) Painting exterior metal 100% (two coats).
(g) Painting three (3) exterior doors (one side only) including trim and frame
(prime one coat and paint one coat for each door).
(h) Contractor shall comply with AFI 32-7041, “Water Quality Compliance” and the SOW, Section 00 72 00, Paragraph 1.3.3.2 when work is being performed.
(c) Contact CEY for color scheme, Loretta Birk or Lester Caldwell, (405)734-3301 or 734-5835).