Revised Bid Schedule
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHED - BASE (Two Yrs)
| PROTECTIVE COATING | |||||
| BID SCHEDULE - BASE YEAR | |||||
| CLIN | DESCRIPTION | ESTIMATED QUANTITY | UNIT OF MEAS | COST PER UNIT | EXTENDED COST |
| INCLUDES LABOR, EQUIPMENT AND MATERIAL UNLESS NOTED OTHERWISE | $ - 0 | ||||
| A0001 | SURFACE PREPARATIONS | ||||
| A0001A | HAND TOOL CLEAN | 310,000 | SF | $ - 0 | |
| A0001B | POWER TOOL CLEAN | 75,227 | SF | $ - 0 | |
| A0001C | WHITE METAL BLAST | 1,989 | SF | $ - 0 | |
| A0001D | COMMERCIAL BLAST | 63,308 | SF | $ - 0 | |
| A0001E | ABRASIVE BLAST | 7,442 | SF | $ - 0 | |
| A0001F | WATER BLAST | 542,090 | SF | $ - 0 | |
| A0001G | SOLVENT (CHEMICAL) CLEAN | 918 | SF | $ - 0 | |
| A0002 | PAINT/STAIN | ||||
| CONCRETE/MASONRY (INTERIOR AND EXTERIOR) | |||||
| A0002A | PAINT INTERIOR CONCRETE/MASONRY (One Coat) | 50,820 | SF | $ - 0 | |
| A0002B | PAINT EXTERIOR CONCRETE/MASONRY (One Coat) | 301,000 | SF | $ - 0 | |
| A0002C | PAINT SWIMMING POOL (Primer and Two Coats) | 11,520 | SF | $ - 0 | |
| A0002D | PRIME/SEAL- CONCRETE/MASONRY (One Coat) | 3,334 | SF | $ - 0 | |
| A0002E | BLOCK FILL-BRICK/ CONCRETE (One Coat) | 61,286 | SF | $ - 0 | |
| METAL, FERROUS AND NON-FERROUS (INTERIOR AND EXTERIOR) | |||||
| A0002F | PAINT INTERIOR METAL (Primer and One Coat) | 275,000 | SF | $ - 0 | |
| A0002G | PAINT INTERIOR METAL (One Coat) | 125,000 | SF | $ - 0 | |
| A0002H | PAINT EXTERIOR METAL (Primer, Intermediate and Topcoat) | 300,000 | SF | $ - 0 | |
| WOOD, DRESSED LUMBER, PANELING, DECKING, SHINGLES, TRIM AND CHAIR RAIL (INTERIOR AND EXTERIOR) | |||||
| A0002I | PAINT INTERIOR WOOD (Primer and One Coat) | 1,000 | SF | $ - 0 | |
| A0002J | PAINT INTERIOR WOOD ( One Coat) | 1,923 | SF | $ - 0 | |
| A0002K | PAINT EXTERIOR WOOD (Primer and One Coat) | 448 | SF | $ - 0 | |
| A0002L | PAINT EXTERIOR WOOD (One Coat) | 448 | SF | $ - 0 | |
| A0002M | COAT INTERIOR WOOD FLOORS (Primer and Two Coats) | 267 | SF | $ - 0 | |
| A0002N | STAIN DOORS - One Side -Frames, and Trim (Primer and Two Coats) | 48 | EA | $ - 0 | |
| A0002O | STAIN INTERIOR WOOD (Primer and Two Coats) | 492 | SF | $ - 0 | |
| A0002P | STAIN INTERIOR WOOD TRIM (Primer and Two Coats) | 3,638 | SF | $ - 0 | |
| EXTERIOR STUCCO, INTERIOR PLASTER, GYPSUM BOARD, TEXTURED SURFACES, AND WALL PANELS | |||||
| A0002Q | PAINT PLASTER (One Coat) | 14,847 | SF | $ - 0 | |
| A0002R | PAINT GYPSUM BOARD (One Coat) | 210,000 | SF | $ - 0 | |
| A0002S | PAINT DOORS - One Side, Frame, and Trim (Primer and One Coat) | 500 | EA | $ - 0 | |
| A0002T | PAINT DOORS - One Side, Frame, and Trim (One Coat) | 175 | EA | $ - 0 | |
| A0002U | STAIN KILLER/SEALER (One Coat) | 109,500 | SF | $ - 0 | |
| A0002V | WATERBORNE EPOXY PRIMER FINISH (One Coat) | 833 | SF | $ - 0 | |
| A0002W | WATERBORNE EPOXY BLOCK FILLER (One Coat) | 2,880 | SF | $ - 0 | |
| A0002X | RECREATIONAL NON-SKID COATING | 83 | SF | $ - 0 | |
| A0002Y | ACRYLIC CAULKING | 3,134 | LF | $ - 0 | |
| A0002Z | ASPHALT SEAL COAT | 19,564 | SF | $ - 0 | |
| A0003 | MISCELLANEOUS | ||||
| A0003A | TEXTURE INTERIOR | 6,200 | SF | $ - 0 | |
| A0003B | TEXTURE EXTERIOR | 340 | SF | $ - 0 | |
| A0003C | TAPE & SPACKLE | 2,109 | SF | $ - 0 | |
| A0003D | FLOAT-WALLS/CEILING | 11,500 | SF | $ - 0 | |
| A0003E | REMOVE GYPSUM BOARD 2' X 4' (LABOR AND EQUIPMENT) | 400 | SF | $ - 0 | |
| A0003F | INSTALL GYPSUM BOARD 2' X 4' | 400 | SF | $ - 0 | |
| A0003G | PAINT GRAPHICS | 100 | SF | $ - 0 | |
| A0003H | PAINT STENCILS 1" TO 12" (2/SET) | 414 | EA | $ - 0 | |
| PAINT FENCE | |||||
| A0003I | CHAIN (One Coat) | 167 | SF | $ - 0 | |
| A0003J | METAL (One Coat) | 167 | SF | $ - 0 | |
| A0003K | WOOD (One Coat) | 1,283 | SF | $ - 0 | |
| A0003L | LEAD BASED PAINT ABATEMENT (REMOVAL AND DISPOSAL) | 1,125 | SF | $ - 0 | |
| A0003M | LEAD BASED PAINT ENCAPSULATION | 1,125 | SF | $ - 0 | |
| A0003N | CERTIFIED INDUSTRIAL HYGIENIST (CIH) | 20 | HR | $ - 0 | |
| A0003O | SET UP AIR MONITORING PUMPS FILTERS AND RUN AIR MONITORING PUMPS FOR 4 HOURS | 10 | EA | $ - 0 | |
| A0004 | EXTERIOR COATING OF STEEL STRUCTURES | ||||
| A0004A | WATERBORNE EPOXY | 1,667 | SF | $ - 0 | |
| A0004B | EPOXY MASTIC STANDARD COLORS | 31,409 | SF | $ - 0 | |
| A0004C | POLYURETHANE ENAMEL | 31,409 | SF | $ - 0 | |
| A0004D | EPOXY & URETHANE THINNER | 14,856 | SF | $ - 0 | |
| A0005 | PAVEMENT MARKINGS (To include Reflective Media) | ||||
| PAINT TRAFFIC AND AIRFIELD MARKINGS | |||||
| A0005A | LAYOUT/PAINT PAVEMENT MARKINGS | 28,500 | SF | $ - 0 | |
| A0005B | LAYOUT/PAINT STRIPING | 110,500 | SF | $ - 0 | |
| A0005C | LAYOUT/PAINT HANDICAP CROSSHATCH | 65 | EA | $ - 0 | |
| A0005D | LAYOUT/PAINT CROSSWALK BLOCKS (2' x 8') | 57 | EA | $ - 0 | |
| A0005E | RE-PAINT EXISTING STRIPES | 45,000 | SF | $ - 0 | |
| A0005F | RE-PAINT EXISTING PAVEMENT MARKINGS | 2,387 | SF | $ - 0 | |
| A0005G | RE-PAINT CROSSWALK BLOCK | 248 | EA | $ - 0 | |
| A0005H | BLACKOUT STRIPING/MARKING | 951 | SF | $ - 0 | |
| A0005I | SCARIFY (LABOR AND EQUIPMENT) | 3,382 | SF | $ - 0 | |
| THERMOPLASTIC | |||||
| A0005J | THERMOPLASTIC STRIPE REMOVAL 4" EQUIVALENT (LABOR AND EQUIPMENT) | 8,333 | SF | $ - 0 | |
| A0005K | THERMOPLASTIC STRIPE INSTALL 4" EQUIVALENT | 8,333 | SF | $ - 0 | |
| A0005L | THERMOPLASTIC ARROW REMOVAL (LABOR AND EQUIPMENT) | 42 | SF | $ - 0 | |
| A0005M | THERMOPLASTIC ARROW INSTALL | 42 | SF | $ - 0 | |
| A0005N | THERMOPLASTIC LETTER REMOVAL (LABOR AND EQUIPMENT) | 42 | SF | $ - 0 | |
| A0005O | THERMOPLASTIC LETTER INSTALL | 42 | SF | $ - 0 | |
| A0005P | PREFORMED RETROFLECTIVE PAVEMENT MARKING TAPE | 333 | SF | $ - 0 | |
| A0005Q | RAISED REFLECTIVE MARKERS | 67 | EA | $ - 0 | |
| A0006 | WALLCOVERINGS | ||||
| VINYL WALL COVERING | |||||
| A0006A | REMOVE COMMERCIAL WALL COVERING (LABOR AND EQUIPMENT) | 5,844 | SF | $ - 0 | |
| A0006B | REMOVE SISAL (LABOR AND EQUIPMENT) | 33 | SF | $ - 0 | |
| A0006C | WALL COVERING/SISAL-REPAIR (LABOR AND EQUIPMENT) | 33 | SF | $ - 0 | |
| A0006D | INSTALL COMMERCIAL WALL COVERING (LABOR AND EQUIPMENT) | 2,013 | SF | $ - 0 | |
| CORNER GUARDS-FLUSH & ADHESIVE | |||||
| A0006E | REMOVE CORNER GUARDS(LABOR AND EQUIPMENT) | 33 | LF | $ - 0 | |
| A0006F | INSTALL CORNER GUARDS-FLUSH | 33 | LF | $ - 0 | |
| A0006G | INSTALL CORNER GUARDS-ADHESIVE | 33 | LF | $ - 0 | |
| CHAIR RAILS | |||||
| A0006H | CHAIR RAILS-REMOVE (LABOR AND EQUIPMENT) | 33 | LF | $ - 0 | |
| A0006I | CHAIR RAILS-INSTALL | 44 | LF | $ - 0 | |
| WOOD TRIM | |||||
| A0006J | REMOVE WOOD TRIM (LABOR AND EQUIPMENT) | 33 | LF | $ - 0 | |
| A0006K | INSTALL WOOD TRIM | 33 | LF | $ - 0 | |
| COVE BASE | |||||
| A0006L | COVE BASE - REMOVE (LABOR AND EQUIPMENT) | 780 | LF | $ - 0 | |
| A0006M | INSTALL COVE BASE ((LABOR AND EQUIPMENT) | 780 | LF | $ - 0 | |
| A0007 | FLOOR COATING SYSTEMS (LABOR AND EQUIPMENT ONLY) | ||||
| A0007A | REMOVE FLOOR COATING MATERIAL | 33,333 | SF | $ - 0 | |
| INSTALL FLOOR COATING MATERIAL (INCLUDES SLIP RESISTANT GRIT) | |||||
| A0007B | MULTI PURPOSE EPOXY (10 MIL) | 16,667 | SF | $ - 0 | |
| A0007C | HIGH TRAFFIC URETHANE SYSTEM (4 MIL) | 833 | SF | $ - 0 | |
| A0007D | STATIC DISSIPATIVE SYSTEM (5 MIL) | 833 | SF | $ - 0 | |
| A0007E | CHEMICAL RESISTANT EPOXY (30 MIL) | 833 | SF | $ - 0 | |
| A0007F | INDUSTRIAL TRAFFIC SYSTEM (2.5 MIL) | 833 | SF | $ - 0 | |
| A0007G | HIGH PERFORMANCE SYSTEM (2.5 MIL) | 833 | SF | $ - 0 | |
| A0007H | CHEMICAL RESISTANT URETHANE (5 MIL) | 16,667 | SF | $ - 0 | |
| A0007I | RESURFACER CEMENTIOUS | 33,333 | SF | $ - 0 | |
| A0007J | RESURFACER | 667 | SF | $ - 0 | |
| A0007K | EPOXY MORTAR SYSTEM | 833 | SF | $ - 0 | |
| A0007L | FLOOR TRAFFIC LINES | 333 | SF | $ - 0 | |
| A0007M | REMOVE JOINT MATERIAL 1/4" TO 1" | 1,000 | LF | $ - 0 | |
| A0007N | INSTALL JOINT MATERIAL 1/4" TO 1" | 1,000 | LF | $ - 0 | |
| A0007O | REMOVE JOINT MATERIAL 1" TO 2" | 1,000 | LF | $ - 0 | |
| A0007P | INSTALL JOINT MATERIAL 1" TO 2" | 1,000 | LF | $ - 0 | |
| A0008 | NON-PRICED ITEMS (NPI) | ||||
| FOR HEIGHTS BETWEEN 8-15 FEET ADD 10% TO LABOR COST | 10.00% | ||||
| FOR HEIGHTS ABOVE 15 FEET ADD 20% TO LABOR COST | 20.00% | ||||
| MULTI PURPOSE EPOXY PRIMER | GALS | ||||
| HIGH TRAFFIC SYSTEM | GALS | ||||
| ELECTRIC STATIC DISCHARGE EPOXY FLOOR COATING SYSTEM | GALS | ||||
| CHEMICAL/ACID RESISTANT COATING | GALS | ||||
| INDUSTRIAL THIN MIL COATING SYSTEM | GALS | ||||
| HIGH PERFORMANCE COATING/BINDER SYSTEM | GALS | ||||
| RESURFACER | GALS | ||||
| EPOXY MORTAR SYSTEM | GALS | ||||
| FLOOR TRAFFIC LINES | GALS | ||||
| SELF-LEVELING CEMENT BASED INDUSTRIAL FLOOR RE-SURFACER | GALS | ||||
| JOINT MATERIAL - POLYUREA AND BACKER ROD | LF | ||||
| DEBRIS/TRASH CONTAINER | EA | ||||
| CONTAINMENT | LF | ||||
| CONTAINMENT SYSTEM FOR LEAD BASED PAINT REMOVAL | EA | ||||
| LIFTS | EA | ||||
| COVE BASE | LF | ||||
| WALL COVERING/SISAL | LY |
&L&D
BID SCHED - OPT I
| PROTECTIVE COATING | |||||
| BID SCHEDULE - OPTION I | |||||
| CLIN | DESCRIPTION | ESTIMATED QUANTITY | UNIT OF MEAS | EST COST PER UNIT | EXTENDED COST |
| INCLUDES LABOR, EQUIPMENT AND MATERIAL UNLESS NOTED OTHERWISE | $ - 0 | ||||
| B0001 | SURFACE PREPARATIONS | ||||
| B0001A | HAND TOOL CLEAN | 170,357 | SF | $ - 0 | |
| B0001B | POWER TOOL CLEAN | 47,017 | SF | $ - 0 | |
| B0001C | WHITE METAL BLAST | 1,243 | SF | $ - 0 | |
| B0001D | COMMERCIAL BLAST | 31,654 | SF | $ - 0 | |
| B0001E | ABRASIVE BLAST | 7,442 | SF | $ - 0 | |
| B0001F | WATER BLAST | 271,045 | SF | $ - 0 | |
| B0001G | SOLVENT (CHEMICAL) CLEAN | 459 | SF | $ - 0 | |
| B0002 | PAINT/STAIN | ||||
| CONCRETE/MASONRY (INTERIOR AND EXTERIOR) | |||||
| B0002A | PAINT INTERIOR CONCRETE/MASONRY (One Coat) | 25,410 | SF | $ - 0 | |
| B0002B | PAINT EXTERIOR CONCRETE/MASONRY (One Coat) | 186,500 | SF | $ - 0 | |
| B0002C | PAINT SWIMMING POOL (Primer and Two Coats) | 5,760 | SF | $ - 0 | |
| B0002D | PRIME/SEAL- CONCRETE/MASONRY (One Coat) | 1,667 | SF | $ - 0 | |
| B0002E | BLOCK FILL-BRICK/ CONCRETE (One Coat) | 30,643 | SF | $ - 0 | |
| METAL, FERROUS AND NON-FERROUS (INTERIOR AND EXTERIOR) | |||||
| B0002F | PAINT INTERIOR METAL (Primer and One Coat) | 184,471 | SF | $ - 0 | |
| B0002G | PAINT INTERIOR METAL (One Coat) | 125,000 | SF | $ - 0 | |
| B0002H | PAINT EXTERIOR METAL (Primer, Intermediate and Topcoat) | 303,704 | SF | $ - 0 | |
| WOOD, DRESSED LUMBER, PANELING, DECKING, SHINGLES, TRIM AND CHAIR RAIL (INTERIOR AND EXTERIOR) | |||||
| B0002I | PAINT INTERIOR WOOD (Primer and One Coat) | 1,202 | SF | $ - 0 | |
| B0002J | PAINT INTERIOR WOOD ( One Coat) | 923 | SF | $ - 0 | |
| B0002K | PAINT EXTERIOR WOOD (Primer and One Coat) | 280 | SF | $ - 0 | |
| B0002L | PAINT EXTERIOR WOOD (One Coat) | 448 | SF | $ - 0 | |
| B0002M | COAT INTERIOR WOOD FLOORS (Primer and Two Coats) | 167 | SF | $ - 0 | |
| B0002N | STAIN DOORS - One Side -Frames, and Trim (Primer and Two Coats) | 12 | EA | $ - 0 | |
| B0002O | STAIN INTERIOR WOOD (Primer and Two Coats) | 307 | SF | $ - 0 | |
| B0002P | STAIN INTERIOR WOOD TRIM (Primer and Two Coats) | 2,273 | SF | $ - 0 | |
| EXTERIOR STUCCO, INTERIOR PLASTER, GYPSUM BOARD, TEXTURED SURFACES, AND WALL PANELS | |||||
| B0002Q | PAINT PLASTER (One Coat) | 14,847 | SF | $ - 0 | |
| B0002R | PAINT GYPSUM BOARD (One Coat) | 199,471 | SF | $ - 0 | |
| B0002S | PAINT DOORS - One Side, Frame, and Trim (Primer and One Coat) | 373 | EA | $ - 0 | |
| B0002T | PAINT DOORS - One Side, Frame, and Trim (One Coat) | 145 | EA | $ - 0 | |
| B0002U | STAIN KILLER/SEALER (One Coat) | 106,533 | SF | $ - 0 | |
| B0002V | WATERBORNE EPOXY PRIMER FINISH (One Coat) | 833 | SF | $ - 0 | |
| B0002W | WATERBORNE EPOXY BLOCK FILLER (One Coat) | 2,880 | SF | $ - 0 | |
| B0002X | RECREATIONAL NON-SKID COATING | 83 | SF | $ - 0 | |
| B0002Y | ACRYLIC CAULKING | 3,134 | LF | $ - 0 | |
| B0002Z | ASPHALT SEAL COAT | 19,565 | SF | $ - 0 | |
| B0003 | MISCELLANEOUS | ||||
| B0003A | TEXTURE INTERIOR | 5,954 | SF | $ - 0 | |
| B0003B | TEXTURE EXTERIOR | 340 | SF | $ - 0 | |
| B0003C | TAPE & SPACKLE | 2,109 | SF | $ - 0 | |
| B0003D | FLOAT-WALLS/CEILING | 10,421 | SF | $ - 0 | |
| B0003E | REMOVE GYPSUM BOARD 2' X 4' (LABOR AND EQUIPMENT) | 400 | SF | $ - 0 | |
| B0003F | INSTALL GYPSUM BOARD 2' X 4' | 400 | SF | $ - 0 | |
| B0003G | PAINT GRAPHICS | 333 | SF | $ - 0 | |
| B0003H | PAINT STENCILS 1" TO 12" (2/SET) | 414 | EA | $ - 0 | |
| PAINT FENCE | |||||
| B0003I | CHAIN (One Coat) | 167 | SF | $ - 0 | |
| B0003J | METAL (One Coat) | 167 | SF | $ - 0 | |
| B0003K | WOOD (One Coat) | 1,283 | SF | $ - 0 | |
| B0003L | LEAD BASED PAINT ABATEMENT (REMOVAL AND DISPOSAL) | 1,125 | SF | $ - 0 | |
| B0003M | LEAD BASED PAINT ENCAPSULATION | 1,125 | SF | $ - 0 | |
| B0003N | CERTIFIED INDUSTRIAL HYGIENIST (CIH) | 20 | HR | $ - 0 | |
| B0003O | SET UP AIR MONITORING PUMPS FILTERS AND RUN AIR MONITORING PUMPS FOR 4 HOURS | 10 | EA | ||
| B0004 | EXTERIOR COATING OF STEEL STRUCTURES | ||||
| B0004A | WATERBORNE EPOXY | 1,667 | SF | $ - 0 | |
| B0004B | EPOXY MASTIC STANDARD COLORS | 31,409 | SF | $ - 0 | |
| B0004C | POLYURETHANE ENAMEL | 31,409 | SF | $ - 0 | |
| B0004D | EPOXY & URETHANE THINNER | 14,856 | SF | $ - 0 | |
| B0005 | PAVEMENT MARKINGS (To include Reflective Media) | ||||
| PAINT TRAFFIC AND AIRFIELD MARKINGS | |||||
| B0005A | LAYOUT/PAINT PAVEMENT MARKINGS | 27,657 | SF | $ - 0 | |
| B0005B | LAYOUT/PAINT STRIPING | 101,780 | SF | $ - 0 | |
| B0005C | LAYOUT/PAINT HANDICAP CROSSHATCH | 50 | EA | $ - 0 | |
| B0005D | LAYOUT/PAINT CROSSWALK BLOCKS (2' x 8') | 48 | EA | $ - 0 | |
| B0005E | RE-PAINT EXISTING STRIPES | 43,452 | SF | $ - 0 | |
| B0005F | RE-PAINT EXISTING PAVEMENT MARKINGS | 2,387 | SF | $ - 0 | |
| B0005G | RE-PAINT CROSSWALK BLOCK | 248 | EA | $ - 0 | |
| B0005H | BLACKOUT STRIPING/MARKING | 951 | SF | $ - 0 | |
| B0005I | SCARIFY (LABOR AND EQUIPMENT) | 3,382 | SF | $ - 0 | |
| THERMOPLASTIC | |||||
| B0005J | THERMOPLASTIC STRIPE REMOVAL 4" EQUIVALENT (LABOR AND EQUIPMENT) | 8,333 | SF | $ - 0 | |
| B0005K | THERMOPLASTIC STRIPE INSTALL 4" EQUIVALENT | 8,333 | SF | $ - 0 | |
| B0005L | THERMOPLASTIC ARROW REMOVAL (LABOR AND EQUIPMENT) | 42 | EA | $ - 0 | |
| B0005M | THERMOPLASTIC ARROW INSTALL | 42 | EA | $ - 0 | |
| B0005N | THERMOPLASTIC LETTER REMOVAL (LABOR AND EQUIPMENT) | 42 | EA | $ - 0 | |
| B0005O | THERMOPLASTIC LETTER INSTALL | 42 | EA | $ - 0 | |
| B0005P | PREFORMED RETROFLECTIVE PAVEMENT MARKING TAPE | 333 | SF | $ - 0 | |
| B0005Q | RAISED REFLECTIVE MARKERS | 67 | EA | $ - 0 | |
| B0006 | WALLCOVERINGS | ||||
| VINYL WALL COVERING | |||||
| B0006A | REMOVE COMMERCIAL WALL COVERING (LABOR AND EQUIPMENT) | 5,844 | SF | $ - 0 | |
| B0006B | REMOVE SISAL (LABOR AND EQUIPMENT) | 33 | SF | $ - 0 | |
| B0006C | WALL COVERING/SISAL-REPAIR (LABOR AND EQUIPMENT) | 33 | SF | $ - 0 | |
| B0006D | INSTALL COMMERCIAL WALL COVERING (LABOR AND EQUIPMENT) | 2,013 | SF | $ - 0 | |
| CORNER GUARDS-FLUSH & ADHESIVE | |||||
| B0006E | REMOVE CORNER GUARDS(LABOR AND EQUIPMENT) | 33 | LF | $ - 0 | |
| B0006F | INSTALL CORNER GUARDS-FLUSH | 33 | LF | $ - 0 | |
| B0006G | INSTALL CORNER GUARDS-ADHESIVE | 33 | LF | $ - 0 | |
| CHAIR RAILS | |||||
| B0006H | CHAIR RAILS-REMOVE (LABOR AND EQUIPMENT) | 33 | LF | $ - 0 | |
| B0006I | CHAIR RAILS-INSTALL | 44 | LF | $ - 0 | |
| WOOD TRIM | |||||
| B0006J | REMOVE WOOD TRIM (LABOR AND EQUIPMENT) | 33 | LF | $ - 0 | |
| B0006K | INSTALL WOOD TRIM | 33 | LF | $ - 0 | |
| COVE BASE | |||||
| B0006L | COVE BASE - REMOVE (LABOR AND EQUIPMENT) | 780 | LF | $ - 0 | |
| B0006M | INSTALL COVE BASE ((LABOR AND EQUIPMENT) | 780 | LF | $ - 0 | |
| B0007 | FLOOR COATING SYSTEMS (LABOR AND EQUIPMENT ONLY) | ||||
| B0007A | REMOVE FLOOR COATING MATERIAL | 33,333 | SF | $ - 0 | |
| INSTALL FLOOR COATING MATERIAL (INCLUDES SLIP RESISTANT GRIT) | |||||
| B0007B | MULTI PURPOSE EPOXY (10 MIL) | 16,667 | SF | $ - 0 | |
| B0007C | HIGH TRAFFIC URETHANE SYSTEM (4 MIL) | 833 | SF | $ - 0 | |
| B0007D | STATIC DISSIPATIVE SYSTEM (5 MIL) | 833 | SF | $ - 0 | |
| B0007E | CHEMICAL RESISTANT EPOXY (30 MIL) | 833 | SF | $ - 0 | |
| B0007F | INDUSTRIAL TRAFFIC SYSTEM (2.5 MIL) | 833 | SF | $ - 0 | |
| B0007G | HIGH PERFORMANCE SYSTEM (2.5 MIL) | 833 | SF | $ - 0 | |
| B0007H | CHEMICAL RESISTANT URETHANE (5 MIL) | 16,667 | SF | $ - 0 | |
| B0007I | RESURFACER CEMENTIOUS | 33,333 | SF | $ - 0 | |
| B0007J | RESURFACER | 667 | SF | $ - 0 | |
| B0007K | EPOXY MORTAR SYSTEM | 833 | SF | $ - 0 | |
| B0007L | FLOOR TRAFFIC LINES | 333 | LF | $ - 0 | |
| B0007M | REMOVE JOINT MATERIAL 1/4" TO 1" | 1,000 | LF | $ - 0 | |
| B0007N | INSTALL JOINT MATERIAL 1/4" TO 1" | 1,000 | LF | $ - 0 | |
| B0007O | REMOVE JOINT MATERIAL 1" TO 2" | 1,000 | LF | $ - 0 | |
| B0007P | INSTALL JOINT MATERIAL 1" TO 2" | 1,000 | LF | $ - 0 | |
| B0008 | NON-PRICED ITEMS (NPI) | ||||
| FOR HEIGHTS BETWEEN 8-15 FEET ADD 10% TO LABOR COST | 10.00% | ||||
| FOR HEIGHTS ABOVE 15 FEET ADD 20% TO LABOR COST | 20.00% | ||||
| MULTI PURPOSE EPOXY PRIMER | GALS | ||||
| HIGH TRAFFIC SYSTEM | GALS | ||||
| ELECTRIC STATIC DISCHARGE EPOXY FLOOR COATING SYSTEM | GALS | ||||
| CHEMICAL/ACID RESISTANT COATING | GALS | ||||
| INDUSTRIAL THIN MIL COATING SYSTEM | GALS | ||||
| HIGH PERFORMANCE COATING/BINDER SYSTEM | GALS | ||||
| RESURFACER | GALS | ||||
| EPOXY MORTAR SYSTEM | GALS | ||||
| FLOOR TRAFFIC LINES | GALS | ||||
| SELF-LEVELING CEMENT BASED INDUSTRIAL FLOOR RE-SURFACER | GALS | ||||
| JOINT MATERIAL - POLYUREA AND BACKER ROD | LF | ||||
| DEBRIS/TRASH CONTAINER | EA | ||||
| CONTAINMENT | LF | ||||
| CONTAINMENT SYSTEM FOR LEAD BASED PAINT REMOVAL | EA | ||||
| LIFTS | EA | ||||
| COVE BASE | LF | ||||
| WALL COVERING/SISAL | LY |
&L&D includes layout/paint striping 4 in wide - 271,225 sf; striping 6 in wide - 29,713 sf; striping over 6 in wide - 4,402 sf includes painting existing stripes 4 in wide - 128,345 sf; 6 in wide - 1,610 sf; and over 6 in wide - 400 sf
BID SCHED - OPT II
| PROTECTIVE COATING | |||||
| BID SCHEDULE - OPTION II | |||||
| CLIN | DESCRIPTION | ESTIMATED QUANTITY | UNIT OF MEAS | EST COST PER UNIT | EXTENDED COST |
| INCLUDES LABOR, EQUIPMENT AND MATERIAL UNLESS NOTED OTHERWISE | $ - 0 | ||||
| C0001 | SURFACE PREPARATIONS | ||||
| C0001A | HAND TOOL CLEAN | 170,357 | SF | $ - 0 | |
| C0001B | POWER TOOL CLEAN | 47,017 | SF | $ - 0 | |
| C0001C | WHITE METAL BLAST | 1,243 | SF | $ - 0 | |
| C0001D | COMMERCIAL BLAST | 31,654 | SF | $ - 0 | |
| C0001E | ABRASIVE BLAST | 7,442 | SF | $ - 0 | |
| C0001F | WATER BLAST | 271,045 | SF | $ - 0 | |
| C0001G | SOLVENT (CHEMICAL) CLEAN | 459 | SF | $ - 0 | |
| C0002 | PAINT/STAIN | ||||
| CONCRETE/MASONRY (INTERIOR AND EXTERIOR) | |||||
| C0002A | PAINT INTERIOR CONCRETE/MASONRY (One Coat) | 25,410 | SF | $ - 0 | |
| C0002B | PAINT EXTERIOR CONCRETE/MASONRY (One Coat) | 186,500 | SF | $ - 0 | |
| C0002C | PAINT SWIMMING POOL (Primer and Two Coats) | 5,760 | SF | $ - 0 | |
| C0002D | PRIME/SEAL- CONCRETE/MASONRY (One Coat) | 1,667 | SF | $ - 0 | |
| C0002E | BLOCK FILL-BRICK/ CONCRETE (One Coat) | 30,643 | SF | $ - 0 | |
| METAL, FERROUS AND NON-FERROUS (INTERIOR AND EXTERIOR) | |||||
| C0002F | PAINT INTERIOR METAL (Primer and One Coat) | 184,471 | SF | $ - 0 | |
| C0002G | PAINT INTERIOR METAL (One Coat) | 125,000 | SF | $ - 0 | |
| C0002H | PAINT EXTERIOR METAL (Primer, Intermediate and Topcoat) | 303,704 | SF | $ - 0 | |
| WOOD, DRESSED LUMBER, PANELING, DECKING, SHINGLES, TRIM AND CHAIR RAIL (INTERIOR AND EXTERIOR) | |||||
| C0002I | PAINT INTERIOR WOOD (Primer and One Coat) | 1,202 | SF | $ - 0 | |
| C0002J | PAINT INTERIOR WOOD ( One Coat) | 923 | SF | $ - 0 | |
| C0002K | PAINT EXTERIOR WOOD (Primer and One Coat) | 280 | SF | $ - 0 | |
| C0002L | PAINT EXTERIOR WOOD (One Coat) | 448 | SF | $ - 0 | |
| C0002M | COAT INTERIOR WOOD FLOORS (Primer and Two Coats) | 167 | SF | $ - 0 | |
| C0002N | STAIN DOORS - One Side -Frames, and Trim (Primer and Two Coats) | 12 | EA | $ - 0 | |
| C0002O | STAIN INTERIOR WOOD (Primer and Two Coats) | 307 | SF | $ - 0 | |
| C0002P | STAIN INTERIOR WOOD TRIM (Primer and Two Coats) | 2,273 | SF | $ - 0 | |
| EXTERIOR STUCCO, INTERIOR PLASTER, GYPSUM BOARD, TEXTURED SURFACES, AND WALL PANELS | |||||
| C0002Q | PAINT PLASTER (One Coat) | 14,847 | SF | $ - 0 | |
| C0002R | PAINT GYPSUM BOARD (One Coat) | 199,471 | SF | $ - 0 | |
| C0002S | PAINT DOORS - One Side, Frame, and Trim (Primer and One Coat) | 373 | EA | $ - 0 | |
| C0002T | PAINT DOORS - One Side, Frame, and Trim (One Coat) | 145 | EA | $ - 0 | |
| C0002U | STAIN KILLER/SEALER (One Coat) | 106,533 | SF | $ - 0 | |
| C0002V | WATERBORNE EPOXY PRIMER FINISH (One Coat) | 833 | SF | $ - 0 | |
| C0002W | WATERBORNE EPOXY BLOCK FILLER (One Coat) | 2,880 | SF | $ - 0 | |
| C0002X | RECREATIONAL NON-SKID COATING | 83 | SF | $ - 0 | |
| C0002Y | ACRYLIC CAULKING | 3,134 | LF | $ - 0 | |
| C0002Z | ASPHALT SEAL COAT | 19,565 | SF | $ - 0 | |
| C0003 | MISCELLANEOUS | ||||
| C0003A | TEXTURE INTERIOR | 5,954 | SF | $ - 0 | |
| C0003B | TEXTURE EXTERIOR | 340 | SF | $ - 0 | |
| C0003C | TAPE & SPACKLE | 2,109 | SF | $ - 0 | |
| C0003D | FLOAT-WALLS/CEILING | 10,421 | SF | $ - 0 | |
| C0003E | REMOVE GYPSUM BOARD 2' X 4' (LABOR AND EQUIPMENT) | 13 | SF | $ - 0 | |
| C0003F | INSTALL GYPSUM BOARD 2' X 4' | 13696 | SF | $ - 0 | |
| C0003G | PAINT GRAPHICS | 333 | SF | $ - 0 | |
| C0003H | PAINT STENCILS 1" TO 12" (2/SET) | 414 | EA | $ - 0 | |
| PAINT FENCE | |||||
| C0003I | CHAIN (One Coat) | 167 | SF | $ - 0 | |
| C0003J | METAL (One Coat) | 167 | SF | $ - 0 | |
| C0003K | WOOD (One Coat) | 1,283 | SF | $ - 0 | |
| C0003L | LEAD BASED PAINT ABATEMENT (REMOVAL AND DISPOSAL) | 1,125 | SF | $ - 0 | |
| C0003M | LEAD BASED PAINT ENCAPSULATION | 1,125 | SF | $ - 0 | |
| C0003N | CERTIFIED INDUSTRIAL HYGIENIST (CIH) | 20 | HR | $ - 0 | |
| C0003O | SET UP AIR MONITORING PUMPS FILTERS AND RUN AIR MONITORING PUMPS FOR 4 HOURS | 10 | EA | ||
| C0004 | EXTERIOR COATING OF STEEL STRUCTURES | ||||
| C0004A | WATERBORNE EPOXY | 1,667 | SF | $ - 0 | |
| C0004B | EPOXY MASTIC STANDARD COLORS | 31,409 | SF | $ - 0 | |
| C0004C | POLYURETHANE ENAMEL | 31,409 | SF | $ - 0 | |
| C0004D | EPOXY & URETHANE THINNER | 14,856 | SF | $ - 0 | |
| C0005 | PAVEMENT MARKINGS (To include Reflective Media) | ||||
| PAINT TRAFFIC AND AIRFIELD MARKINGS | |||||
| C0005A | LAYOUT/PAINT PAVEMENT MARKINGS | 27,657 | SF | $ - 0 | |
| C0005B | LAYOUT/PAINT STRIPING | 101,780 | SF | $ - 0 | |
| C0005C | LAYOUT/PAINT HANDICAP CROSSHATCH | 50 | EA | $ - 0 | |
| C0005D | LAYOUT/PAINT CROSSWALK BLOCKS (2' x 8') | 48 | EA | $ - 0 | |
| C0005E | RE-PAINT EXISTING STRIPES | 43,452 | SF | $ - 0 | |
| C0005F | RE-PAINT EXISTING PAVEMENT MARKINGS | 2,387 | SF | $ - 0 | |
| C0005G | RE-PAINT CROSSWALK BLOCK | 248 | EA | $ - 0 | |
| C0005H | BLACKOUT STRIPING/MARKING | 951 | SF | $ - 0 | |
| C0005I | SCARIFY (LABOR AND EQUIPMENT) | 3,382 | SF | $ - 0 | |
| THERMOPLASTIC | |||||
| C0005J | THERMOPLASTIC STRIPE REMOVAL 4" EQUIVALENT (LABOR AND EQUIPMENT) | 8,333 | SF | $ - 0 | |
| C0005K | THERMOPLASTIC STRIPE INSTALL 4" EQUIVALENT | 8,333 | SF | $ - 0 | |
| C0005L | THERMOPLASTIC ARROW REMOVAL (LABOR AND EQUIPMENT) | 42 | EA | $ - 0 | |
| C0005M | THERMOPLASTIC ARROW INSTALL | 42 | EA | $ - 0 | |
| C0005N | THERMOPLASTIC LETTER REMOVAL (LABOR AND EQUIPMENT) | 42 | EA | $ - 0 | |
| C0005O | THERMOPLASTIC LETTER INSTALL | 42 | EA | $ - 0 | |
| C0005P | PREFORMED RETROFLECTIVE PAVEMENT MARKING TAPE | 333 | SF | $ - 0 | |
| C0005Q | RAISED REFLECTIVE MARKERS | 67 | EA | $ - 0 | |
| C0006 | WALLCOVERINGS | ||||
| VINYL WALL COVERING | |||||
| C0006A | REMOVE COMMERCIAL WALL COVERING (LABOR AND EQUIPMENT) | 5,844 | SF | $ - 0 | |
| C0006B | REMOVE SISAL (LABOR AND EQUIPMENT) | 33 | SF | $ - 0 | |
| C0006C | WALL COVERING/SISAL-REPAIR (LABOR AND EQUIPMENT) | 33 | SF | $ - 0 | |
| C0006D | INSTALL COMMERCIAL WALL COVERING (LABOR AND EQUIPMENT) | 2,013 | SF | $ - 0 | |
| CORNER GUARDS-FLUSH & ADHESIVE | |||||
| C0006E | REMOVE CORNER GUARDS(LABOR AND EQUIPMENT) | 33 | LF | $ - 0 | |
| C0006F | INSTALL CORNER GUARDS-FLUSH | 33 | LF | $ - 0 | |
| C0006G | INSTALL CORNER GUARDS-ADHESIVE | 33 | LF | $ - 0 | |
| CHAIR RAILS | |||||
| C0006H | CHAIR RAILS-REMOVE (LABOR AND EQUIPMENT) | 33 | LF | $ - 0 | |
| C0006I | CHAIR RAILS-INSTALL | 44 | LF | $ - 0 | |
| WOOD TRIM | |||||
| C0006J | REMOVE WOOD TRIM (LABOR AND EQUIPMENT) | 33 | LF | $ - 0 | |
| C0006K | INSTALL WOOD TRIM | 33 | LF | $ - 0 | |
| C0006L | COVE BASE | ||||
| C0006M | COVE BASE - REMOVE (LABOR AND EQUIPMENT) | 780 | LF | $ - 0 | |
| C0006N | INSTALL COVE BASE ((LABOR AND EQUIPMENT) | 780 | LF | $ - 0 | |
| C0007 | FLOOR COATING SYSTEMS (LABOR AND EQUIPMENT ONLY) | ||||
| C0007A | REMOVE FLOOR COATING MATERIAL | 33,333 | SF | $ - 0 | |
| INSTALL FLOOR COATING MATERIAL (INCLUDES SLIP RESISTANT GRIT) | |||||
| C0007B | MULTI PURPOSE EPOXY (10 MIL) | 16,667 | SF | $ - 0 | |
| C0007C | HIGH TRAFFIC URETHANE SYSTEM (4 MIL) | 833 | SF | $ - 0 | |
| C0007D | STATIC DISSIPATIVE SYSTEM (5 MIL) | 833 | SF | $ - 0 | |
| C0007E | CHEMICAL RESISTANT EPOXY (30 MIL) | 833 | SF | $ - 0 | |
| C0007F | INDUSTRIAL TRAFFIC SYSTEM (2.5 MIL) | 833 | SF | $ - 0 | |
| C0007G | HIGH PERFORMANCE SYSTEM (2.5 MIL) | 833 | SF | $ - 0 | |
| C0007H | CHEMICAL RESISTANT URETHANE (5 MIL) | 16,667 | SF | $ - 0 | |
| C0007I | RESURFACER CEMENTIOUS | 33,333 | SF | $ - 0 | |
| C0007J | RESURFACER | 667 | SF | $ - 0 | |
| C0007K | EPOXY MORTAR SYSTEM | 833 | SF | $ - 0 | |
| C0007L | FLOOR TRAFFIC LINES | 333 | LF | $ - 0 | |
| C0007M | REMOVE JOINT MATERIAL 1/4" TO 1" | 1,000 | LF | $ - 0 | |
| C0007N | INSTALL JOINT MATERIAL 1/4" TO 1" | 1,000 | LF | $ - 0 | |
| C0007O | REMOVE JOINT MATERIAL 1" TO 2" | 1,000 | LF | $ - 0 | |
| C0007P | INSTALL JOINT MATERIAL 1" TO 2" | 1,000 | LF | $ - 0 | |
| C0008 | NON-PRICED ITEMS (NPI) | ||||
| FOR HEIGHTS BETWEEN 8-15 FEET ADD 10% TO LABOR COST | 10.00% | ||||
| FOR HEIGHTS ABOVE 15 FEET ADD 20% TO LABOR COST | 20.00% | ||||
| MULTI PURPOSE EPOXY PRIMER | GALS | ||||
| HIGH TRAFFIC SYSTEM | GALS | ||||
| ELECTRIC STATIC DISCHARGE EPOXY FLOOR COATING SYSTEM | GALS | ||||
| CHEMICAL/ACID RESISTANT COATING | GALS | ||||
| INDUSTRIAL THIN MIL COATING SYSTEM | GALS | ||||
| HIGH PERFORMANCE COATING/BINDER SYSTEM | GALS | ||||
| RESURFACER | GALS | ||||
| EPOXY MORTAR SYSTEM | GALS | ||||
| FLOOR TRAFFIC LINES | GALS | ||||
| SELF-LEVELING CEMENT BASED INDUSTRIAL FLOOR RE-SURFACER | GALS | ||||
| JOINT MATERIAL - POLYUREA AND BACKER ROD | LF | ||||
| DEBRIS/TRASH CONTAINER | EA | ||||
| CONTAINMENT | LF | ||||
| CONTAINMENT SYSTEM FOR LEAD BASED PAINT REMOVAL | EA | ||||
| LIFTS | EA | ||||
| COVE BASE | LF | ||||
| WALL COVERING/SISAL | LY |
&L&D
BID SCHED - OPT III
| PROTECTIVE COATING | |||||
| BID SCHEDULE - OPTION III | |||||
| CLIN | DESCRIPTION | ESTIMATED QUANTITY | UNIT OF MEAS | EST COST PER UNIT | EXTENDED COST |
| INCLUDES LABOR, EQUIPMENT AND MATERIAL UNLESS NOTED OTHERWISE | $ - 0 | ||||
| D0001 | SURFACE PREPARATIONS | ||||
| D0001A | HAND TOOL CLEAN | 170,357 | SF | $ - 0 | |
| D0001B | POWER TOOL CLEAN | 47,017 | SF | $ - 0 | |
| D0001C | WHITE METAL BLAST | 1,243 | SF | $ - 0 | |
| D0001D | COMMERCIAL BLAST | 31,654 | SF | $ - 0 | |
| D0001E | ABRASIVE BLAST | 7,442 | SF | $ - 0 | |
| D0001F | WATER BLAST | 271,045 | SF | $ - 0 | |
| D0001G | SOLVENT (CHEMICAL) CLEAN | 459 | SF | $ - 0 | |
| D0002 | PAINT/STAIN | ||||
| CONCRETE/MASONRY (INTERIOR AND EXTERIOR) | |||||
| D0002A | PAINT INTERIOR CONCRETE/MASONRY (One Coat) | 25,410 | SF | $ - 0 | |
| D0002B | PAINT EXTERIOR CONCRETE/MASONRY (One Coat) | 186,500 | SF | $ - 0 | |
| D0002C | PAINT SWIMMING POOL (Primer and Two Coats) | 5,760 | SF | $ - 0 | |
| D0002D | PRIME/SEAL- CONCRETE/MASONRY (One Coat) | 1,667 | SF | $ - 0 | |
| D0002E | BLOCK FILL-BRICK/ CONCRETE (One Coat) | 30,643 | SF | $ - 0 | |
| METAL, FERROUS AND NON-FERROUS (INTERIOR AND EXTERIOR) | |||||
| D0002F | PAINT INTERIOR METAL (Primer and One Coat) | 184,471 | SF | $ - 0 | |
| D0002G | PAINT INTERIOR METAL (One Coat) | 125,000 | SF | $ - 0 | |
| D0002H | PAINT EXTERIOR METAL (Primer, Intermediate and Topcoat) | 303,704 | SF | $ - 0 | |
| WOOD, DRESSED LUMBER, PANELING, DECKING, SHINGLES, TRIM AND CHAIR RAIL (INTERIOR AND EXTERIOR) | |||||
| D0002I | PAINT INTERIOR WOOD (Primer and One Coat) | 1,202 | SF | $ - 0 | |
| D0002J | PAINT INTERIOR WOOD ( One Coat) | 923 | SF | $ - 0 | |
| D0002K | PAINT EXTERIOR WOOD (Primer and One Coat) | 280 | SF | $ - 0 | |
| D0002L | PAINT EXTERIOR WOOD (One Coat) | 448 | SF | $ - 0 | |
| D0002M | COAT INTERIOR WOOD FLOORS (Primer and Two Coats) | 167 | SF | $ - 0 | |
| D0002N | STAIN DOORS - One Side -Frames, and Trim (Primer and Two Coats) | 12 | EA | $ - 0 | |
| D0002O | STAIN INTERIOR WOOD (Primer and Two Coats) | 307 | SF | $ - 0 | |
| D0002P | STAIN INTERIOR WOOD TRIM (Primer and Two Coats) | 2,273 | SF | $ - 0 | |
| EXTERIOR STUCCO, INTERIOR PLASTER, GYPSUM BOARD, TEXTURED SURFACES, AND WALL PANELS | |||||
| D0002Q | PAINT PLASTER (One Coat) | 14,847 | SF | $ - 0 | |
| D0002R | PAINT GYPSUM BOARD (One Coat) | 199,471 | SF | $ - 0 | |
| D0002S | PAINT DOORS - One Side, Frame, and Trim (Primer and One Coat) | 373 | EA | $ - 0 | |
| D0002T | PAINT DOORS - One Side, Frame, and Trim (One Coat) | 145 | EA | $ - 0 | |
| D0002U | STAIN KILLER/SEALER (One Coat) | 106,533 | SF | $ - 0 | |
| D0002V | WATERBORNE EPOXY PRIMER FINISH (One Coat) | 833 | SF | $ - 0 | |
| D0002W | WATERBORNE EPOXY BLOCK FILLER (One Coat) | 2,880 | SF | $ - 0 | |
| D0002X | RECREATIONAL NON-SKID COATING | 83 | SF | $ - 0 | |
| D0002Y | ACRYLIC CAULKING | 3,134 | LF | $ - 0 | |
| D0002Z | ASPHALT SEAL COAT | 19,565 | SF | $ - 0 | |
| D0003 | MISCELLANEOUS | ||||
| D0003A | TEXTURE INTERIOR | 5,954 | SF | $ - 0 | |
| D0003B | TEXTURE EXTERIOR | 340 | SF | $ - 0 | |
| D0003C | TAPE & SPACKLE | 2,109 | SF | $ - 0 | |
| D0003D | FLOAT-WALLS/CEILING | 10,421 | SF | $ - 0 | |
| D0003E | REMOVE GYPSUM BOARD 2' X 4' (LABOR AND EQUIPMENT) | 13 | SF | $ - 0 | |
| D0003F | INSTALL GYPSUM BOARD 2' X 4' | 13696 | SF | $ - 0 | |
| D0003G | PAINT GRAPHICS | 333 | SF | $ - 0 | |
| D0003H | PAINT STENCILS 1" TO 12" (2/SET) | 414 | EA | $ - 0 | |
| PAINT FENCE | |||||
| D0003I | CHAIN (One Coat) | 167 | SF | $ - 0 | |
| D0003J | METAL (One Coat) | 167 | SF | $ - 0 | |
| D0003K | WOOD (One Coat) | 1,283 | SF | $ - 0 | |
| D0003L | LEAD BASED PAINT ABATEMENT (REMOVAL AND DISPOSAL) | 1,125 | SF | $ - 0 | |
| D0003M | LEAD BASED PAINT ENCAPSULATION | 1,125 | SF | $ - 0 | |
| D0003N | CERTIFIED INDUSTRIAL HYGIENIST (CIH) | 20 | HR | $ - 0 | |
| D0003O | SET UP AIR MONITORING PUMPS FILTERS AND RUN AIR MONITORING PUMPS FOR 4 HOURS | 10 | EA | ||
| D0004 | EXTERIOR COATING OF STEEL STRUCTURES | ||||
| D0004A | WATERBORNE EPOXY | 1,667 | SF | $ - 0 | |
| D0004B | EPOXY MASTIC STANDARD COLORS | 31,409 | SF | $ - 0 | |
| D0004C | POLYURETHANE ENAMEL | 31,409 | SF | $ - 0 | |
| D0004D | EPOXY & URETHANE THINNER | 14,856 | SF | $ - 0 | |
| D0005 | PAVEMENT MARKINGS (To include Reflective Media) | ||||
| PAINT TRAFFIC AND AIRFIELD MARKINGS | |||||
| D0005A | LAYOUT/PAINT PAVEMENT MARKINGS | 27,657 | SF | $ - 0 | |
| D0005B | LAYOUT/PAINT STRIPING | 101,780 | SF | $ - 0 | |
| D0005C | LAYOUT/PAINT HANDICAP CROSSHATCH | 50 | EA | $ - 0 | |
| D0005D | LAYOUT/PAINT CROSSWALK BLOCKS (2' x 8') | 48 | EA | $ - 0 | |
| D0005E | RE-PAINT EXISTING STRIPES | 43,452 | SF | $ - 0 | |
| D0005F | RE-PAINT EXISTING PAVEMENT MARKINGS | 2,387 | SF | $ - 0 | |
| D0005G | RE-PAINT CROSSWALK BLOCK | 248 | EA | $ - 0 | |
| D0005H | BLACKOUT STRIPING/MARKING | 951 | SF | $ - 0 | |
| D0005I | SCARIFY (LABOR AND EQUIPMENT) | 3,382 | SF | $ - 0 | |
| THERMOPLASTIC | |||||
| D0005J | THERMOPLASTIC STRIPE REMOVAL 4" EQUIVALENT (LABOR AND EQUIPMENT) | 8,333 | SF | $ - 0 | |
| D0005K | THERMOPLASTIC STRIPE INSTALL 4" EQUIVALENT | 8,333 | SF | $ - 0 | |
| D0005L | THERMOPLASTIC ARROW REMOVAL (LABOR AND EQUIPMENT) | 42 | EA | $ - 0 | |
| D0005M | THERMOPLASTIC ARROW INSTALL | 42 | EA | $ - 0 | |
| D0005N | THERMOPLASTIC LETTER REMOVAL (LABOR AND EQUIPMENT) | 42 | EA | $ - 0 | |
| D0005O | THERMOPLASTIC LETTER INSTALL | 42 | EA | $ - 0 | |
| D0005P | PREFORMED RETROFLECTIVE PAVEMENT MARKING TAPE | 333 | SF | $ - 0 | |
| D0005Q | RAISED REFLECTIVE MARKERS | 67 | EA | $ - 0 | |
| D0006 | WALLCOVERINGS | ||||
| VINYL WALL COVERING | |||||
| D0006A | REMOVE COMMERCIAL WALL COVERING (LABOR AND EQUIPMENT) | 5,844 | SF | $ - 0 | |
| D0006B | REMOVE SISAL (LABOR AND EQUIPMENT) | 33 | SF | $ - 0 | |
| D0006C | WALL COVERING/SISAL-REPAIR (LABOR AND EQUIPMENT) | 33 | SF | $ - 0 | |
| D0006D | INSTALL COMMERCIAL WALL COVERING (LABOR AND EQUIPMENT) | 2,013 | SF | $ - 0 | |
| CORNER GUARDS-FLUSH & ADHESIVE | |||||
| D0006E | REMOVE CORNER GUARDS(LABOR AND EQUIPMENT) | 33 | LF | $ - 0 | |
| D0006F | INSTALL CORNER GUARDS-FLUSH | 33 | LF | $ - 0 | |
| D0006G | INSTALL CORNER GUARDS-ADHESIVE | 33 | LF | $ - 0 | |
| CHAIR RAILS | |||||
| D0006H | CHAIR RAILS-REMOVE (LABOR AND EQUIPMENT) | 33 | LF | $ - 0 | |
| D0006I | CHAIR RAILS-INSTALL | 44 | LF | $ - 0 | |
| WOOD TRIM | |||||
| D0006J | REMOVE WOOD TRIM (LABOR AND EQUIPMENT) | 33 | LF | $ - 0 | |
| D0006K | INSTALL WOOD TRIM | 33 | LF | $ - 0 | |
| COVE BASE | |||||
| D0006L | COVE BASE - REMOVE (LABOR AND EQUIPMENT) | 780 | LF | $ - 0 | |
| D0006M | INSTALL COVE BASE ((LABOR AND EQUIPMENT) | 780 | LF | $ - 0 | |
| D0007 | FLOOR COATING SYSTEMS (LABOR AND EQUIPMENT ONLY) | ||||
| D0007A | REMOVE FLOOR COATING MATERIAL | 33,333 | SF | $ - 0 | |
| INSTALL FLOOR COATING MATERIAL (INCLUDES SLIP RESISTANT GRIT) | |||||
| D0007B | MULTI PURPOSE EPOXY (10 MIL) | 16,667 | SF | $ - 0 | |
| D0007C | HIGH TRAFFIC URETHANE SYSTEM (4 MIL) | 833 | SF | $ - 0 | |
| D0007D | STATIC DISSIPATIVE SYSTEM (5 MIL) | 833 | SF | $ - 0 | |
| D0007E | CHEMICAL RESISTANT EPOXY (30 MIL) | 833 | SF | $ - 0 | |
| D0007F | INDUSTRIAL TRAFFIC SYSTEM (2.5 MIL) | 833 | SF | $ - 0 | |
| D0007G | HIGH PERFORMANCE SYSTEM (2.5 MIL) | 833 | SF | $ - 0 | |
| D0007H | CHEMICAL RESISTANT URETHANE (5 MIL) | 16,667 | SF | $ - 0 | |
| D0007I | RESURFACER CEMENTIOUS | 33,333 | SF | $ - 0 | |
| D0007J | RESURFACER | 667 | SF | $ - 0 | |
| D0007K | EPOXY MORTAR SYSTEM | 833 | SF | $ - 0 | |
| D0007L | FLOOR TRAFFIC LINES | 333 | LF | $ - 0 | |
| D0007M | REMOVE JOINT MATERIAL 1/4" TO 1" | 1,000 | LF | $ - 0 | |
| D0007N | INSTALL JOINT MATERIAL 1/4" TO 1" | 1,000 | LF | $ - 0 | |
| D0007O | REMOVE JOINT MATERIAL 1" TO 2" | 1,000 | LF | $ - 0 | |
| D0007P | INSTALL JOINT MATERIAL 1" TO 2" | 1,000 | LF | $ - 0 | |
| D0008 | NON-PRICED ITEMS (NPI) | ||||
| FOR HEIGHTS BETWEEN 8-15 FEET ADD 10% TO LABOR COST | 10.00% | ||||
| FOR HEIGHTS ABOVE 15 FEET ADD 20% TO LABOR COST | 20.00% | ||||
| MULTI PURPOSE EPOXY PRIMER | GALS | ||||
| HIGH TRAFFIC SYSTEM | GALS | ||||
| ELECTRIC STATIC DISCHARGE EPOXY FLOOR COATING SYSTEM | GALS | ||||
| CHEMICAL/ACID RESISTANT COATING | GALS | ||||
| INDUSTRIAL THIN MIL COATING SYSTEM | GALS | ||||
| HIGH PERFORMANCE COATING/BINDER SYSTEM | GALS | ||||
| RESURFACER | GALS | ||||
| EPOXY MORTAR SYSTEM | GALS | ||||
| FLOOR TRAFFIC LINES | GALS | ||||
| SELF-LEVELING CEMENT BASED INDUSTRIAL FLOOR RE-SURFACER | GALS | ||||
| JOINT MATERIAL - POLYUREA AND BACKER ROD | LF | ||||
| DEBRIS/TRASH CONTAINER | EA | ||||
| CONTAINMENT | LF | ||||
| CONTAINMENT SYSTEM FOR LEAD BASED PAINT REMOVAL | EA | ||||
| LIFTS | EA | ||||
| COVE BASE | LF | ||||
| WALL COVERING/SISAL | LY |
&L&D
BID SCHED - 6 MO EXT
| PROTECTIVE COATING | |||||
| BID SCHEDULE - 6 Month Extension (if required) | |||||
| CLIN | DESCRIPTION | ESTIMATED QUANTITY | UNIT OF MEAS | EST COST PER UNIT | EXTENDED COST |
| INCLUDES LABOR, EQUIPMENT AND MATERIAL UNLESS NOTED OTHERWISE | $ - 0 | ||||
| E0001 | SURFACE PREPARATIONS | ||||
| E0001A | HAND TOOL CLEAN | 85,178 | SF | $ - 0 | |
| E0001B | POWER TOOL CLEAN | 23,509 | SF | $ - 0 | |
| E0001C | WHITE METAL BLAST | 622 | SF | $ - 0 | |
| E0001D | COMMERCIAL BLAST | 15,827 | SF | $ - 0 | |
| E0001E | ABRASIVE BLAST | 3,721 | SF | $ - 0 | |
| E0001F | WATER BLAST | 135,523 | SF | $ - 0 | |
| E0001G | SOLVENT (CHEMICAL) CLEAN | 229 | SF | $ - 0 | |
| E0002 | PAINT/STAIN | ||||
| CONCRETE/MASONRY (INTERIOR AND EXTERIOR) | |||||
| E0002A | PAINT INTERIOR CONCRETE/MASONRY (One Coat) | 12,705 | SF | $ - 0 | |
| E0002B | PAINT EXTERIOR CONCRETE/MASONRY (One Coat) | 93,250 | SF | $ - 0 | |
| E0002C | PAINT SWIMMING POOL (Primer and Two Coats) | 2,880 | SF | $ - 0 | |
| E0002D | PRIME/SEAL- CONCRETE/MASONRY (One Coat) | 833 | SF | $ - 0 | |
| E0002E | BLOCK FILL-BRICK/ CONCRETE (One Coat) | 15,322 | SF | $ - 0 | |
| METAL, FERROUS AND NON-FERROUS (INTERIOR AND EXTERIOR) | |||||
| E0002F | PAINT INTERIOR METAL (Primer and One Coat) | 92,235 | SF | $ - 0 | |
| E0002G | PAINT INTERIOR METAL (One Coat) | 62,500 | SF | $ - 0 | |
| E0002H | PAINT EXTERIOR METAL (Primer, Intermediate and Topcoat) | 151,852 | SF | $ - 0 | |
| WOOD, DRESSED LUMBER, PANELING, DECKING, SHINGLES, TRIM AND CHAIR RAIL (INTERIOR AND EXTERIOR) | |||||
| E0002I | PAINT INTERIOR WOOD (Primer and One Coat) | 1,202 | SF | $ - 0 | |
| E0002J | PAINT INTERIOR WOOD ( One Coat) | 923 | SF | $ - 0 | |
| E0002K | PAINT EXTERIOR WOOD (Primer and One Coat) | 280 | SF | $ - 0 | |
| E0002L | PAINT EXTERIOR WOOD (One Coat) | 448 | SF | $ - 0 | |
| E0002M | COAT INTERIOR WOOD FLOORS (Primer and Two Coats) | 167 | SF | $ - 0 | |
| E0002N | STAIN DOORS - One Side -Frames, and Trim (Primer and Two Coats) | 12 | EA | $ - 0 | |
| E0002O | STAIN INTERIOR WOOD (Primer and Two Coats) | 307 | SF | $ - 0 | |
| E0002P | STAIN INTERIOR WOOD TRIM (Primer and Two Coats) | 1,137 | SF | $ - 0 | |
| EXTERIOR STUCCO, INTERIOR PLASTER, GYPSUM BOARD, TEXTURED SURFACES, AND WALL PANELS | |||||
| E0002Q | PAINT PLASTER (One Coat) | 7,424 | SF | $ - 0 | |
| E0002R | PAINT GYPSUM BOARD (One Coat) | 99,736 | SF | $ - 0 | |
| E0002S | PAINT DOORS - One Side, Frame, and Trim (Primer and One Coat) | 186 | EA | $ - 0 | |
| E0002T | PAINT DOORS - One Side, Frame, and Trim (One Coat) | 90 | EA | $ - 0 | |
| E0002U | STAIN KILLER/SEALER (One Coat) | 53,267 | SF | $ - 0 | |
| E0002V | WATERBORNE EPOXY PRIMER FINISH (One Coat) | 417 | SF | $ - 0 | |
| E0002W | WATERBORNE EPOXY BLOCK FILLER (One Coat) | 1,440 | SF | $ - 0 | |
| E0002X | RECREATIONAL NON-SKID COATING | 42 | SF | $ - 0 | |
| E0002Y | ACRYLIC CAULKING | 1,567 | LF | $ - 0 | |
| E0002Z | ASPHALT SEAL COAT | 9,782 | SF | $ - 0 | |
| E0003 | MISCELLANEOUS | ||||
| E0003A | TEXTURE INTERIOR | 2,977 | SF | $ - 0 | |
| E0003B | TEXTURE EXTERIOR | 170 | SF | $ - 0 | |
| E0003C | TAPE & SPACKLE | 1,055 | SF | $ - 0 | |
| E0003D | FLOAT-WALLS/CEILING | 5,210 | SF | $ - 0 | |
| E0003E | REMOVE GYPSUM BOARD 2' X 4' (LABOR AND EQUIPMENT) | 7 | SF | $ - 0 | |
| E0003F | INSTALL GYPSUM BOARD 2' X 4' | 6848 | SF | $ - 0 | |
| E0003G | PAINT GRAPHICS | 167 | SF | $ - 0 | |
| E0003H | PAINT STENCILS 1" TO 12" (2/SET) | 207 | EA | $ - 0 | |
| PAINT FENCE | |||||
| E0003I | CHAIN (One Coat) | 83 | SF | $ - 0 | |
| E0003J | METAL (One Coat) | 83 | SF | $ - 0 | |
| E0003K | WOOD (One Coat) | 641 | SF | $ - 0 | |
| E0003L | LEAD BASED PAINT ABATEMENT (REMOVAL AND DISPOSAL) | 563 | SF | $ - 0 | |
| E0003M | LEAD BASED PAINT ENCAPSULATION | 563 | SF | $ - 0 | |
| E0003N | CERTIFIED INDUSTRIAL HYGIENIST (CIH) | 10 | HR | $ - 0 | |
| E0003O | SET UP AIR MONITORING PUMPS FILTERS AND RUN AIR MONITORING PUMPS FOR 4 HOURS | 5 | EA | ||
| E0004 | EXTERIOR COATING OF STEEL STRUCTURES | ||||
| E0004A | WATERBORNE EPOXY | 833 | SF | $ - 0 | |
| E0004B | EPOXY MASTIC STANDARD COLORS | 15,704 | SF | $ - 0 | |
| E0004C | POLYURETHANE ENAMEL | 15,704 | SF | $ - 0 | |
| E0004D | EPOXY & URETHANE THINNER | 7,428 | SF | $ - 0 | |
| E0005 | PAVEMENT MARKINGS (To include Reflective Media) | ||||
| PAINT TRAFFIC AND AIRFIELD MARKINGS | |||||
| E0005A | LAYOUT/PAINT PAVEMENT MARKINGS | 13,828 | SF | $ - 0 | |
| E0005B | LAYOUT/PAINT STRIPING | 50,890 | SF | $ - 0 | |
| E0005C | LAYOUT/PAINT HANDICAP CROSSHATCH | 25 | EA | $ - 0 | |
| E0005D | LAYOUT/PAINT CROSSWALK BLOCKS (2' x 8') | 24 | EA | $ - 0 | |
| E0005E | RE-PAINT EXISTING STRIPES | 21,726 | SF | $ - 0 | |
| E0005F | RE-PAINT EXISTING PAVEMENT MARKINGS | 1,194 | SF | $ - 0 | |
| E0005G | RE-PAINT CROSSWALK BLOCK | 124 | EA | $ - 0 | |
| E0005H | BLACKOUT STRIPING/MARKING | 476 | SF | $ - 0 | |
| E0005I | SCARIFY (LABOR AND EQUIPMENT) | 1,691 | SF | $ - 0 | |
| THERMOPLASTIC | |||||
| E0005J | THERMOPLASTIC STRIPE REMOVAL 4" EQUIVALENT (LABOR AND EQUIPMENT) | 4,167 | SF | $ - 0 | |
| E0005K | THERMOPLASTIC STRIPE INSTALL 4" EQUIVALENT | 4,167 | SF | $ - 0 | |
| E0005L | THERMOPLASTIC ARROW REMOVAL (LABOR AND EQUIPMENT) | 21 | EA | $ - 0 | |
| E0005M | THERMOPLASTIC ARROW INSTALL | 21 | EA | $ - 0 | |
| E0005N | THERMOPLASTIC LETTER REMOVAL (LABOR AND EQUIPMENT) | 21 | EA | $ - 0 | |
| E0005O | THERMOPLASTIC LETTER INSTALL | 21 | EA | $ - 0 | |
| E0005P | PREFORMED RETROFLECTIVE PAVEMENT MARKING TAPE | 167 | SF | $ - 0 | |
| E0005Q | RAISED REFLECTIVE MARKERS | 33 | EA | $ - 0 | |
| E0006 | WALLCOVERINGS | ||||
| VINYL WALL COVERING | |||||
| E0006A | REMOVE COMMERCIAL WALL COVERING (LABOR AND EQUIPMENT) | 2,922 | SF | $ - 0 | |
| E0006B | REMOVE SISAL (LABOR AND EQUIPMENT) | 17 | SF | $ - 0 | |
| E0006C | WALL COVERING/SISAL-REPAIR (LABOR AND EQUIPMENT) | 17 | SF | $ - 0 | |
| E0006D | INSTALL COMMERCIAL WALL COVERING (LABOR AND EQUIPMENT) | 1,007 | SF | $ - 0 | |
| CORNER GUARDS-FLUSH & ADHESIVE | |||||
| E0006E | REMOVE CORNER GUARDS(LABOR AND EQUIPMENT) | 17 | LF | $ - 0 | |
| E0006F | INSTALL CORNER GUARDS-FLUSH | 17 | LF | $ - 0 | |
| E0006G | INSTALL CORNER GUARDS-ADHESIVE | 17 | LF | $ - 0 | |
| CHAIR RAILS | |||||
| E0006H | CHAIR RAILS-REMOVE (LABOR AND EQUIPMENT) | 17 | LF | $ - 0 | |
| E0006I | CHAIR RAILS-INSTALL | 22 | LF | $ - 0 | |
| WOOD TRIM | |||||
| E0006J | REMOVE WOOD TRIM (LABOR AND EQUIPMENT) | 17 | LF | $ - 0 | |
| E0006K | INSTALL WOOD TRIM | 17 | LF | $ - 0 | |
| COVE BASE | |||||
| E0006L | COVE BASE - REMOVE (LABOR AND EQUIPMENT) | 390 | LF | $ - 0 | |
| E0006M | INSTALL COVE BASE ((LABOR AND EQUIPMENT) | 390 | LF | $ - 0 | |
| E0007 | FLOOR COATING SYSTEMS (LABOR AND EQUIPMENT ONLY) | ||||
| E0007A | REMOVE FLOOR COATING MATERIAL | 16,667 | SF | $ - 0 | |
| INSTALL FLOOR COATING MATERIAL (INCLUDES SLIP RESISTANT GRIT) | |||||
| E0007B | MULTI PURPOSE EPOXY (10 MIL) | 8,333 | SF | $ - 0 | |
| E0007C | HIGH TRAFFIC URETHANE SYSTEM (4 MIL) | 417 | SF | $ - 0 | |
| E0007D | STATIC DISSIPATIVE SYSTEM (5 MIL) | 417 | SF | $ - 0 | |
| E0007E | CHEMICAL RESISTANT EPOXY (30 MIL) | 417 | SF | $ - 0 | |
| E0007F | INDUSTRIAL TRAFFIC SYSTEM (2.5 MIL) | 417 | SF | $ - 0 | |
| E0007G | HIGH PERFORMANCE SYSTEM (2.5 MIL) | 417 | SF | $ - 0 | |
| E0007H | CHEMICAL RESISTANT URETHANE (5 MIL) | 8,333 | SF | $ - 0 | |
| E0007I | RESURFACER CEMENTIOUS | 16,667 | SF | $ - 0 | |
| E0007J | RESURFACER | 333 | SF | $ - 0 | |
| E0007K | EPOXY MORTAR SYSTEM | 417 | SF | $ - 0 | |
| E0007L | FLOOR TRAFFIC LINES | 167 | LF | $ - 0 | |
| E0007M | REMOVE JOINT MATERIAL 1/4" TO 1" | 500 | LF | $ - 0 | |
| E0007N | INSTALL JOINT MATERIAL 1/4" TO 1" | 500 | LF | $ - 0 | |
| E0007O | REMOVE JOINT MATERIAL 1" TO 2" | 500 | LF | $ - 0 | |
| E0007P | INSTALL JOINT MATERIAL 1" TO 2" | 500 | LF | $ - 0 | |
| E0008 | NON-PRICED ITEMS (NPI) | ||||
| FOR HEIGHTS BETWEEN 8-15 FEET ADD 10% TO LABOR COST | 10.00% | ||||
| FOR HEIGHTS ABOVE 15 FEET ADD 20% TO LABOR COST | 20.00% | ||||
| MULTI PURPOSE EPOXY PRIMER | GALS | ||||
| HIGH TRAFFIC SYSTEM | GALS | ||||
| ELECTRIC STATIC DISCHARGE EPOXY FLOOR COATING SYSTEM | GALS | ||||
| CHEMICAL/ACID RESISTANT COATING | GALS | ||||
| INDUSTRIAL THIN MIL COATING SYSTEM | GALS | ||||
| HIGH PERFORMANCE COATING/BINDER SYSTEM | GALS | ||||
| RESURFACER | GALS | ||||
| EPOXY MORTAR SYSTEM | GALS | ||||
| FLOOR TRAFFIC LINES | GALS | ||||
| SELF-LEVELING CEMENT BASED INDUSTRIAL FLOOR RE-SURFACER | GALS | ||||
| JOINT MATERIAL - POLYUREA AND BACKER ROD | LF | ||||
| DEBRIS/TRASH CONTAINER | EA | ||||
| CONTAINMENT | LF | ||||
| CONTAINMENT SYSTEM FOR LEAD BASED PAINT REMOVAL | EA | ||||
| LIFTS | EA | ||||
| COVE BASE | LF | ||||
| WALL COVERING/SISAL | LY |